14-17R-0110
m
s
0
w
CL
S2
0
Z
a
0
W
U
m
0
to
C U-'
i 0:
0
C 0
a
M
N
I
R:7
r
1 DRYER VENT IN
WALL TO VENT CAP•
DRYERBOX BY HVAC
> CONTRACTOR.
GAS CONNECTION--\
SOLIDS
INTERCEPTOR
ELEVATION VIEW
GAS LINE
RECEPTACLE- -\
DRYERBOX
6" MIN
I r 4"
28" L
L 1-
27"
PLAN VIEW
PLUMBING FIXTURE SCHEDULE
TAG
DESCRIPTION
FIXTURE (SELECT
ONE MFR )
TRIM (SELECT ONE MFR )
PIPE SIZES
SFU
DFU
REMARKS
st
1/4" TURN BALL VALVE
MANUFACTURER
MODEL
MFR
MODEL
TRAP
WASTE
VENT
CW
HW
REQUIRED INSPECTIONS.
COF d
JAY R. SMITH
5618BS
COW (I--
CLEANOUT IN WALL
REFER TO SPECIFICATIONS, SCHEDULES AND NOTES FOR MORE INFORMATION.
1. COORDINATE LOCATIONS OF ALL PLUMBING PIPING AND SPRINKLER PIPING
WATER METER
PIPING ARRANGEMENT SHOWN IS SCHEMATIC. VERIFY ALL CONNECTION SIZES
®
GAS METER
AND LOCATIONS PER MANUFACTURER'S REQUIREMENTS. ADJUST TO SUIT
T
HB
HOSE BIBB
WADE
8601MT
ADDENDUM #1
FD
--
--
--
3/4"
--
--
--
KEY - OPERATED WALL HYDRANT
ISOLATION VALVES AT ALL FIXTURES AND VALVES FOR EACH WATER PIPE
VTR
ZURN
Z1333 -C
SUPPLYING A FIXTURE GROUP (E.G. TOILET ROOM, GROOMING AREA, ETC.)
- COMMON WALL
0°
DETAIL CALLOUT
BETWEEN TWO
XXX
NO SCALE
COMFORT ROOMS
NO SCALE
CONNECT 70 EXISTING
FLUSHING FLOOR
— -SAN- -
SANITARY SEWER PIPING BELOW FLOOR
CD
CONDENSATE PIPING
-SLOAN #WB -1 -A ACCESS COVER PLATE WITH
WALL BOX FRAME, CENTER FRAME ON
V
VENT PIPING
FLUSHING RIM FLOOR DRAIN WITH WHITE EPDXY COATED CAST IRON BODY, 3/4"
FS
DRAIN WITH
WATTS
FD -820 -G
COLD WATER PIPING
3"
3"
2"
--
--
--
3
IPS FLUSHING CONNECTION, NICKEL BRONZE TOP WITH HINGED PERFORATED GRATE.
JUST BELOW FLUSH VALVE COVER PLATE.
FLUSHING P -TRAP
NO SUBSTITUTIONS
GAS
GAS PIPING
FLUSH TO FACE OF WALL AND FLOOR FOR
HORIZONTAL PIPING SUPPORT
CHAIN NOT TO BE A TRIPPING OR ENTANGLING
HAZARD
PROVIDE WITH FACTORY DEEP SEAL P -TRAP WITH 3/4" FLUSHING CONNECTION.
HORIZONTAL PIPE OF
FLUSH VALVE
ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS BUT NOT LESS
THAN THE DISTANCES
LISTED BELOW. NO PIPING IS TO BE SUPPORTED
ENCLOSED 1.6 GALLON PER FLUSH MANUAL OPERATED NON - HOLD -OPEN CHROME PLATED PUSH BUTTON FLUSH
FV
WITH STAINLESS
SLOAN
150- 1.6 -WB
--
--
--
1 -1/4"
--
10
--
VALVE WITH CHLORAMINE RESISTANT DIAPHRAGM WITH PROTECTED ORIFICE, HIGH BACK PRESSURE VACUUM
STEEL COVER PLATE
BREAKER, HANDWHEEL STOP VALVE, STAINLESS STEEL WALL PLATE WITH MOUNTING FRAME.
