14-523-0091. THIS DRAWING= IS ONLY TO 45515T IN SHOWING THE
SCOPE OF DEMOLITION WORK AND 15 NOT INTENDED
TO INDICATE ALL DEMOLITION. CONTRACTOR SHALL
REMOVE ALL EXISTING ITEMS AS REQUIRED TO
COMPLETE THE JOB.
2. NOT ALL ITEMS TO BE DEMOLISHED ARE SHOWN ON
THE PLAN. CONTRACTOR SHALL BE RESPONSIBLE
FOR PERFORMING A WALK -THRU OF THE PROJECT
PRIOR TO SUBMITTING A BID TO THE OWNER FOR
IDENTIFYING P055I5LE CRITICAL ITEMS, NOT OR
INCORRECTLY ADDRESSED, WHICH REQUIRE
REMOVAL/ RELOCATION.
3. PROVIDE SAFETY FEATURES DURING WORK AS
CALLED FOR IN SPECIFICATION5, APPLICABLE
CODES, RULES AND REGULATIONS HAVING
JURISDICTION OF THE PROJECT.
4. CUT, REMOVE, PATCH, ALTER AND REFINISH EXISTING
CONSTRUCTION AS REQUIRED TO LEAVE WORK
COMPLETE AND IN SATISFACTORY MANNER.
5. CONTRACTOR IS TO PROTECT ALL UNDER - GROUND
OR OTHER CONCEALED UTILITIES HE 15 TO INSPECT
CEILING AND CHASES TO ASSURE PROPER
IDENTIFICATION OF UTILITIES. MECHANICAL AND /OR
ELECTRICAL CONTRACTOR ARE TO CAP THEM 45
REQUIRED.
(o. OPENINGS LEFT THROUGH RATED AND SMOKE
PARTITIONS DUE TO REMOVAL OF DUCTWORK
CONDUIT SHALL BE CLOSED (BOTH SIDE5) AS PER
A.P.C.A, PENETRATION DETAILS.
1 REMOVE ALL EXISTING ACOUSTICAL TILE CEILINGS
AND SUSPENDED SYSTEMS IN THE RENOVATION
AREA AS REQUIRED FOR INSTALLATION OF WORK TO
BE DONE. COORDINATE REMOVAL WITH ELECTRICAL
CONTRACTOR REGARDING EXISTING LIGHTING
FIXTURES ETC. REPLACE CEILING ACCORDINGLY
AFTER COMPLETION OF WORK.
S. CONTRACTOR 15 TO WET SAW -CUT ALL OPENINGS IN
CONCRETE, BLOCK WALLS IF REQUIRED.
CONTRACTOR SHALL NOT DEMOLISH OPENINGS WITH
SLEDGE HAMMER UNTIL OUTLINES HAVE BEEN CUT.
GENERAL DEMOLITION NOTE5
S. RENOVATION WORK MAY ENTAIL INTERVENTIONS IN
AREAS OUTSIDE OF THE IMMEDIATE SCOPE OF
WORK, INCLUDING WORK ABOVE AND /OR BELOW THE
FLOOR LEVEL WITHIN THE SCOPE. IT MAY REQUIRE
WORK INVOLVING REMOTE PLUMBING,
COMMUNICATIONS). ANY WORK IN AREAS OUTSIDE OF
THE IMMEDIATE SCOPE OF WORK SHALL BE
ALL- INCLUSIVE, PROVIDING ALL STRUCTURES,
UTILITIES, FINISHES 4ND EQUIPMENT REQUIRED TO
RESTORE THE AREA TO FULLY OPERATIONAL
CONDITIONS, TO FULLY COMPLYING RATINGS
INTEGRITY, AND TO MEET OWNER'S APPROVAL ALL
WORK AS DESCRIBED IN THIS NOTE 15 TO BE PART
OF THE BASE CONTRACT PRICE, OR CONTRACT
CONTINGENCY ALLOWANCE FOR SUCH WORK_
10. CONTRACTOR IS TO COORDINATE DEMOLITION WORK
WITH ADMINISTRATION AND IS TO GIVE SUFFICIENT
ADVANCE NOTICE OF THE BEGINNING OF WORK IN
EACH EXISTING FLOOR TO (12 HOUR MINIMUM). SHUT
DOWN REQUESTS BY THE CONTRACTOR SHALL BE
PROCESSED BY SMH'S PROJECT MANAGER.
