Loading...
14-1187-009HVAC DESIGN REQUIRES: YES NO DUCT SMOKE DETECTOR — X FIRE DAMPER(S) — X SMOKE DAMPER(S) — X FIRE RATED ENCLOSURE — X FIRE RATED ROOF/FLOOR CEILING ASSEMBLY — X FIRE STOPPING — X SMOKE CONTROL — X � VD DUCTWORK SYMBOLS _ _ MANUAL VOLUME DAMPER OR CFM CUBIC FEET PER MINUTE UC UNDERCUT DOOR ® NEW SUPPLY AIR DIFFUSER -Fj O insight design I 5. /, t EXISTING SUPPLY AIR DIFFUSER, USE IN PLACE /..: :tv 5.. .. vii '. L _ .I Z3 Z3 `� m � cn 4--J X X EXISTING SUPPLY AIR DIFFUSER, TO BE ABANDONED �' -0 •o .— U n Q) ��LL U k._JRF EXISTING SUPPLY AIR DIFFUSER, RELOCATED - FROM N 1 �� 1 EXISTING SUPPLY AIR DIFFUSER, RELOCATED - TO L -ART +_J p MNEW RETURN OR EXHAUST AIR DIFFUSER IC — 1 O I \ I EXISTING RETURN OR EXHAUST AIR DIFFUSER, USE IN PLACE L _ N .-J � � 1 vI X \ X EXISTING RETURN OR EXHAUST AIR DIFFUSER, TO BE ABANDONED L N � -1 I \ I EXISTING RETURN OR EXHAUST AIR DIFFUSER, RELOCATED - FROM L_NRF I \ I EXISTING RETURN OR EXHAUST AIR DIFFUSER, RELOCATED - TO L -NRT FLEXIBLE DUCT — — — — — — EXISTING RIGID DUCT -3E — * —X- EXISTING RIGID DUCT TO BE ABANDONED A 8"0 SA LETTER [A] DENOTES AIR DISTRIBUTION DEVICE TYPE 200 CFM F NUMBER [8] DENOTES TERMINAL NECK SIZE NUMBER [200] DENOTES SUPPLY AIR QUANTITY A 49/41 LETTER [A] DENOTES AIR DISTRIBUTION DEVICE TYPE 200 CFM NUMBER [4'/4'] DENOTES PLENUM /ACTIVE LENGTH NUMBER [200] DENOTES SUPPLY AIR QUANTITY RETURN AND EXHAUST AIR SUPPLY AIR TOE THERMOSTAT, EXISTING w -� GENERAL NOTES - H.V.A. C. 1. ALL WORK SHALL CONFORM WITH THE FLORIDA BUILDING CODE, NFPA, NEC, AND ALL OTHER APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS AND ORDINANCES. 2. CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS TAXES, INSPECTIONS, TESTS, PERFORMANCE BONDS, FINES AND OTHER ITEMS AS REQUIRED FOR THE INSTALLATION OF THE COMPLETE CONTROLS SYSTEMS, AND SHALL BE RESPONSIBLE FOR OBTAINING HIS OWN PERMIT. 3. CONTRACTOR SHALL PROVIDE ALL REQUIRED INSURANCE FOR PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY DAMAGE FOR THE DURATION OF THE WORK. 4. EXCEPT WHERE LONGER WARRANTIES ARE SPECIFIED FOR SPECIFIC EQUIPMENT, CONTRACTOR SHALL WARRANT ALL WORK TO BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR AFTER FINAL WRITTEN ACCEPTANCE OF THE PROJECT BY THE OWNER. 5. PROVIDE ALL NECESSARY INSTRUCTIONS TO THE OWNER IN THE OPERATION OF THE MECHANICAL SYSTEMS BEFORE FINAL ACCEPTANCE. 6. PROVIDE EQUIPMENT MAINTENANCE AND INSTRUCTION MANUALS. MANUALS TO BE SUBMITTED TO ARCHITECT /ENGINEER FOR ACCEPTANCE. 7. SUBMIT SHOP DRAWINGS FOR ALL MATERIALS AND EQUIPMENT FOR ACCEPTANCE OF THE ARCHITECT /ENGINEER BEFORE PROCEEDING WITH THE PURCHASE OR INSTALLATION OF ANY EQUIPMENT AND MATERIALS. VERIFY THAT EQUPMENT AND DUCTWORK FITS PRIOR TO ORDERING OR FABRICATING. 