Loading...
12-870-0104. NOT USED 5. DUCTWORK AT LEGEND s GENERAL NOTES 5.1 PROVIDE ALL NECESSARY ACCESS PANELS TO CONTROL VALVES, DAMPERS, SENSORS. DESCRIPTION � U' AIR HANDLER UNIT ER EXISTING TO BE RELOCATED N NEW BDD BACK DRAFT DAMPER r • -r THICKNESS TO PROVIDE # OF •• SUPPLY DUCTWORK O/A OUTSIDE AIR CFM CUBIC FEET PER MINUTE +' i # • •- E.F. EXHAUST FAN E.R. EXISTING TO REMAIN RETURN AIR r • RG RETURN GRILLE •• •+ # i` i • # r S/A SUPPLY AIR SR SIDEWALL REGISTER • r # • • + • • TG TRANSFER GRILLE MVD MANUAL VOLUME DAMPER 1910111 W-0 COND. s r 431=1501494milw1wo T THERMOSTAT, PROGRAMMABLE (k) AIR DISTRIBUTION SEE PLAN - - SPRINKLER (DOWNWARD) SUPPLY DUCT SEC11ON Cal EXHAUST, RETURN, OR OUTSIDE AIR ■ MANUAL VOLUME DAMPER - t AT TAKE OFF FIRE DAMPER 4 � i SUPPLY AIR DUCT RECTANGULAR + r Ell DUAL DUCT ACCESSORIES SHALL HAVE TURNING VANES ALTHOUGH • +- • # r • r- a- -• -# -- SHOWN FLEXIBLE ROUND DUCT +• # `• • TO r •• •- # r # DUCT MOUNTED SMOKE DETECTOR TO GRIIIE REMOTE TEST STATION/ AUDIBLE ALAFZW CEILING SUPPLY DIFFUSER LINEAR SUPPLY DIFFUSER a •- • r • r • • •- r - i • W STANDARD BRANCH SUPPLY OR r r t r # r r `�I• #- • •- RETURN, NO SPUTTER (45' TAP) i� WITH MVD AT TAKE OFF .ply POINT OF CHANGE IN DUCT CONSTRUCTION RETURN AIR (R/A) GRILLE. SIDEWALL, CEILING GRILLE/REGISTER. • r• r # •• r r ONE r # #' UNDERCUT. , EXHAUST FAN (CEILING MOUNTED). • OUTSIDE AIR INTAKE WALL CAP. # _ • • r ,� WALL MOUNTED EXHAUST FAN (PROPELLER CENTRIFUGAL). WALL MOUNTED LOUVER. • • r t • # r • r • # ` �� CONNECT TO EXISTING # I • i NOT ALL SYMBOLS MAY BE USED 4. NOT USED 5. DUCTWORK THROUGH • r • r SPACE AND FOR DUCTWORK -• • r • r SPACE. -• r -•• ••- _© PROVIDE • DAMPERS, _ DUCTWORK •- PROPER AIR FLOW AND BALANCE. PROVIDE MULTIPLE VANE EXTRACTORS OR SPUTTERS NTH FIRE STOPPING CONTROL RODS AT ALL OUTLETS CONNECTED CLOSER THAN TWO DUCT DIAMETERS TO SMOKECONTROL MAIN SUPPLY DUCT • WHERE SHOWN. VENTILATION AND EXHAUST AIR DUCTWORK OF • _ s PER SMACNA'S STANDARDS. 5.6 EXHAUST VENTS SHALL BE LOCATED 10' MINIMUM DISTANCE FROM ANY OUTSIDE AIR INTAKE. OUTSIDE AIR GENERAL NOTES 5.7 N/A EXISTING OUTSIDE AIR DEMAND REMAIN 6. TEST • ! BALANCING ■, . 21M, RFIBROUS BAND OF SAME SIZ AS HANGER STRAP SHEET METAL SADDLE MINIMUM 5' -0" ON CENTER 6" MIN ROUND AND FLEXIBLE DUCT NOTE: HANGERS SHALL BE LOCATED AT DUCT JOINTS OR AS CLOSE AS POSSIBLE AS PER SMACNA DUCT CONSTRUCTION STANDARDS SCALE: r i •, r i i i r t a i• i C4 a : r ueKIr;ER M NOTES: 1. DIMENSIONS AND C AS INDICATED + DRAWINGS. 2. PROVIDE INSULATED FLEXIBLE DUCT UNLESS OTHERWISE NOTED. ROUTE TO DIFFUSER, - GRILLE, OR HEPA/ULPA FILTER NTH MINIMUM BENDS t DISTANCE. 