14-925-015GENERAL NOTES:
1. THE CONTRACTOR SHALL FURNISH ALL LABOR MATERIALS AND EQUIPMENT NECESSARY FOR THE
INSTALLATION OF THE HVAC SYSTEM IN ACCORDANCE WITH THESE DRAWINGS.
FLORIDA BUILDING CODE - 2010 EDITION.
- GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH DEPARTMENT CARE FACILITIES 2010 EDITION.
- NATIONAL ELECTRICAL CODE (NEC 2008).
- ENVIRONMENTAL PROTECTION AGENCY (EPA).
- DEPT. OF ENVIRONMENTAL REGULATION MANAGEMENT (DERM).
- LOCAL ORDINANCES, REGULATIONS OF THE BUILDING DEPTS. AND FIRE DEPTS.
- RECOMMENDATIONS OF NFPA, IN GENERAL AND IN PARTICULAR:
A. LIFE SAFETY, NFPA 101 (2009)
B. HVAC, NFPA 90A, (2009)
C. HVAC, NFPA 90B, (2009)
D. HVAC, NFPA 96 (2008)
E. HOSPITALS, NFPA 99, (2005)
2. THE CONTRACTOR IS RESPONSIBLE FOR VISITING THE SITE OF THE WORK AND BECOMING FAMILIAR WITH
THE CONDITIONS OF THE WORK PRIOR TO SUBMITTING A BID. THE CONTRACTOR IS REQUIRED TO BECOME
FAMILIAR WITH ALL THE CONTRACT DOCUMENTS PERTAINING TO THE PROPOSED WORK. THE SUBMISSION
OF A BID SHALL BE SUFFICIENT TO ESTABLISH THAT THE CONTRACTOR HAS INVESTIGATED THE SITE OF THE
WORK AND IS SATISFIED AS TO ALL REASONABLE CONDITIONS TO BE ENCOUNTERED, THE WORK TO BE
PERFORMED AND THE MATERIALS TO BE PROVIDED IN THE COMPLETION OF THE PROJECT.
3. FAILURE OF BIDDERS TO MAKE REQUIRED VISITATIONS AND /OR INVESTIGATIONS TO INFORM THEMSELVES
FULLY OF EXISTING CONDITIONS, AND TO INCLUDE IN THEIR PROPOSALS A SUM SUFFICIENT TO COVERALL
POSSIBLE FIELD CONDITIONS, WILL NOT IN ANY WAY ENTITLE THEM TO ANY EXTRA CHARGES OVER AND
ABOVE THEIR ORIGINAL PROPOSALS.
4. FLEX DUCT: PROVIDE FACTORY ASSEMBLED CLASS 1 AIR DUCT (UL 181) WITH 1 1/2" THICK 1 PCF FIBERGLASS
INSULATION R -6 AND REINFORCED OUTER PROTECTIVE COVER/VAPOR BARRIER. FLEX DUCT SHALL MEET NFPA 90A
WITH FLAME SPREAD UNDER 25, SMOKE DEVELOPED UNDER 50, AND SHALL BE RATED FOR 2" W.G. PRESSURE AND 0
TO 250 DEGREES FAHRENHEIT. PROVIDE METAL ADJUSTABLE CLAMPING DEVICES, SCREW OPERATED. USE
TWIST -LOCK CONICAL TAP COLLARS AT CONNECTIONS INTO SHEET METAL DUCTWORK. FLEXIBLE DUCTWORK MAY BE
USED FOR BRANCHES TO DIFFUSERS AS INDICATED ON DRAWINGS. DO NOT EXCEED EIGHT (8) FEET IN LENGTH FOR
ANY FLEX DUCT.
8. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT PROPERTY IN AREAS WHERE WORK
IS BEING CONDUCTED. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGES CAUSED TO BUILDING
COMPONENTS DUE TO NEW WORK OPERATIONS. PATCH AND REPAIR EXISTING SURFACES DAMAGED AS
REQUIRED TO MATCH ADJACENT SURFACES.
9. CONTRACTOR SHALL PROVIDE DURING CONSTRUCTION ALL SAFETY MEASURES AND FEATURES AS
REQUIRED BY THE APPLICABLE CODES, RULES AND REGULATIONS HAVING JURISDICTION OVER THE
PROJECT.
