13-62-022GENERAL NOTES: 1. THE CONTRACTOR SHALL FURNISH ALL LABOR MATERIALS AND EQUIPMENT NECESSARY FOR THE INSTALLATION OF THE HVAC SYSTEM IN ACCORDANCE WITH THESE DRAWINGS. - FLORIDA BUILDING CODE - 2010 EDITION. - GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH DEPARTMENT CARE FACILITIES 2010 EDITION. - NATIONAL ELECTRICAL CODE (NEC 2008). - ENVIRONMENTAL PROTECTION AGENCY (EPA). - DEPT. OF ENVIRONMENTAL REGULATION MANAGEMENT (DERM). - LOCAL ORDINANCES, REGULATIONS OF THE BUILDING DEPTS. AND FIRE DEPTS" - RECOMMENDATIONS OF NFPA, IN GENERAL AND IN PARTICULAR: A. LIFE SAFETY, NFPA 101 (2009) B. HVAC, NFPA 90A, (2009) C. HVAC, NFPA 90B, (2009) D. HVAC, NFPA 96 (2008) E. HOSPITALS, NFPA 99, (2005) 2_ THE CONTRACTOR IS RESPONSIBLE FOR VISITING THE SITE OF THE WORK AND BECOMING FAMILIAR WITH THE CONDITIONS OF THE WORK PRIOR TO SUBMITTING A BID. THE CONTRACTOR IS REQUIRED TO BECOME FAMILIAR WITH ALL THE CONTRACT DOCUMENTS PERTAINING TO THE PROPOSED WORK. THE SUBMISSION OF A BID SHALL BE SUFFICIENT TO ESTABLISH THAT THE CONTRACTOR HAS INVESTIGATED THE SITE OF THE WORK AND IS SATISFIED AS TO ALL REASONABLE CONDITIONS TO BE ENCOUNTERED, THE WORK TO BE PERFORMED AND THE MATERIALS TO BE PROVIDED IN THE COMPLETION OF THE PROJECT. 3. FAILURE OF BIDDERS TO MAKE REQUIRED VISITATIONS AND /OR INVESTIGATIONS TO INFORM THEMSELVES FULLY OF EXISTING CONDITIONS, AND TO INCLUDE IN THEIR PROPOSALS A SUM SUFFICIENT TO COVER ALL POSSIBLE FIELD CONDITIONS, WILL NOT IN ANY WAY ENTITLE THEM TO ANY EXTRA CHARGES OVER AND ABOVE THEIR ORIGINAL PROPOSALS. 4. ALL WORK SHALL BE COORDINATED WITH ALL OTHER TRADES AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION OF EQUIPMENT. ANY DISCRIPANCIES BETWEEN THE WORK DEPICTED ON THESE DOCUMENTS AND THE ACTUAL CONDITIONS ENCOUNTERED SHALL BE BROUGHT PROMPTLY TO THE ENGINEER FOR REVIEW AND CLARIFICATION. 5. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT PROPERTY IN AREAS WHERE WORK IS BEING CONDUCTED. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGES CAUSED TO BUILDING COMPONENTS DUE TO NEW WORK OPERATIONS. PATCH AND REPAIR EXISTING SURFACES DAMAGED AS REQUIRED TO MATCH ADJACENT SURFACES. 6. CONTRACTOR SHALL PROVIDE DURING CONSTRUCTION ALL SAFETY MEASURES AND FEATURES AS REQUIRED BY THE APPLICABLE CODES, RULES AND REGULATIONS HAVING JURISDICTION OVER THE PROJECT. 7. ALL WORK SHALL BE COORDINATED WITH ALL OTHER TRADES AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION OF EQUIPMENT. ANY DISCREPANCIES BETWEEN THE WORK DEPICTED ON THESE DOCUMENTS AND THE ACTUAL CONDITIONS ENCOUNTERED SHALL BE BROUGHT PROMPTLY TO THE ENGINEER FOR REVIEW AND CLARIFICATION. 