Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
14-335-001
0 0 -�o w c 'D a� n r- N (o L0 0 N i a� U) i n w 41 c a� U a. a� ry LJU 2 Q U i Q) a CL D E Q) Cn 0 w cn L0 0 I r7 0 N J MECHANICAL SPECIFICATIONS 15001 - GENERAL. HVAC 1. GENERAL A. THE WORK UNDER CONTRACT INCLUDES ALL LABOR, MATERIALS AND APPLIANCES NECESSARY FOR THE FURNISHING, INSTALLING AND TESTING, COMPLETE AND READY FOR SAFE OPERATION OF THE SYSTEMS. WORK SHALL BE INSTALLED IN A NEAT, WORKMANLIKE MANNER. B. PERMITS: THE CONTRACTOR SHALL GIVE NECESSARY NOTICE, FILE DRAWINGS AND SPECIFICATIONS WITH THE AUTHORITY HAVING JURISDICTION (AHJ), OBTAIN PERMITS OR LICENSES NECESSARY TO CARRY OUT THIS WORK AND PAY ALL FEES THEREFOR. THE CONTRACTOR SHALL ARRANGE FOR INSPECTION AND TESTS OF ANY OR ALL PARTS OF THE WORK IF SO REQUIRED BY AUTHORITIES AND PAY ALL CHARGES FOR SAME. THE CONTRACTOR SHALL PAY ALL COSTS FOR, AND FURNISH T0- THE OWNER BEFORE FINAL BILLING, ALL CERTIFICATES NECESSARY AS EVIDENCE THAT THE WORK INSTALLED CONFORMS WITH ALL REGULATIONS WHERE THEY APPLY TO THIS WORK. C. STATE AND NATIONAL CODE REQUIREMENTS: CONFORM IN STRICT COMPLIANCE TO THE LATEST ENFORCED EDITION OF THE STATE OF FLORIDA DEPARTMENT OF PROFESSIONAL REGULATION, FLORIDA ADMINISTRATIVE CODE (F.A.C.) 1997 EDITION, AND THE EDITIONS OF THE NFPA FIRE CODES AS FOLLOWS: A GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH CARE FACILITIES. (2010)) B. FLORIDA BUILDING CODE 2010 C. FLORIDA MECHANICAL CODE 2010 D. NFPA -70, 2008 (NATIONAL ELECTRIC CODE) E. NFPA -90A STANDARD FOR AIR CONDITIONING AND VENTILATING SYSTEMS, 2009 EDITION. F. NFPA -99, 2005 (STANDARD FOR HEALTH CARE FACILITIES) G. NFPA -101 LIFE SAFETY CODE, 2009 EDITION. H. AMERICANS WITH DISABILITY ACT (ADA) I. SMACNA HVAC DUCT CONSTRUCTION STANDARDS, THIRD EDITION. 15250 - THERMAL INSULATION 1. GENERAL: A. ALL PRODUCTS INCLUDING VAPOR BARRIERS AND ADHESIVES SHALL CONFORM TO NFPA SECTION 90A. ALL PRODUCTS SHALL POSSESS A FLAME SPREAD RATING OF NOT OVER 25, AND A SMOKE DEVELOPED RATING NO HIGHER THAN 50. B. INSULATION THICKNESS SHALL BE IN ACCORDANCE WITH ASHRAE 90.1 -2001 AND THE FLORIDA ENERGY CODE, 2004 EDITION. 2. FIBERGLASS DUCT INSULATION: MANVILLE TYPE 814, MANVILLE "R" SERIES MICROLITE OR MANVILLE TYPE 817. MINIMUM 1 -LB DENSITY FIBERGLASS BLANKET, MAXIMUM 0.28 K- FACTOR AT 75 DEG F MEAN TEMPERATURE WITH FACTORY - APPLIED FOIL -SKRIM -KRAFT FACING. 2.01 MANUFACTURER A. GENERAL: REFER TO PARAGRAPH ENTITLED 'MANUFACTURERS" IN SECTION 15010. 1. TRANE. 2. CARRIER. 3. MCQUAY. 