Loading...
13-62-009DEMOLITION PLAN SCALE: 1/8"=l'-O" 4' 0 4' 8' Ill SCALE: 1/8"=1'-0" w, ll 1 a.A NI G I,., 03 T. ZA1 1,3EC "�li��. ?Y: 9 i ' i4l;® DEMOLITION NOTES SCOPE OF WORK LEGEND UDq DAY ENGINIOERSNGE 8 EST. 1915 3390 Mary Street, Suite 216 Miami Florida 33133 USA T: 305.461 .9480 F: 305.461 .3686 Architect O REMOVE FLOORING WITHIN DESIGNATED AREA, INCLUDING APPLICABLE ADHESIVES, 9 O COORDINATE RELOCATION OF SPRINKLER HEADS TO ACCOMMODATE NEW LAY OUT. 1 THIS DRAWING INDICATES GENERAL SCOPE FOR DEMOLITION. IT IS NOT INTENDED TO 9 PATCH AND REPAIR ALL EXISTING SURFACES DAMAGED BY DEMOLITION AND/OR ANY TRANSITION STRIP AND WALL BASES DOWN TO BARE SUBSTRATE. PREPARE REFER TO FIRE PROTECTION PLAN. EXISTING PARTITION TO REMAIN _ 061 - 10064 -020 DEPICT ALL THE DEMOLITION REQUIRED TO COMPLETE THE JOB. Architects Project Number FOR PERMIT 11/13/2012 Drawing Issue NEW WORK AS REQUIRED TO MATCH ADJACENT SURFACES AND /OR AS REQUIRED SURFACE FOR NEW FINISH. 10 REMOVE SUPPLY AND RETURN AIR DIFFUSERS. COORDINATE WITH NEW CEILING NO. 2 GENERAL CONTRACTOR TO PROVIDE PERMITS AND NOTICES AUTHORIZING DEMOLITION. FOR NEW SCHEDULED FINISHES. 2A REMOVE PARTITION ENTIRELY INDICATED BY DASHED LINES. COORDINATE WITH PLAN AND MECHANICAL DRAWINGS FOR NEW LOCATIONS. COORDINATE WITH BLDG. j EXISTING NOT IN THE SCOPE OF WORK 10 GENERAL CONTRACTOR SHALL PERFORM DEMOLITION IN ACCORDANCE WITH CONSTRUCTION FLOOR PLAN FO FO R NEW LAYOUT. MANAGEMENT FOR FINAL DESTINATION OF UNUSED FIXTURES. 3 GENERAL CONTRACTOR SHALL COORDINATE DEMOLITION WORK WITH OFFICE APPLICABLE AUTHORITIES HAVING JURISDICTION. 2B REMOVE HEADER ENTIRLEY AS INDICATED BY DASHED LINES. COORDINATE WITH 11 REMOVE MILLWORK AS INDICATED BY DASHED LINES. MANAGEMENT. PRIOR TO START OF DEMOLITION WORK, CONTRACTOR SHALL NOTIFY _----- ----------- - - - - -_ EXISTING PARTITION TO BE REMOVED ADMINISTRATION OF INTENT TO START AND PROVIDE SUFFICIENT ADVANCE NOTICE 11 IF THERE ARE DOORS AND FRAMES, FIXTURES, ETC. TO REMOVE, SHOULD BE CONSTRUCTION FLOOR PLAN FOR NEW LAYOUT. DEMOLITION PLAN, LEGENDS & NOTES Sheet Title FOR APPROVAL. COORDINATED WITH BLDG. MANAGEMENT FOR DETERMINATION OF RE —USE AND /OR AO,03 Sheet Number 12 REMOVE AND RELOCATE EXISTING FIRE EXTINGUISHERS. – — — — — — — — — — — – EXISTING MILLWORK TO BE REMOVED FINAL DESTINATION. 3� REMOVE ALL UNUSED /ABANDONED DUCTWORK, CHASES, PIPING & CONDUIT ABOVE 4 CUT, REMOVE, PATCH, ALTER AND REFINISH EXISTING CONSTRUCTION AS RESULT OF EXISTING CEILING TO ACCOMMODATE NEW "OPEN TO DECK" LAYOUT. GENERAL 13 REMOVE ALL WALL FINISHES. PATCH AND REPAIR FOR NEW DEMOLITION AND AS REQUIRED TO LEAVE WORK COMPLETE AND IN SATISFACTORY 12 GENERAL CONTRACTOR SHALL REMOVE FROM SITE, CONTAMINATED, CONTRACTOR TO COORDINATE W/ BUILDING MANAGEMENT THE STATUS OF ALL SCHEDULED FINISHES. CONDITION. VERMIN— INFESTED OR DANGEROUS MATERIALS ENCOUNTERED AND DISPOSE OF BY ITEMS TO BE REMOVED TO NOT INTERRUPT SERVICE THROUGHOUT THE BUILDING. SAFE MEANS SO AS NOT TO ENDANGER HEALTH OF WORKERS OR PUBLIC. SEE MEP DWGS. FOR ADDITIONAL INFORMATION. 