8. THE WORK THAT IS TO BE DONE UNDER THIS CONTRACT INCLUDES THE FURNISHING OF ALL LABOR, MATERIALS AND EQUIPMENT, PERMITS, FEES, INSPECTIONS, TESTS, INSURANCE, ETC., REQUIRED FOR THE COMPLETION OF THE HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS SHOWN ON DRAWINGS. 9. THE DRAWINGS ARE GENERALLY DIAGRAMMATIC. THEY DO NOT SHOW EVERY BEND, OFF -SET, ELBOW OR OTHER FITTINGS WHICH MAY BE REQUIRED FOR THE INSTALLATION IN THE SPACE ALLOCATED. 10. DRAWINGS ARE NOT TO BE SCALED. UNLESS SPECIFIC DIMENSIONS ARE SHOWN; THE STRUCTURAL DRAWINGS AND SITE CONDITIONS SHALL GOVERN EXACT LOCATION OF MECHANICAL EQUIPMENT TO BE INSTALLED. 11. IT IS THE INTENT OF THE PLANS AND GENERAL NOTES TO PROVIDE A COMPLETE AND OPERATING INSTALLATION INCLUDING ALL NECESSARY ITEMS REQUIRED, EVEN THOUGH ITEMS ARE NOT INDICATED ON THE DRAWINGS OR IN THE NOTES. ALL WORK CONSIDERED NECESSARY FOR THE COMPLETION OF THE WORK IN PROPER MANNER NOT SHOWN ON THE PLANS OR NOTES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IN WRITING PRIOR TO BIDS OTHERWISE WORK SHALL NOT BE ADDITIONALLY CHARGED AFTER BID IS AWARDED. 12. SUBMIT SHOP DRAWINGS OF ALL MATERIALS, DUCTWORK, DUCT LAYOUT AND EQUIPMENT FOR REVIEW BY ENGINEER PRIOR TO FABRICATION AND /OR INSTALLATION. 13. ALL DUCT SIZES SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS. 14. THE CONTRACTOR SHALL TEST ALL EQUIPMENT, MAKE PRELIMINARY ADJUSTMENTS AND CALIBRATE ALL CONTROLS PRIOR TO REQUESTING TEST AND BALANCE SERVICES. 15. NO PORTION OF THE NEW DUCTWORK OR ITS SUPPORTS SHALL MAKE CONTACT WITH PARTITIONS, CEILING, LIGHTS, ETC. 16. CONTRACTOR SHALL WARRANT ALL WORK TO BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR AFTER ACCEPTANCE OF THE INSTALLATION. 17. PROVIDE OWNER WITH (3) HARD BOUND SETS OF SYSTEM OPERATING INSTRUCTIONS FOR ALL EQUIPMENT INCLUDING CONTROLS. 18. ALL MATERIALS SHALL BE NEW. ANY DAMAGED EQUIPMENT SHALL BE REPLACED OR RESTORED TO ORIGINAL CONDITION. - 19. PROVIDE CEILING /WALL ACCESS PANELS WHERE INDICATED IN THE DRAWINGS AND WHERE REQUIRED TO ACCESS HVAC EQUIPMENT. PANELS SHALL BE RECESSED TYPE, FIRE RATED IF IN FIRE RATED WALLS OR CEILINGS. LOCATION OF PANELS SHALL BE COORDINATED WITH ALL THE OTHER TRADES. 20. CONTRACTOR SHALL OBTAIN THE SERVICES OF AN INDEPENDENT, CERTIFIED TEST AND BALANCE COMPANY TO BALANCE THE AIR SYSTEMS ASSOCIATED WITH THE NEW AND EXISTING MECHANICAL EQUIPMENT AS SHOWN TO THE QUANTITIES AND CAPACITIES INDICATED ON THE PLANS. CONTRACTOR SHALL SUBMIT (3) COPIES OF REPORT TO ENGINEER UPON COMPLETION FOR REVIEW. 21. DURING CONSTRUCTION, ALL SUPPLY DUCTWORK OPENINGS SHALL BE FITTED WITH BLANKET TYPE, DISPOSABLE 1" THICK SYNTHETIC MEDIA IN ORDER TO PREVENT CONSTRUCTION DEBRIS FROM ENTERING AND ACCUMULATING INSIDE THE DUCT SURFACES. 22. UPON COMPLETION, CONTRACTOR SHALL CLEAN ALL DUST AND DEBRIS IN AREAS WHERE WORK WAS CONDUCTED. 