Loading...
13-834-006MECHANICAL SYMBOLS SYMBOLS ARE SHOWN SCHEMATIC AND MAY NOT BE TO SCALE. SYMBOL LOCATION* CITY /STATE MIAMI FLORIDA NEW EQUIPMENT DESIGNATION (TOP - EQUIP. ABBREV., BOTTOM - MARK) e NEW DIFFUSER DESIGNATION (TOP - SCHEDULE DESIG., BOTTOM - CFM) 25.8 EXISTING EQUIPMENT DESIGNATION (TOP - EXISTING., VAV BOX NUMBER) yA NEW SUPPLY VAV DESIGNATION (TOP - SUPPLY VAV, BOTTOM - BOX NUMBER) -VA NEW RETURN VAV DESIGNATION (TOP - RETURN VAV, BOTTOM - BOX NUMBER) - - - ' X EXISTING DUCT TO BE REMOVED OR RELOCATED Il�a�y EXISTING SUPPLY DIFFUSER TO BE REMOVED OR RELOCATED EXISTING R/A OR EXHAUST GRILLE 0.09 EXISTING R/A OR EXHAUST GRILLE TO BE REMOVED OR RELOCATED NEW SLOT DIFFUSER -AAr FLEXIBLE DUCT 55 EXISTING SLOT DIFFUSER - - -- EXISTING SLOT DIFFUSER TO BE REMOVED OR RELOCATED T THERMOSTAT .T; EXISTING THERMOSTAT TO BE REMOVED OR RELOCATED MECHANICAL DETAILS 45' PRESSURE TAP W/ VOLUME DAMPER M8.01 CONICAL TAP NTH V NTS M9.01 J MANUAL VOLUME DAMPER --' FIRE DAMPER NTS SMOKE DAMPER -� FIRE /SMOKE DAMPER M MOTORIZED DAMPER B Wj BAROMETRIC DAMPER - CHS - - CHR - _CS - CHILLED WATER SUPPLY PIPE CHILLED WATER RETURN PIPE CONDENSER WATER SUPPLY PIPE - CR - CONDENSER WATER RETURN PIPE -RL - REFRIGERANT LIQUID PIPE - RG - REFRIGERANT GAS PIPE _HS- HEATING WATER SUPPLY -HR- HEATING WATER RETURN -HPS - HIGH PRESSURE STEAM -HPR - HIGH PRESSURE CONDENSATE RETURN -PCR- PUMPED CONDENSATE RETURN e� aQ DOMESTIC COLD WATER _ _ = - - -- - DOMESTIC HOT WATER RETURN SANITARY WASTE LINE - CD - -� DIRECTION OF SLOPE DIRECTION OF FLOW _ EXPANSION LOOP -0 4 -- GATE VALVE BUTTERFLY VALVE BALL VALVE --N♦ -- GLOBE VALVE TEMPERATURE AND PRESSURE RELIEF VALVE AUTOMATIC 2 -WAY CONTROL VALVE AUTOMATIC 3 -WAY CONTROL VALVE T PLUG VALVE/BALANCING COCK - r SOLENOID VALVE -- CHECK VALVE ❑ HYDRAULIC SHOCK ARRESTOR - -m+ VALVE IN VERTICAL -i}I -- UNION --�- VACCUUM BREAKER 70 P -TRAP :101 FLOOR DRAIN W/ P -TRAP 0 CONNECT TO EXISTING Q EXISTING TO BE DEMOLISHED MECHANICAL ABBREVIATIONS ABOVE CEILING EUH ELECTRIC UNIT HEATER AFF _ FLOOR FCU FAN COIL UNIT Al ANALOG INPUT FPB FAN POWERED BOX AO ANALOG OUTPUT FPI FINS PER INCH BF BELOW FLOOR GC GENERAL CONTRACTOR BFC BELOW FINISHED CEILING MVD MANUAL VOLUME DAMPER BG BELOW GRADE N CD CEILING DIFFUSER OBD OPPOSED BLADE DAMPER CU CONDENSING UNIT RE REBALANCE EXISTING DI DIGITAL INPUT RA RETURN AIR DO DIGITAL OUTPUT RR RETURN REGISTER DS DISCONNECT SNITCH SA SUPPLY AIR EX EXISTING TO REMAIN UH UNIT HEATER EG EXHAUST GRILLE VAV VARIABLE AIR VALVE EF EXHAUST FAN WH WATER HEATER GENERAL DEMOLITION NOTES: A. ALL CAPPED DUCT TAPS AND CONNECTING DUCTS THAT ARE NOT BEING USED ARE TO BE REMOVED BACK TO THE MAIN DUCT AND PATCHED AS PER ITEM B BELOW. B. PATCH