4. YORK. 2.02 STANDARD FAN COIL UNIT A. GENERAL: 1. CASING: 18 GAUGE OR HEAVIER GALVANIZED STEEL; DESIGNED FOR SERVICE ACCESS; INSULATED INTERNALLY WITH FIBERGLASS INSULATION; DISCHARGE DUCT COLLAR AND /OR RETURN AIR DUCT COLLAR WHERE INDICATED. 2. FAN ASSEMBLY: STATICALLY AND DYNAMICALLY BALANCED AT FACTORY, CENTRIFUGAL FORWARD- CURVED DOUBLE WIDTH; WHEELS AND HOUSING CORROSION RESISTANT. HIGH STATIC FAN SHALL BE PROVIDED. 3. MOTOR AND DRIVE: HIGH EFFICIENCY, PERMANENT SPLIT CAPACITOR UNLESS SPECIFICALLY NOTED OTHERWISE; INHERENT THERMAL OVERLOAD PROTECTION; SLEEVE BEARINGS WITH OILERS; DIRECT DRIVE; RESILIENT MOUNT IN SUCH A MANNER THAT EXTERNAL ISOLATION WILL NOT BE NECESSARY, DETACHABLE MOTOR CORD; 3 SPEED CONTROLLER WITH "OFF" POSITION; VOLTAGE AND PHASE AS INDICATED IN THE SCHEDULE OR AS REQUIRED BY THE CIRCUIT WIRING SHOWN ON THE ELECTRICAL DRAWINGS; MOTOR INPUT SHALL NOT EXCEED THE POWER INPUT INDICATED. 4. DRAIN PAN: INSULATED GALVANIZED STEEL; PRIMARY PAN EXTENDING UNDER FULL LENGTH AND WIDTH OF COOLING COIL; SECONDARY PAN UNDER CONTROL VALVE AND ISOLATION VALVES AND ALL UN- INSULATED PIPING CONNECTIONS. 2.03 WATER COIL A. PERFORMANCE: PROVIDE COMPLETE HEATING AND COOLING WATER COIL ASSEMBLIES OF CAPACITY AND CHARACTERISTICS INDICATED IN THE SCHEDULE ON THE DRAWINGS. ALL COILS SHALL BE ARI CERTIFIED. B. COILS SHALL BE AN INTEGRAL COMPONENT OF THE FAN COIL UNIT ASSEMBLY AND SHALL BE FACTORY INSTALLED AND COORDINATED TO FUNCTION WITH THE FAN COIL UNIT AS DESCRIBED. C. FINS: ALUMINUM FINS MECHANICALLY BONDED TO COPPER AND TESTED TO BE LEAK PROOF AT A MINIMUM PRESSURE OF 1.5 TIMES MAXIMUM OPERATING PRESSURE. D. CONNECTION: SUPPLY AND RETURN LEFT OR RIGHT HAND CONNECTIONS ON SAME SIDE OF COIL (UNLESS OTHERWISE SPECIFIED); DRAINABLE; MANUAL AIR VENT. 2.04 CONTROL A. THE CONTROL VALVE SHALL BE PART OF THE PIPING PACKAGE PROVIDED BY AND INSTALLED BY THE FACTORY. THE CONTROL PACKAGE SHALL INCLUDE ISOLATION VALVES AND FLOW MEASURING /BALANCING VALVES AS INDICATED; PROVIDE AN INTEGRAL THERMOSTAT OR A REMOTE WALL MOUNTED THERMOSTAT WHERE INDICATED. PART 3 - EXECUTION 3.02 SUPPORT 1. UNIT SHALL BE HUNG FROM THE STRUCTURE WITH TYPE EVH•3 ISOLATOR. UNIT SHALL BE SUPPORED INDEPENDENTLY OF DUCTWORK OR PIPING. 