Loading...
13-781R-003I� E C I L ro L Q) ro M ri t ru L c 0 U M M III M ro U J I­-B 5 w i a 0 U) N r) fa L (v d-� fu W L W U N ro U N a •c - a N r-I M M -- A ,__4 O N Ln In LLI 1 2 3 4 5 6 7 : t� 5�,Z� - ::��� I ICRA GENERAL NOTES PHASING GENERAL NOTES ICRA KEYNOTES ;�- = A ti ub- Phasin Notes: _ - - _ 1. PR IDE I ; ECTION CONTROL PRECAUTIONS / CONTAINMENT SYSTEM AS REQUIRE BY H'• PITAL INFECTION CONTROL REPRESENTATIVE FOR ALL AREAS 1. THE SHADED AREA INDICATES THE EXTENT OF WORK TO BE PERFORMED IN 0 ub -Phase 1A: THAT PHASE. IC1 PROVIDE STICKY WALK OFF MAT, BOTH SIDES OF DOOR. OUTSIDE E LI OF WORK. - Work includes on unit work east of double egress doors, family waiting, staff lounge, staff toilet, equipment storage and clinicians space. - _ . IC2 SEAL PERIMETER OF EXISTING DOOR DURING CONSTRUCTION IN ADJACENT - Tem ora artition and door next to P -Stair 2 will remain in I _ - ;architect s 2. PROVI CO AINMENT AT THE FLOOR ABOVE AND ADJACENT SPACES FOR 2. CONTRACTOR TO COORDINATE WITH HOSPITAL ANY SHUT DOWN (MPE, AREAS. p ry p pace throughout entirety of all phases of construction work _ - l , ^ ^ _ - ANY WORK I THE ILING PLENUM. ELEVATOR, BLOCKING OF ENTRANCES) TO INSURE THE OPERATION AND - Temp partition to be provided at entrance to nursing unit _ - , - ------ - SERVICES OF ALL OCCUPIED AREAS OUTSIDE CONSTRUCTION AREA. ------------------------------------------------------------------------------- PROVIDE ICRA CONTROL MEASURES PER HOSPITAL STANDARDS IN ABOVE - Vlsqueen and /or zip doors to be provided at doors Into family waiting, staff lounge, clinicians space, equipment storage and electrical closets as essary to perform work inside spaces during this phase. 3. SEE LIFE F Q S FOR AREAS WITH ABOVE CEILING WORK ON OTHER IC3 CEILING WORK DURING CONSTRUCTION 6 ARRAY- ARCHITECTS.COM FLOORS. A S O�RK TO COMPLY WITH ICRA AS REQUIRED BY HOSPITAL 3. CONSTRUCT TEMPORARY PARTITIONS / BARRIERS AS PER SPECIFICATIONS INFECTION O ROL R RES €NTATIVE. SECTION 015000 FOR POLLUTION CONTROL AND TO SEPARATE CONSTRUCTION Sub -Phase 16: 6800 Broken Sound Pkwy NW, Ste 125 WORK FROM OTHER AREAS OF THE BUILDING. ALL TEMPORARY PARTITIONS - Work Includes ongoing Phase 1A work and shut down of corridor In Phase 1 B for above ceiling, finish, new IT closet and door replacement work in ea. Boca Raton, FL. 33487 4. FIRE WATCH T E COORDINATED WITH HOSPITAL WHEN CONSTRUCTION MUST STAY IN PLACE UNTIL THE CEILING IS INSTALLED AND THE ONLY WORK LEFT Tem ora arition and door to be maintained next to P -Stair 2. Door to be closed and locked as art of construction site. o: 561 - 995 -1700 NECESSITATES CLOSURE OF EXISTING PATHS OF EGRESS. TO BE DONE IS MINOR FINISHES AND PUNCH LIST ITEMS. PHASING KEYNOTES p ry p p - Initiate fire watch for CCU suite as corridor shutdown dictates. f: 561 - 995 -1701 4. PRIOR TO PARTIAL OWNER OCCUPANCY OF EACH PHASE, MECHANICAL AND ------------------------------------------------------------------------------- ACTIONS