Loading...
14-17R-0110 m s 0 w CL S2 0 Z a 0 W U m 0 to C U-' i 0: 0 C 0 a M N I R:7 r 1 DRYER VENT IN WALL TO VENT CAP• DRYERBOX BY HVAC > CONTRACTOR. GAS CONNECTION--\ SOLIDS INTERCEPTOR ELEVATION VIEW GAS LINE RECEPTACLE- -\ DRYERBOX 6" MIN I r 4" 28" L L 1- 27" PLAN VIEW PLUMBING FIXTURE SCHEDULE TAG DESCRIPTION FIXTURE (SELECT ONE MFR ) TRIM (SELECT ONE MFR ) PIPE SIZES SFU DFU REMARKS st 1/4" TURN BALL VALVE MANUFACTURER MODEL MFR MODEL TRAP WASTE VENT CW HW REQUIRED INSPECTIONS. COF d JAY R. SMITH 5618BS COW (I-- CLEANOUT IN WALL REFER TO SPECIFICATIONS, SCHEDULES AND NOTES FOR MORE INFORMATION. 1. COORDINATE LOCATIONS OF ALL PLUMBING PIPING AND SPRINKLER PIPING WATER METER PIPING ARRANGEMENT SHOWN IS SCHEMATIC. VERIFY ALL CONNECTION SIZES ® GAS METER AND LOCATIONS PER MANUFACTURER'S REQUIREMENTS. ADJUST TO SUIT T HB HOSE BIBB WADE 8601MT ADDENDUM #1 FD -- -- -- 3/4" -- -- -- KEY - OPERATED WALL HYDRANT ISOLATION VALVES AT ALL FIXTURES AND VALVES FOR EACH WATER PIPE VTR ZURN Z1333 -C SUPPLYING A FIXTURE GROUP (E.G. TOILET ROOM, GROOMING AREA, ETC.) - COMMON WALL 0° DETAIL CALLOUT BETWEEN TWO XXX NO SCALE COMFORT ROOMS NO SCALE CONNECT 70 EXISTING FLUSHING FLOOR — -SAN- - SANITARY SEWER PIPING BELOW FLOOR CD CONDENSATE PIPING -SLOAN #WB -1 -A ACCESS COVER PLATE WITH WALL BOX FRAME, CENTER FRAME ON V VENT PIPING FLUSHING RIM FLOOR DRAIN WITH WHITE EPDXY COATED CAST IRON BODY, 3/4" FS DRAIN WITH WATTS FD -820 -G COLD WATER PIPING 3" 3" 2" -- -- -- 3 IPS FLUSHING CONNECTION, NICKEL BRONZE TOP WITH HINGED PERFORATED GRATE. JUST BELOW FLUSH VALVE COVER PLATE. FLUSHING P -TRAP NO SUBSTITUTIONS GAS GAS PIPING FLUSH TO FACE OF WALL AND FLOOR FOR HORIZONTAL PIPING SUPPORT CHAIN NOT TO BE A TRIPPING OR ENTANGLING HAZARD PROVIDE WITH FACTORY DEEP SEAL P -TRAP WITH 3/4" FLUSHING CONNECTION. HORIZONTAL PIPE OF FLUSH VALVE ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS BUT NOT LESS THAN THE DISTANCES LISTED BELOW. NO PIPING IS TO BE SUPPORTED ENCLOSED 1.6 GALLON PER FLUSH MANUAL OPERATED NON - HOLD -OPEN CHROME PLATED PUSH BUTTON FLUSH FV WITH STAINLESS SLOAN 150- 1.6 -WB -- -- -- 1 -1/4" -- 10 -- VALVE WITH CHLORAMINE RESISTANT DIAPHRAGM WITH PROTECTED ORIFICE, HIGH BACK PRESSURE VACUUM STEEL COVER PLATE BREAKER, HANDWHEEL STOP VALVE, STAINLESS STEEL WALL PLATE WITH MOUNTING FRAME. FIBERGLASS FLOOR SERVICE SINK, 3" DRAIN WITH OPEN GRID STRAINER, MS MOP SINK FIAT MSB2424 FIAT 830 AA 2" 2" 2" 1/2" 1/2" 3 3 FAUCET WITH TOP BRACE, STOPS & VACUUM BREAKER WORK - RO-O. M — S..aP..L: A-_ Sa_ H , SQUARE CORNER CONSTRUCTION S- TU-R--D,- IB — U. ILT � .. T_ YP e E _- .3: -0, 4 _ . _.S. T_A- IN-L- E.