Loading...
14-236-008r r , i r ' '•rr r r r r NUT ADJUSTABLE SWIVEL LOOP HANGER PIPE i • r • i r' ' r r EXISTING BRANCHLINE . .ii if i:1► . d Q d e _ ALL THREADED I -Ala HANGER ROD DROP IN ANCHOR ALL THREADED HANGER ROD EXISTING 1' NIPPLE 1 NEW 1 " ELBOW is� fl EXISTING CONCEALED FIRE SPRINKLER HEAD TO BE REMOVED. • r r r , • IIMFAT- • . r, 1 " DROP NEW CONCEALED SPRINKLER HEAD. *ARMOVER GREATER THAN 24" IN LENGTH SHALL BE SUPPORTED BY A HANGER. ARMOVER DETAIL r FINISHED J CEILING LINE SUPPLY LINE 1/2- REDUCING COUPLING II INr. rnVFR PI ATF oil !r r •• rI •.. .. i •r r 1 ..• r rl We] • rI Oftilkwavie IN wltmeLej oxei IN, 1 r 1 • 11 1 •li • • • . li • • WI I. ..• • • 1 rr : r r ' • j0ij •' • • # .. • # f. • mi"WOWWWWWWA • v • • r rr . ;. • # .1 r I • # • 1. 1 r r• r • r • '� 1 r l •'r• !• •0 r •'r• i' i• r 1 r A •1 •• �: •1 # #'r r• • r. 11 • • • • ! 1' : r r•'r r r Ir • •. .. • r wasm •. r.. ; r. SPRINKLER HEAD SCHEDULE AREA SERVED MFR. & ORIFICE CONFIGURATION TEMP. REMARKS USE MODEL NO. SIZE MODEL NO. RATING FIRE RATED ROOF /FLOOR CEILING ASSEMBLY AREAS WITH CEILINGS CENTRAL 1/2- CONCEALED ORDINARY WHITE PAINT FINISH 1.5' WIDE STRAP SADDLE- 1 x K= 5.6 TAPE ABOVE WITH 12 GA HANGER QUICK RESPONSE EXPOSED AREAS CENTRAL K/25.6 UPRIGHT ORDINARY QUICK RESPONSE HVAC DESIGN REQUIRES: DUCT SMOKE DETECTOR YES NO X FIRE DAMPER(S) X � SMOKE DAMPER(S) USE X FIRE RATED ENCLOSURE MODEL NO. X FIRE RATED ROOF /FLOOR CEILING ASSEMBLY CEILING x FIRE STOPPING Ln o x SMOKE CONTROL 1.5' WIDE STRAP SADDLE- 1 x AIR DISTRIBUTION SCHEDULE 1' WIDE HANGER 22 GA.- TO STRUCTURE ABOVE AS MFG. & SYMBOL USE TYPE ACCESSORIES MODEL NO. INSULATED R-EXIBLE -� RETURN CEILING L� DATE/TYPE OF REVISION TITUS PAR Ln o AIR GRILLE 1.5' WIDE STRAP SADDLE- SEALER do `-/ TAPE ABOVE WITH 12 GA HANGER HAUL REMOVED WORK FROM SITE. MODULE m RETURN CEILING r-i m TITUS PAR � AIR GRILLE -- 12x I2 Q) j W m S- LL MODULE c- -- SUPPLY CEILING O.B.D. TITUS PAS AIR DIFFUSER 0 O 24X24 27. COORDINATE WITH LANDLORD OR LANDLORD FOR THE WORK TIMES Ln O Q MODULE TENANTS. COORDINATE INTERFACE WITH ANY APPLICABLE BASE BUILDING 4_j 1 I NOTE: ALL AIR DISTRIBUTION SHALL BE FINISHED WHITE BAKED ENAMEL. I DRAW AIR FLOW BAND QVD I IMM1110 •�• 2 xl.5' -22 GA CHANNEL AT 6'-0' O.C. MAX. SEAL JOINT WITH DUCT SEALER do TAPE NOTES, DETAILS AND SCHEDULES SCALE: N.T.S. `xYSAS °ST%� l S I VSTALLED II P. MODL;LED, N0 __T_ E__S - H. V. A. C 1. ALL WORK SHALL CONFORM WITH THE FLORIDA BUILDING CODE; -HfPA, N`C; k ALL OTHER APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS AND` ORDINANCE. 2. CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS TAXES, INSPECTIONS, TESTS, PERFORMANCE BONDS, FINES AND OTHER ITEMS AS REQUIRED FOR THE INSTALLATION OF THE COMPLETE CONTROLS SYSTEMS, AND SHALL BE RESPONSIBLE FOR OBTAINING HIS OWN PERMIT. 3. CONTRACTOR SHALL PROVIDE ALL REQUIRED INSURANCE FOR PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY DAMAGE FOR THE DURATION OF THE WORK. 4. EXCEPT WHERE LONGER WARRANTIES ARE SPECIFIED FOR SPECIFIC EQUIPMENT, CONTRACTOR SHALL WARRANT ALL WORK TO BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF TWO YEARS AFTER FINAL WRITTEN ACCEPTANCE OF THE PROJECT BY THE OWNER. 5. PROVIDE ALL NECESSARY INSTRUCTIONS TO THE OWNER IN THE OPERATION OF THE MECHANICAL. SYSTEMS BEFORE FINAL ACCEPTANCE. 6. PROVIDE EQUIPMENT MAINTENANCE AND INSTRUCTION MANUALS. MANUALS TO BE SUBMITTED TO ARCHITECT /ENGINEER FOR ACCEPTANCE. 7. SUBMIT SHOP DRAWINGS FOR ALL MATERIALS AND EQUIPMENT FOR ACCEPTANCE OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE PURCHASE OR INSTALLATION OF ANY EQUIPMENT AND MATERIALS. VERIFY THAT EQUPMENT AND DUCTWORK FITS PRIOR TO ORDERING OR FABRICATING. E:�1:UIoII:LbIIlia CAU - r til�►t��il��l�a 10. PRODUCTS AND MATERIALS SPECIFIED BY TRADE NAME AND /OR MODEL ON THE DRAWINGS ESTABLISH A STANDARD OF QUALITY, APPEARANCE, PERFORMANCE AND DIMENSIONS. CONTRACTOR SHALL BASE HIS BID ON THOSE ITEMS, WHICH SHALL. BE CONSIDERED TO ESTABLISH A STANDARD BASIS OF BIDDING. REQUESTS FOR SUBSTITUTION SHALL BE SUBMITTED IN WRITING TO THE OWNER /ENGINEER DEMONSTRATING THAT THE PROPOSED PRODUCT IS COMPARABLE, AND THAT BASIC DESIGN, CONSTRUCTION STANDARDS, QUALITY AND WARRANTIES ARE EQUAL OR BETTER THAN THE PRODUCT SPECIFIED. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CHANGE IN THE WORK REQUIRED BY OTHER TRADES AND SHALL PAY FOR ANY EXPENSES INCURRED DUE TO THE CONTRACTOR'S REQUEST FOR REVISIONS OR SUBSTITUTIONS. 11. PROVIDE ALL NEW MATERIALS OF AMERICAN MANUFACTURE, BEARING THE U.L. LABEL AS APPLICABLE. PROVIDE SUPPLEMENTAL MATERIALS NOT SPECIFICALLY NOTED HEREIN, BUT REQUIRED TO COMPLETE THE INSTALLATION IN ACCORDANCE WITH THE INTENT OF THE CONTRACT DRAWINGS, AT NO ADDITIONAL COST TO THE OWNER. 12. FURNISH ALL NECESSARY ACCESS PANELS TO CONTROLS, ETC. 13. BALANCE ALL SYSTEMS TO PROVIDE QUANTITIES AND CAPACITIES INDICATED ON DRAWINGS. SUBMIT FINAL. TEST AND BALANCE REPORT TO OWNER /ENGINEER FOR ACCEPTANCE. ALL ABOVE TO BE DONE BY AN INDEPENDENT TEST AND BALANCE COMPANY. SEE 1`40TI ES ON THIS SHEET. 14. ALL WORK SHALL BE FIELD CHECKED BEFORE INSTALLATION AND COORDINATED WITH ALL OTHER TRADES. THE CONTRACT DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO DEPICT APPROXIMATE EQUIPMENT LOCATIONS AND ARRANGEMENTS, NOT TO SHOW ANY MINOR DETAIL, PLANS SHALL NOT BE SCALED. 