23. ALL WORK SHALL CONFORM WITH THE 2010 EDITION, FLORIDA BUILDING CODE AND ALL APPLICABLE CODES AND REGULATIONS. 24. DUCTWORK LEAKAGE TESTS: A) ALL DUCTWORK SHALL BE LEAKAGE TESTED IN STRICT CONFORMANCE WITH THE PROCEDURES DESCRIBED IN THE LATEST EDITION OF SMACNA'S "HVAC AIR DUCT LEAKAGE TEST MANUAL ". TEST SHALL BE CONDUCTED AT A STATIC PRESSURE EQUAL TO THE STATIC PRESSURE CLASSIFICATION OF MEDIUM PRESSURE DUCTWORK AND /OR LOW PRESSURE CONSTRUCTION. FOR INSTANCE, IF MEDIUM PRESSURE DUCTWORK IS CONSTRUCTED TO A 3" STATIC PRESSURE CLASSIFICATION, THE LEAKAGE TEST SHALL BE CONDUCTED AT 3" WG STATIC PRESSURE TEST. RECOMMENDATIONS IN THE MANUAL AS TO WHAT DUCTS MAY OR MAY NOT BE TESTED ARE IRRELEVANT; LEAKAGE TESTING MUST BE PERFORMED. B) SMACNA "HVAC AIR DUCT LEAKAGE TEST MANUAL" SHALL BE USED AS A MANUAL OF GOOD PRACTICES FOR ALL PRESSURE TESTS. C) THE CONTRACTOR SHALL USE NO SMACNA PUBLICATION, AS A REFERENCE IN AN ATTEMPT TO INVALIDATE OR NOT TO PERFORM ANY AND ALL DUCTWORK PRESSURE TESTING REQUIRED UNDER THIS CONTRACT. HVAC SYSTEM ABBREVIATIONS A AMPERES AC AIR CONDENSING UNIT (DX TYPE) AD ACCESS DOOR AFC AIR FAN CURTAIN AFF ABOVE FINISHED FLOOR AFMD AIR FLOWING MEASURING DEVICE AHU AIR HANDLING UNIT APID AIR PRESSURE DIFFERENTIAL ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATING AND AIR CONDITIONING ENGINEERS BD BACKDRAFT DAMPER BHP BRAKE HORSEPOWER BTU BRITISH THERMAL UNIT BTUH BRITISH THERMAL UNITS PER HOUR BOP BOTTOM OF PIPE BOD BOTTOM OF DUCT CF CUBIC FOOT CFM CUBIC FEET PER MINUTE CHW CHILLED WATER CO CLEAN OUT CU CONDENSING UNIT CV CONSTANT VOLUME CW CONDENSER WATER DA DRY AIR DB DRY BULB (TEMPERATURE) DB DECIBEL (UNIT OF LOGARITHMIC SOUND POWER OR SOUND PRESSURE RATIO) DDC DIRECT DIGITAL CONTROL DG DOOR GRILLE DP DIFFERENTIAL PRESSURE DT DIFFERENTIAL TEMPERATURE DX DIRECT EXPANSION (COIL) EA EACH E/A EXHAUST AIR EAT ENTERING AIR TEMPERATURE EDH ELECTRIC DUCT HEATER EEF EMERGENCY EXHAUST FAN (E.H.P,A.) EF EXHAUSTFAN EG EXHAUST GRILLE FMCS ENERGY MANAGEMENT & CONTROL SYSTEM ESP EXTERNAL STATIC PRESSURE EWT ENTERING WATER TEMPERATURE F &BPD FACE & BY -PASS DAMPER FBC FLORIDA BUILDING CODE - BUILDING FBC -M FLORIDA BUILDING CODE - MECHANICAL F FIRE DAMPER FEEC FLORIDA ENERGY EFFICIENCY CODE FLA FULL LOAD AMPS FPF FINS PER FOOT (IN THE COIL) FIDI FINS PER INCH (IN THE COIL) FPM FEET PER MINUTE FPS FEET PER SECOND GPM GALLONS PER MINUTE H HUMIDISTAT HP HORSEPOWER HVAC HEATING VENTILATION AND AIR CONDITIONING IAQ INDOOR AIR QUALITY ID INSIDE DIAMETER KW KILOWATT = 1000 WATTS LAT LEAVING AIR TEMPERATURE LAT LATENT (HEAT LOAD) L.B POUND (UNIT OF MASS) LWT LEAVING WATER TEMPERATURE MAT MIXED AIR TEMPERATURE MAX MAXIMUM