� SS - -.ST- E E,.. L WITH 24" - �D-R�A- IN _.,B- O;-A- Rmo, t -8. _ BAC K SK2 SINK ELKAY SS- 8124 -(L OR R) ELKAY LK940GN04T4H 2" 2" 2" 1/2" 1/2" 3 2 #LK -18B GRID STRAINER WITH TAILPIECE, FOUR TUBULAR STEEL LEGS. VERIFY DRAIN BOARD SIDE (LEFT OR RIGHT) STAINLESS STEEL WITH FLOOR PLAN. PROVIDE 1.6 GPM FLOW RESTRICTOR. 6" WIDE, PRE- SLOPED, HIGH DENSITY POLYETHYLENE TRENCH DRAIN. 48" LONG, RADIUS BOTTOM, 4" WIDE TD TRENCH WADE WN900 -091 3" 3" 2" -- -- -- 3 THROAT, 3" OUTLET. PROVIDE CUSTOM FABRICATED SOLID STAINLESS STEEL COVER. COORDINATE EXACT COVER DRAIN REQUIREMENTS WITH PETCO PM PRIOR TO BID. 3/4" GAS LINE REFERENCE PLAN FOR CONTINUATION DIRT LEG RECEPTACLE OUTLET BOX. 2" COPPER STANDPIPE I1 EXPOSED WITH ONE (1) 90' ELBOW. 11 PIPE MOUNTING BRACKET I) B -LINE #83198 -% " ALL THREAD I B -LINE #B3199H 2" HINGED EXTENSION SPLIT II 30" PIPE CLAMP. (TYPICAL), II FASTEN TO WALL. I 7-1/4" I FLOOR 2" WASTE AND VENT IN WALL. SEE PLANS FOR ROUGH -IN LOCATIONS. DROP COLD WATER AND HOT WATER IN WALL TO HOSE BOX USE ONLY ONE 900 ELL ON OUTLET OF SOLIDS INTERCEPTOR BEFORE CONNECTION TO VERTICAL WASTE AND VENT WASHER STANDPIPE STACKABLE DRYER & WASHER NOTE: ARRANGEMENT MAY BE MIRRORED. FROM POSITION SHOWN WASHER / DRYER UTILITY CONNECTIONS 15 REF.: 04/P3.1, 04/133.2, 051M3.1 NO SCALE 1 -1 2 DC - �?-- -1 "DHW - - .N -1 /2 "DCW- I� KENNEL ROOM MEP Engineer of Record Randall A. Nelson, P. E. 14817 West 95th Street Lenexa, Kansas 66215 Phone 913 322 5150 1/2- WATTS 9D 1 /2 "DCW- BACKFLOW DEVICE 1/4 TURN BALL VALVE FOR MANUAL FLUSHING OF CAGE WASTE HEADER SECURE PIPING TO FACE OF WALL WASTE CONNECTION TO CAGE �p0� COMPARTMENT, VERIFY EXACT SIZE AND LOCATION WITH PET CAGE - VENDOR BEFORE WORK BEGINS SECURE PIPING TO FACE OF WALL 3h� 3" PVC CLEANOUT PLUG TYPICAL TWO PLACES 5-1/2- FLEXIBLE BRAIDED STEEL HOSE INSTALLED BELOW PET CAGES ?h Ur rj�h4c� r- �—� N 1 "CW BELOW SLAB TO FLUSHING DRAIN ASSEMBLY MAINTAIN PROPER AIR GAP PER CODE ON ALL WASTE LINES 3" WASTE HEADER INSTALLED TO BOTTOM SIDE OF CAGE COMPARTMENTS PIPING ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST TO SUIT FIELD CONDITIONS. REFERENCE FLOOR PLANS FOR EXACT LOCATIONS OF FLUSH VALVE AND FLUSHING FLOOR DRAIN AND PIPE CONNECTION TO THE PET CAGES. FRONT ELEVATION VIEW 3" WASTE HEA[ PLAN VIEW CAGE PIPING DETAIL 14 