10. ALL WORK SHALL BE COORDINATED WITH ALL OTHER TRADES AT JOB SITE PRIOR TO FABRICATION AND
INSTALLATION OF EQUIPMENT. ANY DISCREPANCIES BETWEEN THE WORK DEPICTED ON THESE
DOCUMENTS AND THE ACTUAL CONDITIONS ENCOUNTERED SHALL BE BROUGHT PROMPTLY TO THE
ENGINEER FOR REVIEW AND CLARIFICATION.
11. THE WORK THAT IS TO BE DONE UNDER THIS CONTRACT INCLUDES THE FURNISHING OF ALL LABOR,
MATERIALS AND EQUIPMENT, PERMITS, FEES, INSPECTIONS, TESTS, INSURANCE, ETC., REQUIRED FOR THE
COMPLETION OF THE HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS SHOWN ON DRAWINGS.
12. THE DRAWINGS ARE GENERALLY DIAGRAMMATIC. THEY DO NOT SHOW EVERY BEND, OFF -SET, ELBOW OR
OTHER FITTINGS WHICH MAY BE REQUIRED FOR THE INSTALLATION IN THE SPACE ALLOCATED.
13, DRAWINGS ARE NOT TO BE SCALED, UNLESS SPECIFIC DIMENSIONS ARE SHOWN, THE STRUCTURAL
DRAWINGS AND SITE CONDITIONS SHALL GOVERN EXACT LOCATION OF MECHANICAL EQUIPMENT TO BE
INSTALLED.
14. IT IS THE INTENT OF THE PLANS AND GENERAL NOTES TO PROVIDE A COMPLETE AND OPERATING
INSTALLATION INCLUDING ALL NECESSARY ITEMS REQUIRED, EVEN THOUGH ITEMS ARE NOT INDICATED ON
THE DRAWINGS OR IN THE NOTES. ALL WORK CONSIDERED NECESSARY FOR THE COMPLETION OF THE
WORK IN PROPER MANNER NOT SHOWN ON THE PLANS OR NOTES SHALL BE BROUGHT TO THE ATTENTION
OF THE ENGINEER IN WRITING PRIOR TO BIDS OTHERWISE WORK SHALL NOT BE ADDITIONALLY CHARGED
AFTER BID IS AWARDED.
15. SUBMIT SHOP DRAWINGS OF ALL MATERIALS, DUCTWORK, DUCT LAYOUT AND EQUIPMENT FOR REVIEW BY
ENGINEER PRIOR TO FABRICATION AND /OR INSTALLATION,
16. ALL DUCT SIZES SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS.
17, THE CONTRACTOR SHALL TEST ALL EQUIPMENT, MAKE PRELIMINARY ADJUSTMENTS AND CALIBRATE ALL
CONTROLS PRIOR TO REQUESTING TEST AND BALANCE SERVICES,
18. NO PORTION OF THE NEW DUCTWORK OR ITS SUPPORTS SHALL MAKE CONTACT WITH PARTITIONS, CEILING,
LIGHTS, ETC.
19. CONTRACTOR SHALL WARRANT ALL WORK TO BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR
A PERIOD OF ONE YEAR AFTER ACCEPTANCE OF THE INSTALLATION,
20. PROVIDE OWNER WITH (3) HARD BOUND SETS OF SYSTEM OPERATING INSTRUCTIONS FOR ALL EQUIPMENT
INCLUDING CONTROLS.
21. ALL MATERIALS SHALL BE NEW. ANY DAMAGED EQUIPMENT SHALL BE REPLACED OR RESTORED TO
ORIGINAL CONDITION.
22. PROVIDE CEILING/WALL ACCESS PANELS WHERE INDICATED IN THE DRAWINGS AND WHERE REQUIRED TO
ACCESS HVAC EQUIPMENT. PANELS SHALL BE RECESSED TYPE, FIRE RATED IF IN FIRE RATED WALLS OR
CEILINGS. LOCATION OF PANELS SHALL BE COORDINATED WITH ALL THE OTHER TRADES.