8. LABEL AND IDENTIFY ALL CONTROLS, PERMANENTLY ENGRAVE 9. ALL CONTROL WIRING SHALL BE THE RESPONSIBILITY OF THE MECHANICAL SUB- CONTRACTOR. MECHANICAL SUB - CONTRACTOR TO FURNISH ALL RELAYS, THERMOSTATS, TRANSFORMERS AS REQUIRED ETC. MECHANICAL CONTRACTOR SHALL HIRE A USCENCED ELECTRICAL SUBCONTRACTOR TO INSTALL WIRING AND ELECTRICAL DEVICES. 10. PRODUCTS AND MATERIALS SPECIFIED BY TRADE NAME AND /OR MODEL ON THE DRAWINGS ESTABLISH A STANDARD OF QUALITY, APPEARANCE, PERFORMANCE AND DIMENSIONS. CONTRACTOR SHALL BASE THEIR BID ON THOSE ITEMS, WHICH SHALL BE CONSIDERED TO ESTABLISH A STANDARD BASIS OF BIDDING. REQUESTS FOR SUBSTITUTION SHALL BE SUBMITTED IN WRITING TO THE OWNER AND ENGINEER DEMONSTRATING THAT THE PROPOSED PRODUCT IS COMPARABLE, AND THAT BASIC DESIGN, CONSTRUCTION STANDARDS, QUALITY AND WARRANTIES ARE EQUAL OR BETTER THAN THE PRODUCT SPECIFIED. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CHANGE IN THE WORK REQUIRED BY OTHER TRADES AND SHALL PAY FOR ANY EXPENSES INCURRED DUE TO THE CONTRACTOR'S REQUEST FOR REVISIONS OR SUBSTITUTIONS. 11. PROVIDE ALL NEW MATERIALS OF AMERICAN MANUFACTURE, BEARING THE U.L LABEL AS APPLICABLE. PROVIDE SUPPLEMENTAL MATERIALS NOT SPECIFICALLY NOTED HEREIN, PUT REQUIRED TO COMPLETE THE INSTALLATION IN ACCORDANCE WITH THE INTENT OF THE CONTRACT DRAWINGS, AT NO ADDITIONAL COST TO THE OWNER. 12. FURNISH ALL NECESSARY ACCESS PANELS TO CONTROLS, ANYTHING REQUIREING ACCESS. 13. BALANCE AIR SYSTEMS TO PROVIDE QUANTITIES AND CAPACITIES INDICATED ON DRAWINGS. SUBMIT FINAL TEST AND BALANCE REPORT TO OWNER AND ENGINEER FOR ACCEPTANCE. ALL ABOVE TO BE DONE BY AN INDEPENDENT TEST AND BALANCE COMPANY. INCLUDE IN CONTRACT. 14. ALL WORK SHALL BE FIELD CHECKED BEFORE INSTALLATION AND COORDINATED WITH ALL OTHER TRADES. THE CONTRACT DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO DEPICT APPROXIMATE EQUIPMENT LOCATIONS AND ARRANGEMENTS, NOT TO SHOW ANY MINOR DETAIL PLANS SHALL NOT BE SCALED. 15. NOT USED. 16. NOT USED. 17. SUBMIT PROPOSED CONTROLS DESCRIPTION ALONG WITH BID DOCUMENTS INCLUDING MODEL NUMBERS, CONTROLS SEQUENCE AND CONTROL POINTS. 18. PATCH WALLS, CEILINGS ETC. EQUAL TO EXISTING AS REQUIRED TO PERFORM WORK. HAUL REMOVED WORK FROM SITE. 19. COORDINATE WITH LANDLORD'S REPRESENTATIVE FOR PERMITTED WORK HOURS. THE FACILITY WILL CONTINUE TO OPERATE WHILE WORK IS PERFORMED. COORDINATE WITH LANDLORD'S REPRESENTATIVE FOR SECURITY REQUIREMENTS. 