13-834R-017DEMOLITION NOTES: A. ALL EQUIPMENT SHOWN DASHED IS EXISTING TO BE REMOVED. CONTRACTOR SHALL DISCONNECT AND REMOVE ALL DISCONNECT SWITCHES, CIRCUIT BREAKERS, MOTOR CONNECTIONS, STARTERS, ELECTRICAL PANELS, NURSE CALL SYSTEM EQUIPMENT, ETC. WITHIN THE AREA OF WORK, UNLESS OTHERWISE INDICATED. ALSO, REMOVE ALL CONDUIT AND WIRE BACK TO POWER SOURCE. CIRCUIT SHALL REMAIN AS SPARE OR SPACE IN THEIR RESPECTIVE PANELS, OR BE REUSED AS INDICATED ON PANEL SCHEDULES, WHERE CONDUIT IS INACCESSIBLE, REMOVE CONDUCTORS AND CUT BACK CONDUIT FLUSH WITH SLAB OR WALL. PATCH OPENING TO MATCH EXISTING FINISH. WHERE EXISTING WIRING EXTENDS OUTSIDE OF THE AREA BY NATURE OF THE ORIGINAL INSTALLATION, CONTRACTOR SHALL MODIFY EXISTING WIRING AS REQUIRED TO MAINTAIN CONTINUITY OF EXISTING CIRCUITRY SUCH THAT NO EQUIPMENT TO REMAIN IS LEFT WITHOUT SERVICE. B. PRIOR TO BID, THE EXTENT AND UNDERSTANDING OF THE WORK TO BE PERFORMED SHALL BE CLEARLY ESTABLISHED SUCH THAT NO ADDITIONAL COSTS WILL BE INCURRED BY THE OWNER. ANY WORK, OTHER THAN AS DESCRIBED ON ANY ITEM OR SYSTEMS SHALL BE QUALIFIED WITHIN THE BID. C. CONTRACTOR SHALL EXERCISE EXTREME CAUTION DURING DEMOLITION WORK. EXISTING FEEDERS AND PANELS ARE SHOWN SCHEMATIC FOR REFERENCE PURPOSES ONLY. CONTRACTOR SHALL VERIFY IN FIELD ROUTING OF ALL EXISTING FEEDERS PRIOR TO DEMOLITION. D. CONTRACTOR SHALL PROVIDE TEMPORARY POWER, LIGHTING, COMM., ETC., WHERE REQUIRED DURING DEMOLITION AND CONSTRUCTION SCOPE OF WORK, DURING DEMOLITION, ALL TEMPORARY LIGHTING SHALL BE CONNECTED TO THE LIFE SAFETY BRANCH. E. ALL WORK SHALL BE PERFORMED BY A LICENSED ELECTRICAL CONTRACTOR AND SHALL BE COORDINATED WITH OTHER TRADES. F. CONTRACTOR SHALL PROVIDE ALL REQUIRED INSURANCE FOR PROTECTION AGAINST PUBLIC LIABILITY FOR THE DURATION OF THE WORK. G. CONTRACTOR SHALL PAY FOR THE PERMITS, FEES & INSPECTIONS. H. CONTRACTOR SHALL NOT DISRUPT SERVICE TO ELECTRICAL APPURTENANCES TO REMAIN. I. ALL CIRCUITS SHOWN ARE FOR REFERENCE PURPOSES ONLY. CONTRACTOR SHALL VERIFY ALL CIRCUITS TO . BE REMOVED PRIOR TO COMMENCEMENT OF WORK. J. THE CONTRACT DOCUMENTS DO NOT PROPOSE TO SHOW ALL EXISTING SYSTEMS, MATERIAL OR EQUIPMENT. IT IS THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO OBTAIN DATA RELATED TO EXISTING CONDITIONS FROM EXISTING DOCUMENTS, NOTATIONS, PHOTOGRAPHS, SURVEYS AND OTHER OBSERVATIONS AT THE SITE. K. REMOVE EXISTING WIRE, CONDUIT, EQUIPMENT, FIXTURES AND OTHER ITEMS TO PROVIDE ACCESS FOR WORK IN EXISTING FACILITIES. REINSTALL AND REFINISH ITEMS REMOVED, OR OTHERWISE DAMAGED, TO MATCH EXISTING AT NO ADDITIONAL COST TO OWNER. L WHERE EXISTING FUNCTIONS TO REMAIN IN USE ARE DISRUPTED, THEY SHALL BE FULLY