13-834R-017DEMOLITION NOTES:
A. ALL EQUIPMENT SHOWN DASHED IS EXISTING TO BE REMOVED. CONTRACTOR
SHALL DISCONNECT AND REMOVE ALL DISCONNECT SWITCHES, CIRCUIT
BREAKERS, MOTOR CONNECTIONS, STARTERS, ELECTRICAL PANELS, NURSE
CALL SYSTEM EQUIPMENT, ETC. WITHIN THE AREA OF WORK, UNLESS
OTHERWISE INDICATED. ALSO, REMOVE ALL CONDUIT AND WIRE BACK TO
POWER SOURCE. CIRCUIT SHALL REMAIN AS SPARE OR SPACE IN THEIR
RESPECTIVE PANELS, OR BE REUSED AS INDICATED ON PANEL SCHEDULES,
WHERE CONDUIT IS INACCESSIBLE, REMOVE CONDUCTORS AND CUT BACK
CONDUIT FLUSH WITH SLAB OR WALL. PATCH OPENING TO MATCH EXISTING
FINISH. WHERE EXISTING WIRING EXTENDS OUTSIDE OF THE AREA BY NATURE
OF THE ORIGINAL INSTALLATION, CONTRACTOR SHALL MODIFY EXISTING WIRING
AS REQUIRED TO MAINTAIN CONTINUITY OF EXISTING CIRCUITRY SUCH THAT
NO EQUIPMENT TO REMAIN IS LEFT WITHOUT SERVICE.
B. PRIOR TO BID, THE EXTENT AND UNDERSTANDING OF THE WORK TO BE
PERFORMED SHALL BE CLEARLY ESTABLISHED SUCH THAT NO ADDITIONAL
COSTS WILL BE INCURRED BY THE OWNER. ANY WORK, OTHER THAN AS
DESCRIBED ON ANY ITEM OR SYSTEMS SHALL BE QUALIFIED WITHIN THE BID.
C. CONTRACTOR SHALL EXERCISE EXTREME CAUTION DURING DEMOLITION WORK.
EXISTING FEEDERS AND PANELS ARE SHOWN SCHEMATIC FOR REFERENCE
PURPOSES ONLY. CONTRACTOR SHALL VERIFY IN FIELD ROUTING OF ALL
EXISTING FEEDERS PRIOR TO DEMOLITION.
D. CONTRACTOR SHALL PROVIDE TEMPORARY POWER, LIGHTING, COMM., ETC.,
WHERE REQUIRED DURING DEMOLITION AND CONSTRUCTION SCOPE OF WORK,
DURING DEMOLITION, ALL TEMPORARY LIGHTING SHALL BE CONNECTED TO THE
LIFE SAFETY BRANCH.
E. ALL WORK SHALL BE PERFORMED BY A LICENSED ELECTRICAL CONTRACTOR
AND SHALL BE COORDINATED WITH OTHER TRADES.
F. CONTRACTOR SHALL PROVIDE ALL REQUIRED INSURANCE FOR PROTECTION
AGAINST PUBLIC LIABILITY FOR THE DURATION OF THE WORK.
G. CONTRACTOR SHALL PAY FOR THE PERMITS, FEES & INSPECTIONS.
H. CONTRACTOR SHALL NOT DISRUPT SERVICE TO ELECTRICAL APPURTENANCES
TO REMAIN.
I. ALL CIRCUITS SHOWN ARE FOR REFERENCE PURPOSES ONLY. CONTRACTOR
SHALL VERIFY ALL CIRCUITS TO . BE REMOVED PRIOR TO COMMENCEMENT OF
WORK.
J. THE CONTRACT DOCUMENTS DO NOT PROPOSE TO SHOW ALL EXISTING
SYSTEMS, MATERIAL OR EQUIPMENT. IT IS THE RESPONSIBILITY OF THE
ELECTRICAL CONTRACTOR TO OBTAIN DATA RELATED TO EXISTING CONDITIONS
FROM EXISTING DOCUMENTS, NOTATIONS, PHOTOGRAPHS, SURVEYS AND OTHER
OBSERVATIONS AT THE SITE.
K. REMOVE EXISTING WIRE, CONDUIT, EQUIPMENT, FIXTURES AND OTHER ITEMS TO
PROVIDE ACCESS FOR WORK IN EXISTING FACILITIES. REINSTALL AND REFINISH
ITEMS REMOVED, OR OTHERWISE DAMAGED, TO MATCH EXISTING AT NO
ADDITIONAL COST TO OWNER.