CAGE DRAINAGE DETAIL REF.: NO SCALE REF.: -1/2"DCW - - 1 -1/2 "DCW "I)HW- ROOF 1 -1 /4 "DCW -� - -1 /2 "DCW- - -1/2 "DHW - - = 1 %2"[3ZIN 1 -1/2 "DCW U \�3/4"DHW 0 Per Qo 3 WMB SK2 FS' CLEANING CLOSET WATER PIPING RISER DIAGRAM REF.: s3 �b b A m SLOAN "REGAL PRO" FLUSHOMETER #150 -1.6 INSTALLED IN WALL, MOUNT CENTER OF PUSH BUTTON AT 36 "AFF- VACUUM 1" TYPE 'K' SOFT COPPER TO BELOW SL v 3 IDENTIFIER U � 7 CHECK VALVE K � st 1/4" TURN BALL VALVE 5. EXPOSED w GAS DOCK — ALL PIPING IN EXPOSED LOCATIONS TO ROUTE ALONG WALLS COF I� KENNEL ROOM MEP Engineer of Record Randall A. Nelson, P. E. 14817 West 95th Street Lenexa, Kansas 66215 Phone 913 322 5150 1/2- WATTS 9D 1 /2 "DCW- BACKFLOW DEVICE 1/4 TURN BALL VALVE FOR MANUAL FLUSHING OF CAGE WASTE HEADER SECURE PIPING TO FACE OF WALL WASTE CONNECTION TO CAGE �p0� COMPARTMENT, VERIFY EXACT SIZE AND LOCATION WITH PET CAGE - VENDOR BEFORE WORK BEGINS SECURE PIPING TO FACE OF WALL 3h� 3" PVC CLEANOUT PLUG TYPICAL TWO PLACES 5-1/2- FLEXIBLE BRAIDED STEEL HOSE INSTALLED BELOW PET CAGES ?h Ur rj�h4c� r- �—� N 1 "CW BELOW SLAB TO FLUSHING DRAIN ASSEMBLY MAINTAIN PROPER AIR GAP PER CODE ON ALL WASTE LINES 3" WASTE HEADER INSTALLED TO BOTTOM SIDE OF CAGE COMPARTMENTS PIPING ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST TO SUIT FIELD CONDITIONS. REFERENCE FLOOR PLANS FOR EXACT LOCATIONS OF FLUSH VALVE AND FLUSHING FLOOR DRAIN AND PIPE CONNECTION TO THE PET CAGES. FRONT ELEVATION VIEW 3" WASTE HEA[ PLAN VIEW CAGE PIPING DETAIL 14 CAGE DRAINAGE DETAIL REF.: NO SCALE REF.: -1/2"DCW - - 1 -1/2 "DCW "I)HW- ROOF 1 -1 /4 "DCW -� - -1 /2 "DCW- - -1/2 "DHW - - = 1 %2"[3ZIN 1 -1/2 "DCW U \�3/4"DHW 0 Per Qo 3 WMB SK2 FS' CLEANING CLOSET WATER PIPING RISER DIAGRAM REF.: s3 �b b A m SLOAN "REGAL PRO" FLUSHOMETER #150 -1.6 INSTALLED IN WALL, MOUNT CENTER OF PUSH BUTTON AT 36 "AFF- VACUUM 1" TYPE 'K' SOFT COPPER TO BELOW SL CENTER OF DRAIN WATTS #FD -820 -G DIRECTLY FROM THE ROOF DECK. MORTAR SHALL BE 10" OFF FLUSHING FLOOR DRAIN FLOOR CAP FACE OF WALL WITH WITH HINGED PERFORATED 1. CAST IRON SOIL PIPE HINGED SIDE OF GRATE GRATE AND FRAME - FIVE FOOT (5') INTERVALS EXCEPT WHERE TEN FOOT (10') LENGTHS OF CONCRETE FLOOR SLAB ON WALL SIDE OF DRAIN CAST IRON SOIL PIPE ARE USED. TEN FOOT (10') INTERVALS BETWEEN � --� LL - SUPPORTS ARE ACCEPTABLE. 2. STEEL THREADED PIPE - 1 -1 /4" IN DIAMETER OR LESS - EIGHT FOOT (8') INTERVALS 1" TYPE 'K' (SOFT.___-..