13-62-009DEMOLITION PLAN
SCALE: 1/8"=l'-O"
4' 0 4' 8'
Ill
SCALE: 1/8"=1'-0"
w, ll 1 a.A NI G I,., 03 T.
ZA1 1,3EC "�li��.
?Y:
9
i
' i4l;®
DEMOLITION
NOTES
SCOPE OF
WORK
LEGEND
UDq DAY ENGINIOERSNGE
8
EST. 1915
3390 Mary Street, Suite 216
Miami Florida 33133 USA
T: 305.461 .9480 F: 305.461 .3686
Architect
O
REMOVE FLOORING WITHIN DESIGNATED AREA, INCLUDING APPLICABLE ADHESIVES,
9
O
COORDINATE RELOCATION OF SPRINKLER HEADS TO ACCOMMODATE NEW LAY OUT.
1
THIS DRAWING INDICATES GENERAL SCOPE FOR DEMOLITION. IT IS NOT INTENDED TO
9
PATCH AND REPAIR ALL EXISTING SURFACES DAMAGED BY DEMOLITION AND/OR
ANY TRANSITION STRIP AND WALL BASES DOWN TO BARE SUBSTRATE. PREPARE
REFER TO FIRE PROTECTION PLAN.
EXISTING PARTITION TO REMAIN
_
061 - 10064 -020
DEPICT ALL THE DEMOLITION REQUIRED TO COMPLETE THE JOB.
Architects Project Number
FOR PERMIT
11/13/2012
Drawing Issue
NEW WORK AS REQUIRED TO MATCH ADJACENT SURFACES AND /OR AS REQUIRED
SURFACE FOR NEW FINISH.
10
REMOVE SUPPLY AND RETURN AIR DIFFUSERS. COORDINATE WITH NEW CEILING
NO.
2
GENERAL CONTRACTOR TO PROVIDE PERMITS AND NOTICES AUTHORIZING DEMOLITION.
FOR NEW SCHEDULED FINISHES.
2A
REMOVE PARTITION ENTIRELY INDICATED BY DASHED LINES. COORDINATE WITH
PLAN AND MECHANICAL DRAWINGS FOR NEW LOCATIONS. COORDINATE WITH BLDG.
j EXISTING NOT IN THE SCOPE OF WORK
10
GENERAL CONTRACTOR SHALL PERFORM DEMOLITION IN ACCORDANCE WITH
CONSTRUCTION FLOOR PLAN FO
FO R NEW LAYOUT.
MANAGEMENT FOR FINAL DESTINATION OF UNUSED FIXTURES.
3
GENERAL CONTRACTOR SHALL COORDINATE DEMOLITION WORK WITH OFFICE
APPLICABLE AUTHORITIES HAVING JURISDICTION.
2B
REMOVE HEADER ENTIRLEY AS INDICATED BY DASHED LINES. COORDINATE WITH
11
REMOVE MILLWORK AS INDICATED BY DASHED LINES.
MANAGEMENT. PRIOR TO START OF DEMOLITION WORK, CONTRACTOR SHALL NOTIFY
_----- ----------- - - - - -_ EXISTING PARTITION TO BE REMOVED
ADMINISTRATION OF INTENT TO START AND PROVIDE SUFFICIENT ADVANCE NOTICE
11
IF THERE ARE DOORS AND FRAMES, FIXTURES, ETC. TO REMOVE, SHOULD BE
CONSTRUCTION FLOOR PLAN FOR NEW LAYOUT.
DEMOLITION PLAN,
LEGENDS & NOTES
Sheet Title
FOR APPROVAL.
COORDINATED WITH BLDG. MANAGEMENT FOR DETERMINATION OF RE —USE AND /OR
AO,03
Sheet Number
12
REMOVE AND RELOCATE EXISTING FIRE EXTINGUISHERS.
– — — — — — — — — — — – EXISTING MILLWORK TO BE REMOVED
FINAL DESTINATION.
3�
REMOVE ALL UNUSED /ABANDONED DUCTWORK, CHASES, PIPING & CONDUIT ABOVE
4
CUT, REMOVE, PATCH, ALTER AND REFINISH EXISTING CONSTRUCTION AS RESULT OF
EXISTING CEILING TO ACCOMMODATE NEW "OPEN TO DECK" LAYOUT. GENERAL
13
REMOVE ALL WALL FINISHES. PATCH AND REPAIR FOR NEW
DEMOLITION AND AS REQUIRED TO LEAVE WORK COMPLETE AND IN SATISFACTORY
12
GENERAL CONTRACTOR SHALL REMOVE FROM SITE, CONTAMINATED,
CONTRACTOR TO COORDINATE W/ BUILDING MANAGEMENT THE STATUS OF ALL
SCHEDULED FINISHES.