FIBERGLASS FLOOR SERVICE SINK, 3" DRAIN WITH OPEN GRID STRAINER,
MS
MOP SINK
FIAT
MSB2424
FIAT
830 AA
2"
2"
2"
1/2"
1/2"
3
3
FAUCET WITH TOP BRACE, STOPS & VACUUM BREAKER
WORK - RO-O. M —
S..aP..L: A-_ Sa_ H , SQUARE CORNER CONSTRUCTION
S- TU-R--D,- IB — U. ILT � .. T_ YP e E _- .3: -0, 4 _ . _.S. T_A- IN-L- E.� SS - -.ST- E E,.. L WITH 24" - �D-R�A- IN _.,B- O;-A- Rmo, t -8. _ BAC K
SK2
SINK
ELKAY
SS- 8124 -(L OR R)
ELKAY
LK940GN04T4H
2"
2"
2"
1/2"
1/2"
3
2
#LK -18B GRID STRAINER WITH TAILPIECE, FOUR TUBULAR STEEL LEGS. VERIFY DRAIN BOARD SIDE (LEFT OR RIGHT)
STAINLESS STEEL
WITH FLOOR PLAN. PROVIDE 1.6 GPM FLOW RESTRICTOR.
6" WIDE, PRE- SLOPED, HIGH DENSITY POLYETHYLENE TRENCH DRAIN. 48" LONG, RADIUS BOTTOM, 4" WIDE
TD
TRENCH
WADE
WN900 -091
3"
3"
2"
--
--
--
3
THROAT, 3" OUTLET. PROVIDE CUSTOM FABRICATED SOLID STAINLESS STEEL COVER. COORDINATE EXACT COVER
DRAIN
REQUIREMENTS WITH PETCO PM PRIOR TO BID.
3/4" GAS LINE
REFERENCE PLAN FOR
CONTINUATION
DIRT LEG
RECEPTACLE
OUTLET BOX.
2" COPPER STANDPIPE
I1 EXPOSED WITH ONE (1)
90' ELBOW.
11 PIPE MOUNTING BRACKET
I) B -LINE #83198 -%
" ALL THREAD
I B -LINE #B3199H 2"
HINGED EXTENSION SPLIT
II 30" PIPE CLAMP. (TYPICAL),
II FASTEN TO WALL.
I
7-1/4"
I FLOOR
2" WASTE AND VENT IN
WALL. SEE PLANS FOR
ROUGH -IN LOCATIONS.
DROP COLD WATER
AND HOT WATER IN
WALL TO HOSE BOX
USE ONLY ONE 900 ELL
ON OUTLET OF SOLIDS
INTERCEPTOR BEFORE
CONNECTION TO VERTICAL
WASTE AND VENT
WASHER STANDPIPE
STACKABLE DRYER
& WASHER
NOTE:
ARRANGEMENT MAY BE MIRRORED. FROM POSITION SHOWN
WASHER / DRYER UTILITY CONNECTIONS 15
REF.: 04/P3.1, 04/133.2, 051M3.1 NO SCALE
1 -1 2 DC -
�?-- -1 "DHW - - .N
-1 /2 "DCW-
I�
KENNEL ROOM
MEP Engineer of Record
Randall A. Nelson, P. E.