15. ALL WORK PERFORMED IS IN RETURN AIR PLENUMS DO NOT INSTALL COMBUSTIBLE OR PLASTIC MATERIALS IN PLENUMS ALL DEVICES AND WIRING SHALL BE PLENUM RATED. it -=iNl fl&i X91 17. NOT USED. 18. PATCH WALLS, CEILINGS ETC. EQUAL TO EXISTING AS REQUIRED TO PERFORM WORK. HAUL REMOVED WORK FROM SITE. 19. COORDINATE WITH LANDLORD'S REPRESENTATIVE FOR PERMITTED WORK HOURS. THE FACILITY WILL CONTINUE TO OPERATE WHILE WORK IS PERFORMED. COORDINATE WITH LANDLORD'S REPRESENTATIVE FOR SECURITY REQUIREMENTS. 20. ADJUST DUCT SIZES TO MATCH INLET AND OUTLET CONNECTIONS OF EXISTING DUCTS. 21. ALL DUCTWORK DOWNSTREAM OF VAV'S SHALL BE CLASS 1 U.L LISTED FIBERGLASS DUCTBOARD, 1' THICK R -4.2 MIN.CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS. ALL DUCT JOINTS SHALL BE SEALED AND TAPED. PROVIDE VOLUME DAMPERS, TURNING VANES, ETC., IN DUCTWORK FOR PROPER AIR FLOW AND BALANCE. PROVIDE VOLUME DAMPER WITH LOCKING QUADRANT AT ALL FLEXIBLE DUCT CONNECTIONS WITH SUPPLY DUCTWORK. PROVIDE MULTIPLE VANE EXTRACTORS WITH CONTROL RODS AT ALL OUTLETS CONNECTED CLOSER THAN TWO DUCT DIAMETERS TO MAIN SUPPLY DUCT, AND WHERE SHOWN ON DRAWINGS. 1' WIDE HANGER 22 GA.- TO STRUCTURE ABOVE AS PER SMACNA STANDARDS. OF WORK TO OTHER AREAS. PROVIDE POLYETHELENE OR OTHER BARRIERS AS LOW VELOCITY SUPPLY REVISIONS AIR DUCT (SEE PLAN VIEW) INSULATED R-EXIBLE -� co DUCT. SUPPORT AT L� DATE/TYPE OF REVISION EVERY 5' -0- (MAX.) Ln o TO AVOID SAG. SEAL JOIM WITH DUCT 1.5' WIDE STRAP SADDLE- SEALER do SUPPORTED TO STRUCTURE TAPE ABOVE WITH 12 GA HANGER HAUL REMOVED WORK FROM SITE. WIRE. DRAW AIR FLOW BAND QVD I IMM1110 •�• 2 xl.5' -22 GA CHANNEL AT 6'-0' O.C. MAX. SEAL JOINT WITH DUCT SEALER do TAPE NOTES, DETAILS AND SCHEDULES SCALE: N.T.S. `xYSAS °ST%� l S I VSTALLED II P. MODL;LED, N0 __T_ E__S - H. V. A. C 1. ALL WORK SHALL CONFORM WITH THE FLORIDA BUILDING CODE; -HfPA, N`C; k ALL OTHER APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS AND` ORDINANCE. 2. CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS TAXES, INSPECTIONS, TESTS, PERFORMANCE BONDS, FINES AND OTHER ITEMS AS REQUIRED FOR THE INSTALLATION OF THE COMPLETE CONTROLS SYSTEMS, AND SHALL BE RESPONSIBLE FOR OBTAINING HIS OWN PERMIT. 3. CONTRACTOR SHALL PROVIDE ALL REQUIRED INSURANCE FOR PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY DAMAGE FOR THE DURATION OF THE WORK. 4. EXCEPT WHERE LONGER WARRANTIES ARE SPECIFIED FOR SPECIFIC EQUIPMENT, CONTRACTOR SHALL WARRANT ALL WORK TO BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF TWO YEARS AFTER FINAL WRITTEN ACCEPTANCE OF THE PROJECT BY THE OWNER. 5. PROVIDE ALL NECESSARY INSTRUCTIONS TO THE OWNER IN THE OPERATION OF THE MECHANICAL. SYSTEMS BEFORE FINAL ACCEPTANCE. 