3.03 PIPING A. GENERAL: PROPERLY CONNECT ALL PIPING; ALLOW ADEQUATE SPACE FOR ALL SERVICE AND OPERATIONAL CLEARANCES NECESSARY, PROVIDE TRAP IN CONDENSATE DRAIN FROM THE PRIMARY DRAIN PAN; SLOPE CONDENSATE DRAIN DOWN TOWARD THE DISCHARGE AT LOCATION INDICATED ON THE DRAWING. PARTIAL M-1. SCALE: 1/8" = 1' -0" 15890 - DUCTWORK 1. GENERAL: A ALL EXHAUST AIR DUCTWORK SHALL BE CONSTRUCTED OF NON - CORROSIVE ALUMINUM SHEET METAL AND EXTERNALLY WRAPPED WITH 2 INCH THICK FIBERGLASS INSULATION. B. CONSTRUCTION: PROVIDE FULLY WELDED ALUMINUM DUCTWORK OR FLANGED ALUMINUM DUCTWORK WITH HIGH - TEMPERATURE GASKETING. DUCTWORK SHALL BE AIR AND WATER TIGHT. SEALANT SHALL BE APPLIED OVER ALL SEAMS. ALL FASTENERS, HANGERS AND STRAPS SHALL BE OF SAME MATERIAL OR PROVIDE GALVANIC SEPARATION TO PREVENT CORROSION. 15990 - TEST AND BALANCE 1. BALANCING SHALL BE ACCOMPLISHED BY ADJUSTMENT OF FANS AND BRANCH DAMPERS FOR MAJOR ADJUSTMENTS. ADJUSTMENT OF TERMINAL DAMPERS AND DEVICES SHALL BE FOR TRIM OR MINOR ADJUSTMENT ONLY. THIS SHALL BE DONE TO PERMIT THE LEAST NOISE GENERATION IN THE TERMINAL AREAS AND UTILIZE MINIMUM FAN ENERGY. 2. THE CONTRACTOR SHALL PROVIDE ALL LABOR, SHEAVES, AND BELTS REQUIRED TO BALANCE SYSTEMS. 3. BALANCING REPORT SHALL BE PROVIDED ON AABC -TYPE FORMS. TESTING AND BALANCING OF ALL AIR HANDLING EQUIPMENT SHALL BE PERFORMED BY AN AABC OR NEBB CERTIFIED BALANCING CONTRACTOR, AND AIR BALANCING REPORTS SHALL BE SUBMITTED TO ARCHITECT FOR REVIEW A MIN. OF 72 HOURS PRIOR TO AHCA FINAL INSPECTION. 4. FAN AND FCU UNITS SHALL BE BALANCED TO WITHIN +5q OF THEIR DESIGN CAPACITIES. ALL OTHER AIR QUANTITIES SHALL BE BALANCED TO WITHIN +10% OF THE DESIGN AIR QUANTITIES. 5. BALANCE OF EXISTING SYSTEM AFFECTED BY THIS PROJECT IS TO BE PROVIDED. HVAC GENERAL NOTES: 1. CONTRACTOR SHALL VERIFY SERVICES AND LOCATIONS PRIOR TO ANY WORK. ANY DEVIATIONS IMPACTING WORK SHOWN ON THESE DOCUMENTS SHALL BE REPORTED TO THE ENGINEER PRIOR TO BEGINNING DEMOLITION. BEGINNING OF DEMOLITION SHALL SIGNIFY CONTRACTORS ACCEPTANCE OF EXISTING CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR ALL REQUIRED DEMOLITION WHETHER SHOWN ON THE PLANS OR NOT. 2. CONTRACTOR SHALL PERFORM A PRE-BID SURVEY TO FIELD - VERIFY AND COORDINATE ALL DIMENSIONS PRIOR TO PROCUREMENT OR FABRICATION. FIELD CONDITIONS SHALL GOVERN. COORDINATE THE WORK WITH OTHER TRADES INVOLVED. COORDINATE NEW WORK WITH EXISTING ELEMENTS SUCH AS THE BUILDING STRUCTURE AND ARCHITECTURAL FEATURES, SPRINKLER PIPING, LIGHTS, PLUMBING, ELECTRICAL CONDUIT AND EQUIPMENT. COST OF REROUTING DUCTWORK OR PIPING DUE TO CONFLICTS WITH EXISTING CONDITIONS SHALL BE PAID BY CONTRACTOR. 