M MOTORIZED MBH THOUSANDS OF BTUS PER HOUR MUA MAKE UP AIR NC NOISE CRITERIA O/A OUTDOOR AIR OAD OUTDOOR AIR DAMPER OAF OUTSIDE AIR FAN OAI OUTDOOR AIR INTAKE OAL OUTDOOR AIR LOUVER OAR OUTDOOR AIR RELIEF PCF POUNDS PER CUBIC FOOT PD PRESSURE DIFFERENTIAL PSI POUNDS PER SQUARE INCH R/A RETURN AIR RE RELIEF EXHAUST CAP REF RELIEF EXHAUST FAN RG RETURN GRILLE RH RELATIVE HUMIDITY ( %) RPM REVOLUTIONS PER MINUTE RV RELIEF VENT S SMOKE DAMPER S/A SUPPLY AIR SAT SUPPLY AIR TEMPERATURE SAT SATURATION, SATURATED SCBA SELF CONTAINED BREATHING APPARATUS SCT SATURATION CONDENSING TEMPERATURE SD SMOKE DETECTOR SEN SENSIBLE (HEAT LOAD) SF SUPPLY FAN SIT SENSIBLE HEAT SHG SENSIBLE HEAT GAIN SHR SENSIBLE HEAT RATIO SMACNASHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION SREF STATE REQUIREMENTS FOR EDUCATIONAL FACILITIES SST SATURATION SUCTION TEMPERATURE SZ SINGLE ZONE (TYPE OF AHU) T THERMOSTAT L TD TRANSFER DUCT TG TRANSFER GRILLE TR TRANSFER REGISTER TSP TOTAL STATIC PRESSURE TU TERMINAL UNIT UC DOOR UNDERCUT (IN HVAC DRAWINGS) V VOLTS VAV VARIABLE AIR VOLUME (TYPE OF HVAC EQUIPMENT) VD VOLUME DAMPER VFD VARIABLE FREQUENCY DRIVE W WATT (UNIT OF POWER) WB WET BULB (TEMPERATURE) WPD WATER PRESSURE DIFFERENTIAL EQUIPMENT SPECIFICATIONS: SUPPLY, RETURN, OUTSIDE AIR, TRANSFER; AND EXHAUST AIR DUCTWORK: SHALL BE GALVANIZED SHEET STEEL, DESIGNED, CONSTRUCTED AND INSTALLED PER SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS- METAL AND FLEXIBLE" MANUAL, LATEST EDITION, STATIC PRESSURE CLASSIFICATION AS FOLLOWS: 3" STATIC PRESSURE: SUPPLY AIR AND RETURN AIR DUCTWORK. 2" STATIC PRESSURE: OUTSIDE AIR, TRANSFER DUCTS AND EXHAUST AIR DUCTWORK. EXTERIOR DUCTWORK INSULATION: SHALL BE 2.2 INCH THICK, 3/4 PCF DENSITY FIBERGLASS BLANKET WITH UL APPROVED ALUMINUM FOIL VAPOR SEAL JACKET REINFORCED WITH FIBERGLASS SCRIM, LAMINATED TO 30 LB. KRAFT PAPER, R = 6.0 MINIMUM. JACKET TO BE LAPPED NOT LESS THAN TWO INCHES AT ALL JOINTS AND SEAMS, AND SEALED WITH A VAPOR - RETARDER MASTIC. INSTALLED THICKNESS OF INSULATION SHALL NOT BE LESS THAN TWO INCHES. FLEXIBLE DUCTWORK: SHALL BE CLASS 1, UL STANDARD 181, INSULATED ROUND DUCT BY THERMAFLEX MKE OR FLEXMASTER 8M; R -6 MINIMUM. FACTORY FABRICATED WITH AN OUTER JACKET ENCLOSING 1 -1f2 INCH THICK GLASS FIBER INSULATION AROUND A CONTINUOUS METAL INNER LINER. GLASS - REINFORCED SILVER MYLAR OUTER JACKET WITH A CONTINUOUS HANGING TAB. INSULATE THE FOLLOWING DUCT SYSTEMS: INDOOR CONCEALED / EXPOSED SUPPLY AND RETURN AIR DUCTWORK. FLEXIBLE CONNECTORS: SHALL BE STANDARD METAL -EDGED CONNECTOR BY VENTFABRICS OR EQUAL. FACTORY FABRICATED WITH A STRIP OF NONCOMBUSTIBLE FABRIC 3 -1/2" INCHES WIDE ATTACHED TO TWO STRIPS OF 2 -3/4 INCH WIDE, .028- INCH - THICK, GALVANIZED SHEET STEEL. RECTANGULAR MANUAL VOLUME. DAMPERS: SHALL BE RUSKIN MODEL MD35 OR EQUAL. MULTIPLE OPPOSED BLADE OR SINGLE BLADE, FURNISHED COMPLETE WITH FACTORY FABRICATED LOCKING HAND QUADRANT. PROVIDE WITH 2" STAND -OFF WHEN INSTALLED ON EXTERNALLY INSULATED DUCT. DUCT SUPPORTS: SHALL BE GALVANIZED SHEET STEEL STRAP. WIDTH, GAGE AND SUPPORT INTERVALS PER SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS - -METAL AND FLEXIBLE" MANUAL, LATEST EDITION. CEILING DIFFUSER, RETURN, EXHAUST GRILLE /REGISTER: AS SCHEDULED GENERAL DEMOLITION NOTES: 1. THE CONTRACTOR IS RESPONSIBLE FOR VISITING THE SITE OF THE WORK AND BECOMING FAMILIAR WITH THE CONDITIONS OF THE WORK PRIOR TO SUBMITTING A BID. THE CONTRACTOR IS REQUIRED TO BECOME FAMILIAR WITH ALL THE CONTRACT DOCUMENTS PERTAINING TO THE PROPOSED WORK. THE SUBMISSION OF A BID SHALL BE SUFFICIENT TO ESTABLISH THAT THE CONTRACTOR HAS INVESTIGATED THE SITE OF THE WORK AND IS SATISFIED AS TO ALL REASONABLE CONDITIONS TO BE ENCOUNTERED, THE WORK TO BE PERFORMED AND THE MATERIALS TO BE PROVIDED IN THE COMPLETION OF THE PROJECT. 2. FAILURE OF BIDDERS TO MAKE REQUIRED VISITATIONS AND /OR INVESTIGATIONS TO INFORM THEMSELVES FULLY OF EXISTING CONDITIONS, AND TO INCLUDE IN THEIR PROPOSALS A SUM SUFFICIENT 1'0 COVER ALL POSSIBLE FIELD CONDITIONS, WILL NOT IN ANY WAY ENTITLE THEM TO ANY EXTRA CHARGES OVER AND ABOVE 'THEIR ORIGINAL PROPOSALS. 3. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT PROPERTY IN AREAS WHERE WORK IS BEING CONDUCTED. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGES CAUSED TO BUILDING COMPONENTS DUE TO DEMOLITION OPERATIONS. PATCH AND REPAIR EXISTING SURFACES DAMAGED AS REQUIRED TO MATCH ADJACENT SURFACES. 4. REMOVE, CUT, ALTER, REPLACE, PATCH AND REPAIR EXISTING WORK AS NECESSARY TO INSTALL NEW WORK, EXCEPT AS OTHERWISE SHOWN OR SPECIFIED. DO NOT CUT ALTER OR REMOVE ANY STRUCTURAL WORK AND DO NOT DISTURB ANY DUCTS, PLUMBING, ELECTRICAL WORK, WALLS, CEILING, PARTITIONS OR FLOORS. MECHANICAL AND ELECTRICAL WORK DISTURBED OR REMOVED AS A RESULT OF PERFORMING REQUIRED NEW WORK SHALL BE REFINISHED AND LEFT IN AS GOOD CONDITION AS EXISTED BEFORE .COMMENCING WORK. EXISTING WORK TO BE ALTERED OR EXTENDED AND THAT IS FOUND TO BE DEFECTIVE IN ANY WAY, SHALL BE REPORTED TO THE ARCHITECT BEFORE IT IS DISTURBED. MATERIALS AND WORKMANSHIP USED IN RESTORING WORK, SHALL CONFORM IN TYPE AND QUALITY TO THAT OF ORIGINAL EXISTING CONSTRUCTION, EXCEPT AS OTHERWISE SHOWN OR SPECIFIED. 