Loading...
13-781R-03614.7 C 14 D 175E P IEN-ga II i , 7g, �41 T P-STAIR I -,�12A 7 Ek 75E 250 P-STAIR I VESTIBULE EX. LO 04 • '400 (IS 300 MIin El T-4 0 r*4 Z W U U)i U ) U),u E :3 H U 0 U) cn .E tn U) tn U 13 (1) fQ U tn r-i Ln A 1q, V-11 0 In L- 0 E0 13 175 E 175 E 12 AIR BALANCE SCHEDULE - 4TH FLOOR EQUIPMENT 501 275 C6 C3 325 ­75 E 0 W 41. 75- 04 75 4 16 5 Er F 75 E`­ -/2,100 2 P TIE- 275 r25500M 1 -/400 200 E 175 E 22,935/23,820 14,360/14,995 FOURTH FLOOR PLAN - NEW CONSTRUCTION - MECHANICAL EF-14 REVISIONS/ISSUES 175 E 175 E 12 AIR BALANCE SCHEDULE - 4TH FLOOR EQUIPMENT SUPPLY AIR EXIST/NEW RETURN AIR EXIST/NEW EXHAUST AIR EXISTINEW OUTSIDE AIR EXIST/NEW AHU-4 -/9,760 -/7,260 4 -/2,500 EF-1,2 3 PRICING SET -/2,100 2 EF-ISO-1 03 -11 -1" 1 -/400 10-17-12 AHU-5 (CORE) 22,935/23,820 14,360/14,995 NO. 8,575/8,825 EF-14 REVISIONS/ISSUES 8,575/8,825 AHU-5 AND EF-14 SERVE FLOORS AND AREAS OUTSIDE THE SCOPE OF THIS PROJECT. 175 E 175 E 9 84 ' 4.5 13.9' .:- 10'� 9.4 7 6.8 6 5 CORRIDOR EX NU. OFF. PATIENT ROOM SOIL UTILITY SUPPLY & M.P. EX. --- , I I I EX. EX _EX_ TREATMENT EX. CORRIDOR 400T J PATIENT ROOM BLOOD FLOW LAB EX, STORAGE 7 FROM T. J.C. EX. EXISTING I r_ QX, -EX. AHLI-5 C, (TYP FL 4-7)-----11:� ION ELEVATOR EVATOR 3 ELEVATOR 4 STORAGE T. LOUNGE Ek � I '. .1 EX. I . Ex" EX I EX. EX FROM EXISTING 75 T. wi EF-14 STING ALCOVE, (TYP FL 4-7) EX. 125 E 125 E 125 E 125 E I 125 E 125 E 175 175 FAH ELEVATOR 5 CLINICA I 16"x12" RA 26"x`12" RA EX. EX, ELEVATOR LOBBY i CORRIDOR PATI- Tgopm PATIEN-250 N26 OM PATIENT PATIE OOM 175 E 175 E 400S - .CORRIDOR 00 41 R A J TELECOM/ 406 05 404 403 ; F 200 40ON NETWORK T� 0 200 49-9- F 8"x8" ED ED FD F-4 MECH. EQUIP 0 E k [ EX, I - 100 475=:ZZZ=I RHC-1 lu PhlENT 18"x`10" EA LEVATOR6 T. 14"x8" EA �/;T( RAGE AIR 2 .4 i_ W­:j- I - .1 A I „tae X75 i 7501 75- 175 E 751o[_ 75 4 EX. UTILITY ROON 75 E! 75 E 1�75E 1 498 \RHC C3 C 3 J 11 7,11! 1 ­� -- . -3 20 sv� D ��'200 D - !- .4 0 2 - -2 D. 2021 75b F- L C14 1 8"x8” A 100 E CIP NG TOILET co 700 E i 17 x1 3" RA 20"x13" RA 30 700 E 04 EX. I 50_ ,A h- 20"x9" EA 20"x9" EA GUNWIJUR 25 250 El. 50 C 20"x`10" 750 NIM LIFT cl"J 20")QO" ------ nL < i UJI IP. i LCOV if FL) p, c8 ED HC-2- - RHC-2 A CLO4 _RJ c- �X- C) Ln FD 40 (A ELEC.CLW. U') U') 1, : 496 uj - 125 x CRAC-4-1 125 E NUI NA 0 GER 300 E 04 C14 04 �ES LE 1230 CFM FE KP 1 ' 11 17 iA E MENT.?< ?< 150 ?< INENS 125 4Z STAFF OILET I.T. ROOM I STAFF LOCKE Z,' 75 E 0 A RHC- rd --LNQSU P H C) 445 EXISTING TOILET 3- 43 75 EX. IDOR 100 E 16 PA SAGE U) I Z7 E 00 .4150 4010- 7 MAL, ef 150 0 CLINICIANS 45� 11 7 443 ox SD AHU4 ELE ATOR LOBBY 100 E QUIPMENT C, 11 V 4 111 /-n*N i ELEVATOR 11 x2ollp A C 6 T .. f4 400Q C14 ALCOVE 60' TV I /r STAI L U SHMENT 6 'x24" RA I EX, C E HOL125G 150 100 :8 1 400L '111 1 424/1 150 STORAGE �;E RA 2 x12- RA T� IN Fill 05 40, "T. 7 C3 0 24 5 22"x1O"1, �ET 150 EX. Aft, loop. 275 10 n1A -- - - -- - • C 1 4.401 A El , xr: r- =X N 30"x18 RXI, AFMS 5.4'. 