Loading...
14-236-010TYP2 EXISTING SERVICE. 30,4w VOLTA Gf� 277/480 MOUNTING: SURFACE LOCATION- ELECTRICALROOM ELECTRICAL NOTES: PANEL CRH5 BUS RATING 225A MAINS: ML)D POLES:42 FEEDER­- EXISTING NEUTRAL- EXISTING CKT� SERVES TRIP POLE WIRE CON DUIT VA CKI SERVES TRIP POLE WIRE CON DUIT VA A B C CODES. -A B C I MST. ITS. 20'1 2. - 1,700 1 IN 010 IrAyAll 2 MST. PANT- 'CRI-5 30,13 CONTRACTOR SHALL MEET All REQUIREMENTS SET FORTH BY 5,367 CONTRACTOR. 3 OUST. ITS. 20`I - 29, 1,300 3. 4 (THERMAL-MAGNETIC). TWO AND THREE POLE CIRCUIT BREA- FOR PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY KERS SHALL BE COMMON TRIP. TIE HANDLES ARE NOT PERMI- 5,367 DAMAGE FOR THE DURATION OF THE WORK. 5 MST. LTS. 20'1 THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND - ALL ELECTRICAL EQUIPMENT SHALL BE RAINTIGHT (NEMA 3R) 2,2 1 6­ WHERE EXPOSED TO THE WEATHER. ALL FLEX CONDUITS CO- LESS THAN (1) YEAR FROM DATE OF FINAL ACCEPTANCE. NNECTED TO SUCH EQUIPMENT SHALL BE LIQUIDTIGHT. 5. IT SHALL NOT BE THE INTENT OF THESE PLANS AND SPECIFI- 5367 7 EX[ST[NENV. LTS. 20/1 117 1/2 1 2,8301 CONTRACTOR SHALL FURNISH AND INSTALL ANY ADDITIONAL 11 8 1EXIST. PANEL'� 30V3 CLASSIFIED AREAS, U.O.N. 4-9ml ELECTRICAL SYSTEM AND PROVIDE ALL REQUIREMENTS FOR --iq LOAD CALCULATION CONNECTED LOAD=- 38,530 VA 25%UGHT LOAD = 2,008 VA TOTAL LOAD = 40,538 VA 49 Amps 4,800 TYPE: EXISTING BUS RA TING: 225A SERVICE: 30,4w MAINS: MLO VOLTA CM 277/480 PANEL NH5 POLES: 42 MOUNTING: SURFACE FEEDER: EXISTING LOCATION: IIECIRICALROOM NEUTRAL- EXISTING ELECTRICAL NOTES: 1. �� 27. ® THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE(NEC), TED OR REQUIRED, WITH OVERLOAD RELAYS OR FUSES-IN EACH ® AND THE LATEST EDITION OF THE FLORIDA BUILDING CODE 0-- Em ® ® ®� CODES. 28. FURNISH AND INSTALL DISCONNECT SWITCHES AND WIRING FOR 2. ALL WORK SHALL BE PERFORMED BY A LICENSED ELECTRICAL 1 IN 010 IrAyAll CONTRACTOR IN A FIRST CLASS WORKMANLIKE MANNER . SAID THE HVAC CONTRACTOR AND INSTALLED BY THE ELECTRICAL CONTRACTOR SHALL MEET All REQUIREMENTS SET FORTH BY CONTRACTOR. ANY LOCAL ORDINANCE AND GOVERNING AUTHORITIES. 29, I.T. ROOM REC. 3. THE CONTRACTOR SHALL PROVIDE ALL REQUIRED INSURANCE (THERMAL-MAGNETIC). TWO AND THREE POLE CIRCUIT BREA- FOR PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY KERS SHALL BE COMMON TRIP. TIE HANDLES ARE NOT PERMI- DAMAGE FOR THE DURATION OF THE WORK. TTED. 4. THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND 30. ALL ELECTRICAL EQUIPMENT SHALL BE RAINTIGHT (NEMA 3R) WORKMANSHIP FREE FROM DEFECTS FOR A PERIOD OF NOT WHERE EXPOSED TO THE WEATHER. ALL FLEX CONDUITS CO- LESS THAN (1) YEAR FROM DATE OF FINAL ACCEPTANCE. NNECTED TO SUCH EQUIPMENT SHALL BE LIQUIDTIGHT. 5. IT SHALL NOT BE THE INTENT OF THESE PLANS AND SPECIFI- 31. OUTLET BOXES SHALL BE PRESSED STEEL IN DRY LOCATIONS, CATIONS TO SHOW EVERY MINOR DETAIL OF CONSTRUCTION. CAST ALLOY WITH THREADED HUBS IN WET OR DAMP LOCA-- CONTRACTOR SHALL FURNISH AND INSTALL ANY ADDITIONAL TIONS, AND SPECIAL ENCLOSURES".AS: REQUIRED FOR OTHER CONDUIT, BOXES AND WIRING NECESSARY FOR A COMPLETE CLASSIFIED AREAS, U.O.N. ELECTRICAL SYSTEM AND PROVIDE ALL REQUIREMENTS FOR A EQUIPMENT TO BE PLACED IN PROPER WORKING ORDER. 32. PROVIDE ALL FIXTURES WITH LAMPS, VERIFY TYPE WITH MANU- FACTURER. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING TO ORIGINAL CONDITIONS ANY AND ALL DAMAGES TO BUILDING 33. ALL OPENINGS FOR LIGHT FIXTURES IN CEILINGS SHALL BE SURFACES, EQUIPMENT, ETC. CAUSED DURING THE PERFOR- PROTECTED IN A MANNER (PER ALL GOVERNING CODES) THAT MANCE OF WORK. WILL PROVIDE THE SAME RATING AS THE COILING. THIS APPLIES TO ALL FIRE RATED CEILINGS. 7. CORRECTION OF ANY DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL CHARGE OR DELAYS AND SHALL INCLUDE REPLACE- 34. ELECTRICAL CONTRACTOR SHALL VERIFY THE CEILING FINISHES MENT OR REPAIR OF ANY OTHER PHASE OF THE INSTALLATION AND SUSPENSION SYSTEMS FOR SELECTION OF PROPER TRIMS WHICH MAY HAVE BEEN DAMAGED THEREBY. MORMONISM AND SUPPORT ARRANGEMENTS FOR LIGHTING FIXTURES. 