21 CONTRACTOR SHALL OBTAIN THE SERVICES OF AN INDEPENDENT, CERTIFIED TEST AND BALANCE COMPANY
TO BALANCE THE AIR SYSTEMS ASSOCIATED WITH THE NEW AND EXISTING MECHANICAL EQUIPMENT AS
SHOWN TO THE QUANTITIES AND CAPACITIES INDICATED ON THE PLANS. CONTRACTOR SHALL SUBMIT (3)
COPIES OF REPORT TO ENGINEER UPON COMPLETION FOR REVIEW.
24. DURING CONSTRUCTION, ALL SUPPLY DUCTWORK OPENINGS SHALL BE FITTED WITH BLANKET TYPE,
DISPOSABLE 1" THICK SYNTHETIC MEDIA IN ORDER TO PREVENT CONSTRUCTION DEBRIS FROM ENTERING
AND ACCUMULATING INSIDE THE DUCT SURFACES.
25. UPON COMPLETION, CONTRACTOR SHALL CLEAN ALL DUST AND DEBRIS IN AREAS WHERE WORK WAS
CONDUCTED.
26. ALL WORK SHALL CONFORM WITH THE 2010 EDITION, FLORIDA BUILDING CODE AND ALL APPLICABLE CODES
AND REGULATIONS.
25. THE CONTRACTOR SHALL DEVELOP DETAILED COORDINATION DRAWINGS SHOWING CLEARANCES WITH
BUILDING STRUCTURE, CEILINGS HEIGHT AND OVERALL COORDINATION WITH ALL OTHER TRADES. DRAWING
SHALL DETAIL MAJOR ELEMENTS, COMPONENTS, AND SYSTEMS OF MECHANICAL EQUIPMENT AND
MATERIALS IN RELATIONSHIP WITH OTHER SYSTEMS, INSTALLATIONS, AND BUILDING COMPONENTS. SHOW
SPACE REQUIREMENTS FOR INSTALLATION AND ACCESS. WHENEVER THERE IS A CONFLICT, THE
CONTRACTOR SHALL SHOW THE PROPOSED SOLUTION ON THE COORDINATION DRAWINGS. DUCTWORK
PIPING OFFSETS, RISE /DROPS, RE- ROUTINE AND RE- DIMENSIONING SHALL BE SHOWN ON THE
COORDINATION DRAWINGS FOR REVIEW AND APPROVAL BY THE ENGINEER.
26. BALANCING DAMPERS: FABRICATED OF SAME MATERIAL AS DUCT, TWO METAL GAUGES HEAVIER THAN DUCT. MOUNT
ON 3/8" SQUARE ROD WITH SAW SLOT POSITION INDICATOR. PIVOT AND BEARING, LOCKING POSITION REGULATOR.
27. PROVIDE DOUBLE THICKNESS TURNING VANES AT ELBOWS AND EXTRACTOR DAMPERS AT ALL DUCT BRANCHES AND
TAKE -OFFS.
28. ALL AIR CONDITIONING DUCTWORK SHALL BE CODE GAGE GALVANIZED SHEET METAL INSULATED WITH 2 INCH THICK
AND 1.0 PCF GLASS FIBER FLEXIBLE BLANKET INSULATION WITH ALUMINUM FOIL REINFORCED WITH GLASS FIBER
FASING (FSKL) JOHN - MANVILLE MICROLITE (R -6 INSTALLED) OR APPROVED EQUIVALENT, DUCT SIZES SHOWN ARE NET
FREE AREA, PROVIDE DOUBLE THICKNESS TURNING VANES AND EXTRACTORS AT ALL ELBOWS AND TAKE -OFFS.
29. ALL CONCEALED SUPPLY AIR DUCTS SHALL BE EXTERNALLY INSULATED WITH DUCT WRAP AS INDICATED IN GENERAL
NOTES.
30. DUCT FINISHES AND SEALERS SHALL HAVE A SMOKE DEVELOPED RATING OF LESS THAN 50 AND A FLAME SPREAD OF
25 OR LESS.
,AIR DISTRIBUTION LEGEND
DOUBLE WALL INSULATED DUCT
(SEE NOTE tt3)
DESCRIPTION
AHU
DIRECTION OF FLOW
TYPE OF DIFFUSER
SIZE OF DIFFUSER
AMOUNT OF CFM
A 1.W
6x6
5 ,
....................
