Loading...
14-62-008GENERAL NOTES DEMOLITION NOTES: 1, AREA OF CONSTRUCTION SHALL BE MAINTAINED UNDER NEGATIVE PRESSURE IN RELATION TO SURROUNDING AREAS. THE CONSTRUCTION AREAS TO BE TESTED WEEKLY TO ASSURE A NEGATIVE PRESSURE OF 0.03 INCHES WATER GAUGE IN BEING MAINTAINED WHEN ALL DOORS AND WINDOWS ARE CLOSED. ALL AIR OUTLETS AND WALL PENETRATIONS SHALL BE BLOCKED OF TO MAINTAIN NEGATIVE PRESSURE IN THE SPACE. CONTRACTOR WILL PROVIDE A TEMPORARY EXHAUST FAN TO MAINTAIN NEGATIVE PRESSURE IN THE SPACE. 2. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL DEMOLITION WORK INFORMATION. 3. WORK SHALL SCHEDULE TO MINIMIZE IMPACT TO THE NORMAL OPERATION OF THE HOSPITAL SEE ARCHITECTURAL DRAWING PLAN. COORDINATE WITH THE AUTHORIZED SMH HOSPITAL REPRESENTATIVE MINIMUM OF 72 HOURS PRIOR TO ANY SHUTDOWN REQUIRED TO PERFORM WORK ON H.V.A.C. SYSTEMS. 4. PROVIDE VISUAL NEGATIVE PRESSURE GAUGE TO MONITOR THE PRESSURE RELATIONSHIP BETWEEN THE CONSTRUCTION AREA AND THE ADJACENT SPACE TO PROVIDE NEGATIVE PRESSURE OF 0.03" W.G. WITHIN THE SPACE. EQUIPMENT SPECIFICATIONS: SUPPLY, RETURN, TRANSFER, AND EXHAUST AIR DUCTWORK: SHALL BE GALVANIZED SHEET STEEL, DESIGNED, CONSTRUCTED AND INSTALLED PER SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS- METAL AND FLEXIBLE" MANUAL, LATEST EDITION. STATIC PRESSURE CLASSIFICATION AS FOLLOWS: 3" STATIC PRESSURE: SUPPLY AIR AND RETURN AIR DUCTWORK. 2" STATIC PRESSURE: OUTSIDE AIR, TRANSFER DUCTS AND EXHAUST AIR DUCTWORK. FLEXIBLE DUCTWORK: SHALL BE CLASS 1, UL STANDARD 181, INSULATED ROUND DUCT BY THERMAFLEX MKE OR FLEXMASTER 8M; R -6 MINIMUM. FACTORY FABRICATED WITH AN OUTER JACKET ENCLOSING 1 -1/2 INCH THICK GLASS FIBER INSULATION AROUND A CONTINUOUS METAL INNER LINER. GLASS - REINFORCED SILVER MYLAR OUTER JACKET WITH A CONTINUOUS HANGING TAB. FLEXIBLE DUCT SHALL MEET THE REQUIREMENTS OF FBC 2010 CHAPTER 419.3.6.4 RECTANGULAR MANUAL VOLUME DAMPERS: SHALL BE RUSKIN MODEL MD35 OR EQUAL. MULTIPLE OPPOSED BLADE OR SINGLE BLADE, FURNISHED COMPLETE WITH FACTORY FABRICATED LOCKING HAND QUADRANT. PROVIDE WITH 2" STAND -OFF WHEN INSTALLED ON EXTERNALLY INSULATED DUCT. INFECTION CONTROL RISK ASSESSMENT 1. TO THE EXTEND THAT IT IS REQUIRED BY THE ICRA, THE CONTRACTOR SHALL MAINTAIN EXISTING LEVELS OF INDOOR AIR QUALITY IN SURROUNDING AND ADJACENT AREAS TO THE CONSTRUCTION AREA, AND ELSEWHERE IN THE FACILITY. IT SHOULD BE ANTICIPATED THAT THE ICRA REPORT WILL REQUIRE ERECTION OF CONSTRUCTION ZONE BARRIERS AND PROVISION OF NEGATIVE PRESSURE IN THE CONSTRUCTION ZONE RELATIVE TO SURROUNDING AREAS. 2. IN ADDITION TO MEETING THE REQUIREMENTS OF THE ICRA REPORT, THE CONTRACTOR SHALL PROVIDE THE EQUIPMENT NECESSARY TO CREATE A NEGATIVE PRESSURE IN THE CONSTRUCTION AREA, RELATIVE TO THE ADJACENT AREA. EXISTING HVAC SYSTEM AND COMPONENTS SHALL NOT BE USED FOR THIS FUNCTION, UNLESS SPECIFICALLY APPROVED BY THE OWNER'S INFECTION CONTROL OFFICER. THE CONCEPT AND ALL ASPECTS OF THIS WORK SHALL BE DONE IN ACCORDANCE WITH THE ICRA REQUIREMENTS AND AS A MINIMUM THE FOLLOWING: A. VERIFY ALL EXISTING DUCTWORK WHICH PASSES THROUGH