14817 West 95th Street
Lenexa, Kansas 66215
Phone 913 322 5150
1/2- WATTS 9D 1 /2 "DCW-
BACKFLOW DEVICE
1/4 TURN BALL VALVE
FOR MANUAL FLUSHING
OF CAGE WASTE HEADER
SECURE PIPING
TO FACE OF WALL
WASTE CONNECTION TO CAGE �p0�
COMPARTMENT, VERIFY EXACT SIZE
AND LOCATION WITH PET CAGE -
VENDOR BEFORE WORK BEGINS
SECURE PIPING
TO FACE OF WALL 3h�
3" PVC CLEANOUT
PLUG TYPICAL TWO
PLACES
5-1/2- FLEXIBLE
BRAIDED STEEL
HOSE INSTALLED
BELOW PET CAGES
?h
Ur
rj�h4c�
r-
�—� N
1 "CW BELOW SLAB
TO FLUSHING
DRAIN ASSEMBLY
MAINTAIN PROPER AIR
GAP PER CODE ON
ALL WASTE LINES
3" WASTE HEADER
INSTALLED TO
BOTTOM SIDE OF
CAGE COMPARTMENTS
PIPING ARRANGEMENT SHOWN IS
SCHEMATIC. ADJUST TO SUIT FIELD
CONDITIONS. REFERENCE FLOOR PLANS
FOR EXACT LOCATIONS OF FLUSH VALVE
AND FLUSHING FLOOR DRAIN AND PIPE
CONNECTION TO THE PET CAGES.
FRONT ELEVATION VIEW
3" WASTE HEA[
PLAN VIEW
CAGE PIPING DETAIL 14 CAGE DRAINAGE DETAIL
REF.: NO SCALE REF.:
-1/2"DCW - - 1 -1/2 "DCW
"I)HW- ROOF
1 -1 /4 "DCW -� - -1 /2 "DCW- -
-1/2 "DHW - -
= 1 %2"[3ZIN 1 -1/2 "DCW
U
\�3/4"DHW
0
Per Qo
3
WMB SK2
FS'
CLEANING CLOSET
WATER PIPING RISER DIAGRAM
REF.:
s3 �b b
A
m
SLOAN "REGAL PRO"
FLUSHOMETER
#150 -1.6 INSTALLED
IN WALL, MOUNT
CENTER OF PUSH
BUTTON AT 36 "AFF-
VACUUM
1" TYPE 'K'
SOFT COPPER
TO BELOW SL
v
3
IDENTIFIER
U
�
7
CHECK VALVE K
�
st
1/4" TURN BALL VALVE
5. EXPOSED
w
GAS DOCK
— ALL PIPING IN EXPOSED LOCATIONS TO ROUTE ALONG WALLS
COF
I�
KENNEL ROOM
MEP Engineer of Record
Randall A. Nelson, P. E.
14817 West 95th Street
Lenexa, Kansas 66215
Phone 913 322 5150
1/2- WATTS 9D 1 /2 "DCW-
BACKFLOW DEVICE
1/4 TURN BALL VALVE
FOR MANUAL FLUSHING
OF CAGE WASTE HEADER
SECURE PIPING
TO FACE OF WALL
WASTE CONNECTION TO CAGE �p0�
COMPARTMENT, VERIFY EXACT SIZE
AND LOCATION WITH PET CAGE -
VENDOR BEFORE WORK BEGINS
SECURE PIPING
TO FACE OF WALL 3h�
3" PVC CLEANOUT
PLUG TYPICAL TWO
PLACES
5-1/2- FLEXIBLE
BRAIDED STEEL
HOSE INSTALLED
BELOW PET CAGES
?h
Ur
rj�h4c�
r-
�—� N
1 "CW BELOW SLAB
TO FLUSHING
DRAIN ASSEMBLY
MAINTAIN PROPER AIR
GAP PER CODE ON
ALL WASTE LINES
3" WASTE HEADER
INSTALLED TO
BOTTOM SIDE OF
CAGE COMPARTMENTS
PIPING ARRANGEMENT SHOWN IS
SCHEMATIC. ADJUST TO SUIT FIELD
CONDITIONS. REFERENCE FLOOR PLANS
FOR EXACT LOCATIONS OF FLUSH VALVE
AND FLUSHING FLOOR DRAIN AND PIPE
CONNECTION TO THE PET CAGES.