OPENINGS IN EXISTING DUCTWORK THAT IS TO REMAIN INCLUDING OPENINGS. WHERE TAPS OR DUCTWORK ARE TO BE REMOVED, THE FOLLOWING SHALL OCCUR: • OPENINGS IN THE MAIN DUCTS ARE TO BE COVERED WITH A SHEET METAL PATCH. THE PATCH IS TO BE LARGER THAN THE EXISTING OPENING AND IS TO BE SECURED WITH SHEET METAL SCREWS FOUR INCHES ON CENTERS. • A LIBERAL QUANTITY OF FIRE RESISTANT ADHESIVE IS TO BE APPLIED TO THE EDGES OF THE METAL PATCH AND THE ASSEMBLY SCREWED IN PLACE. C. ALL WORK SHALL BE PERFORMED IN STRICT COORDINATION WITH HOSPITAL SCHEDULES, OCCUPANCIES AND WORK. CONTRACTOR SHALL COORDINATE WITH HOSPITAL REPRESENTATIVE. D. ALL NECESSARY SHUTDOWNS OR OUT OF PHASE WORK SHALL BE SCHEDULED WITH THE HOSPITAL REPRESENTATIVE. E. FIELD VERIFY THE EXACT SIZES AND LOCATIONS OF ALL EXISTING DUCTWORK AND PIPING PRIOR TO DEMOLITION OF ANY EXISTING WORK. THE DEMOLITION WORK SHALL BE COORDINATED MATH THE NEW WORK TO ASSURE PROPER LIMITS OF DEMOLITION. F. REMOVE ALL EXISTING EQUIPMENT AND ASSOCIATED PIPING, WHETHER SPECIFICALLY INDICATED OR NOT, THAT IS NO LONGER REQUIRED. G. REMOVE AND CAP EXISTING BRANCH PIPING AND DUCTWORK NO LONGER REQUIRED TO REMAIN AS PART OF AN ACTIVE SYSTEM, AT THE APPROPRIATE MAIN. REINSULATE PIPING AND DUCTWORK THAT HAS MISSING OR DAMAGED INSULATION PER SPECIFICATIONS. H. ANY PIPING AND DUCTWORK WHICH MUST REMAIN AS PART OF AN ACTIVE SYSTEM AND IS IN CONFLICT WITH THE NEW LAYOUT SHALL BE RELOCATED AT NO ADDITIONAL COST OVER THE CONTRACT AMOUNT. I. ALL EXISTING DIFFUSERS, EQUIPMENT AND PIPING REMOVED DURING CONSTRUCTION SHALL REMAIN THE PROPERTY OF THE OWNER AND SHALL BE STORED, REMOVED FROM THE JOB SITE OR DISPOSED OF AS DIRECTED BY THE OWNER'S REPRESENTATIVE. J. WHERE EXISTING EQUIPMENT IS TO BE RELOCATED, EXTREME CARE SHALL BE TAKEN TO PREVENT DAMAGE DURING THE REMOVAL AND REINSTALLATION. WHERE DAMAGE OCCURS, THE EQUIPMENT SHALL BE REPLACED OR REPAIRED TO THE SATISFACTION OF THE ARCHITECT, AT NO ADDITIONAL COST TO THE OWNER. K. ALL EbSTING CEILING DIFFUSERS SHALL BE REUSED, REMOVED AND STORED OR DISPOSED OF AS DIRECTED BY THE OWNER'S REPRESENTATIVE. L CONTRACTORS SHALL SEAL ALL LEAKS IN EXISTING DUCTWORK AND NEW DUCTWORK. M. EXISTING EQUIPMENT AND DUCTWORK HAS BEEN LIGHTLY DRAWN TO SHOW THE APPROXIMATE LOCATION. NEW EQUIPMENT AND DUCTWORK IS SHOWN BY HEAVY LINES. N. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND /OR DISPOSING OF ALL ITEMS THAT ARE NOT NECESSARY IN THE COMPLETION OF THE PROJECT AND SHALL CLEAN THE AREA OF CONSTRUCTION AFTER THE COMPLETION OF THE PROJECT. 