RESTORED AFTER DISRUPTION, IN FULL COMPLIANCE WITH APPLICABLE CODES AND STANDARDS. M. MODIFY , REMOVE, OR RELOCATE MATERIALS AND ITEMS INDICATED ON THE DRAWINGS OR REQUIRED DUE TO THE DEMOLITION WORK. N. WORK JOINTLY WITH THE ARCHITECT, ESTABLISH AND MARK SALVAGE AND DEMOLITION ITEMS BEFORE COMMENCING WORK; REPORT ITEMS SCHEDULE FOR RELOCATION, REINSTALLATION OR REUSE, WHICH ARE FOUND TO BE IN DAMAGED CONDITION; AWAIT FURTHER INSTRUCTIONS FROM THE ARCHITECT O BEFORE COMMENCING WITH WORK. DEMOLITION EQUIPMENT, DEVICES AND MATERIAL SHALL BE REMOVED FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR. SALVAGED EQUIPMENT AND P DEVICES SHALL BE THE PROPERTY OF THE OWNER UNLESS NOTED OTHERWISE. MAKE RELOCATION NECESSITATED BY THE CONDITIONS AT THE SITE OR AS DIRECTED BY THE ARCHITECT, WITHOUT ADDITIONAL COST TO THE OWNER. REPAIR, REPLACE AND /OR RESTORE TO GOOD FUNCTIONAL CONDITION, EQUIPMENT, MATERIAL AND ITEMS SCHEDULE FOR RELOCATION, WHICH ARE DAMAGED DURING DISMANTLING OR REASSEMBLE OPERATIONS. PROVIDE NEW MATERIALS, FITTINGS AND APPURTENANCES REQUIRED TO COMPLETE THE RELOCATION AND TO RESTORE TO GOOD OPERATING ORDER. PERFORM THE RELOCATION WORK IN ACCORDANCE TO APPLICABLE CODES ASD STANDARDS, Q USING SKILLED WORKERS. RELOCATING DEVICES: REMOVE AND REINSTALL IN LOCATIONS DESIGNATED BY THE ARCHITECT, TEMPERATURE CONTROL SYSTEM DEVICES, RELAYS, WIRE CONDUIT, FIXTURES, EQUIPMENT AND OTHER DEVICES REQUIRED FOR THE OPERATION OF THE VARIOUS SYSTEMS THAT ARE INSTALLED IN EXISTING TO R BE REMOVED CONSTRUCTION. CONTRACTOR SHALL KEEP A CLEAN SET OF DRAWINGS ON THE JOB, NOTING DAILY, ALL CHANGES MADE IN THESE DRAWINGS IN CONNECTION WITH THE DEMOLITION PHASE, INCLUDING EXACT DIMENSIONED LOCATIONS OF ALL UNCOVERED EXISTING UTILITIES AND SHALL, WITH THIS, REQUEST FOR FINAL PAYMENT. TURN OVER A CLEAN, NEATLY MARKED SET OF REPRODUCIBLE MYLARS SHOWING "EXISTING CONDITIONS" WORK TO THE ARCHITECT FOR SUBSEQUENT REVIEW AND TRANSMITTAL TO THE OWNER. CONTRACTOR SHALL NOTE ALL CONSTRUCTION CHANGES, DATE EACH AND LABEL "AS— BUILTS" IN THE REVISION BLOCK ON THE DRAWINGS. CONTRACTOR SHALL ALSO FURNISH S ONE SET OF "AS— BUILTS" BLUEPRINTS. T DEVICES SHOWN IN SOLID LIGHT LINES ARE EXISTING TO REMAIN, CONTRACTOR SHALL UPDATE ALL ELECTRICAL PANEL SCHEDULES AFFECTED BY THIS DEMOLITION. HAND WRITTEN SCHEDULES ARE NOT ACCEPTED. SCHEDULES U SHALL BE TYPED OR COMPUTER GENERATED. REMOVE ALL CEILING MOUNTED LIGHT FIXTURES AND ELECTRICAL APPURTENANCES WITHIN THE AREA OF WORK UNLESS OTHERWISE INDICATED. NOTE: IT IS THE RESPONSIBILITY OF MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION CONTRACTORS TO VISIT THE SITE AND EXAMINE IN DETAIL THE SCOPE OF WORK