14-62-006GENERAL NOTES: 1. THE CONTRACTOR SHALL FURNISH ALL LABOR MATERIALS AND EQUIPMENT NECESSARY FOR THE INSTALLATION OF THE HVAC SYSTEM IN ACCORDANCE WITH THESE DRAWINGS. - FLORIDA BUILDING CODE - 2010 EDITION. GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH CARE FACILITIES - 2010 EDITION. - N TIONAL ELECTRICAL CODE (NEC 2008). - ENVIRONMENTAL PROTECTION AGENCY (EPA). - DEPT. OF ENVIRONMENTAL REGULATION MANAGEMENT (DERM). - LOCAL ORDINANCES, REGULATIONS OF THE BUILDING DEPTS. AND FIRE DEPTS. - RECOMMENDATIONS OF NFPA, IN GENERAL AND IN PARTICULAR: A. LIFE SAFETY, NFPA 101 (2009) B. HVAC, NFPA 90A, (2009) C. HVAC, NFPA 90B, (2009) D. HVAC, NFPA 96 (2008) E. HOSPITALS, NFPA 99, (2005) 2. THE CONTRACTOR IS RESPONSIBLE FOR VISITING THE SITE OF THE WORK AND BECOMING FAMILIAR WITH THE CONDITIONS OF THE WORK PRIOR TO SUBMITTING A BID. THE CONTRACTOR IS REQUIRED TO BECOME FAMILIAR WITH ALL THE CONTRACT DOCUMENTS PERTAINING TO THE PROPOSED WORK. THE SUBMISSION OF A BID SHALL BE SUFFICIENT TO ESTABLISH THAT THE CONTRACTOR HAS INVESTIGATED THE SITE OF THE WORK AND IS SATISFIED AS TO ALL REASONABLE CONDITIONS TO BE ENCOUNTERED, THE WORK TO BE PERFORMED AND THE MATERIALS TO BE PROVIDED IN THE COMPLETION OF THE PROJECT. 3. FAILURE OF BIDDERS TO MAKE REQUIRED VISITATIONS AND /OR INVESTIGATIONS TO INFORM THEMSELVES FULLY OF EXISTING CONDITIONS, AND TO INCLUDE IN THEIR PROPOSALS A SUM SUFFICIENT TO COVER ALL POSSIBLE FIELD CONDITIONS, WILL NOT IN ANY WAY ENTITLE THEM TO ANY EXTRA CHARGES OVER AND ABOVE THEIR ORIGINAL PROPOSALS. 4. ALL WORK SHALL BE COORDINATED WITH ALL OTHER TRADES AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION OF EQUIPMENT. ANY DISCRIPANCIES BETWEEN THE WORK DEPICTED ON THESE DOCUMENTS AND THE ACTUAL CONDITIONS ENCOUNTERED SHALL BE BROUGHT PROMPTLY TO THE ENGINEER FOR REVIEW AND CLARIFICATION. 5. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT PROPERTY IN AREAS WHERE WORK IS BEING CONDUCTED. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGES CAUSED TO BUILDING COMPONENTS DUE TO NEW WORK OPERATIONS. PATCH AND REPAIR EXISTING SURFACES DAMAGED AS REQUIRED TO MATCH ADJACENT SURFACES. 6. CONTRACTOR SHALL PROVIDE DURING CONSTRUCTION ALL SAFETY MEASURES AND FEATURES AS REQUIRED BY THE APPLICABLE CODES, RULES AND REGULATIONS HAVING JURISDICTION OVER THE PROJECT. 