Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
13-781R-001
A C L � 5 L a� i v SHEETINDEX COVER SHEET 2 3 4 5 6 Yes SHEETINDEX COVER SHEET Yes 3 04 -10 -13 Current SHEET Yes Construction Bulletin Bulletin Bulletin Bulletin Current Revision NUMBER SHEET NAME Set B1 -01 B1 -02 B1 -03 B1 -04 Revision Date GENERAL CS COVER SHEET Yes 3 04 -10 -13 G001 SHEETINDEX Yes Yes No 5 02 -07 -14 G002 GENERAL NOTES, SYMBOLS AND CODE INFORMATION Yes 4 06 -07 -13 G003 UL ASSEMBLIES 3 04 -10 -13 G004 UL ASSEMBLIES 1 13 04 -10 -13 ARCHITECTURAL ALS111 LIFE SAFETY PLAN - FIRST FLOOR Yes 5 04 -23 -14 ALS121 LIFE SAFETY PLAN - SECOND FLOOR ALS141 LIFE SAFETY PLAN - FOURTH FLOOR Yes 5 07 -01 -13 ALS151 LIFE SAFETY PLAN - FIFTH FLOOR 5 07 -01 -13 ALS161 LIFE SAFETY PLAN - SIXTH FLOOR 5 07 -01 -13 ALS171 LIFE SAFETY PLAN - SEVENTH FLOOR 5 07 -01 -13 AD141 DEMOLITION PLAN - FOURTH FLOOR 4 08 -16 -13 AD151 DEMOLITION PLAN - FIFTH FLOOR 4 08 -16 -13 AD161 DEMOLITION PLAN - SIXTH FLOOR 4 08 -16 -13 AD171 DEMOLITION PLAN - SEVENTH FLOOR 4 08 -16 -13 AD181 DEMOLITION PLAN - ROOF /MECHANICAL PENTHOUSE PLAN 3 04 -10 -13 AT121 ARCHITECTURAL PLAN- SECOND FLOOR PLAN A031 PHASING /ICRA PLAN - THIRD FLOOR 5 07 -26 -13 A041 PHASING /ICRA PLAN - FOURTH FLOOR Yes Yes 6 04 -23 -14 A051 PHASING /ICRA PLAN - FIFTH FLOOR 1 3 04 -10 -13 A061 PHASING /ICRA PLAN - SIXTH FLOOR 3 -04-10-13 A071 PHASING /ICRA PLAN - SEVENTH FLOOR 3 04 -10 -13 A081 PHASING PLAN - ROOF /MECHANICAL PENTHOUSE PLAN 3 04 -10 -13 A111 DEMO /ICRA AND ARCHITECTURAL PLANS - FIRST FLOOR Yes 1 04 -23 -14 A121 DEMO /ICRA AND ARCHITECTURAL PLANS - SECOND FLOOR A141 ARCHITECTURAL PLAN - FOURTH FLOOR Yes Yes 7 04 -23 -14 A143 FURNITURE AND EQUIPMENT PLAN - FOURTH FLOOR Yes Yes Yes 3 04 -23 -14 A144 REFLECTED CEILING PLAN- FOURTH FLOOR Yes 1 4 01 -15 -14 A145 ARCHITECTURAL FINISH & FLOOR PATTERN PLAN - FOURTH FLOOR Yes Yes 4 02 -07 -14 A151 ARCHITECTURAL PLAN - FIFTH FLOOR Yes 7 10 -11 -13 A153 FURNITURE AND EQUIPMENT PLAN - FIFTH FLOOR A154 REFLECTED CEILING PLAN -FIFTH FLOOR 3 04 -10 -13 A155 ARCHITECTURAL FINISH AND FLOOR PATTERN PLAN - FIFTH FLOOR Yes 3 10 -11 -13 A161 ARCHITECTURAL PLAN - SIXTH FLOOR Yes 1 7 10 -11 -13 A163 FURNITURE AND EQUIPMENT PLAN - SIXTH FLOOR A164 REFLECTED CEILING PLAN -SIXTH FLOOR 3 04 -10 -13 A165 ARCHITECTURAL FINISH AND FLOOR PATTERN PLAN - SIXTH FLOOR Yes 3 10 -11 -13 A171 ARCHITECTURAL PLAN - SEVENTH FLOOR Yes 7 10 -11 -13 A173 FURNITURE AND EQUIPMENT PLAN - SEVENTH FLOOR A174 REFLECTED CEILING PLAN- SEVENTH FLOOR 3 04 -10 -13 A175 ARCHITECTURAL FINISH AND FLOOR PATTERN PLAN - SEVENTH FLOOR Yes 4 10 -11 -13 A181 ROOF PLAN 3 04 -10 -13 NA. EXTERIOR ELEVATION AND DETAILS Yes Yes Yes 4 02 -07 -14 A212 PLANS, NOTES AND PHOTOS - STUCCO REPAIR Yes Yes 2 04 -23 -14 A213 EXTERIOR ELEVATIONS - STUCCO REPAIRS Yes Yes 2 04 -23 -14 A 01 BUILDING SECTIONS 4 06 -07 -13 A400 INTERIOR LEGENDS 4 06 -07 -13 A401 ENLARGED PLANS AND INTERIOR ELEVATIONS Yes Yes Yes 10 04 -23 -14 A402 ENLARGED PLANS AND INTERIOR ELEVATIONS Yes Yes 5 04 -23 -14 A403 ENLARGED PLANS AND INTERIOR ELEVATIONS Yes Yes 7 04 -23 -14 A404 ENLARGED PLANS AND INTERIOR ELEVATIONS Yes Yes Yes 8 04 -23 -14 A405 ENLARGED PLANS AND INTERIOR ELEVATIONS Yes 6 01 -15 -14 A406 NOT USED 2 03 -11 -13 A613 ROOF AND EXPANSION JOINT DETAILS 1 06 -07 -13 A614 TOILET /SHOWER DETAILS Yes Yes 4 01 -15 -14 A616 SOFFIT /CEILING DETAILS Yes 3 04 -23 -14 A617 FRAMING DETAILS Yes Yes 2 04 -23 -14 A618 FRAMING DETAILS 3 04 -10 -13 A621 PARTITION TYPES Yes 4 01 -15 -14 A622 UL AND PATCHING DETAILS 3 04 -10 -13 A623 DOOR AND BORROWED LIGHT FRAME DETAILS Yes 4 02 -07 -14 A624 CASEWORK DETAILS 5 01 -15 -14 A625 CASEWORK DETAILS 3 04 -10 -13 A626 CASEWORK DETAILS - NURSE STATIONS 3 04 -10 -13 A627 FINISH DETAILS 3 04 -10 -13 A701 DOOR SCHEDULE - FOURTH FLOOR Yes Yes 7 01 -15 -14 A702 DOOR SCHEDULE -FIFTH FLOOR Yes 5 10 -11 -13 A703 DOOR SCHEDULE -SIXTH FLOOR Yes 7 10 -11 -13 A704 DOOR SCHEDULE - SEVENTH FLOOR I Yes 1 17 10 -11 -13 STRUCTURAL S -1 PARTIAL FLOOR PLANS - 2ND & 4TH THRU 7TH FLOOR S -2 PARTIAL ROOF FRAMING PLAN S -3 STRUCTURAL NOTES AND TYPICAL DETAILS Yes S -4 SECTIONS S -5 SECTIONS MECHANICAL M001 N NECHANICAL NOTES, LEGEND AND DRAWING INDEX M002 M MECHANICAL NOTES M003 M MECHANICAL SCHEDULES Y Yes M004 M MECHANICAL SCHEDULES M005 M MECHANICAL ICRA NOTES 0006 F FOURTH FLOOR PLAN - ICRA SHEETINDEX Current SHEET Construction Bulletin Bulletin Bulletin Bulletin Current Revision NUMBER SHEET NAME Set B1 -01 B1 -02 B1 -03 B1 -04 Revision Date M008 SIXTH FLOOR PLAN - ICRA M009 SEVENTH FLOOR PLAN - ICRA M010 FIFTH FLOOR PLAN - ICRA M011 SIXTH FLOOR PLAN - ICRA M012 SEVENTH FLOOR PLAN - ICRA M013 FIRST FLOOR PLAN - MECHANICAL - ICRA M111 FIRST FLOOR PLAN - DEMOLITION - MECHANICAL Yes M112 FIRST FLOOR PLAN - DEMOLITION - PIPING M121 SECOND FLOOR PLAN - DEMOLITION - MECHANICAL M122 SECOND FLOOR PLAN - DEMOLITION - PIPING M141 FOURTH FLOOR PLAN - DEMOLITION - MECHANICAL M142 FOURTH FLOOR PLAN- DEMOLITION - PIPING M151 FIFTH FLOOR PLAN - DEMOLITION - MECHANICAL M152 FIFTH FLOOR PLAN- DEMOLITION - PIPING M161 SIXTH FLOOR PLAN - DEMOLITION - MECHANICAL M162 SIXTH FLOOR PLAN- DEMOLITION - PIPING M171 SEVENTH FLOOR PLAN - DEMOLITION - MECHANICAL M172 SEVENTH FLOOR PLAN- DEMOLITION - PIPING M211 FIRST FLOOR PLAN - NEW CONSTRUCTION - Yes MECHANICAL M212 FIRST FLOOR PLAN - NEW CONSTRUCTION - PIPING Yes M221 SECOND FLOOR PLAN - NEW CONSTRUCTION - MECHANICAL M222 SECOND FLOOR PLAN - NEW CONSTRUCTION - PIPING M241 FOURTH FLOOR PLAN - NEW CONSTRUCTION - Yes MECHANICAL M242 FOURTH FLOOR PLAN - NEW CONSTRUCTION - PIPING Yes M251 FIFTH FLOOR PLAN - NEW CONSTRUCTION - Yes MECHANICAL M252 FIFTH FLOOR - NEW CONSTRUCTION - PIPING Yes M261 SIXTH FLOOR PLAN - NEW CONSTRUCTION - Yes MECHANICAL M262 SIXTH FLOOR - NEW CONSTRUCTION - PIPING Yes M271 SEVENTH FLOOR PLAN - NEW CONSTRUCTION - Yes MECHANICAL M272 SEVENTH FLOOR - NEW CONSTRUCTION - PIPING Yes M281 ROOF PLAN - MECHANICAL M282 ROOF PLAN- MECHANICAL -NEW CONSTRUCTION M301 MECHANICAL PHOTOS M401 MECHANICAL SECTIONS M402 MECHANICAL ISOMETRIC M501 MECHANICAL DETAILS M502 MECHANICAL DETAILS r M503 MECHANICAL DETAILS M601 MECHANICAL CONTROLS M602 MECHANICAL CONTROLS Yes PLUMBING P001 PLUMBING SCHEDULES, LEGEND AND DRAWING INDEX P002 PLUMBING SCHEDULES P131 THIRD FLOOR PLAN - DEMOLITION PIPING P141 FOURTH FLOOR PLAN- DEMOLITION - PLUMBING P142 FOURTH FLOOE PLAN- DEMOLITION - MEDICAL GAS P151 FIFTH FLOOR PLAN- DEMOLITION - PLUMBING P152 FIFTH FLOOR PLAN- DEMOLITION - MEDICAL GAS P161 SIXTH FLOOR PLAN- DEMOLITION - PLUMBING P162 SIXTH FLOOR PLAN- DEMOLITION - MEDICAL GAS P171 SEVENTH FLOOR - DEMOLITION - PLUMBING P172 SEVENTH FLOOR - DEMOLITION - MEDICAL GAS P181 ROOF PLAN - DEMOLITION - PLUMBING P211 FIRST FLOOR - NEW CONSTRUCTION - PLUMBING P221 SECOND FLOOR - NEW CONSTRUCTION - PLUMBING P231 THIRD FLOOR PLAN - NEW CONSTRUCTION - PLUMBING P232 THIRD FLOOR PLAN - NEW CONSTRUCTION - MEDICAL GAS P241 FOURTH FLOOR PLAN - NEW CONSTRUCTION - PLUMBING P242 FOURTH FLOOR PLAN - NEW CONSTRUCTION - MEDICAL GAS P251 FIFTH FLOOR PLAN - NEW CONSTRUCTION - PLUMBING P252 FIFTH FLOOR PLAN - NEW CONSTRUCTION - MEDICAL GAS P261 SIXTH FLOOR PLAN - NEW CONSTRUCTION - PLUMBING P262 SIXTH FLOOR PLAN - NEW CONSTRUCTION - MEDICAL GAS P271 SEVENTH FLOOR PLAN - NEW CONSTRUCTION - PLUMBING P272 SEVENTH FLOOR PLAN - NEW CONSTRUCTION - MEDICAL GAS P301 PARTIAL PLUMBING PLANS P401 PLUMBING RISERS P402 PLUMBING RISERS P403 PLUMBING RISERS P404 PLUMBING RISERS P405 PLUMBING RISERS P501 PLUMBING DETAILS P502 PLUMBING DETAILS SHEETINDEX Current SHEET Construction Bulletin Bulletin Bulletin Bulletin Current Revision - UMBER N SHEET NAME Set B1 -01 B1 -02 B1 -03 B1 -04 Revision Date FIRE PRr)TF(:TIC)N FP001 FIRE PROTECTION SCHEDULE, LEGEND AND DRAWING INDEX FP002 FIRE PROTECTION RISER FP141 FOURTH FLOOR PLAN - DEMOLITION - FIRE PROTECTION FP151 FIFTH FLOOR PLAN - DEMOLITION - FIRE PROTECTION FP161 SIXTH FLOOR PLAN - DEMOLITION - FIRE PROTECTION FP171 SEVENTH FLOOR PLAN - DEMOLITION - FIRE PROTECTION FP181 ROOF PLAN - DEMOLITION - FIRE PROTECTION FP211 FIRST FLOOR - NEW CONSTRUCTION - FIRE PROTECTION u FP221 SECOND FLOOR - NEW CONSTRUCTION - FIRE PROTECTION FP241 FOURTH FLOOR PLAN - NEW CONSTRUCTION - FIRE PROTECTION FP251 FIFTH FLOOR PLAN - NEW CONSTRUCTION - FIRE ` PROTECTION FP261 SIXTH FLOOR PLAN - NEW CONSTRUCTION - FIRE PROTECTION FP271 SEVENTH FLOOR PLAN - NEW CONSTRUCTION - FIRE PROTECTION FP501 FIRE PROTECTION DETAILS C 13> 614.4CN_\I E001 ELECTRICAL SCHEDULES, LEGEND AND SHEET LIST E002 SCHEDULES AND DETAILS E003 SCHEDULES AND DETAILS E004 DETAILS E005 DETAILS E101 FIRST FLOOR PLAN - REFERENCE PLAN ELECTRICAL Yes E141 FOURTH FLOOR PLAN - DEMOLITION - ELECTRICAL E151 DEMOLITION - ELECTRICAL E161 SIXTH FLOOR PLAN - DEMOLITION - ELECTRICAL E171 SEVENTH FLOOR PLAN - DEMOLITION - ELECTRICAL E181 ROOF /PENTHOUSE PLAN - DEMOLITION - ELECTRICAL E222 SECOND FLOOR PLAN -NEW CONSTRUCTION -POWER E223 SECOND THROUGH SEVENTH FLOOR CONDUIT ROUTING PLANS E241 FOURTH FLOOR PLAN - NEW CONSTRUCTION - LIGHTING Yes Yes E242 FOURTH FLOOR PLAN - NEW CONSTRUCTION - POWER Yes Yes Yes E243 FOURTH FLOOR PLAN - NEW CONSTRUCTION - Yes SYSTEMS E251 FIFTH FLOOR PLAN - NEW CONSTRUCTION - LIGHTING Yes Yes E252 FIFTH FLOOR PLAN - NEW CONSTRUCTION - POWER Yes Yes Yes E253 FIFTH FLOOR PLAN - NEW CONSTRUCTION - SYSTEMS Yes E261 SIXTH FLOOR PLAN - NEW CONSTRUCTION - LIGHTING Yes Yes E262 SIXTH FLOOR PLAN - NEW CONSTRUCTION - POWER Yes Yes Yes E263 SIXTH FLOOR PLAN - NEW CONSTRUCTION - SYSTEMS Yes E271 SEVENTH FLOOR PLAN -NEW CONSTRUCTION - LIGHTING Yes Yes E272 SEVENTH FLOOR PLAN -NEW CONSTRUCTION -POWER Yes Yes Yes E273 SEVENTH FLOOR -NEW CONSTRUCTION - SYSTEMS Yes E281 PENTHOUSE /ROOF PLAN- ELECTRICAL E301 PATIENT ROOM DETAILS E401 PARTIAL ELECTRICAL ONE -LINE DIAGRAM Yes E402 PARTIAL ELECTRICAL DISTRIBUTION DIAGRAM - DEMOLITION E403 PARTIAL ELECTRICAL DISTRIBUTION DIAGRAM - NEW Yes CONSTRUCTION E501 PANEL SCHEDULES E502 PANEL SCHEDULES Yes E503 PANEL SCHEDULES Yes E601 ELECTRICAL STUDIES E602 ELECTRICAL STUDIES E603 ELECTRICAL STUDIES TECHNOLOGY T001 TECHNOLOGY LEGEND AND SHEET INDEX Yes Yes 02 TECHNOLOGY NOTES AND BACK BOX REQUIREMENTS T003 TECHNOLOGY DETAILS Yes T_rTi FOURTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T151 FIFTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T161 SIXTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T171 SEVENTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T241 FOURTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY T251 FIFTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY T261 SIXTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY T271 SEVENTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY 301 TECHNOLOGY NURSE CALL RISER DIAGRAM T302 4 TECHNOLOGY COPPER AND FIBER RISER DIAGRAM Yes T401 TECHNOLOGY LARGE SCALE COMM ROOMS Yes Yes (ANY F,`JF,pe i0i2 MOUIRCATION MAY REQUIRE A E30Ar1D P.PPEARANCE) ^ architects ARRAY- ARCHITECTS.COM 6800 Broken Sound Pkwy NW, Ste 125 Boca Raton, FL. 33487 o: 561- 995 -1700 f: 561 - 995 -1701 SEAL: firm license # AA26000880 Mark D. Taudien �'�.