11. CONTRACTOR SHALL VERIFY EXACT LOCATION OF
EXISTING CONCRETE COLUMNS IN AREAS WHERE
WALLS ARE BEINGS REMOVI<D AND INFORM
ARCHITECT OF ANY CONFLICTS BEFORE ANY WALLS
ARE REMOVED SO THAT A/E CAN INSPECT THEM
FOR CLARIFICATION PRIOR TO PROCEEDING WITH
WORK.
12. PATCH AND REPAIR ALL EXISTING SURFACES
DAMAGED BY DEMOLITION AND /OR INSTALLATION
OF NEW ELECTRICAL CONDUITS, GA5 PIPINGS, ETC. AS
REQUIRED TO MATCH ADJACENT SURFACES AND /OR
AS REQUIRED FOR NEW SCHEDULED FINISHES.
13. DEMOLITION 15 DENOTED BY BROKEN LINES.
14. FOR REMOVAL OF FIXTURES AND EQUIPMENT, SEE
ARCHITECTURAL, PLUMBING, MECHANICAL AND
ELECTRICAL DRAWINGS.
15. PREPARE EXISTING CONCRETE SLAB AS REQUIRED
BY GRINDING, LEVELING WITH ARDEX LEVELER AS
PER MANUFACTURER'S SPECIFICATIONS. MATCH
EXISTING SLAB ELEVATION AS REQUIRED TO
RECEIVE NEW SCHEDULED FLOORING MATERIAL.
16. VERIFY WITH CIVIL, PLUMBING, MECHANICAL AND
ELECTRICAL DRAWINGS ITEMS TO BE
REMOVED /RELOCATED IN CASE OF CONFLICT.
11. DESTINATION OF ALL EXISTING EQUIPMENT,
PLUMBING FIXTURES, DOORS AND FRAMES, ETC. TO
BE REMOVED SHALL BE COORDINATED WITH THE
OWNER.
18. CONTRACTOR TO SURVEY PROJECT AREA PRIOR TO
COMMENCEMENT OF WORK. NOTE AND REPAIR ANY
DAMAGE TO AREAS WHERE WORK IS GOING TO BE
PERFORMED. NOTIFY OWNER AND ARCHITECT WITH A
LIST OF WORK PRIOR TO CONTRACT_
19. THIS SET OF DRAWINGS 15 TO BE USED AS A UNIT,
CONTRACTOR 15 RESPONSIBLE FOR ALL
DISCIPLINES AND SHOULD INCLUDE EVERYTHING
THAT IS NEEDED FOR MAKING ALL SYSTEMS WORK.
EXAMPLE: IF A SINK IS SHOWN IN THE
ARCHITECTURAL PLANS, IT IS ASSUMED THAT THE
GENERAL CONTRACTOR I5 PROVIDING EVERYTHING
NEEDED, A/E WILL PROVIDE THEM WITH THE
UNDERSTANDING THAT THERE WILL BE NO
ADDITIONAL COST TO OWNER.
20. ALL ITEMS THAT ARE SCHEDULED TO BE REMOVED
TEMPORARILY AND RE- INSTALLED SHALL BE
STORED IN A DUST -FREE, CLEAN AND SAFE
LOCATION BY THE CONTRACTOR IN COORDINATION
WITH THE OWNER, IF ITEMS ARE DAMAGED IN ANY
WAY THE AG CONTRACTOR SHALL REPLACE PL E TO
MATCH EXISTING AT NO ADDITIONAL COST TO THE
OWNER.
21. PRIOR TO THE REMOVAL OF ANY EXISTING SECURITY
DEVICE AND EXISTING WIRING, THE CONTRACTOR 15
TO COORDINATE THIS IN ADVANCE WITH THE "SOUTH
MIAMI HOSPITAL PROJECT MANAGER.