TO BE PERFORMED DURING CONSTRUCTION OR RENOVATION ELECTRICAL SYSTEMS ARE TO BE FULLY OPERATIONAL. - Temporary partition and temp door to be Installed next to Elevator #5 to maintain access to CCU suite from elevator. SEAL: firm license # AA26b 0880 1. REMOVE AND ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE O TEMPORARY FIRE RATED DOOR TO BE IN PLACE FOR DURATION OF All work in shutdown corridor to be completed in this phase in order to reopen corridor access to elevators 5 and 6. • ,. . II TO PREVENT CONTAMINATION OF THE DUCT SYSTEM. 5. PROVIDE SCHEDULE TO OWNER /ARCHITECT THAT SHOWS THE FOLLOWING: P1 CONSTRUCTION IN PHASE A OF EACH FLOOR. - Temp partition and temp door at P -Stair 2 to remain In place Until the end Of construction. -" N " - BEGINNING AND END DATES OF EACH PHASE I ' ' ' I J - DATES THAT COORDINATE SHUT -DOWN AND TIE -INS TEMPORARY 1HR FIRE RATED PARTITION /BARRIER. SEE PARTITION TYPES :' �; '' �:` J o_ ^; `, ,f, , "'.%_.: , 2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEET ROCK, PLYWOOD, PLASTIC TO -ALL OTHER IMPORTANT INFORMATION THAT WILL AFFECT THE P2 FOR C TRU TION TAIL AND SPECIFICATIONS Sub -Phase 1 C: 11.111 SEAL AREA FROM NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD OWNERS OCCUPANCY OF AREAS OUTSIDE THE LIMIT OF WORK. 5 ork includes finishes in corridors outside of Phase 1A and 1 B which must be coordinated with BHSF and SMH for an closures to complete wor � ' r-' + (CART WITH PLASTIC COVERING AND SEALED CO WORK SITE WITH HEPA VACUUM Y p PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS. P3 CONSTRUCTION BARRIER CONSISTING OF VISQUEEN BARRIER OR ZIP DOOR aintain contamination prevention methods at CCU entrance doors to keep construction debris and dust out of unit while work is being done in tacent corridors. , , %_ � ' .xrt �, 6. NOTIFY IN WRITING TO OWNER AND ARCHITECT, WITHIN SEVEN WORKING _ V_ • 3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA DAYS, AREAS OF THE BUILDING TO BE TURNED -OVER FOR CONSTRUCTION. TEMPORARY 1HR IRE RATED ALL IN FRONT OF PATIENT ELEVATORS TO upen and /or zip doors to be provided at doors into family waiting, staff lounge, clinicians space, equipment storage and electrical closets as n cessary to perform work inside spaces. • 0•� ,, �. ` 'I . EQUIPPED AIR FILTRATION UNITS. P4 PROTECT PUBLIC SHOULD ELEVATOR OPEN ON THAT FLOOR. Copturrent Phase 1A work will be on going and completed at the same time as this phase. ' -� _ ••.. a, ". , 7. PERFORM THE NECESSARY DEMOLITION WORK REQUIRED TO COMPLETE d,, ! ••.. �r. \ -- THE NEW WORK ON EACH PHASE. REFER TO DEMOLITION PLANS AND NOTES. IT IS P5 ELEVATORS TO REMAIN OPERATIONAL TO ALL FLOORS DURING . - "- "----- "- "- "- " " "' """"" """"- 1 # 4. CONTAIN CONSTRUCTION WASTE IN TIGHTLY COVERED CONTAINERS BEFORE THE CONTRACTORS RESPONSIBILITY TO DETERMINE WHAT PORTION OF THE CONSTRUCTION. Ub -Phase 1 D: - = - ti' , TRANSPORTING. OVERALL DEMOLITION