8. THE CONTRACTOR SHALL VISIT THE JOB SITE AND VERIFY ALL 35. ALL LIGHTING SWITCHES AND/OR DIMMERS SHALL BE GANGED EXISTING CONDITIONS, AND SHALL THOROUGHLY REVIEW ALL TOGETHER WHERE SHOWN TOGETHER. DRAWINGS, SPECIFICATIONS AND POSSIBLE ADDENDA PRIOR TO 36. ALL CONNECTIONS TO GROUND RODS SHALL BE MADE WITH UL BIDDING ON HIS WORK. NO EXTRAS TO HIS CONTRACT WILL BE APPROVED WELDED CONNECTIONS, UNLESS NOTED OTHERWISE. EU®a��00 ALLOWED FOR FAILURE TO COMPLY WITH THIS REQUIREMENT. THE CONTRACTOR SHALL FORM A GROUNDING ELECTRODE SYS- 9. THE CONTRACTOR SHALL NOT SCALE THE ELECTRICAL DWGS. m 1 *401101111M, 171M REFER TO ARCHITECTURAL PLANS AND ELEVATIONS FOR EXACT 37. ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED IN ACCESIBLE 19 1 N VA, 1 111 a 0.402 1 [G LOAD CALCULATION CONNECTED LOAD- 9,550 VA 25% LIGHT LOAD = 2,388 VA TOTAL LOAD = 11,938 VA 14 Amps 11 MSTING BUS RATING: 225A VICE: 30,4u, MAINS: MLO .TAGS: 120/208 PANEL CRL5B MOUNTING: FLUSH FEEDER. FXISTING LCCAT1ON: SHOWNONPLANS NEUTRAL EXISTING ELECTRICAL NOTES: 1. THE ENTIRE INSTALLATION SHALL BE IN ACCORDANCE WITH 27. RH a, THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE(NEC), TED OR REQUIRED, WITH OVERLOAD RELAYS OR FUSES-IN EACH AND THE LATEST EDITION OF THE FLORIDA BUILDING CODE HOT LEG. AND ANY OTHER APPLICABLE FEDERAL, STATE AND LOCAL CODES. 28. FURNISH AND INSTALL DISCONNECT SWITCHES AND WIRING FOR 2. ALL WORK SHALL BE PERFORMED BY A LICENSED ELECTRICAL 1 IN 010 IrAyAll CONTRACTOR IN A FIRST CLASS WORKMANLIKE MANNER . SAID THE HVAC CONTRACTOR AND INSTALLED BY THE ELECTRICAL CONTRACTOR SHALL MEET All REQUIREMENTS SET FORTH BY CONTRACTOR. ANY LOCAL ORDINANCE AND GOVERNING AUTHORITIES. 29, I.T. ROOM REC. 3. THE CONTRACTOR SHALL PROVIDE ALL REQUIRED INSURANCE (THERMAL-MAGNETIC). TWO AND THREE POLE CIRCUIT BREA- FOR PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY KERS SHALL BE COMMON TRIP. TIE HANDLES ARE NOT PERMI- DAMAGE FOR THE DURATION OF THE WORK. TTED. 4. THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND 30. ALL ELECTRICAL EQUIPMENT SHALL BE RAINTIGHT (NEMA 3R) WORKMANSHIP FREE FROM DEFECTS FOR A PERIOD OF NOT WHERE EXPOSED TO THE WEATHER. ALL FLEX CONDUITS CO- LESS THAN (1) YEAR FROM DATE OF FINAL ACCEPTANCE. NNECTED TO SUCH EQUIPMENT SHALL BE LIQUIDTIGHT. 5. IT SHALL NOT BE THE INTENT OF THESE PLANS AND SPECIFI- 31. OUTLET BOXES SHALL BE PRESSED STEEL IN DRY LOCATIONS, CATIONS TO SHOW EVERY MINOR DETAIL OF CONSTRUCTION. CAST ALLOY WITH THREADED HUBS IN WET OR DAMP LOCA-- CONTRACTOR SHALL FURNISH AND INSTALL ANY ADDITIONAL TIONS, AND SPECIAL ENCLOSURES".AS: REQUIRED FOR OTHER CONDUIT, BOXES AND WIRING NECESSARY FOR A COMPLETE CLASSIFIED AREAS, U.O.N. ELECTRICAL SYSTEM AND PROVIDE ALL REQUIREMENTS FOR A EQUIPMENT TO BE PLACED IN PROPER WORKING ORDER. 32. PROVIDE ALL FIXTURES WITH LAMPS, VERIFY TYPE WITH MANU- FACTURER. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING TO ORIGINAL CONDITIONS ANY AND ALL DAMAGES TO BUILDING 33. ALL OPENINGS FOR LIGHT FIXTURES IN CEILINGS SHALL BE SURFACES, EQUIPMENT, ETC. CAUSED DURING THE PERFOR- PROTECTED IN A MANNER (PER ALL GOVERNING CODES) THAT MANCE OF WORK. WILL PROVIDE THE SAME RATING AS THE COILING. THIS APPLIES TO ALL FIRE RATED CEILINGS. 7. CORRECTION OF ANY DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL CHARGE OR DELAYS AND SHALL INCLUDE REPLACE- 34. ELECTRICAL CONTRACTOR SHALL VERIFY THE CEILING FINISHES MENT OR REPAIR OF ANY OTHER PHASE OF THE INSTALLATION AND SUSPENSION SYSTEMS FOR SELECTION OF PROPER TRIMS WHICH MAY HAVE BEEN DAMAGED THEREBY. MORMONISM AND SUPPORT ARRANGEMENTS FOR LIGHTING FIXTURES. 8. THE CONTRACTOR SHALL VISIT THE JOB SITE AND VERIFY ALL 35. ALL LIGHTING SWITCHES AND/OR DIMMERS SHALL BE GANGED EXISTING CONDITIONS, AND SHALL THOROUGHLY REVIEW ALL TOGETHER WHERE SHOWN TOGETHER. DRAWINGS, SPECIFICATIONS AND POSSIBLE ADDENDA PRIOR TO 36. ALL CONNECTIONS TO GROUND RODS SHALL BE MADE WITH UL BIDDING ON HIS WORK. NO EXTRAS TO HIS CONTRACT WILL BE APPROVED WELDED CONNECTIONS, UNLESS NOTED OTHERWISE. EU®a��00 ALLOWED FOR FAILURE TO COMPLY WITH THIS REQUIREMENT. THE CONTRACTOR SHALL FORM A GROUNDING ELECTRODE SYS- 9. THE CONTRACTOR SHALL NOT SCALE THE ELECTRICAL DWGS. m 1 *401101111M, 171M REFER TO ARCHITECTURAL PLANS AND ELEVATIONS FOR EXACT 37. ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED IN ACCESIBLE LOCATIONS OF ALL EQUIPMENT UNLESS NOTED OTHERWISE. rox M r.. �- 10. CONTRACTOR SHALL COORDINATE HIS WORK WITH THE GENERAL 38. THE ELECTRICAL INSTALLATION SHALL MEET ALL STANDARD RE- CONTRACTOR SO THAT INTERFERENCE WITH OTHER TRADES BE �M AVOIDED. 