12-870-004•
•
I
DEMOLITION PLAN
WAM, 114"'-r
;j
ICormulbut 9 Soal/84pature
Issue Dab & Issue Descrfption
Dram By Check
1 7.30.12
L.L.R. C.R.
PERMIT ISSUE
z
CL
to
•
z
0
ra
ILI
0
re
----------------------
----------------------
Uj
0
Date ► Issue Dowdpdm
Drawn By Check
•
z
•
0
0
w
XISTING
THRU
./E
CITY TH MIAM
BUILDING DEPT.
Tic
STRUCTW-�AL SECTION
UP
0
0
Project Number
Client Name
iemrw &=w I sa*r Project
12246
MwW - BUT CB►EI Gkbal
Dncvipdm
camaw swkes
DEMOLITION PLAN
ClisidAddress
4W North k"q Dft &ft 17M
scab
TwnM FL =12
AS SHOWN
Merit Phone Number
----------------------
CAD I'lle Name
C 813 313 7398
---------------------
ICormulbut 9 Soal/84pature