___.".. _ M REDUCING TEE _ - 1 -1/2" AND OVER - TEN FOOT (10') INTERVALS. CONNECTION WITH COPPER, NO JOINTS BRAZED JOINTS, 3. COPPER TUBE UNDER FLOOR), SEE REFERENCE - 1 -1/4" OR LESS - SIX FOOT (6') INTERVALS. PIPE SPEC. COVER SPECIFICATIONS - 1 -1/2" OR OVER - TEN FOOT (10') INTERVALS. WITH ARMAFLEX 4. PLASTIC (PVC AND ABS) PIPE PLUMBING- vYN[BOLS - - 1 -1/2" OR LESS - THREE FOOT (3') INTERVALS. IDENTIFIER - DESCRIPTI JNL - 2" OR OVER - FOUR FOOT (4') INTERVALS. 7 CHECK VALVE K CONNECTED TO THE ACTIVE SYSTEM. 1/4" TURN BALL VALVE 5. EXPOSED w GAS DOCK — ALL PIPING IN EXPOSED LOCATIONS TO ROUTE ALONG WALLS COF GAS PRESSURE REGULATOR OR STRUCTURE. III UNION REQUIRED INSPECTIONS. COF d CLEANOUT FLOOR MOUNTED COW (I-- CLEANOUT IN WALL REFER TO SPECIFICATIONS, SCHEDULES AND NOTES FOR MORE INFORMATION. 1. COORDINATE LOCATIONS OF ALL PLUMBING PIPING AND SPRINKLER PIPING WATER METER PIPING ARRANGEMENT SHOWN IS SCHEMATIC. VERIFY ALL CONNECTION SIZES ® GAS METER AND LOCATIONS PER MANUFACTURER'S REQUIREMENTS. ADJUST TO SUIT T THERMOMETER FIELD CONDITIONS. REFER TO FLOOR PLANS FOR PIPE SIZES. WALL HYDRANT ADDENDUM #1 FD FLOOR DRAIN FS tn FLOOR SINK XX 1 Px EQUIPMENT DESIGNATION PLUMBING FIXTURE TAG " 12 ISOLATION VALVES AT ALL FIXTURES AND VALVES FOR EACH WATER PIPE VTR VENT THROUGH ROOF SUPPLYING A FIXTURE GROUP (E.G. TOILET ROOM, GROOMING AREA, ETC.) - COMMON WALL 0° DETAIL CALLOUT BETWEEN TWO XXX NO SCALE COMFORT ROOMS NO SCALE CONNECT 70 EXISTING — -SAN- - SANITARY SEWER PIPING BELOW FLOOR CD CONDENSATE PIPING -SLOAN #WB -1 -A ACCESS COVER PLATE WITH WALL BOX FRAME, CENTER FRAME ON V VENT PIPING CENTERLINE OF PUSH BUTTON OF FLUSH VALVE DCW COLD WATER PIPING DHW HOT WATER PIPING - INSTALL 1/8" THICK 304 STAINLESS STEEL CHAIN FOR LIFTING OF FLOOR DRAIN GRATE _ _ HWR HOT WATER RECIRCULATING PIPING JUST BELOW FLUSH VALVE COVER PLATE. CHAIN SHALL BE LONG ENOUGH TO HANG GAS GAS PIPING FLUSH TO FACE OF WALL AND FLOOR FOR HORIZONTAL PIPING SUPPORT CHAIN NOT TO BE A TRIPPING OR ENTANGLING HAZARD HORIZONTAL PIPE OF THE FOLLOWING MATERIALS SHALL BE SUPPORTED ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS BUT NOT LESS THAN THE DISTANCES LISTED BELOW. NO PIPING IS TO BE SUPPORTED CENTER OF DRAIN WATTS #FD -820 -G DIRECTLY FROM THE ROOF DECK. MORTAR SHALL BE 10" OFF FLUSHING FLOOR DRAIN FLOOR CAP FACE OF WALL WITH WITH HINGED PERFORATED 1. CAST IRON SOIL PIPE HINGED SIDE OF GRATE GRATE AND FRAME - FIVE FOOT (5') INTERVALS EXCEPT WHERE TEN FOOT (10') LENGTHS OF CONCRETE FLOOR SLAB ON WALL SIDE OF DRAIN CAST IRON SOIL PIPE ARE USED. TEN FOOT (10') INTERVALS BETWEEN � --� LL - SUPPORTS ARE ACCEPTABLE. 