4 300 25 C� 175 E 175 E 175E 175 E ----­--------- - 175 E 210 E r5 E KEYED NOTES I PROVIDE VOLUME DAMPER IN I0X10 DUCT CONNECTION INSIDE RISER WITH HEX KEY CABLE CONTROL VOLUME DAMPER WITH COVER PLATE. INSTALL CONTROLLER UNDER SINK AREA OUT OF LINE OF SIGHT OF PATIENT AND STAFF OR FIRE RATED ACCESS DOOR FOR DAMPER ACCESS.GRILLE SHALL BE TYPE #10, ZERO DEGREE BLADES WITH BUILT IN FIRE DAMPER. TYPICAL OF ALL FLOORS 4-7. DURING CONSTRUCTION EACH FLOOR SHALL BE BALANCED PER FLOOR CONSTRUCTION AND REBALANCED UPON NEXT PHASE (NEXT FLOOR UPWARD) CONSTRUCTION. SEE ARCHITECTURAL PLANS FOR DETAILS. 2. OA DUCT AND OA LOUVER PLENUM BOX SHALL BE FULLY INSULATED. SEE SPECIFICATIONS FOR DETAILS. TYPICAL OF FLOORS 4-7. TURN DUCT DOWN AND CONNECT TO BACK OF PLENUM BOX. INSTALL AIR FLOW MEASURING STATION IN STRAIGHT SECTION OF DUCT AS SHOWN. TYPICAL OF FLOORS 4-7. 3. EXISTING GENERAL EXHAUST DUCT AND SHAFT. SEE NOTES SHEET M.002 FOR DUCT AND CLEANING. TYPICAL OF FLOORS 1-7. - - - 4. TRANSITION DUCTWORK AFTER ELBOWS AND BEFORE DUCTWORK CONNECTIONS TO SYSTEM. TYPICAL OF FLOORS 4-7. 5. INSTALL DUCTWORK IN PATIENT ROOM AS SHOWN. SEE DETAIL #5 SHEET M5.01 AND CAV SCHEDULE SHEET M.004 FOR DETAILED INSTRUCTIONS. FLEX DUCT SHALL NOT EXCEED 60". TYPICAL OF ALL PATIENT ROOMS FLOORS 4-7. 6. ALL DUCTS THAT TERMINATE AT THE WALL SHALL HAVE TYPE "F" S/A GRILLES AND TYPE " 8" RETURN AIR GRILLES. TYPICAL OF ALL ENTIRE FLOOR AND FLOORS 4-7. 7. ELECTRICAL PANEL TO BE INSTALL IN THIS LOCATION. MECHANICAL CONTRACTOR SHALL COORDINATE WITH ELECTRICAL CONTRACTOR PRIOR TO INSTALLATION THROUGH THE GENERAL CONTRACTOR. UIS No 45360 OF '--Rk NA1- 111 110 ---- --- - - ----- --- AY --- ---- a r c h i te c t s -------------------------------------------- ARRAY-ARCHITECTS.COM 6800 Broken Sound Pkwy NW, Ste 125 Boca Raton, FL. 33487 o: 561-995-1700 f: 561-995-1701 ------------------------------------------------------------------------------ SEAL: firm license # AA26000880 Mark D. Taudien AR0011821 ------------------------------------------------------------------------------ CONSULTANTS: Smith Seckman Reid Inc. 600 West Hillsboro Blvd., Suite 300 Deerfield Beach, FL 33441 (954) 421-1260 FAX: (954) 421-1466 www.ssr-inc.com Frank Rivera PE - 54525 Jorge Rivera PE - 45360 SSR!s JOB #1132077.0 - -------------------------------------------------------- - ------- - ----------- OWNER: BAPTIST HEALTH SOUTH FLORIDA HOSPITAL: SOUTH MIAMI HOSPITAL PROJECT: PAVILION RENOVATIONS FLOORC 4-7 6200 Southwest 73rd Street South Miami., FL 33143 7 General Revision 04-03-14 6 Bulletin B1 -03 02-07-14 5 ADDENDUM #5 08-16-121 4 AHCA COMMENTS RESPONSES 07-26-121 3 PRICING SET 04 -10 -1" 2 50% CONSTRUCTION SET 03 -11 -1" 1 AHCA STAGE 11 10-17-12 NO. DESCRIPTION DATE REVISIONS/ISSUES ------------------------------------------------------------------------------ SHEET TITLE: FOURTH FLOOR PLAN - NEW CONSTRUCTION - M ECHAN ICAL ------------------------------------------------------------------------------ DRAWN: Author CHECKEDChecker CON/REF NcAHCA 23/100154-191-1 PROJECT No3593 DATE:05-03-13 SCALE: As indicated --------------------------------------------------------------- - ------ - - - - -- SHEET NO. M.241 This document is a copyright protected instrument of service, prope of Array Architects and licensed for use in the title project only. Reproduction or use of this document without written permission of Array Architects is illegal and will be prosecuted under the law. © COPYRIGHT - 2013 ARRAY - ARCHITECTS, INC. ,\", I