0• THE MECHANICAL CONTRACTOR SHALL ADJUST AND REBALANCE THE AIR CONDITIONING SYSTEM AND EXHAUST SYSTEM TO PROPER DESIGN VOLUME AS SHOWN ON PLAN. P. ANY EXISTING WALLS DAMAGED FROM PIPING OR DUCTWORK THAT WAS REMOVED SHALL BE PATCHED AND SEALED TO MEET THE FULL INTEGRITY OF THE REMAINING WALL COORDINATE WITH ARCHITECTURAL PLANS FOR RATINGS OF WALLS. PROJECT DESIGN CRITERIA LOCATION* CITY /STATE MIAMI FLORIDA APPLICABLE CODES: BUILDING MECHANICAL PLUMBING GUIDELINES FOR DEIGN AND CONSTRUCTION OF HEALTH CARE FACILITIES 2010 FBC 2010 FMC 2010 FPC 2010 LATITUDE: DEG. N. LAT. 25.8 LONGITUDE: DEG. W. LONG. 80.3 ELEVATION: FT. ABOVE SEA LEVEL 13.0 ASHRAE SUMMER DESIGN CONDITIONS 0.49 DB MWB 91/78 ASHRAE WINTER DESIGN CONDITIONS 99% DB BUILDING SPACE DESIGN TEMPERATURES SUMMER DB WINTER DB 47 72 68 ROOF: U FACTOR 0.09 WALL: U FACTOR 0.24 SUPPLY AIR TEMPERATURE: DEG. F. DRY BULB 55 GENERAL NOTES -ALL HVAC SHEETS A. ALL WORK SHALL BE PERFORMED IN ACCORDANCE MATH THE APPLICABLE FLORIDA UNIFORM STATEWIDE BUILDING CODE STATE AND LOCAL CODES IBC, AIA, IMC, NEC THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA). AND THE LOCAL AUTHORITIES HAVING JURISDICTION. ALL EQUIPMENT, MATERIALS, CONTROLS, ETC. SHALL BE NEW UNLESS NOTED OTHERWISE AND SHAD_ MATCH ALL FACILITY STANDARDS OR, IF APPROVED BY THE OWNER, BE OF THE SAME QUALITY AS REPRESENTED BY THE SCHEDULED ITEM. B. CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS, PAY ALL FEES, AND COMPLY WITH ALL NATIONAL, STATE, AND MUNICIPAL LAWS, CODES, AND ORDINANCES RELATING TO BUILDING AND PUBLIC SAFETY. C. CONTRACTOR SHALL FURNISH ALL MATERIALS, EQUIPMENT, AND LABOR REQUIRED FOR A COMPLETE WORKING AND COORDINATED SYSTEM. D. COORDINATE THE EXACT LOCATION OF MECHANICAL AND PLUMBING EQUIPMENT WITH THE LOCATIONS OF LIGHT FIXTURES, PIPING, CONDUIT, AND OTHER CONSTRUCTION, TO ALLOW FOR PROPER ACCESS TO SERVICE EQUIPMENT. E. COORDINATE THE LOCATION OF DUCTWORK AND PIPING WITH OTHER TRADES AND PROVIDE OFFSETS IN DUCTWORK AND PIPING AS REQUIRED. F. IT IS THE INTENT OF THESE DOCUMENTS TO ALLOW ALL CEILING CONSTRUCTION AND HEIGHTS TO BE AS SHOWN ON THE ARCHITECTURAL DRAWINGS. COORDINATE THE LOCATION OF DUCTWORK AND PIPING AND PROVIDE OFFSETS IN DUCTWORK AND PIPING AS REQUIRED TO MEET THIS INTENT. G. CONDUIT, PIPING, AND DUCTWORK SHALL BE INDEPENDENTLY SUPPORTED, AND EACH SUPPORT SHALL BE INDEPENDENT OF PARTITION AND CEILING SYSTEM SUPPORTS. WHERE INDEPENDENT SUPPORT IS NOT POSSIBLE AN ENGINEERED SUPPORT SYSTEM SHALL BE UTILIZED. H. ALL WORK SHALL BE SCHEDULED AND PERFORMED IN STRICT COORDINATION WITH ARCHITECTURAL PHASING PLANS AND WITH HOSPITAL SCHEDULES, OCCUPANCIES, AND WORK. I. PROTECT EQUIPMENT AND WORK FROM DAMAGE DURING HANDLING AND INSTALLATION UNTIL COMPLETION OF CONSTRUCTION. J. REMOVE ALL EXCESS MATERIAL AND DEBRIS AND CLEAN ALL EQUIPMENT UPON COMPLETION OF WORK. TOUCH UP WITH PAINT WHERE REQUIRED. K. ALL CONNECTION BETWEEN PIPES OF DISSIMILAR MATERIALS SHALL BE MADE WITH DIELECTRIC UNIONS. L OWNER SHALL HAVE FINAL APPROVAL OF ALL GRILLE, DIFFUSER, AND THERMOSTAT LOCATIONS. M. COORDINATE ALL AIR DEVICE LOCATIONS AND MOUNTING FRAME STYLES MATH LIGHTING PLANS AND REFLECTED CEILING PLANS. N. COORDINATE ALL WALL MOUNTED DEVICE LOCATIONS NTH ARCHITECTURAL INTERIOR ELEVATIONS. 