Loading...
14-62-004CORRIDOR FILES FILE 2 TOMOGRAPHY NEW CEILING PLAN A1.1 SCALE: 1/4"=l'-O" f FILES FILE CORRIDOR 1 TOMOGRAPHY EQUIPMENT REPLACEMENT AREA A1.1 SCALE: 1/4 " =1' -0" CEILING PLAN LEGEND NEW 2' X 2' LAY —IN ACOUSTICAL CEILING CEILING PLAN GENERAL NOTES 1. ACOUSTICAL CEILING TILE AND GRID IN LINEAR ACCELERATOR ROOM 1231 IS TO BE TAKEN DOWN AND DISPOSED OF. NEW CEILING GRID AND ACOUSTICAL CEILING TILES ARE TO BE INSTALLED TO MATCH FORMER EXISTING ACT GRID PATTERN AND CEILING HEIGHT. CEILING EQUIPMENT IN LINEAR ACCELERATOR ROOM 1231 IS TO BE TAKEN DOWN AND STORED FOR RE— INSTALLATION. SEE MEP DRAWINGS FOR LOCATIONS OF NEW AND EXISTING CEILING EQUIPMENT IN ROOM 1231. 2. UNLESS OTHERWISE NOTED: CEILING EQUIPMENT AND ACT NEEDING TO BE REMOVED TO INSTALL NEW ABOVE CEILING MECHANICAL EQUIPMENT IS TO BE HELD AND REINSTALLED IN THE SAME PATTERN AND HEIGHT. CEILING PLAN KEYED NOTES O1 NEW ACT CEILING AND GRID THIS ROOM. SEE MEP FOR NEW EQUIPMENT LAYOUT. O2 ACT CEILING AND ANY CEILING EQUIPMENT SHOULD NOT BE DISTURBED IN THIS ROOM. OACT CEILING AND CEILING EQUIPMENT MAY BE DISTURBED IN THIS AREA. REMOVE AND REINSTALL AS REQUIRED AFTER INSTALLATION OF ANY ABOVE CEIUNG MECHANICAL EQUIPMENT. EaSTING FORTIOP S OF BUILDINGS SHALL COMPLY WITH THE PROViSiOu' OF EXISTI1NiG OCCUPAN'CIES, AS SET FORTH IN THE FLORIDA FIRE PfiLVCiyTION COU111 rM L Lj— Q MIAMI -DADS COUNTY FIRE DEPARTMENT BLDG.PER!VIT / FIREALARM 7@t11*PREi31 N W_ }ATER MAIN EXT. 0AT& E3Y: �t - FLOOR PLAN LEGEND 40073.000 NOT USED AS SHOWN - FLOOR PLAN GENERAL NOTES 11 -14 -2013 a. SEE MEP PLANS FOR LOCATION OF NEW EQUIPMENT IN LINEAR ACCELERATOR ROOM 1231 AND CONTROL ROOM 1230. BH b. THERE IS NO NEW EQUPMENT IN LINEAR ACCELERATOR ROOM 1232 — ONLY NEW FINISHES. c. SEE SHEET A7.1 FOR LIST AND LOCATION OF NEW FINISHES. FLOOR PLAN KEYED NOTES OA THIS ROOM TO RECEIVE: 1. NEW MEDICAL EQUIPMENT (SEE MEP DRAWINGS AND VENDOR INFORMATION). 2. NEW FINISHES ON FLOORS AND WALLS (SEE FINISH SHEET). 3. SOME NEW MECHANICAL EQUIPMENT ABOVE CEILING (SEE MEP DRAWINGS). 4. NEW CEILING TILES AND GRID FINISHES (SEE FINISH SHEET). OB THIS ROOM TO RECEIVE: 1. NEW MEDICAL EQUIPMENT (SEE MEP DRAWINGS AND VENDOR INFORMATION).;, 2. NEW FINISHES ON FLOORS AND WALLS (SEE FINISH SHEET). "t l'9i� C OL 3. SOME NEW MECHANICAL EQUIPMENT ABOVE CEILING (SEE MEP DRAWINGS):; rUC eJ'�";C CE OC THIS ROOM TO RECEIVE: 1. NEW FINISHES ON FLOORS AND WALLS (SEE FINISH SHEET). ' "" '`:w` oy D THIS ROOM TO RECEIVE: O S� '� • _ J 1. SOME NEW MECHANICAL EQUIPMENT ABOVE CEILING SEE MEP DRAWINGS). ■ x ARCHITECT: ;�ERMMELO AJAMIL & PARTNERS, INC. Architecture Engineering Planning In:edor Design Landscape Architecture _2601_ Soalth 8ayshore Drive 10th Floor - - -fli:&mi; Florida 33133 (305) 859 -2050 Fax (305) 860 -3700 Ll LOUIS J. AGUIRRE & ASSOCIATES. P.A. Consulting Engineers 9150 South Dadeland Blvd. • Suite 900 Miami • Florida 33156 • ED0000924 Telephone 305.670.0141 Facsimile 305.670.0144 www.ljgapa.com t4 k 6574.k CONSTRUCTION DOCUMENTS REVISIONS: PROJECT NAME: SMH -Tomo Equipment Replace PROJECT ADDRESS: 7400 S.W. 62nd Ave. South Miami, Florida 33143 KEY PLAN COMM. NO. 40073.000 SCALE: AS SHOWN - DATE: 11 -14 -2013 DRAWN: NJP CHECKED: BH CADD FILE: MINSTITUTIONAL DRAWING TITLE: SMH -TOMO EQUIPMENT REPLACEMENT SHEET NO. A1.1 N