Loading...
13-781R-017E I C I 3/32" =1' -0" 2 3 LDBI rd 5 (C.91 rBk1_11tTY F [F.4] G H Yi Wt:61 tLtVAI IUN - 61 UUL;U Ktl'AIKS 3/32" =1' -0" SOUTH ELEVATION - STUCCO REPAIR 3/32" =1'-0" 0 R00 811- 6" :NTH FLOOR 70' - 00" v �IXTH FLOOR � 581- 66" V IFTH FLOOR 471-011 -V JRTH FLOOR � 351- 66" V HIRD FLOOR 241-011 7 ELEVATION NOTES - STUCCO REPAIR 1. ALL ELEVATIONS TO RECEIVE STUCCO REPAIR BASED ON SPECIFICATION SECTION 092200. 2. CONTRACTOR TO USE METHODS NOTED IN 1.1 WORK SUMMARY OF SPECIFICATION SECTION 092200 FOR IDENTIFICATION OF DEFECTIVE OR UNSOUND STUCCO SURFACES REQUIRING REHABILITATION. 3. SEE SPECIFICATION SECTION 099720 FOR BHSF STANDARD STUCCO, CONCRETE AND MASONRY COATING INFORMATION. 4. ALL EXTERIOR SURFACES AS INDICATED ON KEY PLANS TO RECEIVE 10 MIL THICKNESS OF BASH THOROCOAT PER SPECIFICATIONS. 5. SEE SHEET A211 FOR WINDOW DETAILS. 6. REMOVE EXISTING STUCCO /FINISH FROM SUBSTRATE AT ALL EXISTING WINDOW ATTACHMENTS. PREPARE SUBSTRATE FOR THOROSEAL PLASTER MIX AND 5MIL THOROCOAT FINISH PRIOR TO WINDOW INSTALLATION. 7. WINDOW WORK WILL COORDINATE WITH THE PHASE OF EACH FLOOR WHILE STUCCO REPAIR WORK CAN PROCEED VERTICALLY ACROSS BUILDING FACADE INDEPENT OF PHASE. 8. FINAL 10 MIL THOROCOAT FINISH WILL BE APPLIED DURING PHASE 4 OF THE WORK. ELEVATION LEGEND - STUCCO REPAIR PARAPET CONDITION; REFER TO DETAIL B1 /A212 INFILL EXISTING WINDOW OPENING WITH CCONCRETE TO ACCOMODATE NEW LOUVER; 3/4" STUCCO WITH THOROCOAT FINISH COAT; SEE DETAIL A4/A623 AND 13/S -4 TYPICAL CRACK LOCATION ALONG JOINT WHERE ROOF MEETS PARAPET DETERMINE IF CORNERS HAVE ANY DELAMINATION DUE TO OLD OR NON- EXISTENT CORNER BEADS AND REPAIR PER SPECIFICATION SECTION 092200 _ _;t +_; PROVIDE NEW STUCCO AND THOROCOAT FINISH AROUND WINDOWS t' WHERE CRACKS NEED REPAIR, INSIDE WINDOW SILL, JAMB AND HEAD AND AT REMOVED HURRICANE SHUTTER HOUSING KEYNOTES - STUCCO REPAIR Al APPLY COATING TO ALL EXISTING STUCCO AND CONCRETE SURFACE WITHIN THE PROJECT AREA OAPPLY COATING TO ALL EXISTING STUCCO AND CONCRETE SURFACE WITHIN ROOF PERIMETER AND INTERIOR FACE OF PARAPET WALL A3 INFILL OF EXISTING LOUVERS AT PENTHOUSE WITH NEW STUCCO OVER CMU; APPLY THOROCOAT AS INDICATED FOR PROJECT AREA; SEE DETAILS 3 /S -4 AND D1/A181 A4 NEW WINDOWS IN EXISTING OPENING; SEE SHEET A211 FOR DETAILS A5 EXISTING WINDOWS TO REMAIN; EXISTING HURRICANE SHUTTERS TO REMAIN INTERIOR MODIFICATIONS ONLY (ANY EXTERIOR MODIFICATION MAY REQUIRE A BOARD APPEARANCE) ROOF�1 ITH FLOOR 7F-_0" 0" ;TH FLOOR 58' - -6" v �TH FLOOR 47'7' -0" v ;TH FLOOR � 351- 66" V RD FLOOR 24F-_0 F v , A.R--RAY I " I arc h i tec is ARRAY- AkcHI'i' (fs WM, 6800 Broken Sound Pkwy NW, Ste 125 Boca Raton, FL. 33487 o: 561 - 995 -1700 f: 561 - 995 -1701 SEAL: firm license # AA26000880 4- - XXI Mark D. Taudien rf : AR00 '821 ----------------------------------------------------- - ----- --------------- - - -- CONSULTANTS: ' STRUCTURAL ENGINEER O'Donnell, Naccarato, Mignogna & Jackson 321 15th St., Suite 200 West Palm Beach, Florida 33401, USA Phone: 561.835.9994 Fax: 561.835.8255 MEP ENGINEER Smith, Seckman & Reid, Inc. 600 West Hillsboro Blvd, Suite 300 Deerfield Beach, FL 33441 Phone: 954.421.1260 Fax: 954.421.1466 --------------------------------------------------------------------------------- OWNER: BAPTIST HEALTH SOUTH FLORIDA HOSPITAL: SOUTH MIAMI HOSPITAL PROJECT: PAVILION RENOVATIONS FLOORS 4 -7 6200 Southwest 73rd Street South Miami, FL 33143 2 Bulletin #131 -04 04 -23 -14 1 Bulletin #81 -03 02 -07 -14 N0, DESCRIPTION DATE REVISIONS /ISSUES lxx� L _ A4 _- I I IT LE I I A4 A4 A4 A4 — — I — — A5 SEVI IR\Al I ' — — FO f Wt:61 tLtVAI IUN - 61 UUL;U Ktl'AIKS 3/32" =1' -0" SOUTH ELEVATION - STUCCO REPAIR 3/32" =1'-0" 0 R00 811- 6" :NTH FLOOR 70' - 00" v �IXTH FLOOR � 581- 66" V IFTH FLOOR 471-011 -V JRTH FLOOR � 351- 66" V HIRD FLOOR 241-011 7 ELEVATION NOTES - STUCCO REPAIR 1. ALL ELEVATIONS TO RECEIVE STUCCO REPAIR BASED ON SPECIFICATION SECTION 092200. 2. CONTRACTOR TO USE METHODS NOTED IN 1.1 WORK SUMMARY OF SPECIFICATION SECTION 092200 FOR IDENTIFICATION OF DEFECTIVE OR UNSOUND STUCCO SURFACES REQUIRING REHABILITATION. 3. SEE SPECIFICATION SECTION 099720 FOR BHSF STANDARD STUCCO, CONCRETE AND MASONRY COATING INFORMATION. 4. ALL EXTERIOR SURFACES AS INDICATED ON KEY PLANS TO RECEIVE 10 MIL THICKNESS OF BASH THOROCOAT PER SPECIFICATIONS. 5. SEE SHEET A211 FOR WINDOW DETAILS. 6. REMOVE EXISTING STUCCO /FINISH FROM SUBSTRATE AT ALL EXISTING WINDOW ATTACHMENTS. PREPARE SUBSTRATE FOR THOROSEAL PLASTER MIX AND 5MIL THOROCOAT FINISH PRIOR TO WINDOW INSTALLATION. 7. WINDOW WORK WILL COORDINATE WITH THE PHASE OF EACH FLOOR WHILE STUCCO REPAIR WORK CAN PROCEED VERTICALLY ACROSS BUILDING FACADE INDEPENT OF PHASE. 8. FINAL 10 MIL THOROCOAT FINISH WILL BE APPLIED DURING PHASE 4 OF THE WORK. ELEVATION LEGEND - STUCCO REPAIR PARAPET CONDITION; REFER TO DETAIL B1 /A212 INFILL EXISTING WINDOW OPENING WITH CCONCRETE TO ACCOMODATE NEW LOUVER; 3/4" STUCCO WITH THOROCOAT FINISH COAT; SEE DETAIL A4/A623 AND 13/S -4 TYPICAL CRACK LOCATION ALONG JOINT WHERE ROOF MEETS PARAPET DETERMINE IF CORNERS HAVE ANY DELAMINATION DUE TO OLD OR