FRONT ELEVATION VIEW
3" WASTE HEA[
PLAN VIEW
CAGE PIPING DETAIL 14 CAGE DRAINAGE DETAIL
REF.: NO SCALE REF.:
-1/2"DCW - - 1 -1/2 "DCW
"I)HW- ROOF
1 -1 /4 "DCW -� - -1 /2 "DCW- -
-1/2 "DHW - -
= 1 %2"[3ZIN 1 -1/2 "DCW
U
\�3/4"DHW
0
Per Qo
3
WMB SK2
FS'
CLEANING CLOSET
WATER PIPING RISER DIAGRAM
REF.:
s3 �b b
A
m
SLOAN "REGAL PRO"
FLUSHOMETER
#150 -1.6 INSTALLED
IN WALL, MOUNT
CENTER OF PUSH
BUTTON AT 36 "AFF-
VACUUM
1" TYPE 'K'
SOFT COPPER
TO BELOW SL
CENTER OF DRAIN WATTS #FD -820 -G DIRECTLY FROM THE ROOF DECK.
MORTAR SHALL BE 10" OFF FLUSHING FLOOR DRAIN
FLOOR CAP FACE OF WALL WITH WITH HINGED PERFORATED 1. CAST IRON SOIL PIPE
HINGED SIDE OF GRATE GRATE AND FRAME - FIVE FOOT (5') INTERVALS EXCEPT WHERE TEN FOOT (10') LENGTHS OF
CONCRETE
FLOOR SLAB ON WALL SIDE OF DRAIN CAST IRON SOIL PIPE ARE USED. TEN FOOT (10') INTERVALS BETWEEN
� --� LL -
SUPPORTS ARE ACCEPTABLE.
2. STEEL THREADED PIPE
- 1 -1 /4" IN DIAMETER OR LESS - EIGHT FOOT (8') INTERVALS
1" TYPE 'K' (SOFT.___-..___.".. _ M REDUCING TEE _ - 1 -1/2" AND OVER - TEN FOOT (10') INTERVALS.
CONNECTION WITH
COPPER, NO JOINTS BRAZED JOINTS, 3. COPPER TUBE
UNDER FLOOR), SEE REFERENCE - 1 -1/4" OR LESS - SIX FOOT (6') INTERVALS.
PIPE SPEC. COVER SPECIFICATIONS - 1 -1/2" OR OVER - TEN FOOT (10') INTERVALS.
WITH ARMAFLEX
4. PLASTIC (PVC AND ABS) PIPE
PLUMBING- vYN[BOLS -
- 1 -1/2" OR LESS - THREE FOOT (3') INTERVALS.
IDENTIFIER
- DESCRIPTI JNL
- 2" OR OVER - FOUR FOOT (4') INTERVALS.
7
CHECK VALVE K
CONNECTED TO THE ACTIVE SYSTEM.
1/4" TURN BALL VALVE
5. EXPOSED
w
GAS DOCK
— ALL PIPING IN EXPOSED LOCATIONS TO ROUTE ALONG WALLS
COF
GAS PRESSURE REGULATOR
OR STRUCTURE.
III
UNION
REQUIRED INSPECTIONS.
COF d
CLEANOUT FLOOR MOUNTED
COW (I--
CLEANOUT IN WALL
REFER TO SPECIFICATIONS, SCHEDULES AND NOTES FOR MORE INFORMATION.
1. COORDINATE LOCATIONS OF ALL PLUMBING PIPING AND SPRINKLER PIPING
WATER METER
PIPING ARRANGEMENT SHOWN IS SCHEMATIC. VERIFY ALL CONNECTION SIZES
®
GAS METER
AND LOCATIONS PER MANUFACTURER'S REQUIREMENTS. ADJUST TO SUIT
T
THERMOMETER
FIELD CONDITIONS. REFER TO FLOOR PLANS FOR PIPE SIZES.