7. ALL WORK SHALL BE COORDINATED WITH ALL OTHER TRADES AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION OF EQUIPMENT. ANY DISCREPANCIES BETWEEN THE WORK DEPICTED ON THESE DOCUMENTS AND THE ACTUAL CONDITIONS ENCOUNTERED SHALL BE BROUGHT PROMPTLY TO THE ENGINEER FOR REVIEW AND CLARIFICATION. 8. THE WORK THAT IS TO BE DONE UNDER THIS CONTRACT INCLUDES THE FURNISHING OF ALL LABOR, MATERIALS AND EQUIPMENT, PERMITS, FEES, INSPECTIONS, TESTS, INSURANCE, ETC., REQUIRED FOR THE COMPLETION OF THE HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS SHOWN ON DRAWINGS. 9. THE DRAWINGS ARE GENERALLY DIAGRAMMATIC. THEY DO NOT SHOW EVERY BEND, OFF -SET, ELBOW OR OTHER FITTINGS WHICH MAY BE REQUIRED FOR THE INSTALLATION IN THE SPACE ALLOCATED. 10. DRAWINGS ARE NOT TO BE SCALED. UNLESS SPECIFIC DIMENSIONS ARE SHOWN, THE STRUCTURAL DRAWINGS AND SITE CONDITIONS SHALL GOVERN EXACT LOCATION OF MECHANICAL EQUIPMENT TO BE INSTALLED. 11. IT IS THE INTENT OF THE PLANS AND GENERAL NOTES TO PROVIDE A COMPLETE AND OPERATING INSTALLATION INCLUDING ALL NECESSARY ITEMS REQUIRED, EVEN THOUGH ITEMS ARE NOT INDICATED ON THE DRAWINGS OR IN THE NOTES. ALL WORK CONSIDERED NECESSARY FOR THE COMPLETION OF THE WORK IN PROPER MANNER NOT SHOWN ON THE PLANS OR NOTES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IN WRITING PRIOR TO BIDS OTHERWISE WORK SHALL NOT BE ADDITIONALLY CHARGED AFTER BID IS AWARDED. 12. SUBMIT SHOP DRAWINGS OF ALL MATERIALS, DUCTWORK, DUCT LAYOUT AND EQUIPMENT FOR REVIEW BY ENGINEER PRIOR TO FABRICATION AND /OR INSTALLATION. 13. ALL DUCT SIZES SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS. 14. THE CONTRACTOR SHALL TEST ALL EQUIPMENT, MAKE PRELIMINARY ADJUSTMENTS AND CALIBRATE ALL CONTROLS PRIOR TO REQUESTING TEST AND BALANCE SERVICES. 15. NO PORTION OF THE NEW DUCTWORK OR ITS SUPPORTS SHALL MAKE CONTACT WITH PARTITIONS, CEILING, LIGHTS, ETC. 16. CONTRACTOR SHALL WARRANT ALL WORK TO BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR AFTER ACCEPTANCE OF THE INSTALLATION. 17. PROVIDE OWNER WITH (3) HARD BOUND SETS OF SYSTEM OPERATING INSTRUCTIONS FOR ALL EQUIPMENT INCLUDING CONTROLS. 18. ALL MATERIALS SHALL BE NEW. ANY DAMAGED EQUIPMENT SHALL BE REPLACED OR RESTORED TO ORIGINAL CONDITION. 19. PROVIDE CEILING /WALL ACCESS PANELS WHERE INDICATED IN THE DRAWINGS AND WHERE REQUIRED TO ACCESS HVAC EQUIPMENT. PANELS SHALL BE RECESSED TYPE, FIRE RATED IF IN FIRE RATED WALLS OR CEILINGS. LOCATION OF PANELS SHALL BE COORDINATED WITH ALL THE OTHER TRADES. 