3. ALL EQUIPMENT REMOVED UNDER THIS PROJECT SHALL TURNED OVER TO THE OWNER AT THE OWNER'S DISCRETION. PROPERLY REMOVE AND DISPOSE OF ALL EXISTING TO BE REMOVED HVAC MATERIAL CONSULT WITH OWNER AND OBTAIN OWNERS APPROVAL PRIOR TO DISPOSAL OF REMOVED MATERIAL. HVAC PLAN NOTES: O DEMO EXISTING FAN COIL. REPLACE WITH NEW FAN COIL. PROVIDE 4 SPRING VIBRATION ISOLATORS. O CONNECT NEW FAN COIL CHILLED WATER AND CONDENSATE TO EXISTING CONNECTIONS. O WIND- DRIVEN RAIN NOA LOUVER SIMILAR TO GREENHECK EHH -401. MINIMUM 0.68 SQFT FREE AREA. 18 "x18" LOUVER. 6" EXHAUST PLENUM, BOTTOM SLOPED TO DRAIN OUTSIDE. INSULATE PLENUM. SEAL PLENUM WATERTIGHT AND SEAL AROUND LOUVER AND WALL WATERTIGHT. ® INSTALL NEW EXHAUST FAN EF -1. PROVIDE FLEX CONNECTION BETWEEN DUCTWORK AND FAN. PROVIDE 4 SPRING VIBRATION ISOLATORS. O PROVIDE FULLY WELDED ALUMINUM DUCTWORK. WELDS AND SEAMS SHALL BE WATERTIGHT. INSULATE ENTIRE LENGTH OF DUCTWORK FROM TREADPLATE TO DISCHARGE. SLOPE DUCTWORK 1/4" PER FOOT BACK TO EXHAUST INLET. © PROVIDE FLANGED ALUMINUM DUCTWORK FOR BOTTOM 4' -0" SECTION TO ALLOW FOR REMOVEABLE DUCTWORK ABOVE TREADPLATE. PROVIDE HIGH TEMPERATURE GASKET BETWEEN FLANGE SECTIONS AS WELL AS AT CONNECTION POINT OF DUCTWORK TO TREADPLATE. O CUT 10x6 EXHAUST OPENING AT METAL FLOOR TREADPLATE. EXHAUST DUCTWORK TO EXTEND AND SEAL CONNECTION AIRTIGHT. HVAC SYMBOL LEGEND SYMBOL DESCRIPTION zj - REVISION REFERENCE 0 - THERMOSTAT/TEMPERATURE SENSOR �- - CONNECT TO EXISTING �- - DEMOLISH TO POINT INDICATED Q- - PRESSURE SENSOR Oj -SHEET NOTE CALLOUT - MANUAL BALANCING DAMPER 2412 -NEW DUCTWORK, FIRST DIMENSION IS SIDE SHOWN 24x12 - EXISTING DUCTWORK TO REMAIN DOW�N� UP W /IN FLOOR -DUCT ELBOW, EXHAUST �`� - TERMINAL UNIT - SQUARE THROAT ELBOW W/TURNING VANES - RADIUS ELBOW -6 -BALL VALVE -II -UNION - STRAINER -THREE-WAY CONTROL VALVE Q - THERMOMETER G - ELBOW, TURNED DOWN 0-- - ELBOW, TURNED UP HVAC DESIGN REQUIRES: YES NO DUCT SMOKE DETECTORS J/ FIRE DAMPER(S) PLAN MARK MODEL N0. SMOKE DAMPER(S) TYPE J/ FIRE RATED ENCLOSURE STATIC I PRESS. FAN RPM FIRE RATED ROOF /FLOOR CEILING ASSEMBLY VOLT/ PHASE DRIVE TYPE FIRE STOPPING ACCESSORIES RPM SMOKE CONTROL EF 1 BSQ-70 GENERAL NOTES 1. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS. TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED. 2. DIMENSIONS SHALL BE FIELD - VERIFIED AND COORDINATED PRIOR TO PROCUREMENT OR FABRICATION. COORDINATE THE WORK WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS SUCH AS OFFSETS IN PIPING OR DUCTWORK (INCLUDING DIVIDED DUCTWORK) NEEDED DUE TO OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST. FOR PROJECTS INVOLVING RENOVATION, COORDINATE NEW WORK WITH EXISTING ELEMENTS SUCH AS THE BUILDING STRUCTURE AND ARCHITECTURAL FEATURES, SPRINKLER PIPING, LIGHTS, PLUMBING, AND ELECTRICAL CONDUIT. 3. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE THIRD EDITION OF THE SMACNA HVAC DUCT CONSTRUCTION STANDARD. 4. PROVIDE AIR TURNING VANES IN ALL 90 DEGREE RECTANGULAR DUCT ELBOWS. 5. DUCT SIZES AND ALL OPENINGS THROUGH BUILDING CONSTRUCTION SHALL SUIT EQUIPMENT FURNISHED. 6. LOCATE THERMOSTATS, TEMPERATURE SENSORS, HUMIDISTATS, AND HUMIDITY SENSORS AT 48" ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE. COORDINATE LOCATIONS WITH OTHER EQUIPMENT, FURNITURE, AND DOOR SWINGS. 7. ALL EQUIPMENT, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED AND /OR SPECIFIED. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO PROVIDE A VIBRATION -FREE, RIGID INSTALLATION. 8. ALL DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS. 9. ALL DUCTWORK AND PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, TURNING VANES, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH FLOWS. ALL SPLIT DUCT FITTINGS SHALL TRANSITION TO FULL SIZE OF THE SUM OF BOTH BRANCHES, UPSTREAM OF SPLIT. 10. VERIFY FINISH WITH ARCHITECT PRIOR TO PURCHASING GRILLES, REGISTERS, DIFFUSERS, LOUVERS AND OTHER AIR DISTRIBUTION DEVICES. 11. PROVIDE FLEXIBLE DUCT CONNECTIONS ON ALL DUCTWORK CONNECTING TO EACH FAN. 12. SCHEDULE WORK TIMES WITH OWNER FOR LEAST DISRUPTION. 13. ALL EQUIPMENT, DUCTWORK, ETC., TO BE REMOVED SHALL REMAIN PROPERTY OF THE OWNER OR DISPOSED OF LEGALLY, AS DIRECTED BY OWNER. 14. MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC., AND ALL FIRE RATED AND FIRE /SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF RATED WALLS. 15. LOCATE ALL OUTSIDE AIR INTAKES A MINIMUM OF 25' -O" CLEAR FROM ALL PLUMBING VENTS AND EXHAUST AIR DISCHARGE LOCATIONS. LOWEST POINT OF EACH OUTSIDE AIR INTAKE ON ROOF SHALL BE A MINIMUM OF 36" ABOVE ROOF. 16. WATER PRESSURE DROPS THROUGH COIL CONTROL VALVES SHALL NOT EXCEED 5 PSI. 17. UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND VALVE DRAINS SHALL BE INDEPENDENTLY PIPED FULL SIZE TO THE NEAREST PLUMBING DRAIN. 18. SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH BUILDING PARTITIONS. PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS IN CHILLED WATER AND HOT WATER PIPING. 19. PIPING, DUCTWORK, LEAK PROTECTION APPARATUS, OR OTHER EQUIPMENT FOREIGN TO ELECTRICAL SWITCHBOARDS, PANELBOARDS, DISTRIBUTION BOARDS, OR MOTOR CONTROL CENTERS SHALL NOT BE INSTALLED WITHIN THE REQUIRED SPACE FOR WORKING CLEARANCES OR DEDICATED SPACES OF THE ELECTRICAL EQUIPMENT, EXTENDING IN FRONT OF AND FROM FLOOR TO STRUCTURAL CEILING WITH A WIDTH AND DEPTH OF THE ELECTRICAL EQUIPMENT IN ACCORDANCE