❑ AD
BACKDRAFT DAMPER
COND.
20 X 10
DUCT FIRST FIGURE IS SIDE
SHOWN. SIZES ARE INSIDE
DIMENSION.
OVAL DUCT
SECTION NUMBER
DRAWING NUMBER
WHERE LOCATED
CUBIC FEET PER MINUTE
20 X 10 QS
EXHAUST FAN
EA
EACH
E/A
ROUND DUCT
DUCT MTD. SMOKE DETECTOR
VV/REMOTE i TEST LIGHT SWITCH
(PROVIDE ACCESS DOOR)
FIRE DAMPER
20
FULL LOAD AMPS
FPM
FEET PER MINUTE
FPS
FEET PER SECOND
LSD
HORSEPOWER
EXISTING DUCTWORK OR
EQUIPMENT TO REMAIN
ACCESS PANEL /DOOR
IN.
INCH
KW
KILOWATT
t AP AD=
POUNDS
MAX.
MAXIMUM
VD
q FC
EXISTING DUCTWORK OR
EQUIPMENT TO BE REMOVED
NUMBER
O/A
OUTSIDE AIR
FLEXIBLE DUCT, FLEXIBLE
CONNECTION (FC)
REVOLUTIONS PER MINUTE
R/A
RETURN AIR
DUCT RISE IN DIRECTION
OF FLOW
ELECT. STRIP HEATER (MUST
USE ACC, DOOR)
TEMP.
TEMPERATURE
R�
THERMOSTAT
V
VELOCITY
ADD
VARIABLE VOLUME BOX
L
DUCT DROP IN DIRECTION
OF FLOW
u
EDH
C $� 0
U.C.
FAN, WALL, ROOF
I
t
VD
0
TRANSITION RECTANGULAR
TO ROUND
UNDERCUT DOOR
DUCT WITH CAPPED END
AIR FLOW
MEASURING DEVICE
DUCT SECTION! SUPPLY
RETURN
A F M D
D
A.D. ❑
THERMOSTAT
ALL ELBOWS MUST BE PROVIDED
WITH TURNING VANES WHETHER
SHOWN OR NOT ON DINGS.
HUMIDISTAT
TYP. 45° TAP -OFF WITH
VOLUME DAMPER
POINT OF CONNECTION
BETWEEN NEW AND EXISTING
WORK
MOTORIZED DAMPER
WITH ACCESS DOOR F
CAP
A.D. ❑
F
DEMOLITION TO THIS POINT
SPUTTER DAMPER
COMBINATION FIRE /SMOKE
DAMPER (MUST USE ACCESS
DOOR)
FIRE DAMPER
(MUST USE ACCES DOOR)
A
SMOKE DAMPER
(MUST USE ACCESS DOOR)
A.D. ❑
S
NOTES
I. 45 ° TAP -OFFS, SPUTTERS AT EACH TAP -OFF AND TEE, AND ACCESS DOORS SHALL BE
USED WHERE REQUIRED, WHETHER OR NOT INDICATED IN THE DRAWINGS.
2. IN AREAS WHERE NON - REMOVABLE CEILINGS ARE USED, PROVIDE 450 TAP -OFFS OF THE
FIXED TYPE, WITH WIDTH PROPORTIONAL TO BRANCH CFM,
AIR CONDITIONING LEGEND
SYMBOL
DESCRIPTION
AHU
AIR HANDLER UNIT
BD
BACKDRAFT DAMPER
COND.
CONDENSATE
CONC.
CONCRETE
CFM
CUBIC FEET PER MINUTE
EF
EXHAUST FAN
EA
EACH
E/A
EXHAUST AIR
FD
FIRE DAMPER
FLA
FULL LOAD AMPS
FPM
FEET PER MINUTE
FPS
FEET PER SECOND
HP
HORSEPOWER
HR
HOUR
IN.
INCH
KW
KILOWATT
LBS.
POUNDS
MAX.
MAXIMUM
VD
MANUAL VOLUME DAMPER (OPPOSED BLADE TYPE)
NO.
NUMBER
O/A
OUTSIDE AIR
RPM.