20. CONTRACTOR SHALL OBTAIN THE SERVICES OF AN INDEPENDENT, CERTIFIED TEST AND BALANCE COMPANY TO BALANCE THE AIR AND WATER SYSTEMS ASSOCIATED WITH THE NEW AND EXISTING MECHANICAL EQUIPMENT AS SHOWN TO THE QUANTITIES AND CAPACITIES INDICATED ON THE PLANS. CONTRACTOR SHALL SUBMIT (3) COPIES OF REPORT TO ENGINEER UPON COMPLETION FOR REVIEW. 21. DURING CONSTRUCTION, ALL SUPPLY DUCTWORK OPENINGS SHALL BE FITTED WITH BLANKET TYPE, DISPOSABLE 1" THICK SYNTHETIC MEDIA IN ORDER TO PREVENT CONSTRUCTION DEBRIS FROM ENTERING AND ACCUMULATING INSIDE THE DUCT SURFACES. 22. UPON COMPLETION, CONTRACTOR SHALL CLEAN ALL DUST AND DEBRIS IN AREAS WHERE WORK WAS CONDUCTED. 23. ALL WORK SHALL CONFORM WITH THE 2010 EDITION, FLORIDA BUILDING CODE AND ALL APPLICABLE CODES AND REGULATIONS. 24. DUCTWORK LEAKAGE TESTS: A) ALL DUCTWORK SHALL BE LEAKAGE TESTED IN STRICT CONFORMANCE WITH THE PROCEDURES DESCRIBED IN THE LATEST EDITION OF SMACNA'S "HVAC AIR DUCT LEAKAGE TEST MANUAL ". TEST SHALL BE CONDUCTED AT A STATIC PRESSURE EQUAL TO THE STATIC PRESSURE CLASSIFICATION OF MEDIUM PRESSURE DUCTWORK AND /OR LOW PRESSURE CONSTRUCTION. FOR INSTANCE, IF MEDIUM PRESSURE DUCTWORK IS CONSTRUCTED TO A 3" STATIC PRESSURE CLASSIFICATION, THE LEAKAGE TEST SHALL BE CONDUCTED AT 3" WG STATIC PRESSURE TEST. RECOMMENDATIONS IN THE MANUAL AS TO WHAT DUCTS MAY OR MAY NOT BE TESTED ARE IRRELEVANT; LEAKAGE TESTING MUST BE PERFORMED. B) SMACNA "HVAC AIR DUCT LEAKAGE TEST MANUAL" SHALL BE USED AS A MANUAL OF GOOD PRACTICES FOR ALL PRESSURE TESTS. C) THE CONTRACTOR SHALL USE NO SMACNA PUBLICATION, AS A REFERENCE IN AN ATTEMPT TO INVALIDATE OR NOT TO PERFORM ANY AND ALL DUCTWORK PRESSURE TESTING REQUIRED UNDER THIS CONTRACT. 25. AIR COOLED CHILLER CH -1 SHALL BE PROTECTED WITH AN IMPACT SCREENING THAT MEETS THE REQUIREMENTS OF FLORIDA BUILDING CODE 2010, BUILDING, CHAPTER 419.4.2.6. SEE ARCHITECTURAL DRAWINGS FOR CHILLER IMPACT SCREEN SPECIFICATION AND LOCATION. HVAC SYSTEM ABBREVIATIONS A AMPERES AC AIR CONDENSING UNIT (DX TYPE) AD ACCESS DOOR AFC AIR FAN CURTAIN AFF ABOVE FINISHED FLOOR AFMD AIR FLOWING MEASURING DEVICE AHU AIR HANDLING UNIT APD AIR PRESSURE DIFFERENTIAL ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATING AND AIR CONDITIONING ENGINEERS BD BACKDRAFT DAMPER BHP BRAKE HORSEPOWER BTU BRITISH THERMAL UNIT BTUH BRITISH THERMAL UNITS PER HOUR BOP BOTTOM OF PIPE BOD BOTTOM OF