10-722-004KEY NOTES - DEMOLITION
Q1 REMOVE ALL EXISTING COUNTERS AND CABINETS IN KITCHEN
O REMOVE ALL EXISTING PLUMBING FIXTURES IN BATH
O REMOVE EXISTING WATER HEATER
® REMOVE EXISTING NON- BEARING PARTITION
DEMOLITION NOTES
1. ALL ABANDONED MATERIALS, DEVICES, FIXTURES ETC. TO BE REMOVED FROM PREMISES.
Existin
SCALE: 1 /4- =1. -0°
Demo;ition Ground Floor Plan \�
0
z
ZONING DATA:
ZONING:
RS -3
LOT AREA:
15,945 SQ. FT.
MAX LOT
G.G.
COVERAGE ALLOWED:
30% OR 4,783.5 SQ. FT.
EXISTING BUILDING
AREA:
1,416 SQ. FT.
PROPOSED ENTRY
V
TOWER ADDITION:
81 SQ. FT.
TOTAL LOT
COVERAGE:
1,497 SQ. FT. OR 10.6%
NEW ENTRY TOWER
ADDITION
EXISTING ONE STOF
SINGLE FAMILY
DWELLING
Sw
BUILDING SETBACKS:
ALLOWED
FRONT:
REAR:
SIDE INT.
SIDE STREET
78th
25 FT.
25 FT.
7.5 FT.
15 FT.
Street
PROPOSED
25 FT.
86 FT
35 FT.
20 FT.
PROPERTY LINE 108.47'
Proposed Site Plan
SCALE: 1 /16 " =1' -O"
Q)
Q
N
0
z
GUILLERMO
RAMON
GONZALEZ
9000 S.W. 168TH AV
MIAMI. FL. 3,3195
(305) 484 -8171
GUILLERMO R. GONZALEZ
FL. REGIST. # AR139450
PROJECT NAME
ZAS LOW
REMODELING
6200 SW 78TH ST
SOUTH MIAMI, FLA 33143
SHEET TITLE
SITE PLAN 8c
EXISTING/
DEMOLITION
PLAN
DATE:
06/20/10
DRAWN BY:
G.G.
CHECKED BY:
G.G.
i
03 -0
mom
SHEErNO.
V
PROJECT NAME
ZAS LOW
REMODELING
6200 SW 78TH ST
SOUTH MIAMI, FLA 33143
SHEET TITLE
SITE PLAN 8c
EXISTING/
DEMOLITION
PLAN
DATE:
06/20/10
DRAWN BY:
G.G.
CHECKED BY:
G.G.
JOB NO.
03 -0
mom
SHEErNO.