�� . • AROO11821 CONSULTANTS: STRUCTURAL ENGINEER O'Donnell, Naccarato, Mignogna & Jackson 321 15th St., Suite 200 West Palm Beach, Florida 33401, USA Phone: 561.835.9994 Fax: 561.835.8255 MEP ENGINEER Smith, Seckman & Reid, Inc. 600 West Hillsboro Blvd, Suite 300 Deerfield Beach, FL 33441 Phone: 954.421.1260 Fax: 954.421.1466 OWNER: BAPTIST HEALTH SOUTH FLORIDA HOSPITAL: SOUTH MIAMI HOSPITAL' i PROJECT: PAVILION RENOVATIONS FLOORS 4 -7 6200 Southwest 73rd Street South Miami, FL 33143 5 Bulletin #81 -03 02 -07 -14 4 Construction Set 10 -11 -13 3 PRICING SET 04 -10 -13 2 50% CONSTRUCTION SET 03 -11 -13 1 AHCA STAGE II 10 -17 -12 NO. DESCRIPTION DATE REVISIONS /ISSUES SHEET TITLE: SHEETINDEX DRAWN: EAS CHECKED: FB CON /REF No. AHCA 23/100154 -191 PROJECT No. 3593 DATE: 05/03/13 SCALE: SHEET NO. G001 This document is a copyright protected instrument of service, property of Array Architects and licensed for use in the title project only. Reproduction or use of this document without written permission of Array Architects is illegal and will be prosecuted under the law. © COPYRIGHT - 2013 ARRAY- ARCHITECTS, INC. M008 SIXTH FLOOR PLAN - ICRA M009 SEVENTH FLOOR PLAN - ICRA M010 FIFTH FLOOR PLAN - ICRA M011 SIXTH FLOOR PLAN - ICRA M012 SEVENTH FLOOR PLAN - ICRA M013 FIRST FLOOR PLAN - MECHANICAL - ICRA M111 FIRST FLOOR PLAN - DEMOLITION - MECHANICAL Yes M112 FIRST FLOOR PLAN - DEMOLITION - PIPING M121 SECOND FLOOR PLAN - DEMOLITION - MECHANICAL M122 SECOND FLOOR PLAN - DEMOLITION - PIPING M141 FOURTH FLOOR PLAN - DEMOLITION - MECHANICAL M142 FOURTH FLOOR PLAN- DEMOLITION - PIPING M151 FIFTH FLOOR PLAN - DEMOLITION - MECHANICAL M152 FIFTH FLOOR PLAN- DEMOLITION - PIPING M161 SIXTH FLOOR PLAN - DEMOLITION - MECHANICAL M162 SIXTH FLOOR PLAN- DEMOLITION - PIPING M171 SEVENTH FLOOR PLAN - DEMOLITION - MECHANICAL M172 SEVENTH FLOOR PLAN- DEMOLITION - PIPING M211 FIRST FLOOR PLAN - NEW CONSTRUCTION - Yes MECHANICAL M212 FIRST FLOOR PLAN - NEW CONSTRUCTION - PIPING Yes M221 SECOND FLOOR PLAN - NEW CONSTRUCTION - MECHANICAL M222 SECOND FLOOR PLAN - NEW CONSTRUCTION - PIPING M241 FOURTH FLOOR PLAN - NEW CONSTRUCTION - Yes MECHANICAL M242 FOURTH FLOOR PLAN - NEW CONSTRUCTION - PIPING Yes M251 FIFTH FLOOR PLAN - NEW CONSTRUCTION - Yes MECHANICAL M252 FIFTH FLOOR - NEW CONSTRUCTION - PIPING Yes M261 SIXTH FLOOR PLAN - NEW CONSTRUCTION - Yes MECHANICAL M262 SIXTH FLOOR - NEW CONSTRUCTION - PIPING Yes M271 SEVENTH FLOOR PLAN - NEW CONSTRUCTION - Yes MECHANICAL M272 SEVENTH FLOOR - NEW CONSTRUCTION - PIPING Yes M281 ROOF PLAN - MECHANICAL M282 ROOF PLAN- MECHANICAL -NEW CONSTRUCTION M301 MECHANICAL PHOTOS M401 MECHANICAL SECTIONS M402 MECHANICAL ISOMETRIC M501 MECHANICAL DETAILS M502 MECHANICAL DETAILS r M503 MECHANICAL DETAILS M601 MECHANICAL CONTROLS M602 MECHANICAL CONTROLS Yes PLUMBING P001 PLUMBING SCHEDULES, LEGEND AND DRAWING INDEX P002 PLUMBING SCHEDULES P131 THIRD FLOOR PLAN - DEMOLITION PIPING P141 FOURTH FLOOR PLAN- DEMOLITION - PLUMBING P142 FOURTH FLOOE PLAN- DEMOLITION - MEDICAL GAS P151 FIFTH FLOOR PLAN- DEMOLITION - PLUMBING P152 FIFTH FLOOR PLAN- DEMOLITION - MEDICAL GAS P161 SIXTH FLOOR PLAN- DEMOLITION - PLUMBING P162 SIXTH FLOOR PLAN- DEMOLITION - MEDICAL GAS P171 SEVENTH FLOOR - DEMOLITION - PLUMBING P172 SEVENTH FLOOR - DEMOLITION - MEDICAL GAS P181 ROOF PLAN - DEMOLITION - PLUMBING P211 FIRST FLOOR - NEW CONSTRUCTION - PLUMBING P221 SECOND FLOOR - NEW CONSTRUCTION - PLUMBING P231 THIRD FLOOR PLAN - NEW CONSTRUCTION - PLUMBING P232 THIRD FLOOR PLAN - NEW CONSTRUCTION - MEDICAL GAS P241 FOURTH FLOOR PLAN - NEW CONSTRUCTION - PLUMBING P242 FOURTH FLOOR PLAN - NEW CONSTRUCTION - MEDICAL GAS P251 FIFTH FLOOR PLAN - NEW CONSTRUCTION - PLUMBING P252 FIFTH FLOOR PLAN - NEW CONSTRUCTION - MEDICAL GAS P261 SIXTH FLOOR PLAN - NEW CONSTRUCTION - PLUMBING P262 SIXTH FLOOR PLAN - NEW CONSTRUCTION - MEDICAL GAS P271 SEVENTH FLOOR PLAN - NEW CONSTRUCTION - PLUMBING P272 SEVENTH FLOOR PLAN - NEW CONSTRUCTION - MEDICAL GAS P301 PARTIAL PLUMBING PLANS P401 PLUMBING RISERS P402 PLUMBING RISERS P403 PLUMBING RISERS P404 PLUMBING RISERS P405 PLUMBING RISERS P501 PLUMBING DETAILS P502 PLUMBING DETAILS SHEETINDEX Current SHEET Construction Bulletin Bulletin Bulletin Bulletin Current Revision - UMBER N SHEET NAME Set B1 -01 B1 -02 B1 -03 B1 -04 Revision Date FIRE PRr)TF(:TIC)N FP001 FIRE PROTECTION SCHEDULE, LEGEND AND DRAWING INDEX FP002 FIRE PROTECTION RISER FP141 FOURTH FLOOR PLAN - DEMOLITION - FIRE PROTECTION FP151 FIFTH FLOOR PLAN - DEMOLITION - FIRE PROTECTION FP161 SIXTH FLOOR PLAN - DEMOLITION - FIRE PROTECTION FP171 SEVENTH FLOOR PLAN - DEMOLITION - FIRE PROTECTION FP181 ROOF PLAN - DEMOLITION - FIRE PROTECTION FP211 FIRST FLOOR - NEW CONSTRUCTION - FIRE PROTECTION u FP221 SECOND FLOOR - NEW CONSTRUCTION - FIRE PROTECTION FP241 FOURTH FLOOR PLAN - NEW CONSTRUCTION - FIRE PROTECTION FP251 FIFTH FLOOR PLAN - NEW CONSTRUCTION - FIRE ` PROTECTION FP261 SIXTH FLOOR PLAN - NEW CONSTRUCTION - FIRE PROTECTION FP271 SEVENTH