Loading...
13-781R-033E 14.7 C.3i— VE b774a ED Mz= II II I ! D, _J Is. i ' UP C A cn E E_ :E ALAM M o fV I _J z W F °- FE U W cn p 'i C G. ! o' 0 mm v E 21 r I 125 r ! ; FU U) -� L I FIN, N U J H, Q.0- �"11' N� .LEVEL 1 - DEMOLITION - MECHANICAL oA rl 0 N LA L O .0 14' 13 TEMP AIR BALANCE SCHEDULE - 1ST FLOOR EQUIPMENT SUPPLY AIR EXIST /NEW RETURN AIR EXIST /NEW EXHAUST AIR EXIST /NEW OUTSIDE AIR EXIST /NEW AHU -3 17,330/15,000 13,355/11,425 PRICING SET 5,975/5,575 EF -1,2 2 50% CONSTRUCTION SET 25,300/23,530 AHU -4 42,500/40,000 — — EIS PART OF THE CLINICAL EXPANSION PROJECT. IS 100% O/A AND IS EXISTING TO BE DEMOLISHED. 12 1 O ; 9.4 9 ! !,8.4,1 i 1 i 3 5 6 7 6.8 6 1 5 4.5` DISHWASHING AREA 7 3.9 i M1 i N a a � No. 53G0 "4 TE OF ' i =/ ,ARRAY a r c h i t e c t s - - - ARRAY -ARCf i—, Z CTS.COM 6800 Broken Sound Pkwy NW, Ste 125 Boca Raton, FL. 33487 o: 561 - 995 -1700 f: 561 - 995 -1701 ----------------------------------------------------------------------------- SEAL: firm license # AA26000880 Mark D. Taudien -------------------------------- CONSULTANTS: AR0011821 - I -------- - - - - - Smith Seckman Reid, Inc. 600 West Hillsboro Blvd., Suite 300 Deerfield Beach, FL 33441 (954) 421 -1260 FAX: (954) 421 -1466 www.ssr- inc.com Frank Rivera PE - 54525 Jorge Rivera PE - 45360 SSR's JOB #1132077.0 OWNER: BAPTIST HEALTH SOUTH FLORIDA HOSPITAL: SOUTH MIAMI HOSPITAL PROJECT: PAVILION RENOVATIONS FLOOR 4 -7 6200 Southwest 73rd Street South Miami, FL 33143 SHEET TITLE: FIRST FLOOR PLAN DEMOLITION - MECHANICAL DRAWN: Author CHECKEDChecker CON /REF NcAHCA 23/100154 -191 -1 PROJECT No3593 DATE:05 -03 -13 SCALE: As indicated j---------------------------------------------------------------------------- SHEET NO. M.111 This document is a copyright protected instrument of service, prop of Array Architects and licensed for use in the title project only. Reproduction or use of this document without written permission o Array Architects is illegal and will be prosecuted under the law. O COPYRIGHT - 2013 ARRAY-ARCHITECTS, INC. 5 1 Bulletin B1 -04 04 -23 -1 4 AHCA COMMENTS RESPONSES 07 -26 -1 3 PRICING SET 04 -10 -1 2 50% CONSTRUCTION SET 03 -11 -1 1 AHCA STAGE II 10 -17 -1 NO. DESCRIPTION DATE REVISIONS /ISSUES SHEET TITLE: FIRST FLOOR PLAN DEMOLITION - MECHANICAL DRAWN: Author CHECKEDChecker CON /REF NcAHCA 23/100154 -191 -1 PROJECT No3593 DATE:05 -03 -13 SCALE: As indicated j---------------------------------------------------------------------------- SHEET NO. M.111 This document is a copyright protected instrument of service, prop of Array Architects and licensed for use in the title project only. Reproduction or use of this document without written permission o Array Architects is illegal and will be prosecuted under the law. O COPYRIGHT - 2013 ARRAY-ARCHITECTS, INC.