39. LIGHTING FIXTURES DESCRIBED HEREIN ARE INTENDED TO INDI- 11. IT SHALL BE THE RESPONSIBILITY OF THE ELECTRICAL CON- CATE THE GENERAL FIXTURE TYPE, WHICH SHALL BE SUBSTAN- TRACTOR TO PROVIDE ALL LABOR, MATERIALS AND NECESSARY TIALLY AS SPECIFIED. IT IS NOT THE INTENT OF THIS SPECIFI- SUPERVISION TO ACCOMPLISH THE WORK AS SHOWN AND/OR CATIONS TO REQUIRE THE PRODUCT OF ANY PARTICULAR MA -- NOTED ON THE PLANS. NUFACTUREIR WHOSE PRODUCT IS SPECIFIED. 12. IT SHALL BE THE RESPONSIBILITY OF THE ELECTRICAL CON- 40. CONNECT ALL EMERGENCY AND EXIT LIGHTS TO INDICATED CIR- TRACTOR FOR THE ADVANCE ORDERING OF LONG LEAD ITEMS, •�10 "S AS TO NOT INTERFERE WITH THE WORK OF OTHER TRADES RESULTING IN ANY DOWN OR LAC TIME. THE CONTRACTOR 41. PROPER PLASTER RINGS SHALL BE USED WITH OUTLET BOXES. SHALL NOT ORDER ANY ITEMS UNTIL APPROVED SHOP DWGS. PLASTER RINGS SHALL BE A MAXIMUM OF 1/8" -FROM THE - ARE RETURNED TO HIM. FINISHED SURFACE OF THE DRYWALL AFTER THE `DRYWALL IS INSTALLED. PROPER COORDINATION BETWEEN THE ELECTRICAL 13. CONTRACTOR SHALL COORDINATE SERVICES WITH THE RESPEC- CONTRACTOR AND THE GENERAL CONTRACTOR FOR"RING INSTA-' TIVE UTILITY COMPANIES. LILATION IS REQUIRED. ALL OUTLET BOXES SHALL BE SECURELY, 14. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF FASTENED. ANY AND ALL IMPROPERLY INSTALLED-` PLASTER RING CEILING CONSTRUCTION BEFORE ORDERING OR INSTALLING ANY OR OUTLET BOXES SHALL BE REMOVED AND A NEW RING OR LIGHT FIXTURES. 1 MY 11110 1.4 15. ALL CONDUCTORS SHALL BE STRANDED COPPER, TYPE THHN/ THWN, EXCEPT WHERE OTHERWISE REQUIRED BY U.L OR ANY 42. APPROVAL SHALL BE OBTAINED FROM AN STRUCT. ENGINEER CODE. MINIMUM WIRE SIZE SHALL BE 12 AWG, EXCLUDING PRIOR TO CUTTING OR DRILLING ANY STRUCTURAL SUPPORT CONTROL WIRING. MEMBER. 16. ALL CONDUCTORS SHALL BE IN CONDUITS. CONDUITS SHALL 43. INSTALL POWER AND CONTROL WIRING AND REQUIRED CONTROL BE GALVANIZED RIGID STEEL (GRC) EXCEPT THAT: COMPONENTS FOR A/C SYSTEMS AS SHOWN/NOTED ON THESE (A) PVC CONDUITS MAY BE USED UNDERGROUND PROVIDED DRAWINGS AND PER OTHER APPLICABLE DRAWINGS/INSTRUCTIONS. ELBOWS AND RISERS ARE GRC; (B) ELECTRICAL METALLIC SEE AIR CONDITIONING DRAWING:, TUBING (EMT) MAY BE USED IN OR ON WALLS OR CEILINGS 44. ALL MATERIAL REMOVED SHALL, BE "DISPOSED OF AS DIRECTED WHERE NOT SUBJECT TO MECHANICAL DAMAGE, DAMP OR CO- RROSIVE CONDITIONS; (C) LIQUIDTIGHT FLEXIBLE CONDUIT BY OWNER. WHERE REQUIRED; (D) FLEXIBLE METALLIC CONDUIT WHERE 45. EMPTY CONDUITS TO BE PROVIDED WITH NYLON PULL STRINGS. REQUIRED IN DRY LOCACATIONS ONLY. ALL CONDUITS IN HA- ZARDOUS AREAS (PER NEC) SHALL MEET THE REQUIREMENTS 46. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL WIRING, BKR, OF NEC CHAPTER 5. AND FUSE; SIZES IN ACCORDANCE WITH A/C EQUIPMENT NAMEPLATE 17. APPLY TWO COATS OF BITUMASTIC (KOPPERS 60) TO ALL ME- IF DIFFERENT FROM THAT SPECIFIED ON DWGS, AS WELL AS ANY TALLIC CONDUITS IN SLABS OR UNDERGROUND. EMT IS NOT FEEDER CHANGES BEING AFFECTED BY THIS CHANGE. CONTRACTOR PERMITTED IN SLABS. ALUMINUM CONDUITS ARE NOT PERMI- SHALL MAKE ABOVE MENTIONED CHANGES AT NO EXTRA COST. TIED ANYWHERE. 47. CONTRACTOR, SHALL COORDINATE ALL HIS WORK WITH OTHER 18. FLEXIBLE CONDUIT SHALL BE USED FOR CONNECTIONS TO VI- 1 IN IN 3 R BRATING EQUIPMENT AND RECESSED LIGHT FIXTURES, WHERE AND RACEWAYS AS SHOWN ON THE A/C DRAWINGS AND/OR PERMITTED BY CODE. SPECIFICATIONS. AIR CONDITIONING DRAWINGS REFER TO MANUFACTURERS WIRING DIAGRAMS, THE CONTRACTOR SHALL VERIFY 19. FOR UNDERGROUND ELECTRICAL CONDUITS, PROVIDE PULL BO- WITH SAID MANUFACTURER ALL REQUIREMENTS AND INCLUDE ALL XES SUCH THAT NO SINGLE CONDUCE RUN HAS BENDS IN EX- RELATED WORK IN HIS CONTRACT. CESS OF 360 DEGREES, OR 180 DEGREES FOR TELEPHONE. 01 PULL BOXES SHALL BE SUITABLE AND APPROVED FOR THE IN- 48. ALL LUMINARIES SHALL BE PROPERLY SUPPORTED IN ACCORDAN- TENDED USE AND WITH IRON COVERS. WARNING TAPES WHICH LOAD CALCULAT[ON CONNECTED LOA D�- 14,400 VA ALL BREAKERS TO HAVE 10,000 AIC TOTAL LOAD 14,400 NTA 40 Amps !TYPE- EMSTING BUS RATINQ 225A �SERVICF- 30,4w MAINS: MLO VOLTAGE- 12G208 PANEL NLB5B POLES: 42 MOUNTING: FLUSH (SBC-TIONT-1) FEEDER- EXISTING LOCATION. SHOWN • PLANS NEUTRAL EMSTING ELECTRICAL NOTES: 1. THE ENTIRE INSTALLATION SHALL BE IN ACCORDANCE WITH 27. RH a, THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE(NEC), TED OR REQUIRED, WITH OVERLOAD RELAYS OR FUSES-IN EACH AND THE LATEST EDITION OF THE FLORIDA BUILDING CODE HOT LEG. AND ANY OTHER APPLICABLE FEDERAL, STATE AND LOCAL CODES. 