10-722-015SANITARY SEWER AND WATER LINES
3. ALL SANITARY SEWER LINE
WHICH ARE
2" MUST SLOPE 1/4- PER
FOOT.
(AS PER FBC R P3005.3)
HOT WATER PIPE (HW)
EXCEPT OTHERWISE NOTED
CONDENSATE DRAIN PIPE (CD)
4. ALL SANITARY SEWER LINE
WHICH ARE
3" MUST SLOPE 1/8" PER
FOOT.
(AS PER FBC R P3005.3)
INDIRECT SAFE WASTE PIPE ("
EXCEPT OTHERWISE NOTED
w
Pro osed Plumbic
SCALE: 1 /4 " =1 * -O"
r Plan
0
z
PLUMBING LEGEND
SYMBOL
DESCRIPTION
- -
COLD WATER PIPE (CW)
- - - -
HOT WATER PIPE (HW)
P-1
CONDENSATE DRAIN PIPE (CD)
7
w
PRESSURE 8 TEMPERATURE RELIEF PIPE (PT)
FLOOR MOUNTED. FLUSH
TANK
P-Z
INDIRECT SAFE WASTE PIPE ("
Iw
w
SANITARY WASTE PIPE (81W)
COUNTERTOP
- - - - - - - - - -
SANITARY VENT PIPE (V)
2'
WATER HAMMER ARRESTOR AND TYPE
I I
WALL CLEAN OUT (CO)
I
AIR ADMITTANCE VALVE (AAV)
®
FLOOR CLEAN OUT (FCO)
N
CHECK VALVE
oa
GATE VALVE
GATE VALVE IN VERTICAL.
v i'
HOSE BIBS WITH SHUTOFF VALVE & VB (HB)
®
VALVE IN BOX
1 w CD
WATER METER MM)
lr- c-
'P TRAP
C
PIPE DOWN (DN)
0
PIPE UP (UP)
®
ROOF DRAIN (RD)
®
AREA DRAIN (AD)
FLOOR DRAIN (FD)
Q
FLOOR SINK (FS)
BACK FLOW PREVENT ER (BFP)
.L
TRAP PRIMER (TP)
CONNECT TO EXISTING
UG
UNDERGROUND
VB
VACUUM BREAKER
VTR
VENT THRU ROOF
RWL
RAM WATER LEADER
FU
FDCTURE UNIT
CLA
CE ILMO
ECT TO
SEWER
IN LINE
TANKLESS H.W.H
TITAN —SCR2, N -120
TANKLESS WATER HEATER DETAIL
NOT TO SCALE
PLUMBING FIXTURE CONNECTION SCHEDULE
MARKS
DESCRIPTION
WASTE
C.W.
H.W.
REMARIGSPECS
P-1
WATER CLOSET
7
w
-
FLOOR MOUNTED. FLUSH
TANK
P-Z
LAVATORY
Iw
w
w
COUNTERTOP
P-3
KITCHEN SINK
2'
P-4
WASHER
21
PROVIDE SUPPLY AND
DRAIN IN RECESSED BOX
REF
REFRIGERATOR
'1S
CONNECT TO ICE MAKER
AHU
AIR HANDLING UNIT
1 w CD
-
-
SPECIFICATIONS:
1. ALL WORK TO BE DONE IN ACCORDANCE WITH THE FLORIDA BUILDING _CODE.
STATE AND LOCAL ORDINANCES. : - - - _ -
2 BUILDING DRAINAGE SYSTEM TO BE SLOPED AT IlAr PER FT. IHltlii:FALLFOR 3' FIRE
AND LARGER VO PER FT. SLOPE FOR 27 PIPE SI21E AND SMALLER DEVIATIONS SHALL
BE APPROVED BY ARCHITECTIENGINEER.
3.
4.
PROVIDE CLEAN OUTS EVERY 75 FT. AND AT BASE OF EVERY WASTESTACK. ALL
CLOSE -OUTS TO BE FLUSH MOUNTED.
MATERIALS SHALL BE ALL NEW AND AS FOLLOWS:
A. DRAINAGE WASTE AND VENT PIPING INCLUDING:
PVC DRAINAGE WASTE AND PIPING (DWI) CONFORMING TO
ASTM D -2885, UNDERGROUND NO HUB CAST IRON CISPI STANDARD 301
ABOVE GROUND AND CAST IRON HUB. PLAIN END ASTM A-74 WITH NEO-
PRENE GASKETS UNDERGROUND. INSTALL PLASTIC (PVC) PIPES ONLY WHEN
ITS APPROVED BY LOCAL AUTHORITIES AND NOT TO BE USED IN AIR RETURN
PLENUM.
B. WATER PIPING: COPPER TYPE RV ASTM B488 ABOVE GROUND AND
COPPER TYPE 9C' ASTM BBB UNDERGROUND.
C. CONDENSATE DRAIN PIPING: COPPER TYPE wW ASTM 8-88 INSIDE
THE BUILDING AND PVC SCHEDULE 40 ABOVE ROOF AND UNDERGROUND.