3. TAP MUST BE A MINIMUM OF DUCT. r SHOWN, BOTTOM 4. EXTEND SHEET METAL DUCT • LIMIT FLEXIBLE DUCT LENGTH TO 10 FEET OR LESS, AS INDICATED. CONICAL 5. USE POSSIBLE OR OTHERWISE INDICATED. r MUSLIM r w. • #• r' OPPOSED BLA r DAMPER AECT/ROUND TRANSITION (-DRAW BAND INSULATED DUCT ROUND DUCT TO � FSQUARE ADAPTOR i - r • � r t 6,1 PERFORM AN AIR FLOW TEST PRIOR TO COMMENCING THE WORK (REFER TO SCOPE). REQUIREMENTS, OFFICE USAGE REMAINS AS IS. 6,2 BALANCE NEW DIFFUSERS AS INDICATED, TEST AND BALANCE OF THE FINISHED SYSTEM IF NECESSARY (IF SYSTEM IS UNBALANCED DUE TO WORK BEING PERFORMED). PROVIDE WRITTEN REPORT OF THE RESULT OF THIS TEST STATING THE ACCEPTABILITY OF THE SYSTEM AND COMPLIANCE WITH THE DESIGN DOCUMENTS. TEST AGENCY SHALL BE AN INDEPENDENT, AABC OR NEBB CERTIFIED AGENCY, AND SHALL BE RETAINED BY THE OWNER. CONTRACTOR SHALL COORDINATE WITH OWNER AND TESTING AND COMMISSIONING AGENCY ALL WORK FOR FINAL CERTIFICATION OF THE HVAC SYSTEM. SCOPE OF WORK WORK NOTE THE SCOPE OF WORK ENTAILS THE RELOCATION OF EXISTING SUPPLY AIR (S /A) DIFFUSERS AND THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS BEFORE PROCEEDING WITH WORK INSTALLATION OF NEW RETURN AIR DIFFUSER(S) AS INDICATED, CONTRACTOR MUST PERFORM AN AIR IF ANY DISCREPANCIES, ERRORS OR OMISSIONS ARE ENCOUNTERED ON PLANS, CONTRACTOR SHALL FLOW TEST TO DETERMINE CFM/DIFFUSER PRIOR TO RELOCATING ANY DIFFUSER(S), ALL IN ACCORDANCE NOTIFY ARCHITECT /ENGINEER BEFORE ANY PART OF THE WORK IS STARTED SO THAT PROPER WITH THESE PLANS AND APPLICABLE STANDARDS. VERIFY EQUIPMENT OPERATION AND CONDITIONS, CORRECTIONS BE MAKE. IF ARCHITECTS /ENGINEER IS NOT NOTIFIED PRIOR TO COMMENCING OF THE REPORT TO ENGINEER ANY FUNCTIONING ISSUES. WORK , THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ANY DISCREPANCIES , ERROR OR OMISSIONS. THESE PLANS ARE FOR BUILDING DEPARTMENT REVIEW ONLY. THEY ARE NOT TO BE CONSTRUED AS CONSTRUCTION DOCUMENTS UN11L ALL BUILDING DEPARTMENT APPROVALS ARE OBTAINED. 0 + r •r m 161 SF-VFLLA AVENUE, -0-61YE Z' it CORAL i i t i. ADCINTERNATIONAL.N STATE OF FLORIDA AR-0010536 RAYMUNDO FEITO, !/ ,HVAC DESIGN 5 5.1 PROVIDE ALL NECESSARY ACCESS PANELS TO CONTROL VALVES, DAMPERS, SENSORS. DUCT SMOKE DETECTOR 5.3 CONDITIONED AIR DUCTWORK SHALL BE CLASS *ONE" FIBER GLASS DUCT BOARD IN • • r • - SMOKE DAMPER(S) Mechanical ACCORDANCE WITH SMACNA'S FIBROUS DUCTS STANDARDS, Unless specified otherwise on S _ E RATED ENCLOSURE THICKNESS TO PROVIDE # OF •• SUPPLY DUCTWORK RUNNING ■, . 