28. FURNISH AND INSTALL DISCONNECT SWITCHES AND WIRING FOR 2. ALL WORK SHALL BE PERFORMED BY A LICENSED ELECTRICAL 1 IN 010 IrAyAll CONTRACTOR IN A FIRST CLASS WORKMANLIKE MANNER . SAID THE HVAC CONTRACTOR AND INSTALLED BY THE ELECTRICAL CONTRACTOR SHALL MEET All REQUIREMENTS SET FORTH BY CONTRACTOR. ANY LOCAL ORDINANCE AND GOVERNING AUTHORITIES. 29, ALL CIRCUIT BREAKERS SHALL BE OF THE INVERSE 11ME TYPE 3. THE CONTRACTOR SHALL PROVIDE ALL REQUIRED INSURANCE (THERMAL-MAGNETIC). TWO AND THREE POLE CIRCUIT BREA- FOR PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY KERS SHALL BE COMMON TRIP. TIE HANDLES ARE NOT PERMI- DAMAGE FOR THE DURATION OF THE WORK. TTED. 4. THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND 30. ALL ELECTRICAL EQUIPMENT SHALL BE RAINTIGHT (NEMA 3R) WORKMANSHIP FREE FROM DEFECTS FOR A PERIOD OF NOT WHERE EXPOSED TO THE WEATHER. ALL FLEX CONDUITS CO- LESS THAN (1) YEAR FROM DATE OF FINAL ACCEPTANCE. NNECTED TO SUCH EQUIPMENT SHALL BE LIQUIDTIGHT. 5. IT SHALL NOT BE THE INTENT OF THESE PLANS AND SPECIFI- 31. OUTLET BOXES SHALL BE PRESSED STEEL IN DRY LOCATIONS, CATIONS TO SHOW EVERY MINOR DETAIL OF CONSTRUCTION. CAST ALLOY WITH THREADED HUBS IN WET OR DAMP LOCA-- CONTRACTOR SHALL FURNISH AND INSTALL ANY ADDITIONAL TIONS, AND SPECIAL ENCLOSURES".AS: REQUIRED FOR OTHER CONDUIT, BOXES AND WIRING NECESSARY FOR A COMPLETE CLASSIFIED AREAS, U.O.N. ELECTRICAL SYSTEM AND PROVIDE ALL REQUIREMENTS FOR A EQUIPMENT TO BE PLACED IN PROPER WORKING ORDER. 32. PROVIDE ALL FIXTURES WITH LAMPS, VERIFY TYPE WITH MANU- FACTURER. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING TO ORIGINAL CONDITIONS ANY AND ALL DAMAGES TO BUILDING 33. ALL OPENINGS FOR LIGHT FIXTURES IN CEILINGS SHALL BE SURFACES, EQUIPMENT, ETC. CAUSED DURING THE PERFOR- PROTECTED IN A MANNER (PER ALL GOVERNING CODES) THAT MANCE OF WORK. WILL PROVIDE THE SAME RATING AS THE COILING. THIS APPLIES TO ALL FIRE RATED CEILINGS. 7. CORRECTION OF ANY DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL CHARGE OR DELAYS AND SHALL INCLUDE REPLACE- 34. ELECTRICAL CONTRACTOR SHALL VERIFY THE CEILING FINISHES MENT OR REPAIR OF ANY OTHER PHASE OF THE INSTALLATION AND SUSPENSION SYSTEMS FOR SELECTION OF PROPER TRIMS WHICH MAY HAVE BEEN DAMAGED THEREBY. MORMONISM AND SUPPORT ARRANGEMENTS FOR LIGHTING FIXTURES. 8. THE CONTRACTOR SHALL VISIT THE JOB SITE AND VERIFY ALL 35. ALL LIGHTING SWITCHES AND/OR DIMMERS SHALL BE GANGED EXISTING CONDITIONS, AND SHALL THOROUGHLY REVIEW ALL TOGETHER WHERE SHOWN TOGETHER. DRAWINGS, SPECIFICATIONS AND POSSIBLE ADDENDA PRIOR TO 36. ALL CONNECTIONS TO GROUND RODS SHALL BE MADE WITH UL BIDDING ON HIS WORK. NO EXTRAS TO HIS CONTRACT WILL BE APPROVED WELDED CONNECTIONS, UNLESS NOTED OTHERWISE. EU®a��00 ALLOWED FOR FAILURE TO COMPLY WITH THIS REQUIREMENT. THE CONTRACTOR SHALL FORM A GROUNDING ELECTRODE SYS- 9. THE CONTRACTOR SHALL NOT SCALE THE ELECTRICAL DWGS. m 1 *401101111M, 171M REFER TO ARCHITECTURAL PLANS AND ELEVATIONS FOR EXACT 37. ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED IN ACCESIBLE LOCATIONS OF ALL EQUIPMENT UNLESS NOTED OTHERWISE. rox M r.. �- 10. CONTRACTOR SHALL COORDINATE HIS WORK WITH THE GENERAL 38. THE ELECTRICAL INSTALLATION SHALL MEET ALL STANDARD RE- CONTRACTOR SO THAT INTERFERENCE WITH OTHER TRADES BE �M AVOIDED. 39. LIGHTING FIXTURES DESCRIBED HEREIN ARE INTENDED TO INDI- 11. IT SHALL BE THE RESPONSIBILITY OF THE ELECTRICAL CON- CATE THE GENERAL FIXTURE TYPE, WHICH SHALL BE SUBSTAN- TRACTOR TO PROVIDE ALL LABOR, MATERIALS AND NECESSARY TIALLY AS SPECIFIED. IT IS NOT THE INTENT OF THIS SPECIFI- SUPERVISION TO ACCOMPLISH THE WORK AS SHOWN AND/OR CATIONS TO REQUIRE THE PRODUCT OF ANY PARTICULAR MA -- NOTED ON THE PLANS. NUFACTUREIR WHOSE PRODUCT IS SPECIFIED. 12. IT SHALL BE THE RESPONSIBILITY OF THE ELECTRICAL CON- 40. CONNECT ALL EMERGENCY AND EXIT LIGHTS TO INDICATED CIR- TRACTOR FOR THE ADVANCE ORDERING OF LONG LEAD ITEMS, •�10 "S AS TO NOT INTERFERE WITH THE WORK OF OTHER TRADES RESULTING IN ANY DOWN OR LAC TIME. THE CONTRACTOR 41. PROPER PLASTER RINGS SHALL BE USED WITH OUTLET BOXES. SHALL NOT ORDER ANY ITEMS UNTIL APPROVED SHOP DWGS. PLASTER RINGS SHALL BE A MAXIMUM OF 1/8" -FROM THE - ARE RETURNED TO HIM. FINISHED SURFACE OF THE DRYWALL AFTER THE `DRYWALL IS INSTALLED. PROPER COORDINATION BETWEEN THE ELECTRICAL 13. CONTRACTOR SHALL COORDINATE SERVICES WITH THE RESPEC- CONTRACTOR AND THE GENERAL CONTRACTOR FOR"RING INSTA-' TIVE UTILITY COMPANIES. LILATION IS REQUIRED. ALL OUTLET BOXES SHALL BE SECURELY, 14. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF FASTENED. ANY AND ALL IMPROPERLY INSTALLED-` PLASTER RING CEILING CONSTRUCTION BEFORE ORDERING OR INSTALLING ANY OR OUTLET BOXES SHALL BE REMOVED AND A NEW RING OR LIGHT FIXTURES. 1 MY 11110 1.4 15. ALL CONDUCTORS SHALL BE STRANDED COPPER, TYPE THHN/ THWN, EXCEPT WHERE OTHERWISE REQUIRED BY U.L OR ANY 42. APPROVAL SHALL BE OBTAINED FROM AN STRUCT. ENGINEER CODE. MINIMUM WIRE SIZE SHALL BE 12 AWG, EXCLUDING PRIOR TO CUTTING OR DRILLING ANY STRUCTURAL SUPPORT CONTROL WIRING. MEMBER. 16. ALL CONDUCTORS SHALL BE IN CONDUITS. CONDUITS SHALL 43. INSTALL POWER AND CONTROL WIRING AND REQUIRED CONTROL BE GALVANIZED RIGID STEEL (GRC) EXCEPT THAT: COMPONENTS FOR A/C SYSTEMS AS SHOWN/NOTED ON THESE (A) PVC CONDUITS MAY BE USED UNDERGROUND PROVIDED DRAWINGS AND PER OTHER APPLICABLE DRAWINGS/INSTRUCTIONS. ELBOWS AND RISERS ARE GRC; (B) ELECTRICAL METALLIC SEE AIR CONDITIONING DRAWING:, TUBING (EMT) MAY BE USED IN OR ON WALLS OR CEILINGS 44. ALL MATERIAL REMOVED SHALL, BE "DISPOSED OF AS DIRECTED WHERE NOT SUBJECT TO MECHANICAL DAMAGE, DAMP OR CO- RROSIVE CONDITIONS; (C) LIQUIDTIGHT FLEXIBLE CONDUIT BY OWNER. WHERE REQUIRED; (D) FLEXIBLE METALLIC CONDUIT WHERE 45. EMPTY CONDUITS TO BE PROVIDED WITH NYLON PULL STRINGS. REQUIRED IN DRY LOCACATIONS ONLY. ALL CONDUITS IN HA- ZARDOUS AREAS (PER NEC) SHALL MEET THE REQUIREMENTS 46. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL WIRING, BKR, OF NEC CHAPTER 5. AND FUSE; SIZES IN ACCORDANCE WITH A/C EQUIPMENT NAMEPLATE 17. APPLY TWO COATS OF BITUMASTIC (KOPPERS 60) TO ALL ME- IF DIFFERENT FROM THAT SPECIFIED ON DWGS, AS WELL AS ANY TALLIC CONDUITS IN SLABS OR UNDERGROUND. EMT IS NOT FEEDER CHANGES BEING AFFECTED BY THIS CHANGE. CONTRACTOR PERMITTED IN SLABS. ALUMINUM CONDUITS ARE NOT PERMI- SHALL MAKE ABOVE MENTIONED CHANGES AT NO EXTRA COST. TIED ANYWHERE. 47. CONTRACTOR, SHALL COORDINATE ALL HIS WORK WITH OTHER 18. FLEXIBLE CONDUIT SHALL BE USED FOR CONNECTIONS TO VI- 1 IN IN 3 R BRATING EQUIPMENT AND RECESSED LIGHT FIXTURES, WHERE AND RACEWAYS AS SHOWN ON THE A/C DRAWINGS AND/OR PERMITTED BY CODE. SPECIFICATIONS. AIR CONDITIONING DRAWINGS REFER TO MANUFACTURERS WIRING DIAGRAMS, THE CONTRACTOR SHALL VERIFY 19. FOR UNDERGROUND ELECTRICAL CONDUITS, PROVIDE PULL BO- WITH SAID MANUFACTURER ALL REQUIREMENTS AND INCLUDE ALL XES SUCH THAT NO SINGLE CONDUCE RUN HAS BENDS IN EX- RELATED WORK IN HIS CONTRACT. CESS OF 360 DEGREES, OR 180 DEGREES FOR TELEPHONE. 01 PULL BOXES SHALL BE SUITABLE AND APPROVED FOR THE IN- 48. ALL LUMINARIES SHALL BE PROPERLY SUPPORTED IN ACCORDAN- TENDED USE AND WITH IRON COVERS. WARNING TAPES WHICH KERS TO HAVE 10,000 AIC WAD CALCULATION CONNECTED LOAD= 25,500 VA TOTAL LOAD (SECT.-1 +SECL-2) = 30,120 VA 84 Amps 'ITYPE- EM STING BUS RATING: 225A 3(D,4w MAINS: MLO VOLTAGE- 120/208 PANEL NLB5B POLES: 42 MOUNTING: FLUSH (SEMON-2) FEEDER-- EXISTING LOCATION. SHOWN ON PLANS NEUTRA L EXISTING ELECTRICAL NOTES: 1. THE ENTIRE INSTALLATION SHALL BE IN ACCORDANCE WITH 27. RH a, THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE(NEC), TED OR REQUIRED, WITH OVERLOAD RELAYS OR FUSES-IN EACH AND THE LATEST EDITION OF THE FLORIDA BUILDING CODE HOT LEG. AND ANY OTHER APPLICABLE FEDERAL, STATE AND LOCAL CODES. 28. FURNISH AND INSTALL DISCONNECT SWITCHES AND WIRING FOR 2. ALL WORK SHALL BE PERFORMED BY A LICENSED ELECTRICAL TE RECOMMENDATIONS. CONTROLS ARE TO BE SUPPLIED BY CONTRACTOR IN A FIRST CLASS WORKMANLIKE MANNER . SAID THE HVAC CONTRACTOR AND INSTALLED BY THE ELECTRICAL CONTRACTOR SHALL MEET All REQUIREMENTS SET FORTH BY CONTRACTOR. ANY LOCAL ORDINANCE AND GOVERNING AUTHORITIES. 29, ALL CIRCUIT BREAKERS SHALL BE OF THE INVERSE 11ME TYPE 3. THE CONTRACTOR SHALL PROVIDE ALL REQUIRED INSURANCE (THERMAL-MAGNETIC). TWO AND THREE POLE CIRCUIT BREA- FOR PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY KERS SHALL BE COMMON TRIP. TIE HANDLES ARE NOT PERMI- DAMAGE FOR THE DURATION OF THE WORK. TTED. 4. THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND 30. ALL ELECTRICAL EQUIPMENT SHALL BE RAINTIGHT (NEMA 3R) WORKMANSHIP FREE FROM DEFECTS FOR A PERIOD OF NOT WHERE EXPOSED TO THE WEATHER. ALL FLEX CONDUITS CO- LESS THAN (1) YEAR FROM DATE OF FINAL ACCEPTANCE. NNECTED TO SUCH EQUIPMENT SHALL BE LIQUIDTIGHT. 