13-834-022olFpRST FLOOR RCP AND NEW PLAN - ELECTRICAL
GENERAL NOTES
A. CONTRACTOR SHALL PROVIDE ALL EQUIPMENT AND MATERIAL
NECESSARY FOR A COMPLETE AND OPERATIONAL INSTALLATION.
B. CONTRACTOR SHALL NOT DISRUPT POWER TO ELECTRICAL
APPURTENANCES TO REMAIN.
C. ALL EXISTING CEILING MOUNTED EQUIPMENT INCLUDING BUT NOT
LIMITED TO; LIGHT FIXTURES, SPEAKERS, CAMERAS, MICROPHONES,
MODULES, ETC. ARE EXISTING TO REMAIN UNLESS OTHER WISE
INDICATED. CONTRACTOR SHALL EXERCISE EXTREME CAUTION DURING
DUCT WORK INSTALLATION AND MAKE ANY RELOCATION, REMOVAL, AND
MODIFICATIONS NECESSARY IN ORDER FOR THE CONTRACTOR TO
ARCHIVE ALL DUCT WORK INSTALLATION.
AT THE END OF THE PROJECT, IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO INSTALL/PLACE BACK ALL CEILING MOUNTED DEVICES
TO ITS ORIGINAL LOCATION. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO REPLACE ANY DAMAGE TILES, LIGHT FIXTURES,
MICROPHONES, ETC IN THE EVENT OF DAMAGE, AT NO ADDITIONAL
COST TO THE OWNER.
D. ALL CEILING MOUNTED DEVICES ARE SHOWN FOR REFERENCE
PURPOSES ONLY. NOT ALL DEVICES HAVE BEEN SHOWN. THE
CONTRACTOR SHALL VISIT THE SITE AND ASCERTAIN ALL EXISTING
CONDITIONS PRIOR TO BID AND COMMENCEMENT OF WORK.
E. REFER TO LIFE SAFETY PLAN FOR ADDITIONAL CEILING MOUNTED
DEVICES.
LEGEND NOTES
O1 CONTRACTOR SHALL REMOVE EXISTING 4', 2 LAMP CEILING MOUNTED
FLUORESCENT LIGHTING AND PROVIDE NEW AS INDICATED. CONNECT
NEW LIGHT FIXTURES TO EXISTING CIRCUIT WITH 2#12, 1#12G IN 3/4•C.
OLITHONIA DWM- 232- MVOLT- EBIOPS
O3 LITHONIA 2GT6- 332- A12125- MVOLT- 1 /3EB1OPS
OEXISTING AHU TO BE DISCONNECTED AND REMOVED. REMOVE ALL
CONDUIT AND WIRE BACK TO PANEL. BREAKER IN PANEL SHALL
REMAIN AS SPARE.
OEXISTING EXHAUST FAN TO BE DISCONNECTED AND REMOVED. REMOVE
ALL CONDUIT AND WIRE BACK TO PANEL. BREAKER IN PANEL SHALL
REMAIN AS SPARE.
OCONTRACTOR SHALL RELOCATE ALL EXISTING DISCONNECT SWITCHES,
AND JUNCTION BOXES IN THIS AREA TO AVOID CONFLICT WITH NEW
AHU. EXTEND CONDUIT AND WIRE TO NEW LOCATION.
ONEW LOCATION OF RELOCATED JUNCTION BOXES AND DISCONNECT
SWITCHES.
OALL 314• CONDUITS IN THIS AREA RUNNING FROM NORTH /SOUTH
SHALL BE RELOCATED TO THE UNDERSIDE OF THE SLAB CEILING.
CONTRACTOR SHALL EXTEND ALL CONDUIT AND WIRE AS NECESSARY
AND REQUIRED FOR A COMPLETE AND OPERATIONAL INSTALLATION.
OCONTRACTOR TO VERIFY EXACT LOCATION OF VAV BOXES PRIOR TO
INSTALLATION AND ROUGH IN WORK. REFER TO MECHANICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
FIRST FLOOR PLAN DEMO -ELECTRICAL �`2
SCALE: u. .-0
INTERIOR MODIFICATIONS ONLY
(My MEXTERIOR MODIFICATION MAY RI.QVIOX
A BOAR "PEARANC E)
0
0
�t
N
d-
W
ro
v
O
m M N M
0 MID ID
w
–� J 0) a)
N LL- O lD
'p N L() Ln
U N Ln Ln
—00
C O 0 M m
CLm(D
d) c
O 0 X
N cn U a
ro
U
. r)
> c
O
U
cn c
ro
V) N
c R)
Y
C �
O c
j O
3 E
O s
= U
> X
c c
v a�
p O
.
-r-
V) •
ra
- v
ra —
p �>
Ln
fu
V
Z)
a
REVISIONS
MARK: REMARKS:
o♦^- w
VJ 6
Ow
=U
�Q
aJ
_(L
�w
ac
D
�_
oQ
T. C
Qi �+
EL EO RIVAL ENGINEER o '
2
FIRST BOOR
RCP PLAN
ELECTRICAL
Job No:
412474.00
Date:
File: I
Sheet Title:
Sheet No:
E2.01