L WHERE EXISTING FUNCTIONS TO REMAIN IN USE ARE DISRUPTED, THEY SHALL
BE FULLY RESTORED AFTER DISRUPTION, IN FULL COMPLIANCE WITH
APPLICABLE CODES AND STANDARDS.
M. MODIFY , REMOVE, OR RELOCATE MATERIALS AND ITEMS INDICATED ON THE
DRAWINGS OR REQUIRED DUE TO THE DEMOLITION WORK.
N. WORK JOINTLY WITH THE ARCHITECT, ESTABLISH AND MARK SALVAGE AND
DEMOLITION ITEMS BEFORE COMMENCING WORK; REPORT ITEMS SCHEDULE FOR
RELOCATION, REINSTALLATION OR REUSE, WHICH ARE FOUND TO BE IN
DAMAGED CONDITION; AWAIT FURTHER INSTRUCTIONS FROM THE ARCHITECT
O BEFORE COMMENCING WITH WORK.
DEMOLITION EQUIPMENT, DEVICES AND MATERIAL SHALL BE REMOVED FROM
THE SITE AND DISPOSED OF BY THE CONTRACTOR. SALVAGED EQUIPMENT AND
P DEVICES SHALL BE THE PROPERTY OF THE OWNER UNLESS NOTED OTHERWISE.
MAKE RELOCATION NECESSITATED BY THE CONDITIONS AT THE SITE OR AS
DIRECTED BY THE ARCHITECT, WITHOUT ADDITIONAL COST TO THE OWNER.
REPAIR, REPLACE AND /OR RESTORE TO GOOD FUNCTIONAL CONDITION,
EQUIPMENT, MATERIAL AND ITEMS SCHEDULE FOR RELOCATION, WHICH ARE
DAMAGED DURING DISMANTLING OR REASSEMBLE OPERATIONS. PROVIDE NEW
MATERIALS, FITTINGS AND APPURTENANCES REQUIRED TO COMPLETE THE
RELOCATION AND TO RESTORE TO GOOD OPERATING ORDER. PERFORM THE
RELOCATION WORK IN ACCORDANCE TO APPLICABLE CODES ASD STANDARDS,
Q USING SKILLED WORKERS.
RELOCATING DEVICES: REMOVE AND REINSTALL IN LOCATIONS DESIGNATED BY
THE ARCHITECT, TEMPERATURE CONTROL SYSTEM DEVICES, RELAYS, WIRE
CONDUIT, FIXTURES, EQUIPMENT AND OTHER DEVICES REQUIRED FOR THE
OPERATION OF THE VARIOUS SYSTEMS THAT ARE INSTALLED IN EXISTING TO
R BE REMOVED CONSTRUCTION.
CONTRACTOR SHALL KEEP A CLEAN SET OF DRAWINGS ON THE JOB, NOTING
DAILY, ALL CHANGES MADE IN THESE DRAWINGS IN CONNECTION WITH THE
DEMOLITION PHASE, INCLUDING EXACT DIMENSIONED LOCATIONS OF ALL
UNCOVERED EXISTING UTILITIES AND SHALL, WITH THIS, REQUEST FOR FINAL
PAYMENT. TURN OVER A CLEAN, NEATLY MARKED SET OF REPRODUCIBLE
MYLARS SHOWING "EXISTING CONDITIONS" WORK TO THE ARCHITECT FOR
SUBSEQUENT REVIEW AND TRANSMITTAL TO THE OWNER. CONTRACTOR SHALL
NOTE ALL CONSTRUCTION CHANGES, DATE EACH AND LABEL "AS— BUILTS" IN
THE REVISION BLOCK ON THE DRAWINGS. CONTRACTOR SHALL ALSO FURNISH
S ONE SET OF "AS— BUILTS" BLUEPRINTS.
T DEVICES SHOWN IN SOLID LIGHT LINES ARE EXISTING TO REMAIN,
CONTRACTOR SHALL UPDATE ALL ELECTRICAL PANEL SCHEDULES AFFECTED BY
THIS DEMOLITION. HAND WRITTEN SCHEDULES ARE NOT ACCEPTED. SCHEDULES
U SHALL BE TYPED OR COMPUTER GENERATED.
REMOVE ALL CEILING MOUNTED LIGHT FIXTURES AND ELECTRICAL
APPURTENANCES WITHIN THE AREA OF WORK UNLESS OTHERWISE INDICATED.
