10-722-014A
SANITARY SEWER AND WATER LINES
3. ALL SANITARY SEWER LINE
WHICH ARE
2" MUST SLOPE 1/4" PER
FOOT.
(AS PER FBC R P3005.3)
HOT WATER PIPE (HW)
EXCEPT OTHERWISE NOTED
CONDENSATE DRAIN PIPE (CD)
4. ALL SANITARY SEWER LINE
WHICH ARE
3" MUST SLOPE 1/8" PER
FOOT.
(AS PER FBC R P3005.3)
INDIRECT SAFE WASTE PIPE (IW)
EXCEPT OTHERWISE NOTED
w
Pror)osed Plumbin
SCALE: 1 /4 " =1 ' -0"
Floor Plan
0
z
ECT TO
SEWER
'SAN.
PLUMBING LEGEND
SYMBOL
DESCRIPTION
- -
COLD WATER PIPE (CW)
- - - -
HOT WATER PIPE (HW)
03 -0010
CONDENSATE DRAIN PIPE (CD)
3'
'/:"
PRESSURE 8 TEMPERATURE RELIEF PIPE (PT)
FLOOR MOUNTED. FLUSH
TANK.
NREF
INDIRECT SAFE WASTE PIPE (IW)
1W
w
SANITARY WASTE PIPE (SAN)
COUNTER TOP
- - - - - - - - - -
SANITARY VENT PIPE (V)
2"
WATER HAMMER ARRESTOR AND TYPE
II
WALL CLEAN OUT (CO)
I
AIR ADMITTANCE VALVE (AAV)
®
FLOOR CLEAN OUT (FCO)
Fa
CHECK VALVE
GATE VALVE
-
GATE VALVE IN VERTICAL
-
HOSE BIBB WITH SHUTOFF VALVE 8 VB (HB)
®
VALVE IN BOX
1 1 1/4" CD
WATER METER (WM)
(r C—
"P" TRAP
C
PIPE DOWN (DN)
0
PIPE UP (UP)
®
ROOF DRAIN (RD)
®
AREA DRAIN (AD)
®
FLOOR DRAIN (FD)
®
FLOOR SINK (FS)
BACK FLOW PREVENTER (BFP)
x
TRAP PRIMER (TP)
(9
CONNECT TO EXISTING
UG
UNDERGROUND
VB
VACUUM BREAKER
VTR
VENT THRU ROOF
RWL
RAIN WATER LEADER
FU
FIXTURE UNIT
CLG
CEILING
IN LINE
TANKLESS H.W.H
TITAN —SCR2, N -120
TANKLESS WATER HEATER DETAIL
NOT TO SCALE
PLUMBING FIXTURE CONNECTION SCHEDULE
06/20/10
DESCRIPTION
WASTE
C.W.
H.W.
REMARKS /SPECS
03 -0010
WATER CLOSET
3'
'/:"
-
FLOOR MOUNTED. FLUSH
TANK.
NREF
LAVATORY
1W
w
'w
COUNTER TOP
KITCHEN SINK
2"
V2
w
WASHER
2"
w
w
PROVIDE SUPPLY AND
DRAIN IN RECESSED BOX
REFRIGERATOR
-
Y"
-
CONNECT TO ICE MAKER
MU
I AIR HANDLING UNIT
1 1 1/4" CD
I -
I -
SPECIFICATIONS:
1. ALL WORK TO BE DONE IN ACCORDANCE WITH THE FLORIDA BUILDING CODE, -
STATE AND LOCAL ORDINANCES.
2. BUILDING DRAINAGE SYSTEM TO BE SLOPED AT 1/8" PER FT. MIN. FALL FOR 3" PIPE
AND LARGER'/." PER FT. SLOPE FOR 2" PIPE SIZE AND SMALLER DEVIATIONS SHALL
BE APPROVED BY ARCHITECT /ENGINEER.
3.
4.
PROVIDE CLEAN OUTS EVERY 75 FT. AND AT BASE OF EVERY WASTESTACK. ALL
CLOSE -OUTS TO BE FLUSH MOUNTED.
MATERIALS SHALL BE ALL NEW AND AS FOLLOWS:
A. DRAINAGE WASTE AND VENT PIPING INCLUDING:
PVC DRAINAGE WASTE AND PIPING (DWV) CONFORMING TO
ASTM D -2665, UNDERGROUND NO HUB CAST IRON CISPI STANDARD 301
ABOVE GROUND AND CAST IRON HUB, PLAIN END ASTM A -74 WITH NEO-
PRENE GASKETS UNDERGROUND. INSTALL PLASTIC (PVC) PIPES ONLY WHEN
ITS APPROVED BY LOCAL AUTHORITIES AND NOT TO BE USED IN AIR RETURN
PLENUM.
B. WATER PIPING: COPPER TYPE "L" ASTM B-88 ABOVE GROUND AND
COPPER TYPE "K" ASTM B-88 UNDERGROUND.