6. PROVIDE EQUIPMENT MAINTENANCE AND INSTRUCTION MANUALS. MANUALS TO BE SUBMITTED TO ARCHITECT /ENGINEER FOR ACCEPTANCE. 7. SUBMIT SHOP DRAWINGS FOR ALL MATERIALS AND EQUIPMENT FOR ACCEPTANCE OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE PURCHASE OR INSTALLATION OF ANY EQUIPMENT AND MATERIALS. VERIFY THAT EQUPMENT AND DUCTWORK FITS PRIOR TO ORDERING OR FABRICATING. E:�1:UIoII:LbIIlia CAU - r til�►t��il��l�a 10. PRODUCTS AND MATERIALS SPECIFIED BY TRADE NAME AND /OR MODEL ON THE DRAWINGS ESTABLISH A STANDARD OF QUALITY, APPEARANCE, PERFORMANCE AND DIMENSIONS. CONTRACTOR SHALL BASE HIS BID ON THOSE ITEMS, WHICH SHALL. BE CONSIDERED TO ESTABLISH A STANDARD BASIS OF BIDDING. REQUESTS FOR SUBSTITUTION SHALL BE SUBMITTED IN WRITING TO THE OWNER /ENGINEER DEMONSTRATING THAT THE PROPOSED PRODUCT IS COMPARABLE, AND THAT BASIC DESIGN, CONSTRUCTION STANDARDS, QUALITY AND WARRANTIES ARE EQUAL OR BETTER THAN THE PRODUCT SPECIFIED. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CHANGE IN THE WORK REQUIRED BY OTHER TRADES AND SHALL PAY FOR ANY EXPENSES INCURRED DUE TO THE CONTRACTOR'S REQUEST FOR REVISIONS OR SUBSTITUTIONS. 11. PROVIDE ALL NEW MATERIALS OF AMERICAN MANUFACTURE, BEARING THE U.L. LABEL AS APPLICABLE. PROVIDE SUPPLEMENTAL MATERIALS NOT SPECIFICALLY NOTED HEREIN, BUT REQUIRED TO COMPLETE THE INSTALLATION IN ACCORDANCE WITH THE INTENT OF THE CONTRACT DRAWINGS, AT NO ADDITIONAL COST TO THE OWNER. 12. FURNISH ALL NECESSARY ACCESS PANELS TO CONTROLS, ETC. 13. BALANCE ALL SYSTEMS TO PROVIDE QUANTITIES AND CAPACITIES INDICATED ON DRAWINGS. SUBMIT FINAL. TEST AND BALANCE REPORT TO OWNER /ENGINEER FOR ACCEPTANCE. ALL ABOVE TO BE DONE BY AN INDEPENDENT TEST AND BALANCE COMPANY. SEE 1`40TI ES ON THIS SHEET. 14. ALL WORK SHALL BE FIELD CHECKED BEFORE INSTALLATION AND COORDINATED WITH ALL OTHER TRADES. THE CONTRACT DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO DEPICT APPROXIMATE EQUIPMENT LOCATIONS AND ARRANGEMENTS, NOT TO SHOW ANY MINOR DETAIL, PLANS SHALL NOT BE SCALED. 15. ALL WORK PERFORMED IS IN RETURN AIR PLENUMS DO NOT INSTALL COMBUSTIBLE OR PLASTIC MATERIALS IN PLENUMS ALL DEVICES AND WIRING SHALL BE PLENUM RATED. it -=iNl fl&i X91 17. NOT USED. 18. PATCH WALLS, CEILINGS ETC. EQUAL TO EXISTING AS REQUIRED TO PERFORM WORK. HAUL REMOVED WORK FROM SITE. 19. COORDINATE WITH LANDLORD'S REPRESENTATIVE FOR PERMITTED WORK HOURS. THE FACILITY WILL CONTINUE TO OPERATE WHILE WORK IS PERFORMED. COORDINATE WITH LANDLORD'S REPRESENTATIVE FOR SECURITY REQUIREMENTS. 20. ADJUST DUCT SIZES TO MATCH INLET AND OUTLET CONNECTIONS OF EXISTING DUCTS. 