DUCT CF CUBIC FOOT CFM CUBIC FEET PER MINUTE CHW CHILLED WATER CO CLEAN OUT CU CONDENSING UNIT CV CONSTANT VOLUME CW CONDENSER WATER DA DRY AIR DB DRY BULB (TEMPERATURE) DB DECIBEL (UNIT OF LOGARITHMIC SOUND POWER OR SOUND PRESSURE RATIO) DDC DIRECT DIGITAL CONTROL DG DOOR GRILLE DP DIFFERENTIAL PRESSURE DT DIFFERENTIAL TEMPERATURE DX DIRECT EXPANSION (COIL) EA EACH E/A EXHAUST AIR EAT ENTERING AIR TEMPERATURE EDH ELECTRIC DUCT HEATER EEF EMERGENCY EXHAUST FAN (E.H.P.A.) EF EXHAUST FAN EG EXHAUST GRILLE EMCS ENERGY MANAGEMENT & CONTROL SYSTEM ESP EXTERNAL STATIC PRESSURE EWT ENTERING WATER TEMPERATURE F &BPD FACE & BY -PASS DAMPER FBC FLORIDA BUILDING CODE - BUILDING FBC -M FLORIDA BUILDING CODE - MECHANICAL F FIRE DAMPER FEEC FLORIDA ENERGY EFFICIENCY CODE FLA FULL LOAD AMPS FPF FINS PER FOOT (IN THE COIL) FPI FINS PER INCH (IN THE COIL) FPM FEET PER MINUTE FPS FEET PER SECOND GPM GALLONS PER MINUTE H HUMIDISTAT HP HORSEPOWER HVAC HEATING VENTILATION AND AIR CONDITIONING IAQ INDOOR AIR QUALITY ID INSIDE DIAMETER KW KILOWATT = 1000 WATTS LAT LEAVING AIR TEMPERATURE LAT LATENT (HEAT LOAD) LB POUND (UNIT OF MASS) LWT LEAVING WATER TEMPERATURE MAT MIXED AIR TEMPERATURE MAX MAXIMUM M MOTORIZED MBH THOUSANDS OF BTUS PER HOUR MUA MAKE UP AIR NC NOISE CRITERIA O/A OUTDOOR AIR OAD OUTDOOR AIR DAMPER OAF OUTSIDE AIR FAN OAI OUTDOOR AIR INTAKE OAL OUTDOOR AIR LOUVER OAR OUTDOOR AIR RELIEF PCF POUNDS PER CUBIC FOOT PD PRESSURE DIFFERENTIAL PSI POUNDS PER SQUARE INCH R/A RETURN AIR RE RELIEF EXHAUST CAP REF RELIEF EXHAUST FAN RG RETURN GRILLE RH RELATIVE HUMIDITY ( %) RPM REVOLUTIONS PER MINUTE RV RELIEF VENT S SMOKE DAMPER S/A SUPPLY AIR SAT SUPPLY AIR TEMPERATURE SAT SATURATION, SATURATED SCBA SELF CONTAINED BREATHING APPARATUS SCT SATURATION CONDENSING TEMPERATURE SD SMOKE DETECTOR SEN SENSIBLE (HEAT LOAD) SF SUPPLY FAN SH SENSIBLE HEAT SHG SENSIBLE HEAT GAIN SHR SENSIBLE HEAT RATIO SMACNASHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION SST SATURATION SUCTION TEMPERATURE SZ SINGLE ZONE (TYPE OF AHU) T THERMOSTAT TD TRANSFER DUCT TG TRANSFER GRILLE TR TRANSFER REGISTER TSP TOTAL STATIC PRESSURE TU TERMINAL UNIT UC DOOR UNDERCUT (IN HVAC DRAWINGS) V VOLTS VAV VARIABLE AIR VOLUME (TYPE OF HVAC EQUIPMENT) VD VOLUME DAMPER VFD VARIABLE FREQUENCY DRIVE W WATT (UNIT OF POWER) WB WET BULB (TEMPERATURE) WPD WATER PRESSURE DIFFERENTIAL EQUIPMENT PECIFICATIONS: SUPPLY, RETURITRANSFER, EXHAUST AND OUTSIDE AIR DUCTWORK: SHALL BE GALVANIZED SHEET STEEL, DESIGNED, CONSTRUCTED jD INSTALLED PER 2" STATIC PRESSURE CLASSIFICATION OF THE SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS- MEL AND FLEXIBLE" MANUAL, LATEST EDITION. INSULATE THE FLOWING DUCT SYSTEMS: INDOOR CONCEALED SUPPLY, RETURN AND OUTSIDE AIR DUCTWORK, INDOOR EXPOSED SUPPI RETURN AND OUTSIDE DUCTWORK. FLEXIBLE CONNITORS: SHALL BE STANDARD METAL -EDGED CONNECTOR BY VENTFABRICS OR EQUAL. FACTORY FABRICATED WITH A STRIP 01ONCOMBUSTIBLE FABRIC 3 -1/2" INCHES WIDE ATTACHED TO TWO STRIPS OF 2 -3/4 INCH WIDE, .028- INCH - THICK, GALVANIZED SHT STEEL. F C 1 STANDARD 181, INSULATED ROUND DUCT BY THERMAFLEX, TCO, GREENGUARD ENVIRONMENTAJR APPROVED EQUA R -6 MINIMUM. FACTORY FABRICATED WITH AN OUTER JACKET C - C HICK CONTINUOUS POLYETHYLENE FILM INNER LINER. STEEL WIRE HELIX REINFORCEMENT ENCAPSULATEDROUND INNER LINER. GLASS- REINFORCED SILVER MYLAR OUTER JACKET WITH A CONTINUOUS HANGING TAB. FLEXIBLE DUCT IALL MEET THE REQUIREMENTS OF FLORIDA BUILDING CODE 2010 CHAPTER 419.3.6.4. RECTANGULAR i,NUAL VOLUME DAMPERS: SHALL BE RUSKIN MODEL MD35 OR EQUAL. MULTIPLE OPPOSED BLADE OR SINGLE BLADE, FURNISFD COMPLETE WITH FACTORY FABRICATED LOCKING HAND QUADRANT. PROVIDE WITH 2" STAND -OFF WHEN INSTALLED ON E-ERNALLY INSULATED DUCT. DUCT SUPPORTSHALL BE GALVANIZED SHEET STEEL STRAP. WIDTH, GAGE AND SUPPORT INTERVALS PER SMACNA'S "HVAC DUCT CONSTRUCTIONTANDARDS- -METAL AND FLEXIBLE" MANUAL, LATEST EDITION. SUPPLY CEILINOIFFUSERS, RETURN, EXHAUST GRILLE /REGISTER: AS SCHEDULED. GENERAL DEM -ITION NOTES: 1. THE CON -ACTOR IS RESPONSIBLE FOR VISITING THE SITE OF THE /ORK AND BECOMING FAMILIAR WITH THE CONDITIOI OF THE WORK PRIOR TO SUBMITTING A BID. THE CONACTOR IS REQUIRED TO BECOME FAMILIAR WITH ALL THE :ONTRACT DOCUMENTS PERTAINING TO THE PROPOSEIWORK. THE SUBMISSION OF A BID SHALL BE SUFFICIEN TO ESTABLISH THAT THE CONTRACTOR HAS INVESTIGRD THE SITE OF THE WORK AND IS SATISFIED AS TO ALL RSONABLE CONDITIONS TO BE ENCOUNTERED, THE WORTO BE PERFORMED AND THE MATERIALS TO BE PROVIDED THE COMPLETION OF THE PROJECT. 2. FAILURE -- BIDDERS TO MAKE REQUIRED VISITATIONS AND /OR IFESTIGATIONS TO INFORM THEMSELVES FULLY OF EXISIG CONDITIONS, AND TO INCLUDE IN THEIR PROPOSAi A SUM SUFFICIENT TO COVER ALL POSSIBLE FIELD COIITIONS, WILL NOT IN ANY WAY ENTITLE THEM TO ANY EXTI CHARGES OVER AND ABOVE THEIR ORIGINAL PROPOSA. 3. CONTRAOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTIT PROPERTY IN AREAS WHERE WORK IS BEING CONDUC-D. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE,9-,AUSED TO BUILDING COMPONENTS DUE TO DEMOLITIJ OPERATIONS. PATCH AND REPAIR EXISTING SURFACEDAMAGED AS REQUIRED TO MATCH ADJACENT SURFACE 4. REMOVE, ,-UT, ALTER, REPLACE, PATCH AND REPAIR EXISTINGVORK AS NECESSARY TO INSTALL NEW WORK, EXCEPT i OTHERWISE SHOWN OR SPECIFIED. DO NOT CUT ALTI OR REMOVE ANY STRUCTURAL WORK AND DO NOT DISRB ANY DUCTS, PLUMBING, ELECTRICAL WORK, WALLS, 11LING, PARTITIONS OR FLOORS. MECHANICAL AND ELRRICAL WORK DISTURBED OR REMOVED AS A RESULT; PERFORMING REQUIRED NEW WORK SHALL BE REFINISH AND LEFT IN AS GOOD CONDITION AS EXISTED BEFORE OMMENCING WORK. EXISTING WORK TO BE ALTEREEOR EXTENDED AND THAT IS FOUND TO BE DEFECT: IN ANY WAY, SHALL BE REPORTED TO THE ARCHITE' BEFORE IT IS DISTURBED. MATERIALS AND WORKM)SHIP USED IN RESTORING WORK, SHALL CONFOR IN TYPE AND QUALITY TO THAT OF ORIGINAL EXISTINCONSTRUCTION, EXCEPT AS OTHERWISE SHOWN OR SPECIED. 5. ALL SEACE LINES SUCH AS WIRES, CABLES, CONDUITS, DUCTS, PES AND THEIR HANGERS OR SUPPORTS, WHICH ARE TOE ABANDONED BUT ARE NOT REQUIRED TO BE ENTIREL REMOVED SHALL BE SEALED, CAPPED OR PLUGGE IN CEILINGS, WITHIN FURRED SPACES, IN UNFINIS:D AREAS, OR WITHIN WALL OR PARTITIONS SO THAT TlY ARE COMPLETELY BEHIND PLASTERED AREAS, OR OTI-R FINISHED SURFACES. ABANDONED LINES MUST BE CARD AT BOTH ENDS, SO THAT NO DEAD ENDS ARE LEFT. 6. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR ALL EXISTING CONSTRUCTION, INCLUDING EXISTING TO REMAIN AND TO BE REMOVED. ITEMS AND DEBRIS TO BE REMOVED WILL BE PROPERLY DISPOSED OF BY THE CONTRACTOR, WITHIN HIS CONTRACT, AT NO COST TO THE OWNER. 7. CONTRACTOR SHALL PROVIDE DURING DEMOLITION OPERATIONS ALL SAFETY MEASURES AND FEATURES AS REQUIRED BY THE APPLICABLE CODES, RULES AND REGULATIONS HAVING JURISDICTION OVER THE PROJECT. 8. THE DEMOLITION DRAWINGS ARE ONLY TO ASSIST IN SHOWING THE SCOPE OF DEMOLITION WORK AND ARE NOT INTENDED TO INDICATE ALL DEMOLITION. CONTRACTOR SHALL REMOVE ALL EXISTING ITEMS AS REQUIRED TO PROPERLY COMPLETE ALL THE WORK INDICATED IN THE CONTRACT DOCUMENTS. 9. ANY UTILITY LINES TO REMAIN AND THAT ARE BROKEN OR DAMAGED DURING DEMOLITION OPERATIONS SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL CHARGE TO THE CONTRACT PRICE. 