20. ADJUST DUCT SIZES TO MATCH INLET AND OUTLET CONNECTIONS OF VAYS 21. ALL DUCTWORK SHALL BE GALV. SHEET METAL., MINIMUM 24 GAUGE, CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS, METAL AND FLEXIBLE. ALL DUCT JOINTS SHALL BE SEALED AND TAPED. ALL SUPPLY DUCTWORK SHALL BE EXTERNALLY INSULATED WITH 1" U.L DUCT WRAP R -4.2 MIN. PROVIDE VOLUME DAMPERS, TURNING VANES, ETC., IN DUCTWORK FOR PROPER AIR FLOW AND BALANCE PROVIDE VOLUME DAMPER WITH LOCKING QUADRANT AT ALL FLEXIBLE DUCT CONNECTIONS WITH SUPPLY DUCTWORK. PROVIDE MULTIPLE VANE EXTRACTORS WITH CONTROL RODS AT ALL OUTLETS CONNECTED CLOSER THAN TWO DUCT DIAMETERS TO MAIN SUPPLY DUCT, AND WHERE SHOWN ON DRAWINGS, FLEX DUCTS SHALL HAVE METAL CARRIERS. 22. INDOOR AIR QUALITY DURING CONSTRUCTION. ENCAPSULATE AREA OF WORK AS TO ALLOW NO RECIRCULATION OR AIR FROM AREA OF WORK TO OTHER AREAS. PROVIDE POLYETHELENE OR OTHER BARRIERS AS REQUIRED. PROVIDE TEMPORARY HEPA FILTRATION FOR ENCAPUSULTATED AREAS. REPLACE FILTERS IN AFFECTED AREA DURING AND AFTER THE CONSTRUCTION AS REQUIRED WHEN THE FILTERS BECOME DIRTY, BUT BEFORE THE FILTERS ARE LOADED. 23. PATCH BUILDING. EQUAL TO EXISTING AS REQUIRED TO PERFORM WORK. HAUL REMOVED WORK FROM SITE. 24. NOT USED. 25. MECHANICAL CONTRACTOR SHALL COORDINATE WITH THE GENERAL CONTRACTOR AND THE ELECTRICAL CONTRACTOR TO MAKE SURE THAT NO ELECTRICAL CONDUITS ARE INSTALLED PRIOR TO THE DUCTS BEING HUNG, WHERE THE CONDUITS MAY INTERFERE WITH THE REQUIRED DUCT CLEARANCES IN THE CEILING SPACES. GRAVITY TYPE PLUMBING PIPING TAKES PRECEDENCE OVER OTHER TRADES. PLUMBING PRESSURE PIPING MAY BE OFFSET TO CLEAR DUCTWORK AS REQUIRED. RELOCATE EXISTING CONDUITS, PIPES AND DUCTS AS REQUIRED. SCOPE OF THE WORK RELOCATE AIR TERMINALS AND DOCUMENT EXISTING SPRINKLER COVERAGE REFLECTED CEILING PLAN MECHANICAL AND FIRE PROTECTION " 1/4'1"= 1' -0'1 id s I H VAC KEY NOTES I Q REBALANCE AS NOTED Q RELOCATE EXISTING GRILLE EXTEND EXISTING/ NEW FLEX. OF SAME SIZE AS RQED. © EXISTING AIR TERMINAL REMAINS Q EXISTING FIRE SPRINKLER REMAINS © NEW RETURN REGISTER TO PLENUM TITUS PAR 22x22 MODULE. OR EQUAL ® EXISTING THERMOSTAT REMAINS. I _ _ M� W -Fj O insight design n• %.+l$,t'.': L /..��: �i %:3l /..: :tv 5.. .. vii '. Z3 Z3 `� m � ```,``j 3 r. C r rV /,O •_1 C•F�ir rl/ t = 0. 52 ;, =0: S ' LEONARDO NAVEIRAS, INC; q � :• a; = CONSULTING ENGINEERS Leonardo Naveiras P.M. CA# 25830 Q; °° • Fi' i t Julio C. Vidal P.E. PE# 52792 `�.,. �• ^, ° • ° ��'r' . °� 1918 Harrison St. # 207 Hollywood, FL 33020 Phone: 954-270-4622 Fax: 954 -241 -6850 E -mail: hvacleo @aol.com REVISIONS _ ............................... . . DATE/TYPE OF REVISION SHEETTITLE: M FP PLAN ALEJANDRO BONET PROJECT NO: 1110 -11 DRAWN BY: LNI DATE: 05.12.2014 SCALE: SCALE SHEET NO: M FP -1 N lD r-1 N Ol d Q M� W -Fj O .}j (_ m L 4-J L Z3 Z3 `� m � cn 4--J m U O �' -0 •o .— U n Q) ��LL U •= N ft3 Ln +_J p O Z3 0 L O Q) O = zr14 .-J vI 4^ M� W REVISIONS _ ............................... . . DATE/TYPE OF REVISION SHEETTITLE: M FP PLAN ALEJANDRO BONET PROJECT NO: 1110 -11 DRAWN BY: LNI DATE: 05.12.2014 SCALE: SCALE SHEET NO: M FP -1 N lD r-1 N Ol d Q