FLOOR PLAN - NEW CONSTRUCTION - FIRE PROTECTION FP501 FIRE PROTECTION DETAILS C 13> 614.4CN_\I E001 ELECTRICAL SCHEDULES, LEGEND AND SHEET LIST E002 SCHEDULES AND DETAILS E003 SCHEDULES AND DETAILS E004 DETAILS E005 DETAILS E101 FIRST FLOOR PLAN - REFERENCE PLAN ELECTRICAL Yes E141 FOURTH FLOOR PLAN - DEMOLITION - ELECTRICAL E151 DEMOLITION - ELECTRICAL E161 SIXTH FLOOR PLAN - DEMOLITION - ELECTRICAL E171 SEVENTH FLOOR PLAN - DEMOLITION - ELECTRICAL E181 ROOF /PENTHOUSE PLAN - DEMOLITION - ELECTRICAL E222 SECOND FLOOR PLAN -NEW CONSTRUCTION -POWER E223 SECOND THROUGH SEVENTH FLOOR CONDUIT ROUTING PLANS E241 FOURTH FLOOR PLAN - NEW CONSTRUCTION - LIGHTING Yes Yes E242 FOURTH FLOOR PLAN - NEW CONSTRUCTION - POWER Yes Yes Yes E243 FOURTH FLOOR PLAN - NEW CONSTRUCTION - Yes SYSTEMS E251 FIFTH FLOOR PLAN - NEW CONSTRUCTION - LIGHTING Yes Yes E252 FIFTH FLOOR PLAN - NEW CONSTRUCTION - POWER Yes Yes Yes E253 FIFTH FLOOR PLAN - NEW CONSTRUCTION - SYSTEMS Yes E261 SIXTH FLOOR PLAN - NEW CONSTRUCTION - LIGHTING Yes Yes E262 SIXTH FLOOR PLAN - NEW CONSTRUCTION - POWER Yes Yes Yes E263 SIXTH FLOOR PLAN - NEW CONSTRUCTION - SYSTEMS Yes E271 SEVENTH FLOOR PLAN -NEW CONSTRUCTION - LIGHTING Yes Yes E272 SEVENTH FLOOR PLAN -NEW CONSTRUCTION -POWER Yes Yes Yes E273 SEVENTH FLOOR -NEW CONSTRUCTION - SYSTEMS Yes E281 PENTHOUSE /ROOF PLAN- ELECTRICAL E301 PATIENT ROOM DETAILS E401 PARTIAL ELECTRICAL ONE -LINE DIAGRAM Yes E402 PARTIAL ELECTRICAL DISTRIBUTION DIAGRAM - DEMOLITION E403 PARTIAL ELECTRICAL DISTRIBUTION DIAGRAM - NEW Yes CONSTRUCTION E501 PANEL SCHEDULES E502 PANEL SCHEDULES Yes E503 PANEL SCHEDULES Yes E601 ELECTRICAL STUDIES E602 ELECTRICAL STUDIES E603 ELECTRICAL STUDIES TECHNOLOGY T001 TECHNOLOGY LEGEND AND SHEET INDEX Yes Yes 02 TECHNOLOGY NOTES AND BACK BOX REQUIREMENTS T003 TECHNOLOGY DETAILS Yes T_rTi FOURTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T151 FIFTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T161 SIXTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T171 SEVENTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T241 FOURTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY T251 FIFTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY T261 SIXTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY T271 SEVENTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY 301 TECHNOLOGY NURSE CALL RISER DIAGRAM T302 4 TECHNOLOGY COPPER AND FIBER RISER DIAGRAM Yes T401 TECHNOLOGY LARGE SCALE COMM ROOMS Yes Yes (ANY F,`JF,pe i0i2 MOUIRCATION MAY REQUIRE A E30Ar1D P.PPEARANCE) ^ architects ARRAY- ARCHITECTS.COM 6800 Broken Sound Pkwy NW, Ste 125 Boca Raton, FL. 33487 o: 561- 995 -1700 f: 561 - 995 -1701 SEAL: firm license # AA26000880 Mark D. Taudien �'�.�� . • AROO11821 CONSULTANTS: STRUCTURAL ENGINEER O'Donnell, Naccarato, Mignogna & Jackson 321 15th St., Suite 200 West Palm Beach, Florida 33401, USA Phone: 561.835.9994 Fax: 561.835.8255 MEP ENGINEER Smith, Seckman & Reid, Inc. 600 West Hillsboro Blvd, Suite 300 Deerfield Beach, FL 33441 Phone: 954.421.1260 Fax: 954.421.1466 OWNER: BAPTIST HEALTH SOUTH FLORIDA HOSPITAL: SOUTH MIAMI HOSPITAL' i PROJECT: PAVILION RENOVATIONS FLOORS 4 -7 6200 Southwest 73rd Street South Miami, FL 33143 5 Bulletin #81 -03 02 -07 -14 4 Construction Set 10 -11 -13 3 PRICING SET 04 -10 -13 2 50% CONSTRUCTION SET 03 -11 -13 1 AHCA STAGE II 10 -17 -12 NO. DESCRIPTION DATE REVISIONS /ISSUES SHEET TITLE: SHEETINDEX DRAWN: EAS CHECKED: FB CON /REF No. AHCA 23/100154 -191 PROJECT No. 3593 DATE: 05/03/13 SCALE: SHEET NO. G001 This document is a copyright protected instrument of service, property of Array Architects and licensed for use in the title project only. Reproduction or use of this document without written permission of Array Architects is illegal and will be prosecuted under the law. © COPYRIGHT - 2013 ARRAY- ARCHITECTS, INC. PLUMBING P001 PLUMBING SCHEDULES, LEGEND AND DRAWING INDEX P002 PLUMBING SCHEDULES P131 THIRD FLOOR PLAN - DEMOLITION PIPING P141 FOURTH FLOOR PLAN- DEMOLITION - PLUMBING P142 FOURTH FLOOE PLAN- DEMOLITION - MEDICAL GAS P151 FIFTH FLOOR PLAN- DEMOLITION - PLUMBING P152 FIFTH FLOOR PLAN- DEMOLITION - MEDICAL GAS P161 SIXTH FLOOR PLAN- DEMOLITION - PLUMBING P162 SIXTH FLOOR PLAN- DEMOLITION - MEDICAL GAS P171 SEVENTH FLOOR - DEMOLITION - PLUMBING P172 SEVENTH FLOOR - DEMOLITION - MEDICAL GAS P181 ROOF PLAN - DEMOLITION - PLUMBING P211 FIRST FLOOR - NEW CONSTRUCTION - PLUMBING P221 SECOND FLOOR - NEW CONSTRUCTION - PLUMBING P231 THIRD FLOOR PLAN - NEW CONSTRUCTION - PLUMBING P232 THIRD FLOOR PLAN - NEW CONSTRUCTION - MEDICAL GAS P241 FOURTH FLOOR PLAN - NEW CONSTRUCTION - PLUMBING P242 FOURTH FLOOR PLAN - NEW CONSTRUCTION - MEDICAL GAS P251 FIFTH FLOOR PLAN - NEW CONSTRUCTION - PLUMBING P252 FIFTH FLOOR PLAN - NEW CONSTRUCTION - MEDICAL GAS P261 SIXTH FLOOR PLAN - NEW CONSTRUCTION - PLUMBING P262 SIXTH FLOOR PLAN - NEW CONSTRUCTION - MEDICAL GAS P271 SEVENTH FLOOR PLAN - NEW CONSTRUCTION - PLUMBING P272 SEVENTH FLOOR PLAN - NEW CONSTRUCTION - MEDICAL GAS P301 PARTIAL PLUMBING PLANS P401 PLUMBING RISERS P402 PLUMBING RISERS P403 PLUMBING RISERS P404 PLUMBING RISERS P405 PLUMBING RISERS P501 PLUMBING DETAILS P502 PLUMBING DETAILS SHEETINDEX Current SHEET Construction Bulletin Bulletin Bulletin Bulletin Current Revision - UMBER N SHEET NAME Set B1 -01 B1 -02 B1 -03 B1 -04 Revision Date FIRE