14-17R-002LjJW o
wZ
Cra �
I o
°U) a
a
U) >- U
z
Q u°J
1= O N
°z U o
of
zW
�Q
W U
P �
Jw z =
v
=a Q
2
a a cmn
F- J =
LL =
CC
o z o
C) Q 0
Q O
_
_
10
cv
4
SBLM Architects
11430 N Kendall Drive, Suite 310
Miami, FL 33176
Telephone 305 412 9187
Fax 305 412 6731
www.sblm.com
1 >'
James Cohen
.0
DEMOLITION AND SHELL PREPARATION
NOTES:
1. PRIOR TO ANY DEMOLITION WORK, CONTRACTOR MUST FIELD VERIFY ALL
EXISTING MECHANICAL, PLUMBING AND ELECTRICAL WORK LOCATED IN THE
TENANT SPACE THAT AFFECTS ANY ADJACENT TENANT SPACES. THE
LANDLORD AND THE ADJACENT TENANTS MUST BE NOTIFIED PRIOR TO
SHUTDOWN OF ANY SHARED MECHANICAL, PLUMBING AND ELECTRICAL
SYSTEMS.
2. WALLS, PARTITIONS, DOORS, FRAMES, AND OTHER ITEMS TO BE REMOVED
ARE SHOWN DASHED. SERVICES WITHIN WALLS AND PARTITIONS SHALL ALSO
BE REMOVED. EDGES OF WALLS SHOWN TO REMAIN SHALL BE SAW CUT OR
CLEANLY TOOTHED TO ACCEPT NEW CONSTRUCTION. REPAIR AND PATCH
EXISTING WALLS SHOWN TO REMAIN WHERE INTERSECTING WALLS, DOORS,
FRAMES, ETC. ARE SHOWN TO BE REMOVED AND WHERE EXISTING
CONSTRUCTION WILL NOW BE EXPOSED IN THE NEW CONSTRUCTION.
3. EXISTING EXTERIOR WALL INSULATION SHALL BE LEFT IN PLACE OR SHALL
BE REPLACED WITH NEW MATERIAL OF EQUAL INSULATING VALUE.
4. PROVIDE ALL NECESSARY SHORING, BRACING, AND SUPPORT TO PREVENT
MOVEMENT, SETTLEMENT, OR COLLAPSE OF STRUCTURE OR ELEMENT TO BE
DEMOLISHED, AND ADJACENT STRUCTURE OR ELEMENT SHOWN TO REMAIN.
SHORING AND BRACING SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER
LICENSED IN THE JURISDICTION.
5. PROVIDE TEMPORARY WEATHER PROTECTION AND SECURITY DEVICES
DURING INTERVAL BETWEEN DEMOLITION AND REMOVAL OF EXISTING
CONSTRUCTION ON EXTERIOR SURFACES AND INSTALLATION OF NEW
CONSTRUCTION TO ENSURE THAT NO WATER LEAKAGE OR DAMAGE OCCURS TO
STRUCTURE OR TO INTERIOR AREAS OF EXISTING BUILDING.
6. EXISTING CONCRETE FLOOR SLABS, MASONRY WALLS AND EXISTING
STRUCTURAL FRAMING SYSTEMS TO BE REMOVED SHALL BE CLEANLY SAWCUT
FROM EXISTING CONSTRUCTION.
7. WHERE FINISHES ARE SHOWN TO BE REMOVED FROM EXISTING
CONSTRUCTION, REPAIR AND PATCH REMAINING SUBSTRATE AND PREPARE FOR
NEW FINISH. CAREFULLY REPAIR AND PATCH ALL REMAINING SUBSTRATES THAT
WERE ORIGINALLY CONCEALED BY EXISTING FINISHES, BUT WILL NOW BE
EXPOSED IN THE NEW CONSTRUCTION.
8. ALL INFILL OR REPLACEMENT WORK IS TO MATCH EXISTING CONDITIONS IN
MATERIALS, CONSTRUCTION AND FINISH, UNLESS SPECIFICALLY NOTED
ELSEWHERE IN THE CONSTRUCTION DOCUMENTS.
9. REMOVE ALL EXISTING OBSOLETE MISCELLANEOUS NONLOADBEARING ITEMS
IN THEIR ENTIRETY THROUGHOUT TENANT SPACE ABOVE AND BELOW EXISTING
CEILINGS, INCLUDING (BUT NOT LIMITED TO) PLASTER AND DRYWALL
PARTITIONS, DOORS, FRAMES, SOFFITS, STUDS, FURRING, INSULATION, CEILING
SUSPENSION SYSTEMS, ETC. PARTICULARLY WHERE EXISTING ITEMS WILL
INTERFERE WITH THE INSTALLATION OF NEW CONSTRUCTION, OR WHERE
EXISTING ITEMS WILL BE EXPOSED IN THE NEW CONSTRUCTION, UNLESS
SPECIFICALLY SHOWN ELSEWHERE IN THE CONTRACT DOCUMENTS TO REMAIN.
