GENERAL PLUMBING NOTES:
1. A. ALL WORK SHALL BE DONE in accordance with the Florida
Building Code and with all applicable regulations.
B. DRAWINGS: Refer to all drawings for coordination of the
plumbing work.
C. ARRANGE AND PAY for all permits, licenses, inspections
and tests. Obtain the required certificates and present
to owner.
D. GUARANTEE: The completed installation shall be fully
guaranteed against defective materials and /or improper
workmanship for a minimum of one year for material and
labor.
E. ALL HORIZONTAL SANITARY PIPING shall slope at 1/8 inch
per foot minimum for 3" and larger and at 1/4" slope
for 2 1/2" pipes and smaller.
F. ALL materials shall be new, free of defects and correctly
labeled with their appropriate listing agency.
2. SHOP DRAWINGS: Contractor shall submit for approval, within
30 days of signing contract, a minimum of five copies of fully
descriptive literature, including but not limited to: water
heaters, and plumbing fixtures. No work shall proceed without
the approval of these submittals.
3. PLUMBING FIXTURES: Fixtures shall be as selected by owner
and shall be furnished and installed by this contractor. Fixtures
shall be complete with drains, traps, supplies and any other
accessory required. Fixtures and faucets shall comply with the
FBC Water saving standards.
4. MATERIALS:
A. PIPING:
a. Soil, waste and vent, and storm: Sanitary pipe, PVC, DWV,
Schedule 40 under ground, and above ground.
All no HUB connections shall be with cast iron coupling.
All piping in return plenums shall be cast iron.
b. Domestic water: CPVC pipe and fittings.
c. Domestic water supply assembly. Chrome finish tubing
with angle shut off valves in exposed areas.
d. P & T Relief lines: CPVC pipe and fittings
e. Drain Pan lines: DWV PVC pipe and fittings.
f. Insulated all hot water and condensate drain piping.
5. PIPING TEST AND DISINFECTION&
A. Test: All sanitary and domestic water supply piping shall
be tested for leaks before piping is concealed or connected
to equipment and plumbing fixtures.
B. Disinfection: All domestic water piping shall be
disinfected by introducing a solution of calcium
hypochlorite of 50 parts per million of chloride and as
per AWWA Standards.
6. VALVES: Domestic water valves shall be of bronze body,
sweat ends.
7. CONTRACTOR SHALL COORDINATE exact location of all plumbing
system piping before starting any work. Notify
Architect /Engineer of any deviations from design drawings.
8. CONTRACTOR SHALL provide all necessary labor and materials
for a complete "turn —key" plumbing system.
9. CONTRACTOR SHALL keep accurate as —built dwgs on the field and provide
them to owner once job is complete.
10. CONTRACTOR SHALL familiarize himself with job site and with all
construction documents including architectural, electrical. HVAC, and
structural dwgs, prior to bidding. Adjustments in the plumbing system to
accommodate other disciplines should be expected, and shall not represent
additional costs to owner. Notify Arch itect /Enigneer of any discrepancies
prior to commencement of work.
11. Provide wall cleanouts at the base of every stack.
12. CONTRACTOR SHALL obtain insurance protect against public liability and
property damage for the duration of work.
16. CONTRACTOR SHALL use dimensions in architectural drawings to
rough —in plumbing work.
COVER SECURED
WITH SCREWS
THREADED C.O. PLUG
, GRADE
4 X 6' DIA. CONCRETE
PAD FLUSH W /FIN. GRADE
r'
1
I?
TYPICAL CLEAN OU T DETAIL
EXTERIOR TYPE
FIN.