PRr)TF(:TIC)N FP001 FIRE PROTECTION SCHEDULE, LEGEND AND DRAWING INDEX FP002 FIRE PROTECTION RISER FP141 FOURTH FLOOR PLAN - DEMOLITION - FIRE PROTECTION FP151 FIFTH FLOOR PLAN - DEMOLITION - FIRE PROTECTION FP161 SIXTH FLOOR PLAN - DEMOLITION - FIRE PROTECTION FP171 SEVENTH FLOOR PLAN - DEMOLITION - FIRE PROTECTION FP181 ROOF PLAN - DEMOLITION - FIRE PROTECTION FP211 FIRST FLOOR - NEW CONSTRUCTION - FIRE PROTECTION u FP221 SECOND FLOOR - NEW CONSTRUCTION - FIRE PROTECTION FP241 FOURTH FLOOR PLAN - NEW CONSTRUCTION - FIRE PROTECTION FP251 FIFTH FLOOR PLAN - NEW CONSTRUCTION - FIRE ` PROTECTION FP261 SIXTH FLOOR PLAN - NEW CONSTRUCTION - FIRE PROTECTION FP271 SEVENTH FLOOR PLAN - NEW CONSTRUCTION - FIRE PROTECTION FP501 FIRE PROTECTION DETAILS C 13> 614.4CN_\I E001 ELECTRICAL SCHEDULES, LEGEND AND SHEET LIST E002 SCHEDULES AND DETAILS E003 SCHEDULES AND DETAILS E004 DETAILS E005 DETAILS E101 FIRST FLOOR PLAN - REFERENCE PLAN ELECTRICAL Yes E141 FOURTH FLOOR PLAN - DEMOLITION - ELECTRICAL E151 DEMOLITION - ELECTRICAL E161 SIXTH FLOOR PLAN - DEMOLITION - ELECTRICAL E171 SEVENTH FLOOR PLAN - DEMOLITION - ELECTRICAL E181 ROOF /PENTHOUSE PLAN - DEMOLITION - ELECTRICAL E222 SECOND FLOOR PLAN -NEW CONSTRUCTION -POWER E223 SECOND THROUGH SEVENTH FLOOR CONDUIT ROUTING PLANS E241 FOURTH FLOOR PLAN - NEW CONSTRUCTION - LIGHTING Yes Yes E242 FOURTH FLOOR PLAN - NEW CONSTRUCTION - POWER Yes Yes Yes E243 FOURTH FLOOR PLAN - NEW CONSTRUCTION - Yes SYSTEMS E251 FIFTH FLOOR PLAN - NEW CONSTRUCTION - LIGHTING Yes Yes E252 FIFTH FLOOR PLAN - NEW CONSTRUCTION - POWER Yes Yes Yes E253 FIFTH FLOOR PLAN - NEW CONSTRUCTION - SYSTEMS Yes E261 SIXTH FLOOR PLAN - NEW CONSTRUCTION - LIGHTING Yes Yes E262 SIXTH FLOOR PLAN - NEW CONSTRUCTION - POWER Yes Yes Yes E263 SIXTH FLOOR PLAN - NEW CONSTRUCTION - SYSTEMS Yes E271 SEVENTH FLOOR PLAN -NEW CONSTRUCTION - LIGHTING Yes Yes E272 SEVENTH FLOOR PLAN -NEW CONSTRUCTION -POWER Yes Yes Yes E273 SEVENTH FLOOR -NEW CONSTRUCTION - SYSTEMS Yes E281 PENTHOUSE /ROOF PLAN- ELECTRICAL E301 PATIENT ROOM DETAILS E401 PARTIAL ELECTRICAL ONE -LINE DIAGRAM Yes E402 PARTIAL ELECTRICAL DISTRIBUTION DIAGRAM - DEMOLITION E403 PARTIAL ELECTRICAL DISTRIBUTION DIAGRAM - NEW Yes CONSTRUCTION E501 PANEL SCHEDULES E502 PANEL SCHEDULES Yes E503 PANEL SCHEDULES Yes E601 ELECTRICAL STUDIES E602 ELECTRICAL STUDIES E603 ELECTRICAL STUDIES TECHNOLOGY T001 TECHNOLOGY LEGEND AND SHEET INDEX Yes Yes 02 TECHNOLOGY NOTES AND BACK BOX REQUIREMENTS T003 TECHNOLOGY DETAILS Yes T_rTi FOURTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T151 FIFTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T161 SIXTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T171 SEVENTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T241 FOURTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY T251 FIFTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY T261 SIXTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY T271 SEVENTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY 301 TECHNOLOGY NURSE CALL RISER DIAGRAM T302 4 TECHNOLOGY COPPER AND FIBER RISER DIAGRAM Yes T401 TECHNOLOGY LARGE SCALE COMM ROOMS Yes Yes (ANY F,`JF,pe i0i2 MOUIRCATION MAY REQUIRE A E30Ar1D P.PPEARANCE) ^ architects ARRAY- ARCHITECTS.COM 6800 Broken Sound Pkwy NW, Ste 125 Boca Raton, FL. 33487 o: 561- 995 -1700 f: 561 - 995 -1701 SEAL: firm license # AA26000880 Mark D. Taudien �'�.�� . • AROO11821 CONSULTANTS: STRUCTURAL ENGINEER O'Donnell, Naccarato, Mignogna & Jackson 321 15th St., Suite 200 West Palm Beach, Florida 33401, USA Phone: 561.835.9994 Fax: 561.835.8255 MEP ENGINEER Smith, Seckman & Reid, Inc. 600 West Hillsboro Blvd, Suite 300 Deerfield Beach, FL 33441 Phone: 954.421.1260 Fax: 954.421.1466 OWNER: BAPTIST HEALTH SOUTH FLORIDA HOSPITAL: SOUTH MIAMI HOSPITAL' i PROJECT: PAVILION RENOVATIONS FLOORS 4 -7 6200 Southwest 73rd Street South Miami, FL 33143 5 Bulletin #81 -03 02 -07 -14 4 Construction Set 10 -11 -13 3 PRICING SET 04 -10 -13 2 50% CONSTRUCTION SET 03 -11 -13 1 AHCA STAGE II 10 -17 -12 NO. DESCRIPTION DATE REVISIONS /ISSUES SHEET TITLE: SHEETINDEX DRAWN: EAS CHECKED: FB CON /REF No. AHCA 23/100154 -191 PROJECT No. 3593 DATE: 05/03/13 SCALE: SHEET NO. G001 This document is a copyright protected instrument of service, property of Array Architects and licensed for use in the title project only. Reproduction or use of this document without written permission of Array Architects is illegal and will be prosecuted under the law. © COPYRIGHT - 2013 ARRAY- ARCHITECTS, INC. SHEETINDEX Current SHEET Construction Bulletin Bulletin Bulletin Bulletin Current Revision - UMBER N SHEET NAME Set B1 -01 B1 -02 B1 -03 B1 -04 Revision Date FIRE PRr)TF(:TIC)N FP001 FIRE PROTECTION SCHEDULE, LEGEND AND DRAWING INDEX FP002 FIRE PROTECTION RISER FP141 FOURTH FLOOR PLAN - DEMOLITION - FIRE PROTECTION FP151 FIFTH FLOOR PLAN - DEMOLITION - FIRE PROTECTION FP161 SIXTH FLOOR PLAN - DEMOLITION - FIRE PROTECTION FP171 SEVENTH FLOOR PLAN - DEMOLITION - FIRE PROTECTION FP181 ROOF PLAN - DEMOLITION - FIRE PROTECTION FP211 FIRST FLOOR - NEW CONSTRUCTION - FIRE PROTECTION u FP221 SECOND FLOOR - NEW CONSTRUCTION - FIRE PROTECTION FP241 FOURTH FLOOR PLAN - NEW CONSTRUCTION - FIRE PROTECTION FP251 FIFTH FLOOR PLAN - NEW CONSTRUCTION - FIRE ` PROTECTION FP261 SIXTH FLOOR PLAN - NEW CONSTRUCTION - FIRE PROTECTION FP271 SEVENTH FLOOR PLAN - NEW CONSTRUCTION - FIRE PROTECTION FP501 FIRE PROTECTION DETAILS C 13> 614.4CN_\I E001 ELECTRICAL SCHEDULES, LEGEND AND SHEET LIST E002 SCHEDULES AND DETAILS E003 SCHEDULES AND DETAILS E004 DETAILS E005 DETAILS E101 FIRST FLOOR PLAN - REFERENCE PLAN ELECTRICAL Yes E141 FOURTH FLOOR PLAN - DEMOLITION - ELECTRICAL E151 DEMOLITION - ELECTRICAL E161 SIXTH FLOOR PLAN - DEMOLITION - ELECTRICAL E171 SEVENTH FLOOR PLAN - DEMOLITION - ELECTRICAL E181 ROOF /PENTHOUSE PLAN - DEMOLITION - ELECTRICAL E222 SECOND FLOOR PLAN -NEW CONSTRUCTION -POWER E223 SECOND THROUGH SEVENTH FLOOR CONDUIT ROUTING PLANS E241 FOURTH FLOOR PLAN - NEW CONSTRUCTION - LIGHTING Yes Yes E242 FOURTH FLOOR PLAN - NEW CONSTRUCTION - POWER Yes Yes Yes E243 FOURTH FLOOR PLAN - NEW CONSTRUCTION - Yes SYSTEMS E251 FIFTH FLOOR PLAN - NEW CONSTRUCTION - LIGHTING Yes Yes E252 FIFTH FLOOR PLAN - NEW CONSTRUCTION - POWER Yes Yes Yes E253 FIFTH FLOOR PLAN - NEW CONSTRUCTION - SYSTEMS Yes E261 SIXTH FLOOR PLAN - NEW CONSTRUCTION - LIGHTING Yes Yes E262 SIXTH FLOOR PLAN - NEW CONSTRUCTION - POWER Yes Yes Yes E263 SIXTH FLOOR PLAN - NEW CONSTRUCTION - SYSTEMS Yes E271 SEVENTH FLOOR PLAN -NEW CONSTRUCTION - LIGHTING Yes Yes E272 SEVENTH FLOOR PLAN -NEW CONSTRUCTION -POWER Yes Yes Yes E273 SEVENTH FLOOR -NEW CONSTRUCTION - SYSTEMS Yes E281 PENTHOUSE /ROOF PLAN- ELECTRICAL E301 PATIENT ROOM DETAILS E401 PARTIAL ELECTRICAL ONE -LINE DIAGRAM Yes E402 PARTIAL ELECTRICAL DISTRIBUTION DIAGRAM - DEMOLITION E403 PARTIAL ELECTRICAL DISTRIBUTION DIAGRAM - NEW Yes CONSTRUCTION E501 PANEL SCHEDULES E502 PANEL SCHEDULES Yes E503 PANEL SCHEDULES Yes E601 ELECTRICAL STUDIES E602 ELECTRICAL STUDIES E603 ELECTRICAL STUDIES TECHNOLOGY T001 TECHNOLOGY LEGEND AND SHEET INDEX Yes Yes 02 TECHNOLOGY NOTES AND BACK BOX REQUIREMENTS T003 TECHNOLOGY DETAILS Yes T_rTi FOURTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T151 FIFTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T161 SIXTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T171 SEVENTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T241 FOURTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY T251 FIFTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY T261 SIXTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY T271 SEVENTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY 301 TECHNOLOGY NURSE CALL RISER DIAGRAM T302 4 TECHNOLOGY COPPER AND FIBER RISER DIAGRAM Yes T401 TECHNOLOGY LARGE SCALE COMM ROOMS Yes Yes (ANY F,`JF,pe i0i2 MOUIRCATION MAY REQUIRE A E30Ar1D P.PPEARANCE) ^ architects ARRAY- ARCHITECTS.COM 6800 Broken Sound Pkwy NW, Ste 125 Boca Raton, FL. 33487 o: 561- 995 -1700 f: 561 - 995 -1701 SEAL: firm license # AA26000880 Mark D. Taudien �'�.�� . • AROO11821 CONSULTANTS: STRUCTURAL ENGINEER O'Donnell, Naccarato, Mignogna & Jackson 321 15th St., Suite 200 West Palm Beach, Florida 33401, USA Phone: 561.835.9994 Fax: 561.835.8255 MEP ENGINEER Smith, Seckman & Reid, Inc. 600 West Hillsboro Blvd, Suite 300 Deerfield Beach, FL 33441 Phone: 954.421.1260 Fax: 954.421.1466 OWNER: BAPTIST HEALTH SOUTH FLORIDA HOSPITAL: SOUTH MIAMI HOSPITAL' i PROJECT: PAVILION RENOVATIONS FLOORS 4 -7 6200 Southwest 73rd Street South Miami, FL 33143 5 Bulletin #81 -03 02 -07 -14 4 Construction Set 10 -11 -13 3 PRICING SET 04 -10 -13 2 50% CONSTRUCTION SET 03 -11 -13 1 AHCA STAGE II 10 -17 -12 NO. DESCRIPTION DATE REVISIONS /ISSUES SHEET TITLE: SHEETINDEX DRAWN: EAS CHECKED: FB CON /REF No. AHCA 23/100154 -191 PROJECT No. 3593 DATE: 05/03/13 SCALE: SHEET NO. G001 This document is a copyright protected instrument of service, property of Array Architects and licensed for use in the title project only. Reproduction or use of this document without written permission of Array Architects is illegal and will be prosecuted under the law. © COPYRIGHT - 2013 ARRAY- ARCHITECTS, INC. FIRE PRr)TF(:TIC)N FP001 FIRE PROTECTION SCHEDULE, LEGEND AND DRAWING INDEX FP002 FIRE PROTECTION RISER FP141 FOURTH FLOOR PLAN - DEMOLITION - FIRE PROTECTION FP151 FIFTH FLOOR PLAN - DEMOLITION - FIRE PROTECTION FP161 SIXTH FLOOR PLAN - DEMOLITION - FIRE PROTECTION FP171 SEVENTH FLOOR PLAN - DEMOLITION - FIRE PROTECTION FP181 ROOF PLAN - DEMOLITION - FIRE PROTECTION FP211 FIRST FLOOR - NEW CONSTRUCTION - FIRE PROTECTION u FP221 SECOND FLOOR - NEW CONSTRUCTION - FIRE PROTECTION FP241 FOURTH FLOOR PLAN - NEW CONSTRUCTION - FIRE PROTECTION FP251 FIFTH FLOOR PLAN - NEW CONSTRUCTION - FIRE ` PROTECTION FP261 SIXTH FLOOR PLAN - NEW CONSTRUCTION - FIRE PROTECTION FP271 SEVENTH FLOOR PLAN - NEW CONSTRUCTION - FIRE PROTECTION FP501 FIRE PROTECTION DETAILS C 13> 614.4CN_\I E001 ELECTRICAL SCHEDULES, LEGEND AND SHEET LIST E002 SCHEDULES AND DETAILS E003 SCHEDULES AND DETAILS E004 DETAILS E005 DETAILS E101 FIRST FLOOR PLAN - REFERENCE PLAN ELECTRICAL Yes E141 FOURTH FLOOR PLAN - DEMOLITION - ELECTRICAL E151 DEMOLITION - ELECTRICAL E161 SIXTH FLOOR PLAN - DEMOLITION - ELECTRICAL E171 SEVENTH FLOOR PLAN - DEMOLITION - ELECTRICAL E181 ROOF /PENTHOUSE PLAN - DEMOLITION - ELECTRICAL E222 SECOND FLOOR PLAN -NEW CONSTRUCTION -POWER E223 SECOND THROUGH SEVENTH FLOOR CONDUIT ROUTING PLANS E241 FOURTH FLOOR PLAN - NEW CONSTRUCTION - LIGHTING Yes Yes E242 FOURTH FLOOR PLAN - NEW CONSTRUCTION - POWER Yes Yes Yes E243 FOURTH FLOOR PLAN - NEW CONSTRUCTION - Yes SYSTEMS E251 FIFTH FLOOR PLAN - NEW CONSTRUCTION - LIGHTING Yes