NOTE:
IT IS THE RESPONSIBILITY OF MECHANICAL, ELECTRICAL, PLUMBING AND FIRE
PROTECTION CONTRACTORS TO VISIT THE SITE AND EXAMINE IN DETAIL THE
SCOPE OF WORK OF THIS PROJECT PRIOR TO BID AND SHALL NOTIFY THE
ARCHITECT AND /OR ENGINEER IF A CONDITION EXISTS WHICH PREVENTS
HIM /HER FROM ACCOMPLISHING THE WORK INDICATED AND INTENDED BY
THESE DRAWINGS, SO NO ADDITIONAL COST IS INCURRED BY THE OWNER.
AFTER CONTRACT IS AWARDED IT WILL BE ASSUMED THAT THE SITE WAS
VISITED AND EXAMINED AND ALL PARTIES ARE IN AGREEMENT WITH THE SCOPE
OF THE WORK.
GENERAL NOTES: FLOOR PLANS
A. CONTRACTOR SHALL PROVIDE AND INSTALL AN IDENTIFICATION NAMEPLATE FOR
EACH ELECTRICAL EQUIPMENT /APPURTENANCES DEPICTING THE DESIGNATION
INDICATED ON THE DRAWINGS.
B ALL EMPTY CONDUITS SYSTEMS SHALL CONTAIN A PULL WIRE FOR FUTURE
PULLING OF CONDUCTORS.
C. CONTRACTOR SHALL COORDINATE ALL REQUIRED ENERGY MANAGEMENT SYSTEM
POINTS AND CONTACTS CONNECTIONS TO ENSURE THE COMPLETE AND PROPER
OPERATION OF ALL SYSTEMS.
D. CONTRACTOR SHALL PROVIDE AND INSTALL A 1" CONDUIT W /PULL WIRE FROM
EACH WALL MOUNTED TELEPHONE AND /OR DATA OUTLET STUB UP 6" ABOVE
FINISHED CEILING.
E THE CONTRACOTR SHALL COORDINATE WITH OTHER TRADES ALL NECESSARY
WIRING AND CONNECTIONS REQUIRDE PRIOR TO PULLING CONDUCTOIRS INTO
NEW CONDUITS.
F. CONTRACTOR SHALL PROVIDE ALL EQUIPMENT AND MATERIAL NECESSARY FOR
A COMPLETE AND OPERATIONAL INSTALLATION.
G. CONTRACTOR SHALL NOT DISRUPT SERVICE TO ELECTRICAL APPURTENANCES
TO REMAIN.
H. CONTRACTOR SHALL CONNECT ALL NEW FIRE ALARM DEVICES, AS INDICATED
ON DRAWINGS, TO EXISTING SYSTEM. CONTRACTOR SHALL PROVIDE NEW
EXPANDABLE MODULES, CARDS, ETC. AS REQUIRED TO EXISTING SYSTEM, IN
ORDER TO ACCOMODATE NEW DEVICES.
I IT IS THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO CONNECT ALL
NEW FIRE /SMOKE DAMPERS TO THE EXISTING FIRE ALARM SYSTEM.
CONTRACTOR SHALL PROVIDE ALL EQUIPMENT AND MATERIAL NECESSARY FOR
A COMPLETE AND OPERATIONAL INSTALLATION. REFER TO MECHANICAL
DRAWINGS FOR EXACT LOCATION OF FIRE /SMOKE DAMPERS.
,,I, ALL RECEPTACLES AND SWITCH PLATES SHALL HAVE ENGRAVED COVER
PLATES TO INDICATE THE PANEL BOARD AND CIRCUIT NUMBERS POWERING THE
DEVICE.
K. ALL EMERGENCY RECEPTACLES AND LIGHT SWITCHES FACE PLATES AND
DEVICES SHALL BE RED,
L. THE ELECTRICAL CONTRACTOR SHALL VERIFY THAT THE AIC RATING OF ALL
EXISTING CIRCUIT BREAKERS IN PANELS AFFECTED BY THIS PROJECT ARE
EQUAL TO THE AIC RATING OF THE PANEL OR ARE ABOVE THE FAULT
CURRENT VALUES PROVIDED IN THE SHORT CIRCUIT CALCULATIONS (IF
PROVIDED IN THE DRAWINGS). IF THE AIC RATINGS ARE BELOW THE FAULT
CURRENT VALUES, THE ELECTRICAL CONTRACTOR SHALL REPLACE ALL
BREAKERS WITH NEW BREAKERS MATCHING CORRECT AIC RATING. CONTRACTOR
SHALL PROVIDE AN ALLOWANCE OF $5000.00 TO CORRECT DEFICIENCIES
RELATED TO BRANCH CIRCUIT BREAKERS AIC RATING. DO NOT EXCLUDE
ALLOWANCE FROM BID.