10. HOLES AND OPENINGS ON THE BUILDING CEILING SLAB AND WALLS THAT REMAIN AFTER THE DEMOLITION SHALL BE PATCHED TO MATCH THE EXISTING CEILING SLAB AND WALL CONSTRUCTION. 11. ALL WORK SHALL BE COORDINATED WITH ALL OTHER TRADES AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION OF EQUIPMENT. ANY DISCREPANCIES BETWEEN THE WORK DEPICTED ON THESE DOCUMENTS AND THE ACTUAL CONDITIONS ENCOUNTERED SHALL BE BROUGHT PROMPTLY TO THE ENGINEER FOR REVIEW AND CLARIFICATION. 12. DUST CONTAINMENT: CONTRACTOR SHALL PROVIDE VISQUEEN BARRIERS AROUND CORRIDOR AREAS WHERE DEMOLITION WORK IS BEING PERFORMED. BARRIERS SHOULD HAVE NO HOLES OR GAPS BETWEEN THEM. THERE SHALL ALSO BE NO GAPS BETWEEN THE CEILING AND THE BARRIER, AND BETWEEN THE FLOOR AND THE BARRIER. ALL EDGES OF BARRIERS SHALL BE COMPLETELY SEALED OFF. CONTRACTOR SHALL ALSO HAVE STICKY FLOOR MATS IN PLACE AROUND THE WORK AREAS. 13. AREA OF CONSTRUCTION SHALL BE MAINTAINED UNDER NEGATIVE PRESSURE IN RELATION TO SURROUNDING AREAS. THE CONSTRUCTION AREAS TO BE TESTED WEEKLY TO ASSURE A NEGATIVE PRESSURE OF 0.03 INCHES WATER GAUGE IN BEING MAINTAINED WHEN ALL DOORS AND WINDOWS ARE CLOSED. ALL AIR OUTLETS AND WALL PENETRATIONS SHALL BE BLOCKED OF TO MAINTAIN NEGATIVE PRESSURE IN THE SPACE. THE CONTRACTOR SHALL UTILIZE ALL EXISTING EXHAUST FANS TO EXHAUST THE CONSTRUCTION AREA TO MAINTAIN NEGATIVE PRESSURE. IF ADDITIONAL EXHAUST IS REQUIRED, CONTRACTOR WILL PROVIDE A TEMPORARY EXHAUST FAN. AIR DISTRIBUTION LEGEND DOUBLE WALL INSULATED DUCT NO DIRECTION OF DATE: (SEE NOTE tt3) - - - - - -- ___ AP A 1W SMOKE DAMPER(S) CADD FILE: H:INSTITUTIONAL TYPE OF DIFFUSER------- IFFUSER FIRE RATED ENCLOSURE DUCT: FIRST FIGURE IS SIDE 20 X 10 SIZE OF DIFFUSER SHOWN. SIZES ARE INSIDE X AMOUNT OF CFM SMOKE CONTROL DIMENSION. 20 X 10 O OVAL DUCT SECTION NUMBER DRAWING NUMBER 200 WHERE LOCATED ❑ AD ROUND DUCT DUCT MTD. SMOKE DETECTOR W /REMOTE E TEST LIGHT SWITCH (PROVIDE ACCESS DOOR) SD AP AD O EXISTING DUCTWORK OR ACCESS PANEL /DOOR EQUIPMENT TO REMAIN--------- -- 1 L1 L1 L FC AA^^^^AA^^ EXISTING DUCTWORK OR FLEXIBLE DUCT, FLEXIBLE EQUIPMENT TO BE REMOVED QU CONNECTION (FC) lV YV V I 11 AD ❑ DUCT RISE IN DIRECTION OF FLOW ELECT. STRIP HEATER (MUST USE ACC. DOOR) Li EDH DUCT DROP IN DIRECTION OF FLOW 0 FAN, WALL, ROOF TRANSITION RECTANGULAR TO ROUND UNDERCUT DOOR UI-� DUCT WITH CAPPED END AIR FLOW MEASURING DEVICE A.F.M.D. DUCT SECTION: SUPPLY