C. CONDENSATE DRAIN PIPING: COPPER TYPE "M" ASTM B-88 INSIDE
THE BUILDING AND PVC SCHEDULE 40 ABOVE ROOF AND UNDERGROUND.
PROVIDE 1/2" ARMAFLEX PIPE INSULATION TO ALL CONDENSATE DRAIN PIPING.
D. FLOOR CLEAN OUTS: JOSAM SERIES 56020 OR EQUAL.
E. WALL CLEAN OUTS: JOSAM SERIES 58750 WITH ACCESS COVER OR EQUAL.
F. VALVES: 125 PSI NIBCO SCOTT, STOCKHAM OR EQUAL.
G. HOSE BIBBS: CHICAGO 837 OR EQUAL WITH VACUUM BREAKER.
5. H. AIR ADMITTANCE VALVE: STUDOR® MINI -VENT® OR APPROVED EQUAL.
PERFORM THE FOLLOWING TEST:
A. WATER PIPING SHALL BE SUBJECTED TO HYDROSTATIC PRESSURE TEST OF
100 PSIG FOR A PERIOD OF TIME SUFFICIENT TO EXAMINE ENTIRE SYSTEM
BUT NOT LESS THAN ONE HOUR.
B. DRAINAGE SYSTEM: BEFORE INSTALLATION OF ANY DRAINS, THE END OF THE
SYSTEM SHALL BE CAPPED & ALL LINES FILLED WITH WATER TO HIGHEST
POINT & ALLOWED TO STAND UNTIL INSPECTION IS MADE AND WATER LEVELS
REMAIN CONSTANT.
C. CORRECT ALL DEFECTS DISCLOSED BY ABOVE TESTS.
D. COMPLETE SYSTEM FIXTURE & EQUIPMENT SHALL BE GIVEN AN IN- SERVICE
TEST AFTER COMPLETION OF THE INSTALLATION.
E. STERILIZE ALL WATER LINES WITH A MIXTURE OF (2) POUNDS OF
CHLORINATED
LIME TO EACH 1000 gal. OF WATER (50 PPM OF AVAILABLE CHLORINE.) RETAIN
6. MIXTURE IN PIPES FOR 24 HOURS AND FLUSH THOROUGHLY WITH POTABLE
WATER
BEFORE PLACING IN SERVICE.
PLUMBING CONTRACTOR SHALL FURNISH A WRITTEN GUARANTEE THAT ALL
7. PLUMBING WORK SHALL BE FREE FROM DEFECTS OF MATERIALS AND
WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE,
AND THAT HE WILL, AT HIS EXPENSE, REPAIR AND REPLACE ALL WORK WHICH
8. BECOMES DEFECTIVE DURING GUARANTEE PERIOD.
9. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF EXISTING UTILITIES AND
POINTS OF CONNECTION BEFORE COMMENCING ANY WORK.
10. PLUMBING CONTRACTOR SHALL PAY ALL FEES, INSPECTION AND CONNECTION
CHARGES REQUIRED.
11. SUBMIT SHOP DRAWINGS TO ENGINEER FOR APPROVAL OF ALL EQUIPMENT,
MATERIALS AND LAYOUTS PRIOR INSTALLATION.
12. OFFSET PIPING AS REQUIRED TO CLEAR BUILDING STRUCTURE, DUCTWORK, ETC.
AS SHOWN ON DRAWINGS AND AS REQUIRED BY FIELD CONDITIONS.
13. PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL A/C CONDENSATE DRAIN
AND TRAP. SEE A/C PLANS FOR LOCATION OF UNITS AND DRAINS.
14.
PLUMBING CONTRACTOR SHALL VERIFY ALL SPACE CONDITIONS AND DIMENSIONS
15. AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION OF MATERIALS AND
EQUIPMENT.
16.
COORDINATE WORK WITH OTHER TRADES.
17.
FURNISH AND INSTALL FIXTURES AS SPECIFIED IN PLUMBING FIXTURE SCHEDULE.
EACH BATHROOM GROUP SHALL BE PROVIDE WITH WATER HAMMER ARRESTORS
AS PER FBC 604.9.
PROVIDE SHUTOFF VALVE FOR EACH FIXTURE, JUST BEFORE CONNECTING TO
FIXTURE.
WHEREVER DISSIMILAR METALS ARE TO BE JOINED, A DIELECTRIC FITTING SHALL
BE PROVIDED TO CONNECT BOTH TYPES OF PIPES.
IGUILLERMOI
RAMON
IGONZALEZ
9000 S.W. 168TH AV
MIAMI, FL. 33196
(305) 484 -8171
GUILLERMO R. GONZALEZ
FL_ REGIST. # ARI 2960
PROJECT NAME
ZAS LO W
REMODELING
6200 SW 78TH ST
SOUTH MIAMI, FLA 33143
1.1I T k UMMtN I
SHEET TITLE
PLUMBING
FLOOR PLAN
DATE'
06/20/10
DRAWN BY:
G.G.
CHECKED BY:
G.G.
JOB NO.
03 -0010
SHEET NO.
P -1