0. DUCT SIZES ARE NET FREE AREA. P. PROVIDE ROUND DUCTS TO ALL AIR DEVICES UNLESS NOTED OTHERWISE. DUCT SIZE SHALL MATCH AIR DEVICE NECK SIZE OR THE TABLE IN AIR DEVICE SCHEDULE, WHICHEVER IS LARGER. FLEXIBLE DUCTS SHALL BE SIZED SIMILARLY. 0. PROVIDE MANUAL VOLUME DAMPER IN EACH AIR DEVICE RUNOUT DUCT AS FAR FROM AIR DEVICE AS POSSIBLE. R. INSTALL SPACE THERMOSTAT ADJACENT TO LATCH SIDE OF DOOR IN SPACE INDICATED. U.N.O. INDICATED LOCATIONS ARE APPROXIMATE. AVOID HEAT PRODUCING EQUIPMENT. FINAL SPACE THERMOSTAT /SENSOR LOCATIONS SHALL BE AS DIRECTED BY THE ARCHITECT. S. INSTALL TURNING VANES IN ALL 90 DEGREE SQUARE ELLS IN SUPPLY, RETURN, AND EXHAUST DUCTS. (NONE ALLOWED IN COMBUSTION AIR DUCTS). T. LOCATE ISOLATION VALVES FOR EQUIPMENT AS CLOSE TO THE MAIN AS POSSIBLE. U. MULTI -BLADE DAMPERS OF ANY TYPE INSTALLED WITHIN 36' OF AN ELL OR OTHER FITTING SHALL BE INSTALLED WITH THE DAMPER BLADE SHAFTS PARALLEL TO THE AIRSTREAM FLOW DIRECTION UPSTREAM OF THE FITTING. V. FIRE, SMOKE, AND FIRE /SMOKE DAMPERES WILL BE REQUIRED AT ALL DUCT PENETRATIONS THRU RATED WALLS. COORDINATE WITH ARCHITECTURAL DRAWINGS. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR PRICING ALL FIRE, SMOKE, AND FIRE/SMOKE DAMPERS REQUIRED BY CODE. MECHANICAL CONTRACTOR SHALL REPORT EXISTING FIRE, SMOKE, FIRE /SMOKE DAMPERS TO THE ARCHITECT AND ENGINEER BEFORE PRICING. W. DEMONSTRATE TO OWNER'S REPRESENTATIVE THAT ALL INSTALLED CONTROLS ARE WORKING PROPERLY WITHOUT ERRORS PRIOR TO RELEASING SYSTEM TO OWNER. X. RUN DUCTWORK AS TIGHT TO UNDERSIDE OF SLAB AS POSSIBLE. AS REQUIRED FOR LOCATIONS OF DUCT CROSSING, PROVIDE ALL NECESSARY OFFSETS. RUN BRANCHES THROUGH JOIST WEBS WHERE STRUCTURE IS METAL JOIST TO ACCOMMODATE DUCT CROSSING. ROUTE ROUND METAL DUCT THROUGH JOIST WEBS WHERE REQUIRED. Y. THE USE OF FLEXIBLE DUCTWORK SHALL BE UMITED TO CONNECTOR APPLICATIONS. FLEXIBLE DUCTWORK SHALL COMPLY WITH FBC 419.3.11.6. THE USE OF CPE FLEXIBLE DUCTWORK IS ACCEPTABLE. Z. REMOVE, STORE, PROTECT CEILING TILES IN AREAS OF WORK. RE- INSTALL UPON COMPLETION. REPLACE ALL DAMAGED TILES. AA. INDEPENDENT CONTRACTOR SHALL BE RETAINED TO TEST AND BALANCE SYSTEMS. TEST AND BALANCE CONTRACTOR SHALL BE CERTIFIED BY NABC OR AABC AND SHALL PREPARE A TEST AND BALANCE REPORT AT SUBSTANTIAL COMPLETION ACCORDING TO THE REQUIREMENTS OF NABC OR AABC. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE DURING CONSTRUCTION TO VERIFY THAT AIR DEVICES ARE BEING INSTALLED PROPERLY. AB. RUN INSULATED CONDENSATE DRAINS AS SHOWN. CONDENSATE DRAINS SHALL BE COPPER. AC. SHEET METAL MATERIALS: COMPLY WITH SMACNA'S 'HVAC DUCT CONSTRUCTION STANDARDS -METAL AND FLEXIBLE' FOR ACCEPTABLE MATERIALS, MATERIAL THICKNESS, AND DUCT CONSTRUCTION METHODS, UNLESS OTHERWISE INDICATED. SHEET METAL MATERIALS SHALL BE FREE OF PITTING, SEAM MARKS, ROLLER MARKS, STAINS, DISCOLORATIONS, AND OTHER IMPERFECTIONS. REFER TO SPECIFICATION SECTION 233113 FOR ALL METAL DUCT REQUIREMENTS. 1. GALVANIZED SHEET STEEL: LOCK - FORMING QUALITY; COMPLYING WITH ASTM A 653/A 653M AND HAVING G90 (2275) COATING DESIGNATION; DUCTS SHALL HAVE MILL- PHOSPHATIZED FINISH FOR SURFACES EXPOSED TO VIEW AND A MINIMUM 26 GAGE THICKNESS. 2. ALUMINUM SHEETS: ASTM B 209 (ASTM B 209M), ALLOY 3003, TEMPER H14; WITH MILL FINISH FOR CONCEALED DUCTS AND STANDARD, 1 -SIDE BRIGHT FINISH FOR EXPOSED DUCTS. 3. ALL DUCT WORK INSULATION SHALL HAVE A MINIMUM R -VALUE OF 6. AD. REFER TO SPECIFICATION SECTION 230700 FOR ALL HVAC INSULATION REQUIREMENTS. AE. EXERCISE CARE WHEN WORKING IN RENOVATION AREAS. ANY CEILINGS, WALLS, OR OTHER BUILDING COMPONENTS WHICH ARE DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED TO MATCH SURROUNDING AREAS. AF. ALL NEW AND EXISTING DUCTWORK AFFECTED BY RENOVATION SHALL BE CLEANED AS REQUIRED PER SPECIFICATIONS. PROVIDE SPECIFIED DUCT ACCESS DOORS AS REQUIRED ON ALL NEW AND EXISTING DUCTS TO ACCOMPLISH CLEANING. AG. ALL NEW AND EXISTING DUCTS SERVING AREAS WITHIN SCOPE SHALL BE PRESSURE TESTED IN ACCORDANCE WITH SPECIFICATIONS. CONTRACTOR SHALL SEAL ALL DUCTS AS REQUIRED PER SPECIFICATIONS TO MINIMIZE DUCT LEACKAGE. PRESSURE TESTS SHALL BE OBSERVED BY THE OWNER OR DESIGNATE OWNER'S AGENT. AH. CONTRACTOR SHALL VERIFY THAT ALL EXISTING HEATING COILS AND ASSOCIATED CONTROLS THAT ARE TO BE REUSED ARE IN GOOD WORKING CONDITION. IF HEATING COILS /CONTROLS NEED TO BE REPLACED, THEY SHALL BE REPLACED AT NO ADDITIONAL COST OVER CONTRACT AMOUNT. Al. PROVIDE PORTABLE AIR- CONDITIONING UNITS (SPOT COOLERS) FOR ALL SPACES SERVED BY AHU -B1A3. CONTRACTOR SHALL COORDINATE QUANTITIES AND LOCATIONS OF SPOT COOLERS WITH OWNER PRIOR TO BID. COORDINATE WITH PHASING. MECHANICAL SHEET LIST DWG No. DRAWING TITLE F�l ALE MO.00 GENERAL INFORMATION - MECHANICAL MD2.11 CHAPEL DEMOLITION PLAN - MECHANICAL 1/40=f MD2.12 PARTIAL FIRST FLOOR DEMOLITION PLAN - MECHANICAL 1/4' =1' M2.11 CHAPEL FLOOR PLAN - MECHANICAL FIRE RATED ROOF/ FLOOR CEILING ASSEMBLY M2.12 PARTIAL FIRST FLOOR PLAN - MECHANICAL FIRE STOPPING M3.11 CHAPEL FLOOR PLAN - PIPING 1/4" =1' M3.12 PARTIAL FIRST