WALL HYDRANT
ADDENDUM #1
FD
FLOOR DRAIN
FS tn
FLOOR SINK
XX
1
Px
EQUIPMENT DESIGNATION
PLUMBING FIXTURE TAG "
12
ISOLATION VALVES AT ALL FIXTURES AND VALVES FOR EACH WATER PIPE
VTR
VENT THROUGH ROOF
SUPPLYING A FIXTURE GROUP (E.G. TOILET ROOM, GROOMING AREA, ETC.)
- COMMON WALL
0°
DETAIL CALLOUT
BETWEEN TWO
XXX
NO SCALE
COMFORT ROOMS
NO SCALE
CONNECT 70 EXISTING
— -SAN- -
SANITARY SEWER PIPING BELOW FLOOR
CD
CONDENSATE PIPING
-SLOAN #WB -1 -A ACCESS COVER PLATE WITH
WALL BOX FRAME, CENTER FRAME ON
V
VENT PIPING
CENTERLINE OF PUSH BUTTON OF FLUSH VALVE
DCW
COLD WATER PIPING
DHW
HOT WATER PIPING
- INSTALL 1/8" THICK 304 STAINLESS STEEL
CHAIN FOR LIFTING OF FLOOR DRAIN GRATE
_ _
HWR
HOT WATER RECIRCULATING PIPING
JUST BELOW FLUSH VALVE COVER PLATE.
CHAIN SHALL BE LONG ENOUGH TO HANG
GAS
GAS PIPING
FLUSH TO FACE OF WALL AND FLOOR FOR
HORIZONTAL PIPING SUPPORT
CHAIN NOT TO BE A TRIPPING OR ENTANGLING
HAZARD
HORIZONTAL PIPE OF
THE FOLLOWING MATERIALS SHALL BE SUPPORTED
ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS BUT NOT LESS
THAN THE DISTANCES
LISTED BELOW. NO PIPING IS TO BE SUPPORTED
CENTER OF DRAIN WATTS #FD -820 -G DIRECTLY FROM THE ROOF DECK.
MORTAR SHALL BE 10" OFF FLUSHING FLOOR DRAIN
FLOOR CAP FACE OF WALL WITH WITH HINGED PERFORATED 1. CAST IRON SOIL PIPE
HINGED SIDE OF GRATE GRATE AND FRAME - FIVE FOOT (5') INTERVALS EXCEPT WHERE TEN FOOT (10') LENGTHS OF
CONCRETE
FLOOR SLAB ON WALL SIDE OF DRAIN CAST IRON SOIL PIPE ARE USED. TEN FOOT (10') INTERVALS BETWEEN
� --� LL -
SUPPORTS ARE ACCEPTABLE.
2. STEEL THREADED PIPE
- 1 -1 /4" IN DIAMETER OR LESS - EIGHT FOOT (8') INTERVALS
1" TYPE 'K' (SOFT.___-..___.".. _ M REDUCING TEE _ - 1 -1/2" AND OVER - TEN FOOT (10') INTERVALS.
CONNECTION WITH
COPPER, NO JOINTS BRAZED JOINTS, 3. COPPER TUBE
UNDER FLOOR), SEE REFERENCE - 1 -1/4" OR LESS - SIX FOOT (6') INTERVALS.
PIPE SPEC. COVER SPECIFICATIONS - 1 -1/2" OR OVER - TEN FOOT (10') INTERVALS.