5. IT SHALL NOT BE THE INTENT OF THESE PLANS AND SPECIFI- 31. OUTLET BOXES SHALL BE PRESSED STEEL IN DRY LOCATIONS, CATIONS TO SHOW EVERY MINOR DETAIL OF CONSTRUCTION. CAST ALLOY WITH THREADED HUBS IN WET OR DAMP LOCA-- CONTRACTOR SHALL FURNISH AND INSTALL ANY ADDITIONAL TIONS, AND SPECIAL ENCLOSURES".AS: REQUIRED FOR OTHER CONDUIT, BOXES AND WIRING NECESSARY FOR A COMPLETE CLASSIFIED AREAS, U.O.N. ELECTRICAL SYSTEM AND PROVIDE ALL REQUIREMENTS FOR A EQUIPMENT TO BE PLACED IN PROPER WORKING ORDER. 32. PROVIDE ALL FIXTURES WITH LAMPS, VERIFY TYPE WITH MANU- FACTURER. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING TO ORIGINAL CONDITIONS ANY AND ALL DAMAGES TO BUILDING 33. ALL OPENINGS FOR LIGHT FIXTURES IN CEILINGS SHALL BE SURFACES, EQUIPMENT, ETC. CAUSED DURING THE PERFOR- PROTECTED IN A MANNER (PER ALL GOVERNING CODES) THAT MANCE OF WORK. WILL PROVIDE THE SAME RATING AS THE COILING. THIS APPLIES TO ALL FIRE RATED CEILINGS. 7. CORRECTION OF ANY DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL CHARGE OR DELAYS AND SHALL INCLUDE REPLACE- 34. ELECTRICAL CONTRACTOR SHALL VERIFY THE CEILING FINISHES MENT OR REPAIR OF ANY OTHER PHASE OF THE INSTALLATION AND SUSPENSION SYSTEMS FOR SELECTION OF PROPER TRIMS WHICH MAY HAVE BEEN DAMAGED THEREBY. AND SUPPORT ARRANGEMENTS FOR LIGHTING FIXTURES. 8. THE CONTRACTOR SHALL VISIT THE JOB SITE AND VERIFY ALL 35. ALL LIGHTING SWITCHES AND/OR DIMMERS SHALL BE GANGED EXISTING CONDITIONS, AND SHALL THOROUGHLY REVIEW ALL TOGETHER WHERE SHOWN TOGETHER. DRAWINGS, SPECIFICATIONS AND POSSIBLE ADDENDA PRIOR TO 36. ALL CONNECTIONS TO GROUND RODS SHALL BE MADE WITH UL BIDDING ON HIS WORK. NO EXTRAS TO HIS CONTRACT WILL BE FAN M N 1.1 1.4 Will 1.4 a " 061 *9 rim:1111 [111101,1741% LOAD CALCUTAT]ON CONNECTED LOAD= 4,620 VA TOTAL LOAD = 4,620 VA 13 Amps NOTE: ALL PANELS ARE EXISTING. CIRCUIT NUMBERS SHOWN ARE TO DETERMINE THE NUMBER OF REQUIRED Ib AND NOT ACTUAL CIRCUR NUMBERS FOUND IN THE FIELD. CONTRACTOR MAY CHANGE SHOWN CIRCUIT NUMBERS TO COORDINATE WITH FIELD CONDITIONS. IT IS ASSUMED THAT SOME CIRCUITS WILL BECOME AVAILABLE AFTER DEMOLITION OF SPACE, WHICH CAN BE REUSED FOR THIS TENANT. VERIFY THIS AND ADVISE ENGINEER IF THIS IS NOT THE CASE. N 111 Jl�ll 1. desi g n 2930 Northeast 2nd Court Miami, FL 33137 305.545.4964 AA0003130 ID0003964 ti ♦ ♦ ti L0 0 L0 0 5 CL Cf) 0 CO cf) Cl) Cc 13 CY) 0 Oily U- > C E CF 0 coC, 0 0 0 1 e4 W I M r ELECTRICAL NOTES: 1. THE ENTIRE INSTALLATION SHALL BE IN ACCORDANCE WITH 27. MOTORS STARTERS SHALL BE MANUAL OR MAGNETIC-AS INDICA- THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE(NEC), TED OR REQUIRED, WITH OVERLOAD RELAYS OR FUSES-IN EACH AND THE LATEST EDITION OF THE FLORIDA BUILDING CODE HOT LEG. AND ANY OTHER APPLICABLE FEDERAL, STATE AND LOCAL CODES. 28. FURNISH AND INSTALL DISCONNECT SWITCHES AND WIRING FOR 2. ALL WORK SHALL BE PERFORMED BY A LICENSED ELECTRICAL TE RECOMMENDATIONS. CONTROLS ARE TO BE SUPPLIED BY CONTRACTOR IN A FIRST CLASS WORKMANLIKE MANNER . SAID THE HVAC CONTRACTOR AND INSTALLED BY THE ELECTRICAL CONTRACTOR SHALL MEET All REQUIREMENTS SET FORTH BY CONTRACTOR. ANY LOCAL ORDINANCE AND GOVERNING AUTHORITIES. 29, ALL CIRCUIT BREAKERS SHALL BE OF THE INVERSE 11ME TYPE 3. THE CONTRACTOR SHALL PROVIDE ALL REQUIRED INSURANCE (THERMAL-MAGNETIC). TWO AND THREE POLE CIRCUIT BREA- FOR PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY KERS SHALL BE COMMON TRIP. TIE HANDLES ARE NOT PERMI- DAMAGE FOR THE DURATION OF THE WORK. TTED. 4. THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND 30. ALL ELECTRICAL EQUIPMENT SHALL BE RAINTIGHT (NEMA 3R) WORKMANSHIP FREE FROM DEFECTS FOR A PERIOD OF NOT WHERE EXPOSED TO THE WEATHER. ALL FLEX CONDUITS CO- LESS THAN (1) YEAR FROM DATE OF FINAL ACCEPTANCE. NNECTED TO SUCH EQUIPMENT SHALL BE LIQUIDTIGHT. 5. IT SHALL NOT BE THE INTENT OF THESE PLANS AND SPECIFI- 31. OUTLET BOXES SHALL BE PRESSED STEEL IN DRY LOCATIONS, CATIONS TO SHOW EVERY MINOR DETAIL OF CONSTRUCTION. CAST ALLOY WITH THREADED HUBS IN WET OR DAMP LOCA-- CONTRACTOR SHALL FURNISH AND INSTALL ANY ADDITIONAL TIONS, AND SPECIAL ENCLOSURES".AS: REQUIRED FOR OTHER CONDUIT, BOXES AND WIRING NECESSARY FOR A COMPLETE CLASSIFIED AREAS, U.O.N. ELECTRICAL SYSTEM AND PROVIDE ALL REQUIREMENTS FOR A EQUIPMENT TO BE PLACED IN PROPER WORKING ORDER. 