M. CONTRACTOR SHALL UPDATE ALL ELECTRICAL PANEL SCHEDULES AFFECTED BY THIS PROJECT.
HAND WRITTEN SCHEDULES ARE NOT ACCEPTED. SCHEDULES SHALL BE TYPED OR COMPUTER
GENERATED.
CONNECT ALL NEW FIRE SMOKE DAMPERS TO
EXISTING FIRE ALARM SYSTEM
D ® ® ®]
FIRE
ALARM
PANEL
FIRST FLOOR
NEW
EXISTING
FM ALARM NOTES
A. REFER TO FLOOR PLANS FOR LOCATIONS AND QUANTITIES OF ALL DEVICES.
B. PROVIDE NEW WIRING IN 3/4" CONDUIT MINIMUM AS REQUIRED FOR ALL NEW FIRE ALARM DEVICES.
C. ALL NEW FIRE ALARM DEVICES SHALL BE PROGRAMMED INTO EXISTING FIRE ALARM CONTROL PANEL AND BE FULLY COMPATIBLE
WITH EXISTING FIRE ALARM SYSTEM.
D. PROVIDE NEW POWER SUPPLIES AS NECESSARY INCLUDING EXPANSION MODULES AND ANY NECESSARY ACCESSORIES REQUIRED
FOR A COMPLETE AND FULLY FUNCTIONAL INSTALLATION.
E. ALL NEW DEVICES SHALL MEET ALL ADA REQUIREMENTS,
F. FURNISH AND INSTALL ALL SOFTWARE AND HARDWARE NECCESSARY FOR A COMPLETE AND FULLY FUNCTIONAL SYSTEM.
G. ALL AUDIO AND VISUAL DEVICES SHALL BE SYNCHRONIZED,
H. FIRE ALARM VENDOR SHALL RE— CERTIFY EXISTING SYSTEM.
I. THE ENTIRE SYSTEM SHALL BE TESTED TO THE OWNER'S SATISFACTION, CONTRACTOR SHALL PROVIDE A COMPLETE FIRE ALARM
CERTIFICATION AND A SENSITIVITY TEST REPORT FOR ALL NEW, AND EXISTING SMOKE, DUCT AND HEAT DETECTORS. CONTRACTOR
SHALL REPLACE ANY DETECTOR THAT DOES NOT MEET THE ALLOWABLE SENSITIVITY VALUES.
J. FIRE ALARM VENDOR SHALL PROVIDE SIGNED AND SEALED SHOP DRAWINGS INCLUDING:
a. LOCATIONS OF DEVICES.
b. TYPE OF DEVICES.
c. CABLING.
d. BATTERY CALCULTATIQNS.
K. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
L. CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF THE FIRE ALARM SYSTEM DURING CONSTRUCTION.
M. WHERE REQUIRED, THE FIRE ALARM SYSTEM SHALL BE INTERFACED WITH THE BUILDING AUTOMATION SYSTEM IN ORDER TO
SEND/RECEIVE SIGNALS FROM ALARM INITIATING DEVICES AND H —O—A SWITCHES FOR THE OPERATION OF SMOKE CONTROL
SYSTEMS, FAN SHUTDOWN AND COMMUNICATIONS, COORDINATE ALL REQUIREMENTS WITH DIVISION 15.
N. FIRE ALARM PANEL SHALL INDICATE THE ZONE OF ACTUATION OF THE ALARM. EACH SMOKE COMPARTMENT SHALL BE
ANNUNCIATED AS A SEPARATE FIRE ALARM ZONE AS PER FBC 419 .112.1
02 PARTIAL FIRE ALARM RISER DIAGRAM
SCALE: Ms
GENERAL NOTES FIRE ALARM
A. FURNISH AND INSTALL FIRE ALARM AND DETECTION SYSTEM ADDITIONS
AND RELOCATIONS AS INDICATED ON THE DRAWINGS. COMPATIBLE AND
CONSISTENT WITH THE EXISTING SYSTEM,
B. THE EXISTING SYSTEM OPERATION SHALL REMAIN UNCHANGED PROVIDING
CONTINUAL SERVICE DURING ALL PHASES OF THE RENOVATION AND /OR
EXPANSION,
C. IT IS 1HE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO PROVIDE
EXPANDABLE MODULES„ POVIER SUPPLIES, HARDWARE, SOFTWARE, ETC.
TO THE FIRE ALARM SYSTEM IN ORDER TO ACCOMMODATE THE
ADDITIONAL FIRE ALARM DEVICES
D. CONTRACTOR SHALL PROVIDE SENSITIVITY TEST REPORT FOR ALL NEW
SMOKE DETECTORS.