14 CAREFULLY REMOVE EXISTING KITCHEN EQUIPMENT. COORDINATE 5 PROVIDE SAFETY FEATURES DURING WORK AS REQUIRED BY APPLICABLE CODES, STORAGE AND RELOCATION WITH BHSF PRIOR TO DEMOLITION. RULES AND REGULATIONS. 13 CONTRACTOR SHALL INSPECT CEILINGS AND CHASES TO ASSURE PROPER ® REMOVE DOOR, FRAME AND ASSOCIATED HARDWARE, CLEAN, REFURBISH AND STORE � IDENTIFICATION OF UTILITIES (MECHANICAL, PLUMBING AND /OR ELECTRICAL). FOR POSSIBLE RE —USE, COORDINATE WITH BLDG. MANAGEMENT. SAND. PRIME AND PAINT EXISTING DOOR WITH SCHEDULED FINISH. 6 GENERAL CONTRACTOR SHALL CEASE OPERATIONS AND NOTIFY THE ARCHITECT / ENGINEER IMMEDIATELY IF SAFETY OF STRUCTURE APPEARS TO BE ENDANGERED. 14 FOR MECHANICAL, PLUMBING, ELECTRICAL AND FIRE PROTECTION SCOPE OF WORK ® REMOVE UNUSED ELECTRICAL /DATA AND ASSOCIATED BOXES, WIRING AND CONDUIT 5 O SAND, PRIME AND PAINT EXISTING FRAME WITH SCHEDULED FINISH. TAKE PRECAUTIONS TO PROPERLY SUPPORT STRUCTURE. DO NOT RESUME REFER TO MECHANICAL, PLUMBING, ELECTRICAL AND FIRE PROTECTION DRAWINGS. BACK TO ORIGIN. SEE ELECTRICAL DWGS. FOR ADDITIONAL INFORMATION. OPERATION UNTIL SAFETY IS RESTORED. 16 REMOVE DECORATIVE PANEL SURROUNDING TRAY RETURN WINDOW. 15 CONTRACTOR TO X —RAY SLAB PRIOR TO ANY PENETRATIONS IF APPLICABLE. 6 O REMOVE PLUMBING FIXTURE AND ACCESSORIES. CAP WATER SANITARY AND VENT IF 7 ALL DEMOLITION IS DENOTED BY BROKEN LINES. SEE LEGEND COORDINATE WITH BLDG.. MANAGEMENT. REQUIRED, REFER TO PLUMBING DRAWING FOR ADDITIONAL INFORMATION, 17 REMOVE HOLLOW METAL FRAME. 8 GENERAL CONTRACTOR SHALL DEMOLISH IN AN ORDERLY AND CAREFUL MANNER, AS O REMOVE ACOUSTICAL CEILING TILE AND SUSPENSION CEILING SYSTEM, SEE MEP REQUIRED TO ACCOMMODATE NEW WORK INCLUDING THAT REQUIRED FOR DWGS. FOR ADDITIONAL INFORMATION CONNECTION TO THE EXISTING BUILDING. PROTECT EXISTING FOUNDATIONS AND SUPPORTING STRUCTURAL MEMBERS. ® REMOVE LIGHT FIXTURES. COORDINATE WITH BLDG. MANAGEMENT FOR FINAL DESTINATION OF UNUSED FIXTURES. SOUTH MIAMI HOSPITAL SUNSET CAFE CAFETERIA RENOVATION 6200 S.W. 73rd STREET MIAMI, FL 33143 Owner General Contractor UDq DAY ENGINIOERSNGE 8 EST. 1915 3390 Mary Street, Suite 216 Miami Florida 33133 USA T: 305.461 .9480 F: 305.461 .3686 Architect Associate Architect N CAFETERIA Not to Scale _ 061 - 10064 -020 Architects Project Number FOR PERMIT 11/13/2012 Drawing Issue REVISIONS NO. DESCRIPTION DATE LEO A DALY COMPANY Copyright 2012 •< e SERGIO PENDAS, AIA REGISTERED ARCHITECT AR 0013943 Seal DEMOLITION PLAN, LEGENDS & NOTES Sheet Title AO,03 Sheet Number