F'AFRTIAL SECOND FLOOfR
DE1"'10L ITION FLAN
SCALE- 114' = 1' -0"
NOTE: ALL AS SHOWN IS EXISTING TO REMAIN UNLESS OTHERWISE NOTED (U.O.N)
SEE M.E.P. DRAWINGS& TO CONFIRM REQUIRED SCOPE OF WORK.
FOR REQUIRED PRESSURIZATION BETWEEN CONSTRUCTION AREA AND ADJACENT AREA OUT OF SCOPE OF WORK
SEE MECHANICAL DRAWINGS.
lCfR,4 NOTES: PROVIDE 'DU,5T-I-ROOF 5ARRIER' VIZaUEEN ((o MIL. POLY) SEALED WITH DUCT TAPE
CONTINUOUSS ALL AROND AND PROVIDE PROV DEZIPPER ENTRANCE A$
A$ REQUIRED.
OPROVIDE 'DUST -PROOF BARRIER" VIZQUEEN ((o MIL. POLY) SEALED WITH DUCT TAPE
CONTINUOUS ALL AROUND.
•••r ••U r
DEMOLITION FLAN
S.W. 62ND AVENUE
`r0
ONE HOUR ME RATED
rrr rrr
WALL OR PARTITION
(SEE PARTITION TYPF�,) "` «
G�
ONE HOUR FIRE /5M01�EyRAS'I'i
i
WALL OR PARTITION; • • • • L
'
(SEE PARTITION TYPES)
TWO HOUR FIRE /SMOKE RATED
■■iiii�ii
WALL OR PARTITION
(SEE PARTTION TY�S) • o"'
s[m DuVG
KGs
EXISTING REINFORC ikC? ONC. w V
COLUMN OR CON&,ETE -WALLS • • «
FLOOR ANSI
f f
w
EXISTING WALL OR
PARTITION TO REMAIN
—
— — — —
EXISTING WALL OR
O
PARTITION TO BE REMOVED
n
PAVILION
WALL OR PARTITION WITH
— `
C
EXISTING DOOR TO BE REMOVED
DEMOLITION SYMBOL
(SEE DEMOLITION LEGEND)
PARKING
OUT OF SCOPE OF WORK
GARAGE
DEMOLITION NOTES
O
REMOVE EXISTING DOOR AND FRAME - RETURN
TO OWNER INCLUDING HARDWARE.
O
EXISTING FINISHES ON WALLS SHALL BE
REMOVED AND PREPARED TO RECEIVE NEW
AT 2M RAW'
PAINT FINISH.
O
ALL EXISTING ACCESS RAISED FLOOR METAL
FRAMING AND TILES SHALL BE REMOVED.
3A
REMOVE EX15TINGx V.C.T. FLOORING UNDER
PLAN
EXISTING RAISED ACCESS FLOOR SYSTEM.
ASBESTOS ABATEMENT WORK SHALL BE
COORDINATED WITH CONTRACTOR AND OWNER
a
ALL EXISTING SUSPENDED ACOUSTICAL CEILING
SYSTEM SHALL BE REMOVED INCLUDING
LIGHTING FIXTURES.
O
REMOVE PLYWOOD ENCLOSURES FOR EXISTING
FIRE SUPPRESSION TANK AND SUPPLY LINE.
O
FOR SCOPE OF WORK RELATING TO THE
EXISTING FIRE SUPPRESSION SYSTEM SEE M.E.P
DRAWINGS.
REMOVE ALL EXISTING FURNISHINGS (LOCKERS,
WALL CLOCK, ETC.) AND RETURN TO OWNER
(U.ON).
O
EXISTING CABINETS TO BE REMOVED AND
RETURNED TO OWNER
O
EXISTING WALL MOUNTED FIRE EXTINGUISHER.
t(d
REMOVE EXISTING WINDOW - PATCH OPENING TO
MATCH EXISTING.