THE CONSTRUCTION ZONE, AND IS TO REMAIN, IS SEALED AND PROTECTED DURING CONSTRUCTION. B. AIR REMOVED FROM THE CONSTRUCTION ZONE SHALL BE FILTERED AND /OR DISCHARGED AS DIRECTED BY THE ICRA REPORT. C. PRESENT THE NEGATIVE AIR PRESSURE PLAN TO THE OWNER FOR APPROVAL BY THE INFECTION CONTROL OFFICER. D. PROVIDE MEANS TO MONITOR AND VERIFY NEGATIVE PRESSURE IS BEING MAINTAINED IN ACCORDANCE WITH THE ICRA REPORT, AND PROVIDE DOCUMENTS TO THE OWNER AS REQUIRED CODES AND STANDARDS APPLICABLE CODES AND STANDARDS SHALL INCLUDE ALL STATE LAWS, LOCAL ORDINANCES, UTILITY COMPANY REGULATIONS AND THE APPLICABLE REQUIREMENTS OF THE FOLLOWING ACCEPTED CODES AND STANDARDS. WITHOUT LIMITING THE NUMBER AS FOLLOWS. 1. FLORIDA BUILDING CODE - 2010 EDITION. 2. GUIDELINES FOR DESIGN AND CONSTRUCTION ON HEALTH DEPARTMENT CARE FACILITIES 2010 EDITION. 3. NATIONAL ELECTRICAL CODE (NEC 2008). 4. ENVIRONMENTAL PROTECTION AGENCY (EPA). 5. DEPT. OF ENVIRONMENTAL REGULATION MANAGEMENT (DERM). 6. LOCAL ORDINANCES, REGULATIONS OF THE BUILDING DEPTS. AND FIRE DEPTS. 7. NATIONAL ELECTRICAL SAFETY CODE 2002. 8. OCCUPATIONAL SAFETY AND HEALTH STANDARD. 9. RECOMMENDATIONS OF NFPA, IN GENERAL AND IN PARTICULAR: A. LIFE SAFETY, NFPA 101 (2009) B. HVAC, NFPA 90A, B (2009) C. HVAC, NFPA 96 (2008) D. HOSPITALS, NFPA 99 (2005) E. SMOKE CONTROL, NFPA 92A (2009), 92B (2009) F. STANDARD FOR INSTALLATION OF EXHAUST SYSTEMS, NFPA 91 (2004) G. STANDARD FOR INSTALLATION OF SPRINKLERS SYSTEM, NFPA 13 (2007) 10. RECOMMENDATIONS OF ASHRAE (2001), INCLUDING ASHRAE 90 -75. 11. JOINT COMMISSION FIRE ALARM POLICY. 12. FLORIDA WITH DISABILITIES ACCESSIBILITY ACT (2004). 13. SMACNA (2005) I RELATIVE PRESSURE I (0) = EQUAL PRESSURE ( -) = NEGATIVE PRESSURE N = POSITIVE PRESSURE ICRA TYPE "C" CLASS - III DEMOLITION CODED NOTES: 0 INSTALL AGAINST AIR DEVICE TEMPORARY BLANKET TYPE, DISPOSABLE 1" THICK SYNTHETIC MEDIA. REMOVE SYNTHETIC MEDIA AFTER DEMOLITION IS COMPLETED. OINSTALL TEMPORARY CAP IN SUPPLY AND RETURN AIR DUCT AND SEAL AIR TIGHT. REMOVE AT END OF CONSTRUCTION. ODOOR SHALL BE SEALED AIR TIGHT AND KEPT CLOSED DURING CONSTRUCTION. ___- - -_ - AP(,wITEGT: n._.- . -_,,.. _.. -..F ....... .... ... .._.._... _. _ . { 1 -- - - - - -� _-____-------------- --- -_-- -_ / I I ------------- - - - - -- 1 l - - -- t I I X�---------- - - - - -- -- x / I \\ I I 1 - -L - -�I / I I - "1 -T��fi � 18X16 i 46X2_4 5X18 - -- - - - I 16X14 n --- -------------------- - - -i 1 i I 1 I I I I I ------- --- - - ------------- --------------------- L_ ------- - - - - -- _ - - - -- , I I I 1 I � _ � ( I I I -�•j I I I j ( � l I 1 t _ _ _ 8„0 6X6 6X4 I I { I I I I I I I _1, -- - -- --- - - - - -- { 1 -- ---------- - - - - -- - -- _ I - - - -- 1 I 1 - r- ---- -{- - Z�-- - -•- -- - - -- I I I I I I �- I Cam- - - - -- C - - -� - - ------- - - = - -- - -- - - -- N.I.C. W.C. N:IC -18"0 { 1 N.I.C. l I I (Lk�l I I j SAC- -------- �-{- -- �x'� Fox N.I.C. I I I I I 1 k�-I -- -- ----- - - - - -- -- I� �I N. I . C. N.I.C. I I I I I I I 1 ----- - - - - -- -- r-- - - - - -- -- t---I -- - - - - -- - -- - ----- - ----- ---- �t�--- - - - - -- - -- -- I I I MS`S 6 "0 I_ - - - -_ ___ 7N-N P ---- - - - - -- - ---- .