WITH ARMAFLEX
4. PLASTIC (PVC AND ABS) PIPE
fm
FLOOR ; ` "{ FS
.d- yr- *" •.. `}y° "
4 SAN
4"S AN 4 "SAN
D
0
7m
PETCO ANIMAL MIAMI DADE ADOPTION CENTER
SUPPLIES STORES, INC. 6200 SOUTH DIXIE HWY
SAN RICKAND
ANTONIO, TEXAS 82 SOUTH MIAMI, FL 33143
SAN ANTONIO, TEXAS 78245
I1d
cv 15
131.1
SI
4 "SAN
3 " SAN _j
4 "SAN
ON EACH UNDERSLAB PIPE BRANCH, AQUARIUM GROUP, AND AT EACH
SIDE OF VENDOR- SUPPLIED EQUIPMENT. DO NOT LOCATE ISOLATION
VALVES ABOVE HARD CEILINGS.
3. MAINTAIN MINIMUM 10' -0" BETWEEN OUTSIDE AIR INTAKES AND ANY
EXHAUST OUTLET OR PLUMBING VENT.
2 "V 4. PROVIDE SCALD GUARD ON ALL TRAPS AND HOT WATER SUPPLIES OF
SINKS AND LAVATORIES WHERE EXPOSED TO OPEN KNEE SPACE.
5. REFER TO ARCHITECTURAL PLANS AND PROJECT MANUAL FOR TRENCHING
DETAILS AND SLAB REPAIRS.
6. WHERE DEMOLITION IS REQUIRED, CAP OFF WATER AND SANITARY PIPING
= MADE OBSOLETE REMOVE ALL ABOVE SLAB PIPING ABANDON ALL
3/4" TYPE 'K' SOFT CAST IRON
- 1 -1/2" OR LESS - THREE FOOT (3') INTERVALS.
DATE
COPPER TO FLUSHING P -TRAP WITH
- 2" OR OVER - FOUR FOOT (4') INTERVALS.
7
FLOOR DRAIN FLUSHING
CONNECTED TO THE ACTIVE SYSTEM.
CONNECTION
5. EXPOSED
3/4" TYPE 'K' FURNISHED WITH
— ALL PIPING IN EXPOSED LOCATIONS TO ROUTE ALONG WALLS
COF
SOFT COPPER TO FLUSHING FLOOR
OR STRUCTURE.
1320336
FLUSHING P -TRAP DRAIN
REQUIRED INSPECTIONS.
PLUMBING GENERAL NOTES
ar
REFER TO SPECIFICATIONS, SCHEDULES AND NOTES FOR MORE INFORMATION.
1. COORDINATE LOCATIONS OF ALL PLUMBING PIPING AND SPRINKLER PIPING
"
3 CAGE
PIPING ARRANGEMENT SHOWN IS SCHEMATIC. VERIFY ALL CONNECTION SIZES
r "
TO CLEAR INTAKE LOUVERS: PROVIDE 10 -0 CLEARANCE IN ALL
WASTE LINE
AND LOCATIONS PER MANUFACTURER'S REQUIREMENTS. ADJUST TO SUIT
DIRECTIONS FROM VENTS THROUGH ROOF TO OUTSIDE AIR INTAKES.
SIDE ELEVATION VIEW
FIELD CONDITIONS. REFER TO FLOOR PLANS FOR PIPE SIZES.
1794
ADDENDUM #1
2. THE FLOOR PLANS AND RISERS DO NOT SHOW ALL VALVES. PROVIDE
13
FLUSHING FLOOR DRAIN DETAIL
12
ISOLATION VALVES AT ALL FIXTURES AND VALVES FOR EACH WATER PIPE
02 -26-14
SUPPLYING A FIXTURE GROUP (E.G. TOILET ROOM, GROOMING AREA, ETC.)