5. ALL SERVICE LINES SUCH AS WIRES, CABLES, CONDUITS, DUCTS, PIPES AND THEIR HANGERS OR SUPPORTS, WHICH ARE TO BE ABANDONED BUT ARE NOT REQUIRED TO BE ENTIRELY REMOVED SHALL BE SEALED, CAPPED OR PLUGGED IN CEILINGS, WITHIN FURRED SPACES, IN UNFINISHED AREAS, OR WITHIN WALL_ OR PARTITIONS SO THAT THEY ARE COMPLETELY BEHIND PLASTERED AREAS, OR OTHER FINISHED SURFACES. ABANDONED LINES MUST BE CAPPED AT BOTH ENDS, SO THAT NO DEAD ENDS ARE LEFT. AIR DISTRIBUTION LEGEND DOUBLE WALL INSULATED DUCT (SEE NOTE v3) NO DUCT SMOKE DETECTOR .DIRECTION OF FLOW TYPE OF DIFFUSER SIZE OF DIFFUSER AMOUNT OF CFM "- - �\ 1w " X� cJ O .... ,. DAD SD AP AD O 6200 S.W. 73rd STREET X SMOKE DAMPERS) DUCT: FIRST FIGURE IS SIDE SHOWN, SIZES ARE INSIDE DIMENSION. [--- - 20 X 10 FIRE RATED ENCLOSURE OVAL DUCT SECTION NUMBER DRAWING NUMBER - � WHERE LOCATED FIRE RATED ROOF /FLOOR CEILING ASSEMBLY 20 X 10 ¢ X FIRE STOPPING ROUND DUCT DUCT MTD. SMOKE DETECTOR VV/REMOTE � TEST LIGHT SWITCH (PROVIDE ACCESS DOOR) SMOKE CONTROL 20 1 G1 L�L `} EXISTING DUCTWORK OR 'E MAIN EQUIPMENT TO ACCESS PANEL /DOOR FC / V ^n V V V nnn I AD ❑ EDH E $O J UF-. EXISTING DUCTWORK OR EQUIPMENT TO BE REMOVED FLEXIBLE DUCT, FLEXIBLE CONNECTION (FC) DUCT RISE IN DIRECTION OF FLOW ELECT, STRIP HEATER (MUST USE ACC, DOOR) architect R i PROJ. No. 22016 CA 924 DUCT DROP IN DIRECTION OF FLOW CONSULTING ENGINEERS D� FAN, WALL, ROOF VD v TRANSITION RECTANGULAR TO ROUND UNDERCUT DOOR DUCT WITH CAPPED END AIR FLOW MEASURING DEVICE A,F,M.D. TO O z I lu A.D. ❑ DUCT SECTION: SUPPLY RETURN THERMOSTAT ALL ELBOWS MUST BE PROVIDED WITH TURNING VANES WHETHER SHOWN OR NOT ON DWGS. HUMIDISTAT TYP, 45° TAP -OFF WITH VOLUME DAMPER POINT OF CONNECTION BETWEEN NEW AND EXISTING WORK MOTORIZED DAMPER WITH ACCESS DOOR R CAP I A•D' ❑ F A.D. ❑ S DEMOLITION TO THIS POINT SPUTTER DAMPER COMBINATION FIRE /SMOKE DAMPER (MUST USE ACCESS DOOR) FIRE DAMPER (MUST USE ACCES DOOR) NoL to scale SMOKE DAMPER (MUST USE ACCESS DOOR) NOTES I. 45 ° TAP - OFF =S, SPLITTERS AT EACH TAP -OFF AND TEE, AND ACCESS DOORS SHALL BE USED WHERE REQUIRED, WHETHER OR NOT INDICATED IN THE DRAWINGS. 2. IN AREAS WHERE NON - REMOVABLE CEILINGS ARE USED, PROVIDE 45° TAP -OFFS OF THE FIXED TYPE, WITH WIDTH PROPORTIONAL TO BRANCH CFM. 6. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR ALL EXISTING CONSTRUCTION, INCLUDING EXISTING TO REMAIN AND TO BE REMOVED. ITEMS AND DEBRIS TO BE REMOVED WILL BE PROPERLY DISPOSED OF BY THE CONTRACTOR, WITHIN HIS CONTRACT, AT NO COST TO THE OWNER. 7. CONTRACTOR SHALL PROVIDE DURING DEMOLITION OPERATIONS ALL SAFETY MEASURES AND FEATURES AS REQUIRED BY THE APPLICABLE CODES, RULES AND REGULATIONS HAVING JURISDICTION OVER THE PROJECT. 8. THE DEMOLITION DRAWINGS ARE ONLY TO ASSIST IN SHOWING THE SCOPE OF DEMOLITION WORK AND ARE NOT INTENDED TO INDICATE ALL DEMOLITION. CONTRACTOR SHALL REMOVE ALL EXISTING ITEMS AS REQUIRED TO PROPERLY COMPLETE ALL THE WORK INDICATED IN THE CONTRACT DOCUMENTS. 