WORK IS REQUIRED FOR EACH PHASE. - Finish/door replacement work o e completed at entries to CCU. CCU will be closed during the duration of this construction. Mark D. Taudien AR0011821 5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS P6 ELEVATORS TO REMAIN OPERATIONAL TO ALL FLOORS DURING SOLID LID. CONSTRUCTION. COORDINATE WITH FACILITIES THE NEED FOR ON • ,R o CONSULTANTS: ELEVATORS. COORDINATE TEMPORARY PARTITIONS /BARRIER8 WI ER I M••• -•• ;,.••••••.•••" •.•. ; : NEEDS. \ > ...................:...; € - 6. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY. \ \\ • `°'-"-'-,--°--•-•---,-'°'°-•-'-°'-'--- ____._- ----- ° °-- --- ---- - - - - -- N= "' R f :''� \ :� \ 4> _______________________________ ______________________ ________ _____.___.._______________.__.. \l:� 11 \ �,.>.,,.,......,.,......,,.,". ,,......,'n,,....., .,,,,,,,- STRUCTURAL ENGINEER 4:l : \' ACTIONS TO BE PERFORMED UPON COMPLETION/ PRIOR TO OCCUPANCY P7 MAINTAIN EGRESS VIA STAIR DURING ALL PHASES OF CONSTRUCTI .' ` 1 i :k;::; I I f �.,,: ;k SCOPE OF WORK AT STAIR IS REPLACEMENT OF DOOR ONLY THAT SHOULD I i i ''\ • >. ! I / o, I _______.___.________ _____________..______________:; O Donnel Naccarat REQUIRE MIN. CONSTRUCTION TIME. DOORS FOR STAIR #2 AND STAIR #3 TO " °" °"' °""" " °"" °"' °"""""""' °" °'° \ r:E:', ;�_ . ; 1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT •a•' "`` "` " "`` " " "`--- A_ 'S` "` :I :.\ IS THOROUGHLY INSPECTED BY OWNER'S STAFF. BE DONE AT DIFFERENT TIMES TO KEEP ONE STAIR OPEN AT ALL TIMES. A j /'" "' "'- :a a C S O n ignogna FIRE WATCH SHOULD BE INSTITUTED SHOULD THE TIME TO REPLACE THE e `\: ` 4 `': ` ... -�" :, :! : :> `'� ' Ili _ a : , I € P7 € 321 15th St., Suite 200 2. VACUUM WORK WITH HEPA FILTERED VACUUMS. DOOR EXCEED A FEW HOURS. : €; _ w _1 fe ;� :.'"' ;_; \ ; West Palm Beach, Florida € ;� [ f, {e:_: ---- <ii4i c i i :< ziz ; 3. WET MOP /WIPE EXPOSED SURFACES WITH APPROPRIATELY LABELED AND (I PATIENT ROOM f it I_•___.. SUPPLY & M.P. NU. OFF. 1 _ E SOIL UTILITY " i a::: >:. >:k..l <:; .::.,; ;c:::• >:;ti:.:; <; <:;;s; <.;<:.? ': Phone: 561.835.9994 :iiiI BHSFAPPROVEDHOSPITALDISINFECTANT. Ex. € ' EX'" EX i Ex' \ j mow";;;• n ��:, \rte \rte \\ Fax 561.835.8255 :I; II i i TREATMENT . <._.._, EE EE .. f f Z \ € E.. �i i i ;C\,,:\ a\� ,� a\r a\� riy: �y:i�?y::•j\S --- ° °............ °.....:-- -• °- \ ..K \\�-\\\ :� EX. i 4. CONTAIN CONSTRUCTION WASTE IN TIGHTLY COVERED CONTAINERS BEFORE f € °' : TRANSPORTING. i ": I E }"::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::_.. ...... " .....................I.. ICE MEP ENGINEER 5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS I ' lc� :�c�:;c�:,K�:a$i:���:,���',',ct I E E SOLID LID. PATIENT RISKGROUP:HIGHEST 11 � Smith, Seckman &Reid, Inc. i 6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING CONTROL PRECAUTIONS: i i � i` ° --------- ° \r��' 600 West Hillsboro Blvd, Suite 300 11 PERFORMED. IV , : :I CORRIDOR ;