JH /JMMITJA
NO SCALE
REF.:
NO SCALE
FOR EASE OF SERVICE AND MAINTENANCE PROVIDE ISOLATION VALVE
fm
FLOOR ; ` "{ FS
.d- yr- *" •.. `}y° "
4 SAN
4"S AN 4 "SAN
D
0
7m
PETCO ANIMAL MIAMI DADE ADOPTION CENTER
SUPPLIES STORES, INC. 6200 SOUTH DIXIE HWY
SAN RICKAND
ANTONIO, TEXAS 82 SOUTH MIAMI, FL 33143
SAN ANTONIO, TEXAS 78245
I1d
cv 15
131.1
SI
4 "SAN
3 " SAN _j
4 "SAN
ON EACH UNDERSLAB PIPE BRANCH, AQUARIUM GROUP, AND AT EACH
SIDE OF VENDOR- SUPPLIED EQUIPMENT. DO NOT LOCATE ISOLATION
VALVES ABOVE HARD CEILINGS.
3. MAINTAIN MINIMUM 10' -0" BETWEEN OUTSIDE AIR INTAKES AND ANY
EXHAUST OUTLET OR PLUMBING VENT.
2 "V 4. PROVIDE SCALD GUARD ON ALL TRAPS AND HOT WATER SUPPLIES OF
SINKS AND LAVATORIES WHERE EXPOSED TO OPEN KNEE SPACE.
5. REFER TO ARCHITECTURAL PLANS AND PROJECT MANUAL FOR TRENCHING
DETAILS AND SLAB REPAIRS.
6. WHERE DEMOLITION IS REQUIRED, CAP OFF WATER AND SANITARY PIPING
= MADE OBSOLETE REMOVE ALL ABOVE SLAB PIPING ABANDON ALL
SANITARY PIPING RISER DIAGRAM 02 CODES AND AUTHORITIES HAVING JURISDICTION AND PER PLUMBING
SPECIFICATIONS.
REF.: NO SCALE
DISTRIBUTION:
N
DISTRIBUTION:
DATE
DISTRIBUTION:
OBSOLETE UNDERSLAB PIPING. NO UNUSED PIPING SHALL REMAIN
DISTRIBUTION:
DATE:
CONNECTED TO THE ACTIVE SYSTEM.
98% SUBMISSION
7. COORDINATE ACTIVITIES WITH LOCAL UTILITIES (WATER, SEWER, GAS) AND
SHALL INCLUDE ALL UTILITY REQUIREMENTS INCLUDING, BUT NOT LIMITED
COF
TD
TO, MATERIALS, LABOR AND METERING CLEARANCES. CONTRACTOR SHALL
SECURE, PAY AND SCHEDULE ALL REQUIRED PERMITS, FEES, AND
1320336
!,
za 4 SAN
REQUIRED INSPECTIONS.
ar
8. FOR WATER CLOSETS, SINKS, AND LAVATORIES, PROVIDE ALL NECESSARY
PETCO P.M. JOB#
SUPPLY AND DRAINAGE FITTINGS FOR CONNECTIONS TO BUILDING
BUILDING DEPT COMMENTS
SYSTEMS. ON SUPPLY PIPING, PROVIDE WHEEL HANDLE STOPS OR
1/4 -TURN BALL VALVE - NO KEYED STOPS ARE PERMITTED. M
9. PROVIDE WATER HAMMER ARRESTORS AND TRAP PRIMERS AS PER LOCAL
SANITARY PIPING RISER DIAGRAM 02 CODES AND AUTHORITIES HAVING JURISDICTION AND PER PLUMBING
SPECIFICATIONS.
REF.: NO SCALE
DISTRIBUTION:
DATE:
DISTRIBUTION:
DATE
DISTRIBUTION:
DATE:
DISTRIBUTION:
DATE:
ACERTUSJOB#
98% SUBMISSION
12 -04-13
1320336
100% PERMIT SUBMISSION
12 -11 -13
PETCO P.M. JOB#
BUILDING DEPT COMMENTS
01 -27 -14
1794
ADDENDUM #1
01.31 -14
DRAM
ADDENDUM #2
02 -26-14
JH /JMMITJA
CHECKED:
BJT
DRAWING TITLE:
PLUMBING
GENERAL INFORMATION
AND
SCHEDULES
I maim