PROVIDE 1/2' ARMAFLEX PIPE INSULATION TO ALL CONDENSATE DRAIN PIPING.
D. FLOOR CLEAN OUTS: JOSAM SERIES 68020 OR EQUAL
E. WALL CLEAN OUTS: JOSAM SERIES 58750 WITH ACCESS COVER OR EQUAL
F. VALVES: 125 PSI NIBCO SCOTT, STOCIWAM OR EQUAL
G. HOSE BIBBS: CHICAGO 837 OR EQUAL WITH VACUUM BREAIG=R.
5. H. AIR ADMITTANCE VALVE: STUDORM MINI -VENTO OR APPROVED EQUAL.
PERFORM THE FOLLOWING TEST.
A. WATER PIPING SHALL BE SUBJECTED TO HYDROSTATIC PRESSURE TEST OF
100 PSIG FOR A PERIOD OF TIME SUFFICIENT TO EXAMINE ENTIRE SYSTEM
BUT NOT LESS THAN ONE HOUR.
B. DRAINAGE SYSTEM: BEFORE INSTALLATION OF ANY DRAINS, THE END OF THE
SYSTEM SHALL BE CAPPED & ALL LINES FILLED WITH WATER TO HIGHEST
POINT & ALLOWED TO STAND UNTIL INSPECTION IS MADE AND WATER LEVELS
REMAIN CONSTANT.
C. CORRECT ALL DEFECTS DISCLOSED BY ABOVE TESTS.
D. COMPLETE SYSTEM FIXTURE & EQUIPMENT SHALL BE GIVEN AN IN- SERVICE
TEST AFTER COMPLETION OF THE INSTALLATION.
E. STERILIZE ALL WATER LINES WITH A MDMRE OF (2) POUNDS OF
CHLORINATED
LIME TO EACH 1000 gal. OF WATER (50 PPM OF AVAILABLE CHLORINE.) RETAIN
8. MDCTURE IN PIPES FOR 24 HOURS AND FLUSH THOROUGHLY WITH POTABLE
WATER
BEFORE PLACING IN SERVICE.
PLUMBING CONTRACTOR SHALL FURNISH A WRITTEN GUARANTEE THAT ALL
7. PLUMBING WORK SHALL BE FREE FROM DEFECTS OF MATERIALS AND
WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE.
AND THAT HE WILL. AT HIS EXPENSE, REPAIR AND REPLACE ALL WORK WHICH
S. BECOMES DEFECTIVE DURING GUARANTEE PERIOD.
9. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF EXISTING UTILITIES AND
POINTS OF CONNECTION BEFORE COMMENCING ANY WORK
10. PLUMBING CONTRACTOR SHALL PAY ALL FEES, INSPECTION AND CONNECTION
CHARGES REQUIRED.
11. SUBMIT SHOP DRAWINGS TO ENGINEER FOR APPROVAL OF ALL EQUIPMENT,
MATERIALS AND LAYOUTS PRIOR INSTALLATION.
12. OFFSET PIPING AS REQUIRED TO CLEAR BUILDING STRUCTURE. DUCTWORK. ETC.
AS SHOWN ON DRAWINGS AND AS REQUIRED BY FIELD CONDITIONS.
18. PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL A/C CONDENSATE DRAIN
AND TRAP. SEE A/C PLANS FOR LOCATION OF UNITS AND DRAINS.
14.
PLUMBING CONTRACTOR SHALL VERIFY ALL SPACE CONDITIONS AND DIMENSIONS
15. AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION OF MATERIALS AND
EQUIPMENT.
18.
17.
COORDINATE WORK WITH OTHER TRADES.
FURNISH AND INSTALL FIXTURES AS SPECIFIED IN PLUMBING FDCTURE SCHEDULE.
EACH BATHROOM GROUP SHALL BE PROVIDE WITH WATER HAMMER ARRESTORS
AS PER FBC 604.9.
PROVIDE SHUTOFF VALVE FOR EACH FIXTURE, JUST BEFORE CONNECTING TO
FIXTURE.
WHEREVER DISSIMILAR METALS ARE TO BE JOINED, A DIELECTRIC FITTING SHALL
BE PROVIDED TO CONNECT BOTH TYPES OF PIPES.
IG U I LLER M O
RAMON
IG O N ZALEZ
9000 S.W. 16871-1 AV
MIAMI, FL. -3,3195
(305) 484 -8171
GUILLERMO R. GONZALEZ
FL. REGIST. # AR9 3960
vi -
f
PROJECT NAME
ZAS LO W
REMODELING
6200 SW 78TH ST
SOUTH MIAMI, FLA 33143
SHEET TITLE
PLUMBING
FLOOR PLAN
DATE: 06/20/10
DRAWN BY: G.G.
CHECKED BY:
G.G.
JOB NO. 03 -0010
SHEET NO.