Yes E252 FIFTH FLOOR PLAN - NEW CONSTRUCTION - POWER Yes Yes Yes E253 FIFTH FLOOR PLAN - NEW CONSTRUCTION - SYSTEMS Yes E261 SIXTH FLOOR PLAN - NEW CONSTRUCTION - LIGHTING Yes Yes E262 SIXTH FLOOR PLAN - NEW CONSTRUCTION - POWER Yes Yes Yes E263 SIXTH FLOOR PLAN - NEW CONSTRUCTION - SYSTEMS Yes E271 SEVENTH FLOOR PLAN -NEW CONSTRUCTION - LIGHTING Yes Yes E272 SEVENTH FLOOR PLAN -NEW CONSTRUCTION -POWER Yes Yes Yes E273 SEVENTH FLOOR -NEW CONSTRUCTION - SYSTEMS Yes E281 PENTHOUSE /ROOF PLAN- ELECTRICAL E301 PATIENT ROOM DETAILS E401 PARTIAL ELECTRICAL ONE -LINE DIAGRAM Yes E402 PARTIAL ELECTRICAL DISTRIBUTION DIAGRAM - DEMOLITION E403 PARTIAL ELECTRICAL DISTRIBUTION DIAGRAM - NEW Yes CONSTRUCTION E501 PANEL SCHEDULES E502 PANEL SCHEDULES Yes E503 PANEL SCHEDULES Yes E601 ELECTRICAL STUDIES E602 ELECTRICAL STUDIES E603 ELECTRICAL STUDIES TECHNOLOGY T001 TECHNOLOGY LEGEND AND SHEET INDEX Yes Yes 02 TECHNOLOGY NOTES AND BACK BOX REQUIREMENTS T003 TECHNOLOGY DETAILS Yes T_rTi FOURTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T151 FIFTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T161 SIXTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T171 SEVENTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T241 FOURTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY T251 FIFTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY T261 SIXTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY T271 SEVENTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY 301 TECHNOLOGY NURSE CALL RISER DIAGRAM T302 4 TECHNOLOGY COPPER AND FIBER RISER DIAGRAM Yes T401 TECHNOLOGY LARGE SCALE COMM ROOMS Yes Yes (ANY F,`JF,pe i0i2 MOUIRCATION MAY REQUIRE A E30Ar1D P.PPEARANCE) ^ architects ARRAY- ARCHITECTS.COM 6800 Broken Sound Pkwy NW, Ste 125 Boca Raton, FL. 33487 o: 561- 995 -1700 f: 561 - 995 -1701 SEAL: firm license # AA26000880 Mark D. Taudien �'�.�� . • AROO11821 CONSULTANTS: STRUCTURAL ENGINEER O'Donnell, Naccarato, Mignogna & Jackson 321 15th St., Suite 200 West Palm Beach, Florida 33401, USA Phone: 561.835.9994 Fax: 561.835.8255 MEP ENGINEER Smith, Seckman & Reid, Inc. 600 West Hillsboro Blvd, Suite 300 Deerfield Beach, FL 33441 Phone: 954.421.1260 Fax: 954.421.1466 OWNER: BAPTIST HEALTH SOUTH FLORIDA HOSPITAL: SOUTH MIAMI HOSPITAL' i PROJECT: PAVILION RENOVATIONS FLOORS 4 -7 6200 Southwest 73rd Street South Miami, FL 33143 5 Bulletin #81 -03 02 -07 -14 4 Construction Set 10 -11 -13 3 PRICING SET 04 -10 -13 2 50% CONSTRUCTION SET 03 -11 -13 1 AHCA STAGE II 10 -17 -12 NO. DESCRIPTION DATE REVISIONS /ISSUES SHEET TITLE: SHEETINDEX DRAWN: EAS CHECKED: FB CON /REF No. AHCA 23/100154 -191 PROJECT No. 3593 DATE: 05/03/13 SCALE: SHEET NO. G001 This document is a copyright protected instrument of service, property of Array Architects and licensed for use in the title project only. Reproduction or use of this document without written permission of Array Architects is illegal and will be prosecuted under the law. © COPYRIGHT - 2013 ARRAY- ARCHITECTS, INC. C 13> 614.4CN_\I E001 ELECTRICAL SCHEDULES, LEGEND AND SHEET LIST E002 SCHEDULES AND DETAILS E003 SCHEDULES AND DETAILS E004 DETAILS E005 DETAILS E101 FIRST FLOOR PLAN - REFERENCE PLAN ELECTRICAL Yes E141 FOURTH FLOOR PLAN - DEMOLITION - ELECTRICAL E151 DEMOLITION - ELECTRICAL E161 SIXTH FLOOR PLAN - DEMOLITION - ELECTRICAL E171 SEVENTH FLOOR PLAN - DEMOLITION - ELECTRICAL E181 ROOF /PENTHOUSE PLAN - DEMOLITION - ELECTRICAL E222 SECOND FLOOR PLAN -NEW CONSTRUCTION -POWER E223 SECOND THROUGH SEVENTH FLOOR CONDUIT ROUTING PLANS E241 FOURTH FLOOR PLAN - NEW CONSTRUCTION - LIGHTING Yes Yes E242 FOURTH FLOOR PLAN - NEW CONSTRUCTION - POWER Yes Yes Yes E243 FOURTH FLOOR PLAN - NEW CONSTRUCTION - Yes SYSTEMS E251 FIFTH FLOOR PLAN - NEW CONSTRUCTION - LIGHTING Yes Yes E252 FIFTH FLOOR PLAN - NEW CONSTRUCTION - POWER Yes Yes Yes E253 FIFTH FLOOR PLAN - NEW CONSTRUCTION - SYSTEMS Yes E261 SIXTH FLOOR PLAN - NEW CONSTRUCTION - LIGHTING Yes Yes E262 SIXTH FLOOR PLAN - NEW CONSTRUCTION - POWER Yes Yes Yes E263 SIXTH FLOOR PLAN - NEW CONSTRUCTION - SYSTEMS Yes E271 SEVENTH FLOOR PLAN -NEW CONSTRUCTION - LIGHTING Yes Yes E272 SEVENTH FLOOR PLAN -NEW CONSTRUCTION -POWER Yes Yes Yes E273 SEVENTH FLOOR -NEW CONSTRUCTION - SYSTEMS Yes E281 PENTHOUSE /ROOF PLAN- ELECTRICAL E301 PATIENT ROOM DETAILS E401 PARTIAL ELECTRICAL ONE -LINE DIAGRAM Yes E402 PARTIAL ELECTRICAL DISTRIBUTION DIAGRAM - DEMOLITION E403 PARTIAL ELECTRICAL DISTRIBUTION DIAGRAM - NEW Yes CONSTRUCTION E501 PANEL SCHEDULES E502 PANEL SCHEDULES Yes E503 PANEL SCHEDULES Yes E601 ELECTRICAL STUDIES E602 ELECTRICAL STUDIES E603 ELECTRICAL STUDIES TECHNOLOGY T001 TECHNOLOGY LEGEND AND SHEET INDEX Yes Yes 02 TECHNOLOGY NOTES AND BACK BOX REQUIREMENTS T003 TECHNOLOGY DETAILS Yes T_rTi FOURTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T151 FIFTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T161 SIXTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T171 SEVENTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T241 FOURTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY T251 FIFTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY T261 SIXTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY T271 SEVENTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY 301 TECHNOLOGY NURSE CALL RISER DIAGRAM T302 4 TECHNOLOGY COPPER AND FIBER RISER DIAGRAM Yes T401 TECHNOLOGY LARGE SCALE COMM ROOMS Yes Yes (ANY F,`JF,pe i0i2 MOUIRCATION MAY REQUIRE A E30Ar1D P.PPEARANCE) ^ architects ARRAY- ARCHITECTS.COM 6800 Broken Sound Pkwy NW, Ste 125 Boca Raton, FL. 33487 o: 561- 995 -1700 f: 561 - 995 -1701 SEAL: firm license # AA26000880 Mark D. Taudien �'�.