OF THIS PROJECT PRIOR TO BID AND SHALL NOTIFY THE ARCHITECT AND /OR ENGINEER IF A CONDITION EXISTS WHICH PREVENTS HIM /HER FROM ACCOMPLISHING THE WORK INDICATED AND INTENDED BY THESE DRAWINGS, SO NO ADDITIONAL COST IS INCURRED BY THE OWNER. AFTER CONTRACT IS AWARDED IT WILL BE ASSUMED THAT THE SITE WAS VISITED AND EXAMINED AND ALL PARTIES ARE IN AGREEMENT WITH THE SCOPE OF THE WORK. GENERAL NOTES: FLOOR PLANS A. CONTRACTOR SHALL PROVIDE AND INSTALL AN IDENTIFICATION NAMEPLATE FOR EACH ELECTRICAL EQUIPMENT /APPURTENANCES DEPICTING THE DESIGNATION INDICATED ON THE DRAWINGS. B ALL EMPTY CONDUITS SYSTEMS SHALL CONTAIN A PULL WIRE FOR FUTURE PULLING OF CONDUCTORS. C. CONTRACTOR SHALL COORDINATE ALL REQUIRED ENERGY MANAGEMENT SYSTEM POINTS AND CONTACTS CONNECTIONS TO ENSURE THE COMPLETE AND PROPER OPERATION OF ALL SYSTEMS. D. CONTRACTOR SHALL PROVIDE AND INSTALL A 1" CONDUIT W /PULL WIRE FROM EACH WALL MOUNTED TELEPHONE AND /OR DATA OUTLET STUB UP 6" ABOVE FINISHED CEILING. E THE CONTRACOTR SHALL COORDINATE WITH OTHER TRADES ALL NECESSARY WIRING AND CONNECTIONS REQUIRDE PRIOR TO PULLING CONDUCTOIRS INTO NEW CONDUITS. F. CONTRACTOR SHALL PROVIDE ALL EQUIPMENT AND MATERIAL NECESSARY FOR A COMPLETE AND OPERATIONAL INSTALLATION. G. CONTRACTOR SHALL NOT DISRUPT SERVICE TO ELECTRICAL APPURTENANCES TO REMAIN. H. CONTRACTOR SHALL CONNECT ALL NEW FIRE ALARM DEVICES, AS INDICATED ON DRAWINGS, TO EXISTING SYSTEM. CONTRACTOR SHALL PROVIDE NEW EXPANDABLE MODULES, CARDS, ETC. AS REQUIRED TO EXISTING SYSTEM, IN ORDER TO ACCOMODATE NEW DEVICES. I IT IS THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO CONNECT ALL NEW FIRE /SMOKE DAMPERS TO THE EXISTING FIRE ALARM SYSTEM. CONTRACTOR SHALL PROVIDE ALL EQUIPMENT AND MATERIAL NECESSARY FOR A COMPLETE AND OPERATIONAL INSTALLATION. REFER TO MECHANICAL DRAWINGS FOR EXACT LOCATION OF FIRE /SMOKE DAMPERS. ,,I, ALL RECEPTACLES AND SWITCH PLATES SHALL HAVE ENGRAVED COVER PLATES TO INDICATE THE PANEL BOARD AND CIRCUIT NUMBERS POWERING THE DEVICE. K. ALL EMERGENCY RECEPTACLES AND LIGHT SWITCHES FACE PLATES AND DEVICES SHALL BE RED, L. THE ELECTRICAL CONTRACTOR SHALL VERIFY THAT THE AIC RATING OF ALL EXISTING CIRCUIT BREAKERS IN PANELS AFFECTED BY THIS PROJECT ARE EQUAL TO THE AIC RATING OF THE PANEL OR ARE ABOVE THE FAULT CURRENT VALUES PROVIDED IN THE SHORT CIRCUIT CALCULATIONS (IF PROVIDED IN THE DRAWINGS). IF THE AIC RATINGS ARE BELOW THE FAULT CURRENT VALUES, THE ELECTRICAL CONTRACTOR SHALL REPLACE ALL BREAKERS WITH NEW BREAKERS MATCHING CORRECT AIC RATING. CONTRACTOR SHALL PROVIDE AN ALLOWANCE OF $5000.00 TO CORRECT DEFICIENCIES RELATED TO BRANCH CIRCUIT BREAKERS AIC RATING. DO NOT EXCLUDE ALLOWANCE