FLOOR PLAN - PIPING 1/4 " =1' M7.01 MECHANICAL DETAILS NTS M7.02 MECHANICAL DETAILS NTS M8.01 MECHANICAL SCHEDULES NTS M9.01 MECHANICAL CONTROLS NTS M9.02 MECHANICAL CONTROLS NTS M -ICRA MECHANICAL ICRA PLAN 1/8' =1'-O' > .X .so o w a • HVAC DESIGN REQUIRES YES NO DUCT SMOKE DETECTOR X .o FIRE DAMPER(S) X SMOKE DAMPER(S) 0 X FIRE RATED ENCLOSURE ) X FIRE RATED ROOF/ FLOOR CEILING ASSEMBLY c �rnrn X FIRE STOPPING cn X SMOKE CONTROL J _j rn rn X CODES AND STANDARDS THE SCOPE OF THE WORK SHALL INCLUDE THE FURNISHING AND INSTALLATION OF THE NECESSARY MATERIAL AND LABOR TO ACCOMPLISH THE WORK INDICATED BY THE DRAWINGS AND HEREIN SPECIFIED. ALL WORK BY CONTRACTOR SHALL CONFORM TO ALL APPLICABLE FEDERAL, STATE AND LOCAL BUILDING CODES AND STANDARDS INCLUDING BUT NOT LIMITED TO: 1. STATE OF FLORIDA 2. CITY OF MIAMI 3. LIFE SAFETY CODE - NFPA 101 (2009) 4. UNDERWRITERS LABORATORIES, INC. PUBLICATIONS (UL) 5. NATIONAL FIRE PROTECTION ASSOCIATION. (NFPA) 6. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) 7. NATIONAL ELECTRICAL CODE - NFPA 70 (2008) 8. INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE) 9. NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION (NEMA) 10. INTERNATIONAL POWER CABLE ENGINEER'S ASSOCIATION (IPCEA) 11. NATIONAL ELECTRICAL SAFETY CODE (NBS Handbook 81) 12. REQUIREMENTS OF LOCAL UTILITY COMPANY 13. FLORIDA ADMINISTRATIVE CODE 59A -3, (March 2003) 14. NATIONAL FIRE PROTECTION ASSOCIATION 13 (2007) 14. NATIONAL FIRE PROTECTION ASSOCIATION 72 (2007) 15. NATIONAL FIRE PROTECTION ASSOCIATION 99 (2005) 16. NATIONAL FIRE PROTECTION ASSOCIATION 101 (2009) 16. THE STATE FIRE PREVENTION CODE, 060 (2001) 17. BUILDING CODE: FLORIDA BUILDING CODE (2010) 18. MECHANICAL CODE: FLORIDA MECHANICAL CODE (2010) 19. PLUMBING CODE: FLORIDA PLUMBING CODE (2010) 18. GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTHCARE FACILITIES (2010) 19. NFPA 110 (2005) 20. FIRE MARSHALL'S RULE 69A -3.012 F.A.C. ADOPTED DECEMBER 31, 2011 INTERIOR MOMY!CATIONS ONLY (ANYZXTER.IOR 1tiiol ➢11 -j(. MAY REQuiRg A BOARD APPS,­... CE) 0 0 N d- L" REVISIONS MARK: REMARKS: •m a- w CO Ow =U � J a� �w 2 a: 2 ♦0♦^ Q V, Ju Ora, �VA��1AIi, . '� ,19/!x; E 7 �o U .o _A 74 0 CJ a 0 ) m M N M c �rnrn ram p M lD �D cn v M­i -i @ fu J _j rn rn Y Q) LL- v Q) 6 6 o c C) o L, g M M E a. m c c _ 5 D N U) U Q 42 > .X .so o w a • rra fu -_ > u: :- z e� aQ REVISIONS MARK: REMARKS: •m a- w CO Ow =U � J a� �w 2 a: 2 ♦0♦^ Q V, Ju Ora, �VA��1AIi, . '� ,19/!x; GENERAL INFORMATION MECHANICAL Job No: 412474.00 Date: File: Sheet Title: Sheet No: M0,00 _A 74 ✓,�r "$ � 4 -� T,Aq `�`�`''��' yip `�L. >o AAelEdt AN���• GENERAL INFORMATION MECHANICAL Job No: 412474.00 Date: File: Sheet Title: Sheet No: M0,00