9. ANY UTILITY LINES TO REMAIN AND THAT ARE BROKEN OR DAMAGED DURING DEMOLITION OPERATIONS SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL CHARGE TO THE CONTRACT PRICE. 10. HOLES AND OPENINGS ON THE BUILDING CEILING SLAB AND WALLS THAT REMAIN AFTER THE DEMOLITION SHALL BE PATCHED TO MATCH THE EXISTING CEILING SLAB AND WALL CONSTRUCTION" 11. ALL WORK SHALL BE COORDINATED WITH ALL OTHER TRADES AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION OF EQUIPMENT. ANY DISCREPANCIES BETWEEN THE WORK DEPICTED ON THESE DOCUMENTS AND THE ACTUAL CONDITIONS ENCOUNTERED SHALL BE BROUGHT PROMPTLY TO THE ENGINEER FOR REVIEW AND CLARIFICATION. 12. DUST CONTAINMENT: CONTRACTOR SHALL PROVIDE VISQUEEN BARRIERS AROUND CORRIDOR AREAS WHERE DEMOLITION WORK IS BEING PERFORMED. BARRIERS SHOULD HAVE NO HOLES OR GAPS BETWEEN THEM. THERE SHALL ALSO BE NO GAPS BETWEEN THE CEILING AND THE BARRIER, AND BETWEEN THE FLOOR AND THE BARRIER. ALL EDGES OF BARRIERS SHALL BE COMPLETELY SEALED OFF. CONTRACTOR SHALL ALSO HAVE STICKY FLOOR MATS IN PLACE AROUND THE WORK AREAS. 13. AREA OF CONSTRUCTION SHALL BE MAINTAINED UNDER NEGATIVE PRESSURE IN RELATION TO SURROUNDING AREAS. THE CONSTRUCTION AREAS TO BE TESTED WEEKLY TO ASSURE A NEGATIVE PRESSURE OF 0.02 INCHES WATER GAUGE IN BEING MAINTAINED WHEN ALL DOORS AND WINDOWS ARE CLOSED. ALL AIR OUTLETS AND WALL PENETRATIONS SHALL BE BLOCKED OF TO MAINTAIN NEGATIVE PRESSURE IN THE SPACE. THE CONTRACTOR SHALL UTILIZE ALL EXISTING EXHAUST FANS TO EXHAUST THE CONSTRUCTION AREA TO MAINTAIN NEGATIVE PRESSURE. IF ADDITIONAL EXHAUST IS REQUIRED, CONTRACTOR WILL PROVIDE A TEMPORARY EXHAUST FAN. HVAC DESIGN REQUIRES: YES NO DUCT SMOKE DETECTOR X FIRE DAMPER(S) 6200 S.W. 73rd STREET X SMOKE DAMPERS) X owner FIRE RATED ENCLOSURE X FIRE RATED ROOF /FLOOR CEILING ASSEMBLY X FIRE STOPPING X SMOKE CONTROL X RELATIVE PRESSURE (0) = EQUAL PRESSURE ( -) NEGATIVE PRESSURE ( +) = POSITIVE PRESSURE SOUTH MIAMI HOSPITAL SUNSET CAFE CAFETERIA RENOVATION 6200 S.W. 73rd STREET MIAMI, FL 33143 owner General Contractor E NGINEERING La) A DALY IN ERWRSS EST. 1915 3390 Mary Street, Suite 216 Miami Florida 33 "133 USA T: 305.461 .9460 F: 305.461-3686 architect Associa Lc Archiler_L PROJ. No. 22016 CA 924 LOUIS J. AGUIRRE & ASSOCIATES P.A. CONSULTING ENGINEERS 9150 SOUTH DADELAND BLVD. SUITE 900 MIAMI, FLORIDA 33156 TELEPHONE: (305) 670 -0141 FAX: (305) 670 -0144 www.ljcapa.com N CAFETERIA NoL to scale 061 -1 0064 -020 Architects Projeo Nurnber FOR PERMIT Drawing ISSUe 11/13/2012 REVISIONS NO. DESCRIPTION DATE LEO A DAILY COMPANY Copyright 2012 .a. !'ar'Fily +60, >dgi)+} iJ f HANI AL :� RGIO SCR ANO P.E. LICENSE u 57864 s<<d GENERAL NOTES, SYMBOL LEGEND HVAC Shari Title M0,00 Sheet Number