NON- EXISTENT CORNER BEADS AND REPAIR PER SPECIFICATION SECTION 092200 _ _;t +_; PROVIDE NEW STUCCO AND THOROCOAT FINISH AROUND WINDOWS t' WHERE CRACKS NEED REPAIR, INSIDE WINDOW SILL, JAMB AND HEAD AND AT REMOVED HURRICANE SHUTTER HOUSING KEYNOTES - STUCCO REPAIR Al APPLY COATING TO ALL EXISTING STUCCO AND CONCRETE SURFACE WITHIN THE PROJECT AREA OAPPLY COATING TO ALL EXISTING STUCCO AND CONCRETE SURFACE WITHIN ROOF PERIMETER AND INTERIOR FACE OF PARAPET WALL A3 INFILL OF EXISTING LOUVERS AT PENTHOUSE WITH NEW STUCCO OVER CMU; APPLY THOROCOAT AS INDICATED FOR PROJECT AREA; SEE DETAILS 3 /S -4 AND D1/A181 A4 NEW WINDOWS IN EXISTING OPENING; SEE SHEET A211 FOR DETAILS A5 EXISTING WINDOWS TO REMAIN; EXISTING HURRICANE SHUTTERS TO REMAIN INTERIOR MODIFICATIONS ONLY (ANY EXTERIOR MODIFICATION MAY REQUIRE A BOARD APPEARANCE) ROOF�1 ITH FLOOR 7F-_0" 0" ;TH FLOOR 58' - -6" v �TH FLOOR 47'7' -0" v ;TH FLOOR � 351- 66" V RD FLOOR 24F-_0 F v , A.R--RAY I " I arc h i tec is ARRAY- AkcHI'i' (fs WM, 6800 Broken Sound Pkwy NW, Ste 125 Boca Raton, FL. 33487 o: 561 - 995 -1700 f: 561 - 995 -1701 SEAL: firm license # AA26000880 4- - XXI Mark D. Taudien rf : AR00 '821 ----------------------------------------------------- - ----- --------------- - - -- CONSULTANTS: ' STRUCTURAL ENGINEER O'Donnell, Naccarato, Mignogna & Jackson 321 15th St., Suite 200 West Palm Beach, Florida 33401, USA Phone: 561.835.9994 Fax: 561.835.8255 MEP ENGINEER Smith, Seckman & Reid, Inc. 600 West Hillsboro Blvd, Suite 300 Deerfield Beach, FL 33441 Phone: 954.421.1260 Fax: 954.421.1466 --------------------------------------------------------------------------------- OWNER: BAPTIST HEALTH SOUTH FLORIDA HOSPITAL: SOUTH MIAMI HOSPITAL PROJECT: PAVILION RENOVATIONS FLOORS 4 -7 6200 Southwest 73rd Street South Miami, FL 33143 2 Bulletin #131 -04 04 -23 -14 1 Bulletin #81 -03 02 -07 -14 N0, DESCRIPTION DATE REVISIONS /ISSUES --------------------------------------------------------------------------------- SHEET TITLE: EXTERIOR ELEVATIONS - STUCCO REPAIRS --------------------------------------------------------------------------------- DRAWN: KM CHECKED:JG CON /REF No. AHCA 23/100154 -191 PROJECT No. 3593 DATE: 01/10/14 SCALE: As indicated iH ET NO. A213 This document is a copyright protected instrument of service, propel of Array Architects and licensed for use in the title project only. Reproduction or use of this document without written permission of Array Architects is illegal and will be prosecuted under the law. (K) COPYRIGHT - 2013 ARRAY - ARCHITECTS, INC.