FROM BID. M. CONTRACTOR SHALL UPDATE ALL ELECTRICAL PANEL SCHEDULES AFFECTED BY THIS PROJECT. HAND WRITTEN SCHEDULES ARE NOT ACCEPTED. SCHEDULES SHALL BE TYPED OR COMPUTER GENERATED. CONNECT ALL NEW FIRE SMOKE DAMPERS TO EXISTING FIRE ALARM SYSTEM D ® ® ®] FIRE ALARM PANEL FIRST FLOOR NEW EXISTING FM ALARM NOTES A. REFER TO FLOOR PLANS FOR LOCATIONS AND QUANTITIES OF ALL DEVICES. B. PROVIDE NEW WIRING IN 3/4" CONDUIT MINIMUM AS REQUIRED FOR ALL NEW FIRE ALARM DEVICES. C. ALL NEW FIRE ALARM DEVICES SHALL BE PROGRAMMED INTO EXISTING FIRE ALARM CONTROL PANEL AND BE FULLY COMPATIBLE WITH EXISTING FIRE ALARM SYSTEM. D. PROVIDE NEW POWER SUPPLIES AS NECESSARY INCLUDING EXPANSION MODULES AND ANY NECESSARY ACCESSORIES REQUIRED FOR A COMPLETE AND FULLY FUNCTIONAL INSTALLATION. E. ALL NEW DEVICES SHALL MEET ALL ADA REQUIREMENTS, F. FURNISH AND INSTALL ALL SOFTWARE AND HARDWARE NECCESSARY FOR A COMPLETE AND FULLY FUNCTIONAL SYSTEM. G. ALL AUDIO AND VISUAL DEVICES SHALL BE SYNCHRONIZED, H. FIRE ALARM VENDOR SHALL RE— CERTIFY EXISTING SYSTEM. I. THE ENTIRE SYSTEM SHALL BE TESTED TO THE OWNER'S SATISFACTION, CONTRACTOR SHALL PROVIDE A COMPLETE FIRE ALARM CERTIFICATION AND A SENSITIVITY TEST REPORT FOR ALL NEW, AND EXISTING SMOKE, DUCT AND HEAT DETECTORS. CONTRACTOR SHALL REPLACE ANY DETECTOR THAT DOES NOT MEET THE ALLOWABLE SENSITIVITY VALUES. J. FIRE ALARM VENDOR SHALL PROVIDE SIGNED AND SEALED SHOP DRAWINGS INCLUDING: a. LOCATIONS OF DEVICES. b. TYPE OF DEVICES. c. CABLING. d. BATTERY CALCULTATIQNS. K. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. L. CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF THE FIRE ALARM SYSTEM DURING CONSTRUCTION. M. WHERE REQUIRED, THE FIRE ALARM SYSTEM SHALL BE INTERFACED WITH THE BUILDING AUTOMATION SYSTEM IN ORDER TO SEND/RECEIVE SIGNALS FROM ALARM INITIATING DEVICES AND H —O—A SWITCHES FOR THE OPERATION OF SMOKE CONTROL SYSTEMS, FAN SHUTDOWN AND COMMUNICATIONS, COORDINATE ALL REQUIREMENTS WITH DIVISION 15. N. FIRE ALARM PANEL SHALL INDICATE THE ZONE OF ACTUATION OF THE ALARM. EACH SMOKE COMPARTMENT SHALL BE ANNUNCIATED AS A SEPARATE FIRE ALARM ZONE AS PER FBC 419 .112.1 02 PARTIAL FIRE ALARM RISER DIAGRAM SCALE: Ms GENERAL NOTES FIRE ALARM A. FURNISH AND INSTALL FIRE ALARM AND DETECTION SYSTEM ADDITIONS AND RELOCATIONS AS INDICATED ON THE DRAWINGS. COMPATIBLE AND CONSISTENT WITH THE EXISTING SYSTEM, B. THE EXISTING SYSTEM OPERATION SHALL REMAIN UNCHANGED PROVIDING CONTINUAL SERVICE DURING ALL PHASES OF THE RENOVATION AND /OR EXPANSION, C. IT IS 1HE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO PROVIDE EXPANDABLE MODULES„ POVIER SUPPLIES, HARDWARE, SOFTWARE, ETC. TO THE FIRE ALARM