REPAIR AND PATCH ALL SURFACES TO REMAIN WITH MATERIALS MATCHING
EXISTING CONSTRUCTION. COORDINATE WITH NEW CONSTRUCTION.
10. REMOVE ALL EXISTING OBSOLETE PLUMBING, MECHANICAL, AND
ELECTRICAL EQUIPMENT IN THEIR ENTIRETY THROUGHOUT TENANT SPACE
PARTICULARLY WHERE EXISTING ITEMS WILL INTERFERE WITH THE INSTALLATION
OF NEW CONSTRUCTION, OR WHERE EXISTING ITEMS WILL BE EXPOSED IN THE
NEW CONSTRUCTION, UNLESS SPECIFICALLY SHOWN TO REMAIN, WITH
MATERIALS MATCHING EXISTING CONSTRUCTION. COORDINATE WITH NEW
CONSTRUCTION.
11. REMOVE ALL EXISTING OBSOLETE BUILDING MOUNTED AND ROOF MOUNTED
MECHANICAL, PLUMBING AND ELECTRICAL EQUIPMENT AND DEVICES IN THEIR
ENTIRETY FROM THE FRONT ELEVATION OF THE TENANT SPACE PARTICULARLY
WHERE EXISTING ITEMS WILL INTERFERE WITH THE INSTALLATION OF NEW
CONSTRUCTION, UNLESS SPECIFICALLY SHOWN TO REMAIN. REPAIR AND PATCH
ALL SURFACES TO REMAIN WITH MATERIALS MATCHING EXISTING
CONSTRUCTION. COORDINATE WITH NEW CONSTRUCTION.
12. REMOVE ALL EXISTING OBSOLETE ROOF MOUNTED MECHANICAL, PLUMBING
AND ELECTRICAL EQUIPMENT AND DEVICES IN THEIR ENTIRETY FROM THE ROOF
OF THE TENANT SPACE PARTICULARLY WHERE EXISTING ITEMS WILL INTERFERE
WITH THE INSTALLATION OF NEW CONSTRUCTION, UNLESS SPECIFICALLY SHOWN
TO REMAIN. REPAIR AND PATCH ALL SURFACES TO REMAIN WITH MATERIALS
MATCHING EXISTING CONSTRUCTION. COORDINATE WITH NEW CONSTRUCTION.
FLOOR PLAN KEYED NOTES:
(1 EXISTING COLUMNS TO REMAIN.
�2 REMOVE EXISTING BULK HEAD
O SAW -CUT EXISTING CONCRETE SLAB
EXISTING RTU AND CURB TO BE REMOVED AND REPLACE.
REFER TO STRUCTURAL AND MECHANICAL DRAWINGS FOR REFERENCE.
(5 EXISTING ACOUSTICAL CEILING TILES AND LIGHTING TO BE REMOVED.
(6_� EXISTING STRIP LIGHTS TO BE REMOVED AND RELOCATED. REFER TO CEILING PLAN FOR
REFERENCE.
7 EXISTING FIRE ALARM PANEL TO BE RELOCATED. REFER TO ELECTRICAL DRAWINGS.
�$ EXISTING ARDEX FLOORING OVER CONCRETE SLAB TO BE REMOVED DOWN TO CONCRETE
SLAB AND FLOOR PREPPED FOR NEW FLOOR FINISH AND FLOATED AS REQUIRED FOR
GRADE DIFFERENCE.
PETCO ANIMAL MIAMI DADE ADOPTION CENTER
SUPPLIES STORES, INC. 6200 SOUTH DIXIE HWY
�Rl�p O,TEXASR 45 SOUTH MIAMI, FL 33143
DOWELED CONIC. SLAB
AT TRENCHING, INFILL
& NEW CONC. SLAB
CONSTRUCTION
REMOVE CONC. SLAB IN ITS
ENTIRETY AT RELIEF AREA -
3.7 —
G.C. TO MODIFY SPRINKLER
HEADS AND SMOKE
DETECTORS AS REQUIRED IN
AREAS WHERE ACT WILL BE
PROVIDED. G.G. TO SUBMIT
SHOP DRAWINGS FOR
SPRINKLER MODIFICATIONS.
DISTRIBUTION:
DATE:
DISTRIBUTION:
DATE:
DISTRIBUTION:
DATE:
DISTRIBUTION:.
DATE:
SBLM JOB#
100% PERMIT SUBMISSION
12 -11 -13
013200
PETCO P.M. JOB #
1794
DRAWN:
IT
CHECKED:
MS
DRAWING 'TITLE:
DEMOLITION
PLAN
MAIN,