� - - - - - - - ,,- - F F j. i �.�' ��. of I i X l 11 I I ------- - - - - -- - - - - -- ------------------------------------------------------------ - - - - -- 1 11 I I I F - -T- - - -- - � I I I 18X14 1 I 1 I I L_----- - - - - -- --- - --------------------------------------- - - - - -- --------------------- - --1-1 ���----------------------- -r�- -) I- I I I N.I.C. I I _ 1 I 8„� _� � I I I I 001 1 I I I l I I I �g >'0 � �,��� J I I 1 I I I I I fT-�I ------- 17- -A F 1 MAGNETIC 1 I �� 22X22�jl) N( x - - - --- -------- - -I- -� - - - -- DRAFT GAUGE.I I TEMPORARY PARTITION _ 100 CFM I I WALLS AND DOOR. SEE 6- - - -1 -- - =- N.I.C. I xl 1 I - - - -� _� -- - -`� —� ARCHITECTURAL DRAWING ATI. I I 1 TEMPORARY 6X6 CEILING DIFFUSER TO �00 ` \ I 1 I I I BE INSTALLED IN CORRIDOR. DIFFUSER _ SIMILAR TO TITUS TD -AA, 6 "RD. NECK I I I I SIZE W /O.BD, SURFACE MOUNTED. �� �♦ I t 11 I I I Ih-hI\ 10 "o o I 1 - - - -- I f I l l g Ur 8"0 I I -- j - _ - - - -- - - -- �x� 6 % li 1 — I �2 1-I I f l // l II 1 1 I 11 l -J y 1 I I 10% r_-1 I �� 8" 1 1 I I �x� 1 1 FD FD 1 I j �� v 1 '. { I 6 "0 ----- - - - - -- --- - - - - -- I I I I I 11 N.I.C. / 1 IT CFM 1 1 1 1 `-1 I 1 I I I I l ( I I P FILTER l l 1 I N. 1' I I I I I 8 I I 9 EFFJ i i 00 I I I X 11 I I 1 I I I I (LX I 10 "4 I I 6 I I "0 TEMPCRA12Y I I I I 8110 1 1 1 FLEXIBLE DUCT I I I I L� r I J 11 I I 00 CFM 6 (UL 181 CL SS U L__ I I __ _ f - - - -- 1 1 l I �x I �- - - - - - - -�-� 1 1 I I I I D VD -}---( 11 I I 12X12 ILk _�! - -! - - ___._i.._�) I - - - -- x I ----- --1-_y r - - - -- x( I I r k-- i--------____---------- --- --------------- - - - - -- - -- �C I X ( � II --- 1--------------------------------------------------- -1- -2J r- _ _ — �ty - - 100 CFM TO BE EXHAUSTED TO OUTSIDE CONSTRUCTION T _ AREA. THE EXHAUST CFM AMOUNT TO BE INCREMENTALLY -8 N I C MODULATED IN THE FIELD IN ORDER TO SATISFY ICRA L4L=PL� J REQUIREMENT OF 0.03" STATIC PRESSURE, 1 DEMOLITION FLOOR PLAN - ICRA - HVAC M3.01 SCALE 1/4 " =1' -0" UTILITY FAN WITH HEPA FILTER (99.99% EFF.) AND SPEED CONTROL (900 CFM) TO CLEAN AND RECIRCULATE THE AIR IN THE CONSTRUCTION AREA, MAINTAINING NEGATIVE PRESSURE OF 0.03" W.G. BETWEEN CONSTRUCTION AREA AND ADJACENT SPACES. BERMELLO AJAMIL & PARTNERS, INC. - Architia;tare Engineering Planning :Interior Oesig_n Landscape Architecture - 2S01 Scil; Bayshore Drive 10th Floor Miami, Florida 33133 (305) 859 -2050 Fax (305) 860 -3700 L LOUIS J. AGUIRRE & ASSOCIATES, P.A. Consulting Engineers 9150 South Dadeland Blvd. • Suite 900 Miami • Florida 33156 • EB0000924 Telephone 305.670.0141 Facsimile 305.670.0144 www.11aa aR com Project No.: 23075 MEQ!4A�ICAL: 1?D�ARD41 A,: SOAREZ, P.E. `r. -LICENSE tt 64759 CONSTRUCTION DOCUMENTS REVISIONS: PROJECT NAME: SMH -Tomo Equipment Replace PROJECT ADDRESS: 7400 S.W. 62nd Ave. South Miami, Florida 33143 KEY PLAN COMM. NO. 40073.000 SCALE: AS SHOWN DATE: 11 -14 -2013 DRAWN: AP CHECKED: AG CADD FILE: IMNSTITUTIONAL DRAWING TITLE: DEMOLITION FLOOR PLAN - ICRA HVAC SHEET NO. M3.01