2. STEEL THREADED PIPE - 1 -1 /4" IN DIAMETER OR LESS - EIGHT FOOT (8') INTERVALS 1" TYPE 'K' (SOFT.___-..___.".. _ M REDUCING TEE _ - 1 -1/2" AND OVER - TEN FOOT (10') INTERVALS. CONNECTION WITH COPPER, NO JOINTS BRAZED JOINTS, 3. COPPER TUBE UNDER FLOOR), SEE REFERENCE - 1 -1/4" OR LESS - SIX FOOT (6') INTERVALS. PIPE SPEC. COVER SPECIFICATIONS - 1 -1/2" OR OVER - TEN FOOT (10') INTERVALS. WITH ARMAFLEX 4. PLASTIC (PVC AND ABS) PIPE fm FLOOR ; ` "{ FS .d- yr- *" •.. `}y° " 4 SAN 4"S AN 4 "SAN D 0 7m PETCO ANIMAL MIAMI DADE ADOPTION CENTER SUPPLIES STORES, INC. 6200 SOUTH DIXIE HWY SAN RICKAND ANTONIO, TEXAS 82 SOUTH MIAMI, FL 33143 SAN ANTONIO, TEXAS 78245 I1d cv 15 131.1 SI 4 "SAN 3 " SAN _j 4 "SAN ON EACH UNDERSLAB PIPE BRANCH, AQUARIUM GROUP, AND AT EACH SIDE OF VENDOR- SUPPLIED EQUIPMENT. DO NOT LOCATE ISOLATION VALVES ABOVE HARD CEILINGS. 3. MAINTAIN MINIMUM 10' -0" BETWEEN OUTSIDE AIR INTAKES AND ANY EXHAUST OUTLET OR PLUMBING VENT. 2 "V 4. PROVIDE SCALD GUARD ON ALL TRAPS AND HOT WATER SUPPLIES OF SINKS AND LAVATORIES WHERE EXPOSED TO OPEN KNEE SPACE. 5. REFER TO ARCHITECTURAL PLANS AND PROJECT MANUAL FOR TRENCHING DETAILS AND SLAB REPAIRS. 6. WHERE DEMOLITION IS REQUIRED, CAP OFF WATER AND SANITARY PIPING = MADE OBSOLETE REMOVE ALL ABOVE SLAB PIPING ABANDON ALL 3/4" TYPE 'K' SOFT CAST IRON - 1 -1/2" OR LESS - THREE FOOT (3') INTERVALS. DATE COPPER TO FLUSHING P -TRAP WITH - 2" OR OVER - FOUR FOOT (4') INTERVALS. 7 FLOOR DRAIN FLUSHING CONNECTED TO THE ACTIVE SYSTEM. CONNECTION 5. EXPOSED 3/4" TYPE 'K' FURNISHED WITH — ALL PIPING IN EXPOSED LOCATIONS TO ROUTE ALONG WALLS COF SOFT COPPER TO FLUSHING FLOOR OR STRUCTURE. 1320336 FLUSHING P -TRAP DRAIN REQUIRED INSPECTIONS. PLUMBING GENERAL NOTES ar REFER TO SPECIFICATIONS, SCHEDULES AND NOTES FOR MORE INFORMATION. 1. COORDINATE LOCATIONS OF ALL PLUMBING PIPING AND SPRINKLER PIPING " 3 CAGE PIPING ARRANGEMENT SHOWN IS SCHEMATIC. VERIFY ALL CONNECTION SIZES r " TO CLEAR INTAKE LOUVERS: PROVIDE 10 -0 CLEARANCE IN ALL WASTE LINE AND LOCATIONS PER MANUFACTURER'S REQUIREMENTS. ADJUST TO SUIT DIRECTIONS FROM VENTS THROUGH ROOF TO OUTSIDE AIR INTAKES. SIDE ELEVATION VIEW FIELD CONDITIONS. REFER TO FLOOR PLANS FOR PIPE SIZES. 