SLIP JOINT
ADJUSTABLE CO
THREADED C,❑. PLUG
FLOOR
WALL
FACE OF WALL
STAINLESS STEEL COVER
SCREWED TO THREADED
C.O. PLUG,
qW SCALE: 1/4" = I' -0"
PLUMBING SYMBOL LEGEND
SYMBOL
DESCRIPTION
FIXTURE
UNITS
SANITARY LINE
— — — — —
VENT LINE
SD
STORM DRAIN LINE
—� —�
SAFEWASTE LINE
CD
CONDENSATE LINE
P -2
GATE VALVE
—
COLD WATER LINE
--
HOT WATER LINE
P-
PLUMBING FIXTURE DESIGNATION
AAV
AIR ADMITANCE VALVE
FC❑
FLOOR CLEAN OUT
I
FLOOR PENETRATI ❑N
T1
MECHANICAL SHOCK
1/2'
ARRESTOR
WC❑
WALL CLEAN ❑UT
VTR
VENT THRU ROOF
PLUMBING FIXTURE SCHEDULE
MARK
DESCRIPTI ❑N
FIXTURE
UNITS
HOT
WATER
COLD
WATER
REMARKS
P -1
WATER CLOSET
3
- --
1/2'
- - --
P -2
LAVATORY
1
1/2'
1/2'
INTERIORS
P -3
SHOWER
2
1/2'
1/2'
W /ANTI -SCALD VALVE
P -4
KITCHEN SINK
2
1/2'
1/2'
LL
Q
P -5
DISHWASHER
- - --
1/2'
- - --
1' SAFE WASTE
1) FIXTURES TO COMPLY W /FBC 2007 Plumbing Sections
709.1, 603.1, 604.3, & Sections 406 Through 421
2) ANTI -SCALD VALVE,
ALL SHOWERS & BATH /SHOWER COMBINATIONS SHALL
BE PROTECTED WITH A CONTROL VALVE OF THE
PRESSURE BALANCE, THERM❑STSTIC MIXING OR COM-
BINATION TYPE SET. HANDLE POSITION STOPS PER
MANUFACTURERS INSTRUCTIONS AT TIME OF INSTALLATION
TO A MAXIMUM MIXED WATER OUTLET TEMPERATURE OF 110' F.
MAXIMUM FLOW RATES AND CONSUMPTION
TABLE 604.4
PLUMBING FIXTURE
OR FIXTURE FITTING
FLOW RATE
(gpm)
FLOW PRESSURE
(psi)
LAVATORY, PRIVATE
1.0
60
SHOWER HEAD
1.50
60
WATER CLOSET
1.28 gallons per
flushing cycle
- - --
F. (305) 278 -7473
WWW.BELLONMILANES.COM
AA- 0003505
ARCHITECTURE
LAND PLANNING
INTERIORS
1 3" SAN L LINE TO
4TRACTOR TO FIELD
.TION.
ER SIZE AND
%S 15. CONTRACTOR
>F EXISTING WATER
r7
1 L„
QUO If; V11 —lou
GUERRERO /GCNZALEV.' -'(.
ENGINEERS, INC.
Michael C. Guerrero, P.E.
G Mechanical Eng. Uc. /15235 $
Rafael L Gonzalez, P.E. P. 1
Oectrical Eng. Uc. 411057
780 TAMNMI CANAL RD.
Miami, Florida 33144
Tel. (305) 262 -3944, Fax (305) 26 8211
E —mail: PRO,IECiSOCUERREROGON ENGI com
CA4 0007612
r
� .
1
-
12485 S.W. 137 AVE. SUITE 103
MIAMI, FLORIDA 33186
T. (305) 278 -7776
F. (305) 278 -7473
WWW.BELLONMILANES.COM
AA- 0003505
ARCHITECTURE
LAND PLANNING
INTERIORS
CONSTRUCTION MANAGEMENT
CONSULTANTS
*ftmsoomft
O
0.
W
Z
W
Q
�n F-
V
Z ry cr-
(t O
LL
Q
W
0 W C-5 Q
00 O
C9 �
2 z
W �
N �
p
�o
A�
W
Q
Z
Q
MARK
DATE
DESCRIPTION
A. B. AS —BUILT
R.A.P. REVISION AFTER PERMIT
B.D.C. BUILDING DEPT. COMMENTS
C.C. COORDINATION CHANGES
P.S. PERMIT SET
D.D. DESIGN DEVELOPMENT
P.H. PUBLIC HEARING
S.P.R. SITE PLAN REVIEW
PROJECT No. 1104
DRAWN BY: DNM
CHECKED BY: LB
LEOPOLDO BELLON, AIA
AR- 008737
ANGEL MILANES, AIA
AR- 0015845
.SHEET TITLE
;
l!,fLUMBING PLAN
P -1
j
`SHEET 1 OF 'i.