Z ® RETURN THERMOSTAT O O ALL ELBOWS MUST BE PROVIDED WITH TUWRNING VANES WHETHER HUMIDISTAT SHOWN OR NOT ON DWGS. TYP. 45° TAP -OFF WITH POINT OF CONNECTION Z VOLUME DAMPER BETWEEN NEW AND EXISTING VD WORK CAP MOTORIZED DAMPER WITH ACCESS DOOR ❑M M DEMOLITION TO THIS POINT Lim SPLITTE12 DAMPER J A.D. ❑ COMBINATION FIRE /SMOKE DAMPER (MUST USE ACCESS FIRE DAMPER A.D. 0 DOOR) (MUST USE ACCES DOOR) F A.D. 0 SMOKE DAMPER (MUST USE ACCESS DOOR) S NOTES I. 45 ° TAP -OFFS, SPUTTERS AT EACH TAP -OFF AND TEE, AND ACCESS DOORS SHALL BE USED WHERE REQUIRED, WHETHER OR NOT INDICATED IN THE DRAWINGS. 2. IN AREAS WHERE NON- REMOVABLE CEILINGS ARE USED, PROVIDE 45° TAP -OFFS OF THE FIXED TYPE, WITH WIDTH PROPORTIONAL TO BRANCH CFM. HVAC DESIGN REQUIRES: YES NO DUCT SMOKE DETECTOR DATE: X FIRE DAMPERS) AP X SMOKE DAMPER(S) CADD FILE: H:INSTITUTIONAL X FIRE RATED ENCLOSURE X FIRE RATED ROOF /FLOOR CEILING ASSEMBLY NOTES X FIRE STOPPING X SMOKE CONTROL X GENERAL DEMOLITION NOTES: RELATIVE PRESSURE (0) = EQUAL PRESSURE ( -) = NEGATIVE PRESSURE ( +) = POSITIVE PRESSURE ALL MECHANICAL EQUIPMENT INSTALLED OUTDOORS (CHILLERS, FANS, CONDENSING UNITS, AHU'S, ETC.) EXTERIOR LOUVERS SYSTEM, DUCT SYSTEM ARE TO BE DESIGNED TO RESIST THE WIND LOAD; AND DESIGNED AND CONSTRUCTED TO MEET THE STRUCTURAL REQUIREMENTS OF THE CODE AND DEBRIS IMPACT REQUIREMENTS OF THE CODE AND DEBRIS IMPACT REQUIREMENTS AS SPECIFIED IN FLORIDA BUILDING CODE (2010 EDITION), SECTION 1626.2 THROUGH 1626.4 SEE FLORIDA BUILDING CODE. (F.B.C.,2010 EDITION) SECTION 419.4.2.5.1 AND 419.4.2.6.) L, k, ARCHITECT:- _ � M BERMELLO AJAMIL & PARTNERS, INC. Architecture Engineering Planning anterior Desigil Landscape Architecture 260,1 South -eay shore Drive 10th Floor Miami, Florida 33133 (305) 859 -2050 Fax (305) 860 -3700 kL-00-1 LOUIS J. AGUIRRE & ASSOCIATES, P.A. Consulting Engineers 9150 South Dadeland Blvd. • Suite 900 Miami • Florida 33156 • EB0000924 Telephone 305.670.0141 Facsimile 305.670.0144 www.lLgapa.com Project No.: 23075 MEC N10-4b QUARDO A:.SUAREZ,:P.E. ' ;iLl SE 64759/ b, CONSTRUCTION DOCUMENTS REVISIONS: Q 12/06/13 AHCA COMMENTS. PROJECT NAME: SMH -Tomo Equipment Replace PROJECT ADDRESS: 7400 S.W. 62nd Ave. South Miami, Florida 33143 KEY PLAN COMM. NO. 40073.000 SCALE: AS SHOWN DATE: 11-14-2013 DRAWN: AP CHECKED: AG CADD FILE: H:INSTITUTIONAL DRAWING TITLE: SYMBOL LEGEND & GENERAL NOTES HVAC SHEET NO. M0.00