1794 ADDENDUM #1 2. THE FLOOR PLANS AND RISERS DO NOT SHOW ALL VALVES. PROVIDE 13 FLUSHING FLOOR DRAIN DETAIL 12 ISOLATION VALVES AT ALL FIXTURES AND VALVES FOR EACH WATER PIPE 02 -26-14 SUPPLYING A FIXTURE GROUP (E.G. TOILET ROOM, GROOMING AREA, ETC.) JH /JMMITJA NO SCALE REF.: NO SCALE FOR EASE OF SERVICE AND MAINTENANCE PROVIDE ISOLATION VALVE fm FLOOR ; ` "{ FS .d- yr- *" •.. `}y° " 4 SAN 4"S AN 4 "SAN D 0 7m PETCO ANIMAL MIAMI DADE ADOPTION CENTER SUPPLIES STORES, INC. 6200 SOUTH DIXIE HWY SAN RICKAND ANTONIO, TEXAS 82 SOUTH MIAMI, FL 33143 SAN ANTONIO, TEXAS 78245 I1d cv 15 131.1 SI 4 "SAN 3 " SAN _j 4 "SAN ON EACH UNDERSLAB PIPE BRANCH, AQUARIUM GROUP, AND AT EACH SIDE OF VENDOR- SUPPLIED EQUIPMENT. DO NOT LOCATE ISOLATION VALVES ABOVE HARD CEILINGS. 3. MAINTAIN MINIMUM 10' -0" BETWEEN OUTSIDE AIR INTAKES AND ANY EXHAUST OUTLET OR PLUMBING VENT. 2 "V 4. PROVIDE SCALD GUARD ON ALL TRAPS AND HOT WATER SUPPLIES OF SINKS AND LAVATORIES WHERE EXPOSED TO OPEN KNEE SPACE. 5. REFER TO ARCHITECTURAL PLANS AND PROJECT MANUAL FOR TRENCHING DETAILS AND SLAB REPAIRS. 6. WHERE DEMOLITION IS REQUIRED, CAP OFF WATER AND SANITARY PIPING = MADE OBSOLETE REMOVE ALL ABOVE SLAB PIPING ABANDON ALL SANITARY PIPING RISER DIAGRAM 02 CODES AND AUTHORITIES HAVING JURISDICTION AND PER PLUMBING SPECIFICATIONS. REF.: NO SCALE DISTRIBUTION: N DISTRIBUTION: DATE DISTRIBUTION: OBSOLETE UNDERSLAB PIPING. NO UNUSED PIPING SHALL REMAIN DISTRIBUTION: DATE: CONNECTED TO THE ACTIVE SYSTEM. 98% SUBMISSION 7. COORDINATE ACTIVITIES WITH LOCAL UTILITIES (WATER, SEWER, GAS) AND SHALL INCLUDE ALL UTILITY REQUIREMENTS INCLUDING, BUT NOT LIMITED COF TD TO, MATERIALS, LABOR AND METERING CLEARANCES. CONTRACTOR SHALL SECURE, PAY AND SCHEDULE ALL REQUIRED PERMITS, FEES, AND 1320336 !, za 4 SAN REQUIRED INSPECTIONS. ar 8. FOR WATER CLOSETS, SINKS, AND LAVATORIES, PROVIDE ALL NECESSARY PETCO P.M. JOB# SUPPLY AND DRAINAGE FITTINGS FOR CONNECTIONS TO BUILDING BUILDING DEPT COMMENTS SYSTEMS. ON SUPPLY PIPING, PROVIDE WHEEL HANDLE STOPS OR 1/4 -TURN BALL VALVE - NO KEYED STOPS ARE PERMITTED. M 9. PROVIDE WATER HAMMER ARRESTORS AND TRAP PRIMERS AS PER LOCAL SANITARY PIPING RISER DIAGRAM 02 CODES AND AUTHORITIES HAVING JURISDICTION AND PER PLUMBING SPECIFICATIONS. REF.: NO SCALE DISTRIBUTION: DATE: DISTRIBUTION: DATE DISTRIBUTION: DATE: DISTRIBUTION: DATE: ACERTUSJOB# 98% SUBMISSION 12 -04-13 1320336 100% PERMIT SUBMISSION 12 -11 -13 PETCO P.M. JOB# BUILDING DEPT COMMENTS 01 -27 -14 1794 ADDENDUM #1 01.31 -14 DRAM ADDENDUM #2 02 -26-14 JH /JMMITJA CHECKED: BJT DRAWING TITLE: PLUMBING GENERAL INFORMATION AND SCHEDULES I maim