21M, RFIBROUS BAND OF SAME SIZ AS HANGER STRAP SHEET METAL SADDLE MINIMUM 5' -0" ON CENTER 6" MIN ROUND AND FLEXIBLE DUCT NOTE: HANGERS SHALL BE LOCATED AT DUCT JOINTS OR AS CLOSE AS POSSIBLE AS PER SMACNA DUCT CONSTRUCTION STANDARDS SCALE: r i •, r i i i r t a i• i C4 a : r ueKIr;ER M NOTES: 1. DIMENSIONS AND C AS INDICATED + DRAWINGS. 2. PROVIDE INSULATED FLEXIBLE DUCT UNLESS OTHERWISE NOTED. ROUTE TO DIFFUSER, - GRILLE, OR HEPA/ULPA FILTER NTH MINIMUM BENDS t DISTANCE. 3. TAP MUST BE A MINIMUM OF DUCT. r SHOWN, BOTTOM 4. EXTEND SHEET METAL DUCT • LIMIT FLEXIBLE DUCT LENGTH TO 10 FEET OR LESS, AS INDICATED. CONICAL 5. USE POSSIBLE OR OTHERWISE INDICATED. r MUSLIM r w. • #• r' OPPOSED BLA r DAMPER AECT/ROUND TRANSITION (-DRAW BAND INSULATED DUCT ROUND DUCT TO � FSQUARE ADAPTOR i - r • � r t 6,1 PERFORM AN AIR FLOW TEST PRIOR TO COMMENCING THE WORK (REFER TO SCOPE). REQUIREMENTS, OFFICE USAGE REMAINS AS IS. 6,2 BALANCE NEW DIFFUSERS AS INDICATED, TEST AND BALANCE OF THE FINISHED SYSTEM IF NECESSARY (IF SYSTEM IS UNBALANCED DUE TO WORK BEING PERFORMED). PROVIDE WRITTEN REPORT OF THE RESULT OF THIS TEST STATING THE ACCEPTABILITY OF THE SYSTEM AND COMPLIANCE WITH THE DESIGN DOCUMENTS. TEST AGENCY SHALL BE AN INDEPENDENT, AABC OR NEBB CERTIFIED AGENCY, AND SHALL BE RETAINED BY THE OWNER. CONTRACTOR SHALL COORDINATE WITH OWNER AND TESTING AND COMMISSIONING AGENCY ALL WORK FOR FINAL CERTIFICATION OF THE HVAC SYSTEM. SCOPE OF WORK WORK NOTE THE SCOPE OF WORK ENTAILS THE RELOCATION OF EXISTING SUPPLY AIR (S /A) DIFFUSERS AND THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS BEFORE PROCEEDING WITH WORK INSTALLATION OF NEW RETURN AIR DIFFUSER(S) AS INDICATED, CONTRACTOR MUST PERFORM AN AIR IF ANY DISCREPANCIES, ERRORS OR OMISSIONS ARE ENCOUNTERED ON PLANS, CONTRACTOR SHALL FLOW TEST TO DETERMINE CFM/DIFFUSER PRIOR TO RELOCATING ANY DIFFUSER(S), ALL IN ACCORDANCE NOTIFY ARCHITECT /ENGINEER BEFORE ANY PART OF THE WORK IS STARTED SO THAT PROPER WITH THESE PLANS AND APPLICABLE STANDARDS. VERIFY EQUIPMENT OPERATION AND CONDITIONS, CORRECTIONS BE MAKE. IF ARCHITECTS /ENGINEER IS NOT NOTIFIED PRIOR TO COMMENCING OF THE REPORT TO ENGINEER ANY FUNCTIONING ISSUES. WORK , THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ANY DISCREPANCIES , ERROR OR OMISSIONS. THESE PLANS ARE FOR BUILDING DEPARTMENT REVIEW ONLY. THEY ARE NOT TO BE CONSTRUED AS CONSTRUCTION DOCUMENTS UN11L ALL BUILDING DEPARTMENT APPROVALS ARE OBTAINED. 0 + r •r m 161 SF-VFLLA AVENUE, -0-61YE Z' it CORAL i i t i. ADCINTERNATIONAL.N STATE OF FLORIDA AR-0010536 RAYMUNDO FEITO, !/