REVOLUTIONS PER MINUTE
R/A
RETURN AIR
S/A
SUPPLY AIR
TEMP.
TEMPERATURE
T
THERMOSTAT
V
VELOCITY
VAV
VARIABLE VOLUME BOX
HVAC DESIGN REOUIRES:
YES
NO
DUCT SMOKE DETECTOR
X
FIRE DAMPERS)
X
SMOKE DAMPERS)
X
FIRE RATED ENCLOSURE
X
FIRE RATED ROOF /FLOOR CEILING ASSEMBLY
X
FIRE STOPPING
X
SMOKE CONTROL
X
TYPE OF DIFFUSER
A 1 W --- �DIRECTION OF FLOW
6x6
� S o SIZE OF DIFFUSER
AMOUNT OF CFM
AIR OUTLET TAG
N.T.S.
PROJ. No. 23057 CA 92S I
LOUIS d AGUIRRE $ ASSOCIAWS �. P.A.
CONSULTING ENGINEERS
9150 SOUTH DADELAND BLVD. SUITE 900
MIAMI, FLORIDA 33156
TELEPHONE: (305) 670 -0141 I
FAX: (305) 670 -0144
E -MAIL ADDRESS: GRALMAIL @LJAAPA.COI,I I
BID NOTE
THE DRAWINGS DO NOT INDICATE EXISTING INSTALLATIONS OTHER THAN TO IDENTIFY MODIFICATIONS
OR EXTENSIONS THERETO. VISIT THE SITE AND ASCERTAIN THE EXISTING CONDITIONS. REVIEW
CONSTRUCTION DETAILS OF THE EXISTING PORTION OF THE BUILDING DURING THE SITE INSPECTION.
INCLUDE ALL WORK REQUIRED TO REMOVE OR MODIFY PORTIONS OF THE EXISTING INSTALLATION IN
ORDER TO ACCOMMODATE THE NEW WORK. FAILURE TO COMPLY WITH THIS WILL NOT BE CONSIDERED
GROUNDS FOR ADDITIONAL PAYMENT IN CONNECTION WITH REMOVIN OR MODIFYING ANY PART OF THE
EXISTING INSTALLATION OR INSTALLING ANY NEW OR TEMPORARY WOK.
COORDINATION NOTE
AS PART OF THIS CONTRACT, THE SUB - CONTRACTOR AND THE CONTRACTOR ARE RESPONSIBLE FOR
COORDINATION AND VERIFICATION THAT ALL EQUIPMENT, SHOWN IN THE ARCHITECTURAL DRAWINGS
PARTICULARLY, BUT NOT LIMITED TO THE ARCHITECTURAL EQUIPMENT PLAN, INCLUDE ALL
SERVICE /UTILITY REQUIRED TO OPERATE THE EQUIPMENT SHOWN. ANY DISCREPANCIES ARE TO BE
POINTED OUT DURING THE BIDDING PROCESS,
DISCREPANCIES NOT POINTED OUT DURING THE BIDDING PROCESS WILL BE RESOLVED BY THE
CONTRACTOR AS PER THE ARCHITECT DETAILS AT NO ADDITIONAL COST TO THE OWNER.
COORDINATION DRAWINGS
1. THE CONTRACTOR SHALL SUBMIT COORDINATION DRAWINGS TO ARCH. /ENG AND OWNER'S
PROJECT MANAGER FOR APPROVAL PRIOR TO ANY FABRICATION AND INSTALLATION.
2. CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL NEW DUCTWORK, CONDUITS, ECT. WITH
ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL SYSTEMS OF THE BUILDING. VERIFY
ALL SPACE CONDITIONS AND DIMENSIONS AT JOBSITE PRIOR TO FABRICATION AND INSTALLATION
OF EQUIPMENT AND MATERIALS. ANY CONFLICTS SHALL BE REPORTED IMMEDIATELY TO THE
ARCHITECT /ENGINEER PRIOR TO BEGINNING OF CONSTRUCTION.