E. THE ENTIRE SYSTEM SHALL BE TESTED TO THE OWNER'S SATISFACTION,
CONTRACTOR SHALL PROVIDE A COMPLETE FIRE ALARM CERTIFICATION
AND A SENSITIVITY TEST REPORT FOR ALL NEW, AND EXISTING SMOKE,
DUCT AND HEAT DETECTORS. CONTRACTOR SHALL REPLACE ANY
DETECTOR THAT DOES NOT MEET THE ALLOWABLE SENSITIVITY VALUES,
F. WHERE REQUIRED, THE FIRE ALARM SYSTEM SHALL BE INTERFACED WITH
THE BUILDING AUTOMATION SYSTEM IN ORDER TO SEND/RECEIVE
SIGNALS FROM ALARM INITIATING DEVICES AND H —O—A SWITCHES FOR
THE OPERATION OF SMOKE CONTROL SYSTEMS, FAN SHUTDOWN AND
COMMUNICATIONS, COORDINATE ALL REQUIREMENTS WITH DIVISION 15. .
G. VISUAL STROBE DEVICES SHALL MEET THE REQUIREMENTS OF ADA, UL,
AND NFPA.
H. AUDIBLE DEVICES IN PUBLIC AND STAFF AREAS SHALL BE SPEAKERS
WITH A PEAK OUTPUT OF 96dB AT 10' -0".
I. ALL WIRING SHALL BE STRANDED AND IN CONDUIT. COLOR SHALL BE THE
FACILITY'S STANDARD OR RED.
J. PROVIDE NEW CONDUIT AND WIRING AS REQUIRED FOR NEW FIRE ALARM
DEVICES. CONNECT AND PROGRAM DEVICES IN EXISTING FIRE ALARM CONTROL
PANEL. COORDINATE EXACT LOCATION OF EXISTING FIRE CONTROL PANEL WITH
OWNER. NEW DEVICES ARE TO MATCH EXISTING ONES AND BE UL LISTED WITH
EXISTING FIRE ALARM SYSTEM. PROVIDE NEW POWER SUPPLIES AS NECESSARY
INCLUDING EXPANSION MODULES OR ANY SOFTWARE OR HARDWARE
ACCESSORIES REQUIRED FOR A COMPLETE AND FUNCTIONAL INSTALLATION. ALL
DEVICES SHALL MEET ADA REQUIREMENTS.
K. CONTRACTOR SHALL SUBMIT SIGNED AND SEALED PLANS INDICATING EXACT
LOCATION, TYPE, CABLING, AND BATTERY CALCULATIONS.
L. ALL WIRING SHALL BE IN 3/4 "C. MINIMUM.
M. VENDOR SHALL RE— CERTIFY THE SYSTEM AND PROVIDE CERTIFICATION
AND SMOKE DETECTOR SENSITIVITY REPORT PRIOR TO ANY INSPECTION.
N. SYNCHRONIZE ALL AUDIOVISUAL DEVICES,
0. AUDIBLE DEVICES SHALL BE ON SEPARATE CIRCUITS THAN VISUAL DEVICES.
P. UPON ACTIVATION OF THE FIRE ALARM SYSTEM, THE AHU SHALL SHUT DORM
WHEN IN MANUAL OR AUTOMATIC POSITION, EXHAUST FAN SHALL BE
INTERLOCKED WITH THE AHU STARTER. LOCATE FIRE ALARM RELAY WITHIN
3' -0' OF STARTER.
MARK:
CD
0
N
v
cu
.Q
REVISIONS
REMARKS:
H
W
=U
a�
�w
ac
Oa
co
F. ••. .e �h. ,i.
/Al � gFq�a����s'`'
GENERAL
INFORMATION
NOTES
Job No:
412474.00
Date:
File:
Sheet Title:
Sheet No: E 0.01
E
a
u
�
g O
D
U O
o
co M N M
N C
O M l0 tp
Ul
J J (T Ol
Y
cu LL
8 8
7D V Ln u!
Z3
N (U Ln Ln
O C
O
0 O � O O
O
r M M
(1 (Cn
O C
N O
X
z _
i 0 0
N U) U n
L S
> X
��c
�o 0
m R3 =
2 Q
a
REVISIONS
REMARKS:
H
W
=U
a�
�w
ac
Oa
co
F. ••. .e �h. ,i.
/Al � gFq�a����s'`'
GENERAL
INFORMATION
NOTES
Job No:
412474.00
Date:
File:
Sheet Title:
Sheet No: E 0.01