WITH NEC - 110.26. HVAC DRAWING INDEX SHEET DESCRIPTION ISSUED M -1 LEGEND, GENERAL NOTES, INDEX, FLOOR PLAN, SCHEDULES - HVAC Yes M -2 DETAILS - HVAC Yes NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT THIS DRAWING IS BEING RELEASED FOR THE PURPOSE OF 100% CONSTRUCTION DOCUMENTS ENGINEERING FOR ARCHITECTURE 255 S. Orange Avenue Suite 1600 Orlando, Florida 32801 PH: 407.841.9050 www.tic- engineers.com EB #0000015 a Copyright 2009 TLC Engineering for Architecture, Inc. J 3 � "R (a FAN SCHEDULE .Q PLAN MARK MODEL N0. I TYPE CFM I STATIC I PRESS. FAN RPM MOTOR VOLT/ PHASE DRIVE TYPE FAN SERVICE ACCESSORIES RPM HP EF 1 BSQ-70 INLINE co Co co 1 200 1 1.5 2270 1 1725 1/2 480/3 BELT STEAM PIT PROVIDE ALL BELOW NOTES: 1. MODEL NUMBERS AND FAN SELECTION ARE BASED ON GREENHECK ACCESSORIES: 2) D SCONNE T DWWITCH 4� SPE DM CONTRO LERRTS 6) COMPANIONI FLANGES 8� BOTTOM I OR SIDE MOUNTED RMOTOROMPONENTS THIS DRAWING IS BEING RELEASED FOR THE PURPOSE OF 100% CONSTRUCTION DOCUMENTS ENGINEERING FOR ARCHITECTURE 255 S. Orange Avenue Suite 1600 Orlando, Florida 32801 PH: 407.841.9050 www.tic- engineers.com EB #0000015 a Copyright 2009 TLC Engineering for Architecture, Inc. J 3 � "R (a FAN COIL UNIT SCHEDULE .Q U) AIRFLOW a--� COOLING COIL DATA FAN do MOTOR DATA PLAN MODEL N r U co Co co CU G �. M O -C MIN.SEN. MIN.TOT. EAT WATER TEMP. 'F FLOW DRIVE VOLTS/ 4-1 0) CFM SERVICE MARK N0. cc m HP FLA RPM MBH MBH DB WB ENT. LVG. GPM TYPE PHASE FCU -1 BCH 054 1900 1 47.2 60.9 80 67 45 55 12.2 1 BELT 1 1/2 1.2 1750 460/3 1 ELEC ROOM ,, ,.. NOTES: 4. PROVIDE WIRE-MESH SCREEN ON INLET 6. PROVIDE SECONDARY DRIP PAN 1. MODEL NUMBERS AND EQUIPMENT SELECTIONS BASED ON TRANE AND DISCHARGE WITH AUTO SHUT -OFF FLOAT SWITCH. 2. MAX APD ACROSS CHW COIL SHALL BE 0.5" WG 5. PROVIDE FAN SPEED SWITCH ON UNIT AND 7. PROVIDE 30% PRE - FILTERS 3. MAX WPD ACROSS CHW COIL SHALL BE 10 FT. THERMOSTAT PER DRAWING THIS DRAWING IS BEING RELEASED FOR THE PURPOSE OF 100% CONSTRUCTION DOCUMENTS ENGINEERING FOR ARCHITECTURE 255 S. Orange Avenue Suite 1600 Orlando, Florida 32801 PH: 407.841.9050 www.tic- engineers.com EB #0000015 a Copyright 2009 TLC Engineering for Architecture, Inc. J 3 � "R (a .Q U) O a--� co N r U co Co co CU G �. M O -C r, LL ♦--+ O ° .� V 4-1 0) LL :P CL cc m Revisions: No. Date Description Seal Don Bailey, P.E. Florida LiWifai #Q,067 P.E. 35067 O ; STATE OF r .� -S ` 41/11111 0 Project No.: 113515 Issue Date: 02/21/2014 Drawn By: EMF Approved By: EMF Scale: 1/8" = 1' -0" Drawing Title: PARTIAL FIRST FLOOR PLAN - HVAC Drawing No.: MM-1