11
PROVIDE NEW ROUGH OPENING FOR NEW PAIR
OF DOORS. SIZE SHALL BE: (1) 3' -0' X 1' -0' X
I A" AND (1) 2' -4' X 1' -0' X 1 J' (BOTTOM OF NEW
DOOR SHALL BE FLUSH WITH TOP OF EXISTING
RAISED FLOOR).
t2
EXISTING V 0 BLACK PIPE FOR FIRE
SUPPRESSION SYSTEM - SEE M.E.P. DRAWINGS
FOR SCOPE OF WORK,
13
REMOVE EXISTING PRE -FAB MODULAR OFFICE
FURNITURE INCLUDING LOW HEIGHT PARTITION
AND WALL MOUNTED CABINETS (BY OWNER).
t�
EXISTING AREA TO BE REMODELED FOR THE
INSTALLATION OF A NEW ACCE55 RAMP.
t5
EXISTING AREA AS SHOWN TO REMAIN U.O.N.
VERIFY W/ OWNER ITEMS TO BE REMOVED.
t6
EXISTING VCT FLOORING TO REMAIN U.ON.
17
SEE M.E.P. DRAWINGS FOR ADDITIONAL
DEMOLITION WORK.
Is
SEE SHEET A -]A FOR REQUIRED DEMOLITION
WORK ON EXISTING REFLECTED CEILINGS PLAN.
EXISTING ELECTRICAL PANEL TO BE REMOVED
- SEE ELECTRICAL DRAWINGS.
2�
REMOVE EXISTING PARTITION AS SHOWN -
CONTRACTOR TO VERIFY IF ANY SERVICE LINES
ARE INSIDE THIS CHASE. IF ANY ARE FOUND,
NOTIFY ARCHITECT AT ONCE AND PUT
DEMOLITION WORK ON HOLD.
21
SEE ELECTRICAL DRAWINGS TO VERIFY THE
REMOVAL OF DESIGNATED RACKS, SERVERS,
ETC. AND PHASING.
22
REMOVE EXISTING A/C UNITS - SEE MEP
DRAWINGS FOR DEMOLITION NOTES.
laffolD.
i
lEt�►slo>tise• •
• . I U U . w
�s •
N6 «
«
r row
r
u «.w
v 4 •
«
f
N •
AV «
gone
z
O
AC /IaAA
YI
zx
Ing W
MCI
W w
Z �
W
�x
r�AA
vl
A
w
1
r_
yy�
y
y
o .=4 r••w rA
FEN
Chi
C) Q
n
N
a
y
0
V I
rd
h
V2
16.4
a (
Z
0 C7
r.r
Z A
0 a G1
V) z <
O
[�, w
,c0z
� r
AHCA
-3 STAGE iu
12/13/13
DRAWN: RiS.
CFIF.CKED: L.E.N.
DATE; 12 -13 -13
SCALE: 6POWN
co
�3 : U
G���
Sheet No.
A -1
OF
11
jos 2mt31f?
S.W. 62ND AVENUE
`r0
G�
o�
EJ
NORTH
MAIN
s[m DuVG
KGs
.TOWER
!!
f f
w
�
a
O
n
PAVILION
NUILDING
VISITOR'S
PARKING
GARAGE
S.W. 62ND PLACE
PROJECT , AREA
AT 2M RAW'
LOCATION
PLAN
SCALE: N.T.S�
,
i
lEt�►slo>tise• •
• . I U U . w
�s •
N6 «
«
r row
r
u «.w
v 4 •
«
f
N •
AV «
gone
z
O
AC /IaAA
YI
zx
Ing W
MCI
W w
Z �
W
�x
r�AA
vl
A
w
1
r_
yy�
y
y
o .=4 r••w rA
FEN
Chi
C) Q
n
N
a
y
0
V I
rd
h
V2
16.4
a (
Z
0 C7
r.r
Z A
0 a G1
V) z <
O
[�, w
,c0z
� r
AHCA
-3 STAGE iu
12/13/13
DRAWN: RiS.
CFIF.CKED: L.E.N.
DATE; 12 -13 -13
SCALE: 6POWN
co
�3 : U
G���
Sheet No.
A -1
OF
11
jos 2mt31f?