SYSTEM IN ORDER TO ACCOMMODATE THE ADDITIONAL FIRE ALARM DEVICES D. CONTRACTOR SHALL PROVIDE SENSITIVITY TEST REPORT FOR ALL NEW SMOKE DETECTORS. E. THE ENTIRE SYSTEM SHALL BE TESTED TO THE OWNER'S SATISFACTION, CONTRACTOR SHALL PROVIDE A COMPLETE FIRE ALARM CERTIFICATION AND A SENSITIVITY TEST REPORT FOR ALL NEW, AND EXISTING SMOKE, DUCT AND HEAT DETECTORS. CONTRACTOR SHALL REPLACE ANY DETECTOR THAT DOES NOT MEET THE ALLOWABLE SENSITIVITY VALUES, F. WHERE REQUIRED, THE FIRE ALARM SYSTEM SHALL BE INTERFACED WITH THE BUILDING AUTOMATION SYSTEM IN ORDER TO SEND/RECEIVE SIGNALS FROM ALARM INITIATING DEVICES AND H —O—A SWITCHES FOR THE OPERATION OF SMOKE CONTROL SYSTEMS, FAN SHUTDOWN AND COMMUNICATIONS, COORDINATE ALL REQUIREMENTS WITH DIVISION 15. . G. VISUAL STROBE DEVICES SHALL MEET THE REQUIREMENTS OF ADA, UL, AND NFPA. H. AUDIBLE DEVICES IN PUBLIC AND STAFF AREAS SHALL BE SPEAKERS WITH A PEAK OUTPUT OF 96dB AT 10' -0". I. ALL WIRING SHALL BE STRANDED AND IN CONDUIT. COLOR SHALL BE THE FACILITY'S STANDARD OR RED. J. PROVIDE NEW CONDUIT AND WIRING AS REQUIRED FOR NEW FIRE ALARM DEVICES. CONNECT AND PROGRAM DEVICES IN EXISTING FIRE ALARM CONTROL PANEL. COORDINATE EXACT LOCATION OF EXISTING FIRE CONTROL PANEL WITH OWNER. NEW DEVICES ARE TO MATCH EXISTING ONES AND BE UL LISTED WITH EXISTING FIRE ALARM SYSTEM. PROVIDE NEW POWER SUPPLIES AS NECESSARY INCLUDING EXPANSION MODULES OR ANY SOFTWARE OR HARDWARE ACCESSORIES REQUIRED FOR A COMPLETE AND FUNCTIONAL INSTALLATION. ALL DEVICES SHALL MEET ADA REQUIREMENTS. K. CONTRACTOR SHALL SUBMIT SIGNED AND SEALED PLANS INDICATING EXACT LOCATION, TYPE, CABLING, AND BATTERY CALCULATIONS. L. ALL WIRING SHALL BE IN 3/4 "C. MINIMUM. M. VENDOR SHALL RE— CERTIFY THE SYSTEM AND PROVIDE CERTIFICATION AND SMOKE DETECTOR SENSITIVITY REPORT PRIOR TO ANY INSPECTION. N. SYNCHRONIZE ALL AUDIOVISUAL DEVICES, 0. AUDIBLE DEVICES SHALL BE ON SEPARATE CIRCUITS THAN VISUAL DEVICES. P. UPON ACTIVATION OF THE FIRE ALARM SYSTEM, THE AHU SHALL SHUT DORM WHEN IN MANUAL OR AUTOMATIC POSITION, EXHAUST FAN SHALL BE INTERLOCKED WITH THE AHU STARTER. LOCATE FIRE ALARM RELAY WITHIN 3' -0' OF STARTER. MARK: CD 0 N v cu .Q REVISIONS REMARKS: H W =U a� �w ac Oa co F. ••. .e �h. ,i. /Al � gFq�a����s'`' GENERAL INFORMATION NOTES Job No: 412474.00 Date: File: Sheet Title: Sheet No: E 0.01 E a u � g O D U O o co M N M N C O M l0 tp Ul J J (T Ol Y cu LL 8 8 7D V Ln u! Z3 N (U Ln Ln O C O 0 O � O O O r M M (1 (Cn O C N O X z _ i 0 0 N U) U n L S > X ��c �o 0 m R3 = 2 Q a REVISIONS REMARKS: H W =U a� �w ac Oa co F. ••. .e �h. ,i. /Al � gFq�a����s'`' GENERAL INFORMATION NOTES Job No: 412474.00 Date: File: Sheet Title: Sheet No: E 0.01