13-834-018GENERAL NOTES- 1. TYPE D, LOW RISK LEVEL, AND CLASS III. 2 OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS. 3. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM. 4. COMPLETE ALL CRITICAL BARRIERS, (SHEETROCK, PLYWOOD, PLASTIC) TO SEAL AREA FROM NON —WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS. 5. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA /CARBON EQUIPPED AIR FILTRATION UNITS. S. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS. TRANSPORT IN TIGHTLY COVERED do SEALED CONTAINERS. 7. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. 8. WET MOP AREA WITH DISINFECTANT. 9. VISQUEEN CUBE CONSTRUCTION ISOLATION SHALL BE CREATED WHEN WORK IS REQUIRED IN AREAS THAT DO NOT REQUIRE NEGATIVE AIR MACHINES AND /OR CONSTRUCTION BARRIER ISOLATION. HEPA VACUUM SHALL BE USED TO CLEAN WITHIN THE CUBE AFTER THE WORK HAS BEEN COMPLETED. 10. PORTABLE HEPA NEGATIVE AIR MACHINE(S) SHALL BE INSTALLED TO CLEAN THE AIR IN THE ROOM. AIR QUANTITY SHALL BE ADJUSTED TO MAINTAIN A MINIMUM OF 0.03" W.g. NEGATIVE PRESSURE. VISUAL PRESSURE INDICATOR WILL BE INSTALLED AT THE ENTRANCE. AFTER INSTALLATION OF CONSTRUCTION BARRIER WALLS AND THE ABOVE MEASURES, A CERTIFIED TEST AND BALANCE FIRM SHALL CONFIRM THAT THE ABOVE ITEMS ARE IN PLACE AND WORKING PRIOR TO STARTING DEMOLITION. STICKY MAT SHALL ALSO BE INSTALLED. VISQUEEN SHALL BE INSTALLED AT THE EXISTING DOORS. CONTRACTOR SHALL COMPLY WITH OWNER REQUIREMENTS FOR INFECTION CONTROL FINAL FILTER EFFICIENCY SHALL BE 99.97 91x1;% OR HIGHER FOR 1 MICRON PARTICLES. DO NOT POSITIVELY PRESSURIZE EXISTING DUCTWORK. USE THE NEGATIVE AIR MACHINE FOR SPOT FILTRATION /EXHAUST SERVICE WHEN WORKING ABOVE THE CEILING OUTSIDE THE WALLS OF THE RENOVATED SPACE. 11. STRONG ODORS ARE NOT EXPECTED DUE TO THE SCOPE OF WORK. 12. REFERENCE ARCHITECTURAL PLANS FOR LOCATION OF TEMPORARY CONSTRUCTION WALLS AND PHASING. 13. REFERENCE CONSTRUCTION DOCUMENTS FOR ADDITIONAL REQUIREMENTS. 14. ALL WORK PERFORMED IN AREAS REMAINING FUNCTIONAL DURING CONSTRUCTION SHALL BE DURING OFF —HOURS AND UNOCCUPIED PERIODS. COORDINATE WITH OWNER FOR WORK SCHEDULING. NOTES: OCONTRACTOR SHALL INSTALL NEGATIVE AIR MACHINE AND TEMPORARY ROUND FLEX DUCT FROM MACHINE AS INDICATED. REMOVE AT END OF CONSTRUCTION. O2 CONTRACTOR SHALL INSTALL MAGNETIC DRAFT GAUGE. MAINTAIN 0.03" W.C. NEGATIVE PRESSURE. IN THE CONSTRUCTION AREA O3 CONTRACTOR SHALL COVER ALL AIR DEVICES WITHIN RENOVATED AREA WITH VISQUEEN PLASTIC. CONTRACTOR SHALL CLOSE SUPPLY, RETURN, AND EXHAUST DAMPERS THAT SERVE THE AREAS OF RENOVATION PRIOR TO COVERING AIR DEVICES WITH VISQUEEN PLASTIC. CONTRACTOR SHALL REMOVE VISQUEEN PLASTIC AND REBALANCE SPACE AS INDICATED ON FLOOR PLAN AFTER THE RENOVATION IS COMPLETE. OTEMPORARILY CONNECT TO NEAREST EMERGENCY POWER. CONTRACTOR SHALL PROVIDE ALL NECESSARY ELECTRICAL APPURENTECES AS REQUIRED FOR THIS CONNECTION. OTEMPORARY CONSTRUCTION WALL/ VISQUEEN PLASTIC. O12" ROUND FLEX DUCT. O7 PROVIDE HEPA FILTERED AIR SCRUBBER. O8 SEAL DOORS. ON/A 10 REMOVE WINDOW/WALL AS REQUIRED. PROVIDE PLYWOOD OR SHEET METAL (SIZE TO OPENING). FIT WITH INTERIOR BOOT TO FIT DUCT. REPLACE WINDOW/WALL AT COMPLETION OF CONSTRUCTION. 11 REMOVE WALL INSTALL INTAKE LOUVER WITH INTERIOR BOOT AND VOLUME DAMPER. BALANCE DAMPER TO MAINTAIN NEGATIVE PRESSURE IN SPACE. 12 PROVIDE VISQUEEN CUBE. CONSTRUCTION ISOLATION. 13 SEAL DOOR COORDINATE WITH PHASING. 14 SEE DETAIL PROVIDE THE FOLLOWING FILTERS Willi PORTABLE AIR SCRUBBER: STAGE 1 PRE — FILTER: ONE —INCH DEEP FIBER TRAPPER STAGE 2 PRE — FILTER: TWO —INCH MERV 7 STAGE 3 PRE — FILTER: TWO —INCH DEEP FIBER TRAPPER CARBON FILTER. STAGE 4 FINAL — FILTER: METAL —FRAME 99.97% OR HIGHER HEPA FILTER. 75 CFM MIN CFM 12X12 DIFFUSER TRANSFER 75 CFM UNDER DOOR __vp . INSTALL DUCTS AS INDICATED ON FLOOR PLANS AIRFLOW —METAL FLEX (TYP•) PORTABLE AIR SCRUBBER WITH HEPA do CARBON FILTER MANUFACTURER/ MODEL # PORTABLE AIR SCRUBBER TO BE SIMILAR TO: ABATEMENT TECHNOLOGIES/ PAS2400 3NEGATIVE Aft MACHINE- SCALE: 0 Ms 0 0 2SCALE: 1/8" = T-0" CHAPEL FLOOR PLAN — ICRA ol.PARTIAL FIRST FLOOR PLAN - ICRA PF, W_ 11v A BARD APPF-APAN CE% a S d- N REVISIONS MARK: REMARKS: J a. w CO r* 0w =U Qa. �w = or D �-- _ �Q 0 CHAPEL FLOOR PLAN MECHANICAL Job No: 412474.00 Date: File: Sheet Title: Sheet No: M- I.C.R.A. �a > . 0 :3 O d- ;-' O U 4.J m M N M U) C c rnrn ram O M t0 tD to O J --irnrn Y� (J LL tD to -a V in in C 70 a) aj Ln un o c U O O 1 O pOU_) (0Mre) z3 E aM(D v a; r+ (D _ • N :t� O NU)u a`- > X .,; aa)i v c 0 O W a m (O c fu .:� z Q REVISIONS MARK: REMARKS: J a. w CO r* 0w =U Qa. �w = or D �-- _ �Q 0 CHAPEL FLOOR PLAN MECHANICAL Job No: 412474.00 Date: File: Sheet Title: Sheet No: M- I.C.R.A.