32. PROVIDE ALL FIXTURES WITH LAMPS, VERIFY TYPE WITH MANU- FACTURER. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING TO ORIGINAL CONDITIONS ANY AND ALL DAMAGES TO BUILDING 33. ALL OPENINGS FOR LIGHT FIXTURES IN CEILINGS SHALL BE SURFACES, EQUIPMENT, ETC. CAUSED DURING THE PERFOR- PROTECTED IN A MANNER (PER ALL GOVERNING CODES) THAT MANCE OF WORK. WILL PROVIDE THE SAME RATING AS THE COILING. THIS APPLIES TO ALL FIRE RATED CEILINGS. 7. CORRECTION OF ANY DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL CHARGE OR DELAYS AND SHALL INCLUDE REPLACE- 34. ELECTRICAL CONTRACTOR SHALL VERIFY THE CEILING FINISHES MENT OR REPAIR OF ANY OTHER PHASE OF THE INSTALLATION AND SUSPENSION SYSTEMS FOR SELECTION OF PROPER TRIMS WHICH MAY HAVE BEEN DAMAGED THEREBY. AND SUPPORT ARRANGEMENTS FOR LIGHTING FIXTURES. 8. THE CONTRACTOR SHALL VISIT THE JOB SITE AND VERIFY ALL 35. ALL LIGHTING SWITCHES AND/OR DIMMERS SHALL BE GANGED EXISTING CONDITIONS, AND SHALL THOROUGHLY REVIEW ALL TOGETHER WHERE SHOWN TOGETHER. DRAWINGS, SPECIFICATIONS AND POSSIBLE ADDENDA PRIOR TO 36. ALL CONNECTIONS TO GROUND RODS SHALL BE MADE WITH UL BIDDING ON HIS WORK. NO EXTRAS TO HIS CONTRACT WILL BE APPROVED WELDED CONNECTIONS, UNLESS NOTED OTHERWISE. ALLOWED FOR FAILURE TO COMPLY WITH THIS REQUIREMENT. THE CONTRACTOR SHALL FORM A GROUNDING ELECTRODE SYS- 9. THE CONTRACTOR SHALL NOT SCALE THE ELECTRICAL DWGS. TEM AS PER NEC ARTICLE 250. REFER TO ARCHITECTURAL PLANS AND ELEVATIONS FOR EXACT 37. ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED IN ACCESIBLE LOCATIONS OF ALL EQUIPMENT UNLESS NOTED OTHERWISE. AREAS ONLY. 10. CONTRACTOR SHALL COORDINATE HIS WORK WITH THE GENERAL 38. THE ELECTRICAL INSTALLATION SHALL MEET ALL STANDARD RE- CONTRACTOR SO THAT INTERFERENCE WITH OTHER TRADES BE QUIREMENTS OF POWER AND TELEPHONE COMPANIES. AVOIDED. 39. LIGHTING FIXTURES DESCRIBED HEREIN ARE INTENDED TO INDI- 11. IT SHALL BE THE RESPONSIBILITY OF THE ELECTRICAL CON- CATE THE GENERAL FIXTURE TYPE, WHICH SHALL BE SUBSTAN- TRACTOR TO PROVIDE ALL LABOR, MATERIALS AND NECESSARY TIALLY AS SPECIFIED. IT IS NOT THE INTENT OF THIS SPECIFI- SUPERVISION TO ACCOMPLISH THE WORK AS SHOWN AND/OR CATIONS TO REQUIRE THE PRODUCT OF ANY PARTICULAR MA -- NOTED ON THE PLANS. NUFACTUREIR WHOSE PRODUCT IS SPECIFIED. 12. IT SHALL BE THE RESPONSIBILITY OF THE ELECTRICAL CON- 40. CONNECT ALL EMERGENCY AND EXIT LIGHTS TO INDICATED CIR- TRACTOR FOR THE ADVANCE ORDERING OF LONG LEAD ITEMS, CUITS AHEAD OF ANY SWITCH. AS TO NOT INTERFERE WITH THE WORK OF OTHER TRADES RESULTING IN ANY DOWN OR LAC TIME. THE CONTRACTOR 41. PROPER PLASTER RINGS SHALL BE USED WITH OUTLET BOXES. SHALL NOT ORDER ANY ITEMS UNTIL APPROVED SHOP DWGS. PLASTER RINGS SHALL BE A MAXIMUM OF 1/8" -FROM THE - ARE RETURNED TO HIM. FINISHED SURFACE OF THE DRYWALL AFTER THE `DRYWALL IS INSTALLED. PROPER COORDINATION BETWEEN THE ELECTRICAL 13. CONTRACTOR SHALL COORDINATE SERVICES WITH THE RESPEC- CONTRACTOR AND THE GENERAL CONTRACTOR FOR"RING INSTA-' TIVE UTILITY COMPANIES. LILATION IS REQUIRED. ALL OUTLET BOXES SHALL BE SECURELY, 14. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF FASTENED. ANY AND ALL IMPROPERLY INSTALLED-` PLASTER RING CEILING CONSTRUCTION BEFORE ORDERING OR INSTALLING ANY OR OUTLET BOXES SHALL BE REMOVED AND A NEW RING OR LIGHT FIXTURES. OUTLET INSTALLED AT THE CONTRACTOR'S EXPENSE. 15. ALL CONDUCTORS SHALL BE STRANDED COPPER, TYPE THHN/ THWN, EXCEPT WHERE OTHERWISE REQUIRED BY U.L OR ANY 42. APPROVAL SHALL BE OBTAINED FROM AN STRUCT. ENGINEER CODE. MINIMUM WIRE SIZE SHALL BE 12 AWG, EXCLUDING PRIOR TO CUTTING OR DRILLING ANY STRUCTURAL SUPPORT CONTROL WIRING. MEMBER. 16. ALL CONDUCTORS SHALL BE IN CONDUITS. CONDUITS SHALL 43. INSTALL POWER AND CONTROL WIRING AND REQUIRED CONTROL BE GALVANIZED RIGID STEEL (GRC) EXCEPT THAT: COMPONENTS FOR A/C SYSTEMS AS SHOWN/NOTED ON THESE (A) PVC CONDUITS MAY BE USED UNDERGROUND PROVIDED DRAWINGS AND PER OTHER APPLICABLE DRAWINGS/INSTRUCTIONS. ELBOWS AND RISERS ARE GRC; (B) ELECTRICAL METALLIC SEE AIR CONDITIONING DRAWING:, TUBING (EMT) MAY BE USED IN OR ON WALLS OR CEILINGS 44. ALL MATERIAL REMOVED SHALL, BE "DISPOSED OF AS DIRECTED WHERE NOT SUBJECT TO MECHANICAL DAMAGE, DAMP OR CO- RROSIVE CONDITIONS; (C) LIQUIDTIGHT FLEXIBLE CONDUIT BY OWNER. WHERE REQUIRED; (D) FLEXIBLE METALLIC CONDUIT WHERE 45. EMPTY CONDUITS TO BE PROVIDED WITH NYLON PULL STRINGS. REQUIRED IN DRY LOCACATIONS ONLY. ALL CONDUITS IN HA- ZARDOUS AREAS (PER NEC) SHALL MEET THE REQUIREMENTS 46. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL WIRING, BKR, OF NEC CHAPTER 5. AND FUSE; SIZES IN ACCORDANCE WITH A/C EQUIPMENT NAMEPLATE 17. APPLY TWO COATS OF BITUMASTIC (KOPPERS 60) TO ALL ME- IF DIFFERENT FROM THAT SPECIFIED ON DWGS, AS WELL AS ANY TALLIC CONDUITS IN SLABS OR UNDERGROUND. EMT IS NOT FEEDER CHANGES BEING AFFECTED BY THIS CHANGE. CONTRACTOR PERMITTED IN SLABS. ALUMINUM CONDUITS ARE NOT PERMI- SHALL MAKE ABOVE MENTIONED CHANGES AT NO EXTRA COST. TIED ANYWHERE. 47. CONTRACTOR, SHALL COORDINATE ALL HIS WORK WITH OTHER 18. FLEXIBLE CONDUIT SHALL BE USED FOR CONNECTIONS TO VI- TRADES IN OTHER TO FURNISH AND INSTALL ALL CONTROL WIRING BRATING EQUIPMENT AND RECESSED LIGHT FIXTURES, WHERE AND RACEWAYS AS SHOWN ON THE A/C DRAWINGS AND/OR PERMITTED BY CODE. SPECIFICATIONS. AIR CONDITIONING DRAWINGS REFER TO MANUFACTURERS WIRING DIAGRAMS, THE CONTRACTOR SHALL VERIFY 19. FOR UNDERGROUND ELECTRICAL CONDUITS, PROVIDE PULL BO- WITH SAID MANUFACTURER ALL REQUIREMENTS AND INCLUDE ALL XES SUCH THAT NO SINGLE CONDUCE RUN HAS BENDS IN EX- RELATED WORK IN HIS CONTRACT. CESS OF 360 DEGREES, OR 180 DEGREES FOR TELEPHONE. PULL BOXES SHALL BE SUITABLE AND APPROVED FOR THE IN- 48. ALL LUMINARIES SHALL BE PROPERLY SUPPORTED IN ACCORDAN- TENDED USE AND WITH IRON COVERS. WARNING TAPES WHICH CE WITH THE COILING SYSTEM MANUFACTURER RECOMMENDA- "WARNING BURIED ELECTRIC" SHALL BE PLACED IN TRENCHES' TIONS AND LOCAL CODE REQUIREMENTS. ABOVE ELECTRIC CONDUITS. WHERE CONDUITS PASS UNDER 49 THIS DRAWING IS A GUIDE FOR THE ELECTRICAL INSTALLATION PAVED AREAS, THEY SHALL BE GRC. WHERE UNDERGROUND THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING A CONDUITS ARE NOT EXPOSED TO MECHANICAL DAMAGE OR ARE FUNCTIONING SYSTEM. NOT UNDER PAVED AREAS, THEY SHALL BE SCHEDULE 40 PVC. ELBOWS AND RISERS SHALL BE GRC. 50 ALL CABLES SHALL BE RUN WITHOUT SPLICES, U.O.N. 20. ALL CONDUIT RUNS ARE SHOWN DIAGRAMMATICALLY. THE EXACT 51 ALL PULL AND J-BOXES SHALL BE ACCESSIBLE AT ALL TIMES. ROUTING SHALL BE DETERMINED IN THE FIELD, UNLESS NOTED OTHERWISE. 52 . EXACT POINT/METHODS OF CONNECTION SHALL BE DETERMINED 21. PROVIDE FIRE RETARDANT U.L. APPROVED SEALANT ON ALL PE- IN THE FIELD. NETRATIONS, WALLS AND STRUCTURAL SLABS. IT SHALL BE THE 53 . ALL RACEWAY ROUTED INSULATED CONDUCTORS SYSTEM SHALL BE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO VERIFY COLOR CODED AS FOLLOWS. PRIOR TO SUBMITTING BID, THE LOCATIONS OF ALL SUCH FIRE 120/208 V SYSTEM: RATED PARTITIONS, WALLS, AND STRUCTURAL SLABS. PHASE 'A' BLACK 22, UNLESS NOTED AS EXISTING, ALL EQUIPMENT, WIRING, DEVICES, PHASE 'B' RED ETC. SHALL BE NEW. PHASE 'C' BLUE 23. A PULL WIRE OR CORD SHALL BE INSTALLED IN ALL EMPTY NEUTRAL WHITE (see note below) CONDUITS. GROUND GREEN 24. ALL DISCONNECT SWITCHES SHALL BE SIZED BY NEC REQUIRE- 277/480 V SYSTEM 'A' MENTS TO ACCOMODATE THE EQUIPMENT SERVED, INCLUDING PHASE BROWN 'B' REJECTION CLIPS AND FUSES. SWITCHES SHALL BE HIP RATED PHASE PURPLE FOR MAXIMUM HORSEPOWER. PHASE 'C' YELLOW NEUTRAL GRAY 25. CONTRACTOR SHALL VERIFY CIRCUIT PROTECTIVE DEVICE RATING GROUND GREEN FOR EQUIPMENT PRIOR TO INSTALLATION. Note: When mixing different voltage systems in the same raceway 26. ALL FUSES SHALL BE CURRENT LIMITING, PER U.L RATED 600V or enclosure use white insulation wire with a readily distinguishable OR 250V AS REQUIRED, WITH: color stripe running along its entire length. a) NON TIME DELAY FUSES IN MAIN SWITCHES AND SWITCHES FEEDING PANELS. b) DUAL ELEMENT TIME DELAY FUSES FOR MOTORS AND HVAC EQUIPMENT. N 111 Jl�ll 1. desi g n 2930 Northeast 2nd Court Miami, FL 33137 305.545.4964 AA0003130 ID0003964 ti ♦ ♦ ti L0 0 L0 0 5 CL Cf) 0 CO cf) Cl) Cc 13 CY) 0 Oily U- > C E CF 0 coC, 0 0 0 1 e4 W I M r ALEJANDRO BONET PROJECT NO: 1110 -05 DRAWN BY. LINI DATE: 01.10.2014 Sckz' AS NOTED SHEET NO: E-2 cv ko rn SHEEr"FITILE: ELECTRICAL NOTESAND PANELS ALEJANDRO BONET PROJECT NO: 1110 -05 DRAWN BY. LINI DATE: 01.10.2014 Sckz' AS NOTED SHEET NO: E-2 cv ko rn