GENERAL DEMOLITION NOTES:
1. THE CONTRACTOR IS RESPONSIBLE FOR VISITING THE SITE OF THE WORK AND BECOMING
FAMILIAR WITH THE CONDITIONS OF THE WORK PRIOR TO SUBMITTING A BID. THE
CONTRACTOR IS REQUIRED TO BECOME FAMILIAR WITH ALL THE CONTRACT DOCUMENTS
PERTAINING TO THE PROPOSED WORK. THE SUBMISSION OF A BID SHALL BE SUFFICIENT TO
ESTABLISH THAT THE CONTRACTOR HAS INVESTIGATED THE SITE OF THE WORK AND IS
SATISFIED AS TO ALL REASONABLE CONDITIONS TO BE ENCOUNTERED, THE WORK TO BE
PERFORMED AND THE MATERIALS TO BE PROVIDED IN THE COMPLETION OF THE PROJECT.
2. FAILURE OF BIDDERS TO MAKE REQUIRED VISITATIONS AND /OR INVESTIGATIONS TO INFORM
THEMSELVES FULLY OF EXISTING CONDITIONS, AND TO INCLUDE IN THEIR PROPOSALS A SUM
SUFFICIENT TO COVER ALL POSSIBLE FIELD CONDITIONS, WILL NOT IN ANY WAY ENTITLE THEM
TO ANY EXTRA CHARGES OVER AND ABOVE THEIR ORIGINAL PROPOSALS.
3. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT PROPERTY IN AREAS
WHERE WORK IS BEING CONDUCTED. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGES
CAUSED TO BUILDING COMPONENTS DUE TO DEMOLITION OPERATIONS. PATCH AND REPAIR
EXISTING SURFACES DAMAGED AS REQUIRED TO MATCH ADJACENT SURFACES.
4. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR ALL EXISTING CONSTRUCTION, INCLUDING
EXISTING TO REMAIN AND TO BE REMOVED. ITEMS AND DEBRIS TO BE REMOVED WILL BE
PROPERLY DISPOSED OF BY THE CONTRACTOR, WITHIN HIS CONTRACT, AT NO COST TO THE
OWNER.
5. CONTRACTOR SHALL PROVIDE DURING DEMOLITION OPERATIONS ALL SAFETY MEASURES AND
FEATURES AS REQUIRED BY THE APPLICABLE CODES, RULES AND REGULATIONS HAVING
JURISDICTION OVER THE PROJECT.
6. THE DEMOLITION DRAWINGS ARE ONLY TO ASSIST IN SHOWING THE SCOPE OF DEMOLITION
WORK AND ARE NOT INTENDED TO INDICATE ALL DEMOLITION, CONTRACTOR SHALL REMOVE
ALL EXISTING ITEMS AS REQUIRED TO PROPERLY COMPLETE ALL THE WORK INDICATED IN THE
CONTRACT DOCUMENTS.
7. ANY UTILITY LINES TO REMAIN AND THAT ARE BROKEN OR DAMAGED DURING DEMOLITION
OPERATIONS SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL CHARGE TO THE
CONTRACT PRICE, OR SHALL BE REPAIRED BY THE OWNER AT THE CONTRACTOR'S EXPENSE.
8. HOLES AND OPENINGS ON THE BUILDING CEILING SLAB AND WALLS THAT REMAIN AFTER THE
DEMOLITION SHALL BE PATCHED TO MATCH THE EXISTING CEILING SLAB AND WALL
CONSTRUCTION.
9. ANY DISCREPANCIES BETWEEN THE WORK DEPICTED ON THESE DOCUMENTS AND THE ACTUAL
CONDITIONS ENCOUNTERED SHALL BE BROUGHT PROMPTLY TO THE ENGINEER FOR REVIEW
AND CLARIFICATION.
10. UPON COMPLETION OF DEMOLITION WORK, CONTRACTOR SHALL CLEAN ALL DUST AND DEBRIS
IN PREPARATION FOR NEW CONSTRUCTION.
11. ALL WORK SHALL CONFORM WITH THE 2010 FLORIDA BUILDING CODE AND ALL APPLICABLE
CODES AND REGULATIONS.
r \
A
Q
w�
z�
VC
O
o
Q
z
W
A
W O
� V
� W
oz
co W
:�.: V
PERMIT SET
05/12/14
DRAWl�k J_I3,
COED: P.A.
DATE: 03 -28 -14
SCALE: A5 NOTED
;NIC L X .
4;