�� . • AROO11821 CONSULTANTS: STRUCTURAL ENGINEER O'Donnell, Naccarato, Mignogna & Jackson 321 15th St., Suite 200 West Palm Beach, Florida 33401, USA Phone: 561.835.9994 Fax: 561.835.8255 MEP ENGINEER Smith, Seckman & Reid, Inc. 600 West Hillsboro Blvd, Suite 300 Deerfield Beach, FL 33441 Phone: 954.421.1260 Fax: 954.421.1466 OWNER: BAPTIST HEALTH SOUTH FLORIDA HOSPITAL: SOUTH MIAMI HOSPITAL' i PROJECT: PAVILION RENOVATIONS FLOORS 4 -7 6200 Southwest 73rd Street South Miami, FL 33143 5 Bulletin #81 -03 02 -07 -14 4 Construction Set 10 -11 -13 3 PRICING SET 04 -10 -13 2 50% CONSTRUCTION SET 03 -11 -13 1 AHCA STAGE II 10 -17 -12 NO. DESCRIPTION DATE REVISIONS /ISSUES SHEET TITLE: SHEETINDEX DRAWN: EAS CHECKED: FB CON /REF No. AHCA 23/100154 -191 PROJECT No. 3593 DATE: 05/03/13 SCALE: SHEET NO. G001 This document is a copyright protected instrument of service, property of Array Architects and licensed for use in the title project only. Reproduction or use of this document without written permission of Array Architects is illegal and will be prosecuted under the law. © COPYRIGHT - 2013 ARRAY- ARCHITECTS, INC. TECHNOLOGY T001 TECHNOLOGY LEGEND AND SHEET INDEX Yes Yes 02 TECHNOLOGY NOTES AND BACK BOX REQUIREMENTS T003 TECHNOLOGY DETAILS Yes T_rTi FOURTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T151 FIFTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T161 SIXTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T171 SEVENTH FLOOR PLAN - DEMOLTION - TECHNOLOGY T241 FOURTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY T251 FIFTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY T261 SIXTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY T271 SEVENTH FLOOR PLAN - NEW CONSTRUCTION - Yes Yes Yes TECHNOLOGY 301 TECHNOLOGY NURSE CALL RISER DIAGRAM T302 4 TECHNOLOGY COPPER AND FIBER RISER DIAGRAM Yes T401 TECHNOLOGY LARGE SCALE COMM ROOMS Yes Yes (ANY F,`JF,pe i0i2 MOUIRCATION MAY REQUIRE A E30Ar1D P.PPEARANCE) ^ architects ARRAY- ARCHITECTS.COM 6800 Broken Sound Pkwy NW, Ste 125 Boca Raton, FL. 33487 o: 561- 995 -1700 f: 561 - 995 -1701 SEAL: firm license # AA26000880 Mark D. Taudien �'�.�� . • AROO11821 CONSULTANTS: STRUCTURAL ENGINEER O'Donnell, Naccarato, Mignogna & Jackson 321 15th St., Suite 200 West Palm Beach, Florida 33401, USA Phone: 561.835.9994 Fax: 561.835.8255 MEP ENGINEER Smith, Seckman & Reid, Inc. 600 West Hillsboro Blvd, Suite 300 Deerfield Beach, FL 33441 Phone: 954.421.1260 Fax: 954.421.1466 OWNER: BAPTIST HEALTH SOUTH FLORIDA HOSPITAL: SOUTH MIAMI HOSPITAL' i PROJECT: PAVILION RENOVATIONS FLOORS 4 -7 6200 Southwest 73rd Street South Miami, FL 33143 5 Bulletin #81 -03 02 -07 -14 4 Construction Set 10 -11 -13 3 PRICING SET 04 -10 -13 2 50% CONSTRUCTION SET 03 -11 -13 1 AHCA STAGE II 10 -17 -12 NO. DESCRIPTION DATE REVISIONS /ISSUES SHEET TITLE: SHEETINDEX DRAWN: EAS CHECKED: FB CON /REF No. AHCA 23/100154 -191 PROJECT No. 3593 DATE: 05/03/13 SCALE: SHEET NO. G001 This document is a copyright protected instrument of service, property of Array Architects and licensed for use in the title project only. Reproduction or use of this document without written permission of Array Architects is illegal and will be prosecuted under the law. © COPYRIGHT - 2013 ARRAY- ARCHITECTS, INC. (ANY F,`JF,pe i0i2 MOUIRCATION MAY REQUIRE A E30Ar1D P.PPEARANCE) ^ architects ARRAY- ARCHITECTS.COM 6800 Broken Sound Pkwy NW, Ste 125 Boca Raton, FL. 33487 o: 561- 995 -1700 f: 561 - 995 -1701 SEAL: firm license # AA26000880 Mark D. Taudien �'�.�� . • AROO11821 CONSULTANTS: STRUCTURAL ENGINEER O'Donnell, Naccarato, Mignogna & Jackson 321 15th St., Suite 200 West Palm Beach, Florida 33401, USA Phone: 561.835.9994 Fax: 561.835.8255 MEP ENGINEER Smith, Seckman & Reid, Inc. 600 West Hillsboro Blvd, Suite 300 Deerfield Beach, FL 33441 Phone: 954.421.1260 Fax: 954.421.1466 OWNER: BAPTIST HEALTH SOUTH FLORIDA HOSPITAL: SOUTH MIAMI HOSPITAL' i PROJECT: PAVILION RENOVATIONS FLOORS 4 -7 6200 Southwest 73rd Street South Miami, FL 33143 5 Bulletin #81 -03 02 -07 -14 4 Construction Set 10 -11 -13 3 PRICING SET 04 -10 -13 2 50% CONSTRUCTION SET 03 -11 -13 1 AHCA STAGE II 10 -17 -12 NO. DESCRIPTION DATE REVISIONS /ISSUES SHEET TITLE: SHEETINDEX DRAWN: EAS CHECKED: FB CON /REF No. AHCA 23/100154 -191 PROJECT No. 3593 DATE: 05/03/13 SCALE: SHEET NO. G001 This document is a copyright protected instrument of service, property of Array Architects and licensed for use in the title project only. Reproduction or use of this document without written permission of Array Architects is illegal and will be prosecuted under the law. © COPYRIGHT - 2013 ARRAY- ARCHITECTS, INC. SHEET TITLE: SHEETINDEX DRAWN: EAS CHECKED: FB CON /REF No. AHCA 23/100154 -191 PROJECT No. 3593 DATE: 05/03/13 SCALE: SHEET NO. G001 This document is a copyright protected instrument of service, property of Array Architects and licensed for use in the title project only. Reproduction or use of this document without written permission of Array Architects is illegal and will be prosecuted under the law. © COPYRIGHT - 2013 ARRAY- ARCHITECTS, INC.