21. ALL DUCTWORK DOWNSTREAM OF VAV'S SHALL BE CLASS 1 U.L LISTED FIBERGLASS DUCTBOARD, 1' THICK R -4.2 MIN.CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS. ALL DUCT JOINTS SHALL BE SEALED AND TAPED. PROVIDE VOLUME DAMPERS, TURNING VANES, ETC., IN DUCTWORK FOR PROPER AIR FLOW AND BALANCE. PROVIDE VOLUME DAMPER WITH LOCKING QUADRANT AT ALL FLEXIBLE DUCT CONNECTIONS WITH SUPPLY DUCTWORK. PROVIDE MULTIPLE VANE EXTRACTORS WITH CONTROL RODS AT ALL OUTLETS CONNECTED CLOSER THAN TWO DUCT DIAMETERS TO MAIN SUPPLY DUCT, AND WHERE SHOWN ON DRAWINGS. 22. INDOOR AIR QUALITY DURING CONSTRUCTION. ENCAPSULATE AREA OF WORK AS TO ALLOW NO RECIRCULATION OR AIR FROM AREA OF WORK TO OTHER AREAS. PROVIDE POLYETHELENE OR OTHER BARRIERS AS REVISIONS REQUIRED. PROVIDE TEMPORARY HEPA FILTRATION FOR co L� DATE/TYPE OF REVISION Ln Ln o 4J Ln _ L N L-j HAUL REMOVED WORK FROM SITE. cn m ro Q1 r-i m 25. MECHANICAL CONTRACTOR SHALL. COORDINATE WITH THE GENERAL CONTRACTOR AND THE � m • L Q) j W m S- LL tn c- -- --- CL? AS REQUIRED. 26. NOT USED. 4_j 0 O 27. COORDINATE WITH LANDLORD OR LANDLORD FOR THE WORK TIMES Ln O Q r 1 TENANTS. COORDINATE INTERFACE WITH ANY APPLICABLE BASE BUILDING 4_j SHEET TITLE: -�E--j HVAC ARID v� FIRE co 22. INDOOR AIR QUALITY DURING CONSTRUCTION. ENCAPSULATE AREA OF WORK AS TO ALLOW NO RECIRCULATION OR AIR FROM AREA OF WORK TO OTHER AREAS. PROVIDE POLYETHELENE OR OTHER BARRIERS AS REVISIONS REQUIRED. PROVIDE TEMPORARY HEPA FILTRATION FOR ENCAPUSULTATED AREAS. REPLACE FILTERS IN AFFECTED AREA DURING AND AFTER L� DATE/TYPE OF REVISION THE CONSTRUCTION AS REQUIRED WHEN THE FILTERS BECOME DIRTY, BUT BEFORE THE FILTERS ARE LOADED. _ 23. PATCH BUILDING. EQUAL TO EXISTING AS REQUIRED TO PERFORM WORK. HAUL REMOVED WORK FROM SITE. 24. NOT USED. 25. MECHANICAL CONTRACTOR SHALL. COORDINATE WITH THE GENERAL CONTRACTOR AND THE ELECTRICAL CONTRACTOR TO MAKE SURE THAT NO ELECTRICAL CONDUITS ARE INSTALLED PRIOR TO THE DUCTS BEING HUNG, WHERE THE CONDUITS MAY INTERFERE WITH THE REQUIRED DUCT CLEARANCES IN THE CEILING SPACES. GRAVITY TYPE PLUMBING PIPING TAKES PRECEDENCE OVER OTHER TRADES. PLUMBING PRESSURE PIPING MAY BE OFFSET --- TO CLEAR DUCTWORK AS REQUIRED. RELOCATE EXISTING CONDUITS, PIPES AND DUCTS AS REQUIRED. 26. NOT USED. 27. COORDINATE WITH LANDLORD OR LANDLORD FOR THE WORK TIMES ALLOWED TO PERFORM THE WORK. PROVIDE MIN. DISTURBANCE TO OTHER TENANTS. COORDINATE INTERFACE WITH ANY APPLICABLE BASE BUILDING LIFE SAFETY SYSTEMS. PROVIDE THESE SERVICES AT NO ADDITIONAL COST. SHEET TITLE: HVAC ARID v� FIRE a� PROTECTION CEILING c PLAN z PROJECT NO: 1110-05 DRAWN BY: 1.V. DATE: 01.10.2014 SCAM. AS NOTED SHEET NO: M -FP -2 ` m .a r E a 0 N