CONDITION.
VERMIN— INFESTED OR DANGEROUS MATERIALS ENCOUNTERED AND DISPOSE OF BY
ITEMS TO BE REMOVED TO NOT INTERRUPT SERVICE THROUGHOUT THE BUILDING.
SAFE MEANS SO AS NOT TO ENDANGER HEALTH OF WORKERS OR PUBLIC.
SEE MEP DWGS. FOR ADDITIONAL INFORMATION.
14
CAREFULLY REMOVE EXISTING KITCHEN EQUIPMENT. COORDINATE
5
PROVIDE SAFETY FEATURES DURING WORK AS REQUIRED BY APPLICABLE CODES,
STORAGE AND RELOCATION WITH BHSF PRIOR TO DEMOLITION.
RULES AND REGULATIONS.
13
CONTRACTOR SHALL INSPECT CEILINGS AND CHASES TO ASSURE PROPER
®
REMOVE DOOR, FRAME AND ASSOCIATED HARDWARE, CLEAN, REFURBISH AND STORE
�
IDENTIFICATION OF UTILITIES (MECHANICAL, PLUMBING AND /OR ELECTRICAL).
FOR POSSIBLE RE —USE, COORDINATE WITH BLDG. MANAGEMENT.
SAND. PRIME AND PAINT EXISTING DOOR WITH SCHEDULED FINISH.
6
GENERAL CONTRACTOR SHALL CEASE OPERATIONS AND NOTIFY THE ARCHITECT /
ENGINEER IMMEDIATELY IF SAFETY OF STRUCTURE APPEARS TO BE ENDANGERED.
14
FOR MECHANICAL, PLUMBING, ELECTRICAL AND FIRE PROTECTION SCOPE OF WORK
®
REMOVE UNUSED ELECTRICAL /DATA AND ASSOCIATED BOXES, WIRING AND CONDUIT
5
O
SAND, PRIME AND PAINT EXISTING FRAME WITH SCHEDULED FINISH.
TAKE PRECAUTIONS TO PROPERLY SUPPORT STRUCTURE. DO NOT RESUME
REFER TO MECHANICAL, PLUMBING, ELECTRICAL AND FIRE PROTECTION DRAWINGS.
BACK TO ORIGIN. SEE ELECTRICAL DWGS. FOR ADDITIONAL INFORMATION.
OPERATION UNTIL SAFETY IS RESTORED.
16
REMOVE DECORATIVE PANEL SURROUNDING TRAY RETURN WINDOW.
15
CONTRACTOR TO X —RAY SLAB PRIOR TO ANY PENETRATIONS IF APPLICABLE.
6
O
REMOVE PLUMBING FIXTURE AND ACCESSORIES. CAP WATER SANITARY AND VENT IF
7
ALL DEMOLITION IS DENOTED BY BROKEN LINES. SEE LEGEND
COORDINATE WITH BLDG.. MANAGEMENT.
REQUIRED, REFER TO PLUMBING DRAWING FOR ADDITIONAL INFORMATION,
17
REMOVE HOLLOW METAL FRAME.
8
GENERAL CONTRACTOR SHALL DEMOLISH IN AN ORDERLY AND CAREFUL MANNER, AS
O
REMOVE ACOUSTICAL CEILING TILE AND SUSPENSION CEILING SYSTEM, SEE MEP
REQUIRED TO ACCOMMODATE NEW WORK INCLUDING THAT REQUIRED FOR
DWGS. FOR ADDITIONAL INFORMATION
CONNECTION TO THE EXISTING BUILDING. PROTECT EXISTING FOUNDATIONS AND
SUPPORTING STRUCTURAL MEMBERS.
®
REMOVE LIGHT FIXTURES. COORDINATE WITH BLDG. MANAGEMENT FOR FINAL
DESTINATION OF UNUSED FIXTURES.
SOUTH MIAMI HOSPITAL
SUNSET CAFE
CAFETERIA RENOVATION
6200 S.W. 73rd STREET
MIAMI, FL 33143
Owner
General Contractor
UDq DAY ENGINIOERSNGE
8
EST. 1915
3390 Mary Street, Suite 216
Miami Florida 33133 USA
T: 305.461 .9480 F: 305.461 .3686
Architect
Associate Architect
N
CAFETERIA
Not to Scale
_
061 - 10064 -020
Architects Project Number
FOR PERMIT
11/13/2012
Drawing Issue
REVISIONS
NO.
DESCRIPTION
DATE
LEO A DALY COMPANY Copyright 2012
•<
e
SERGIO PENDAS, AIA
REGISTERED ARCHITECT
AR 0013943
Seal
DEMOLITION PLAN,
LEGENDS & NOTES
Sheet Title
AO,03
Sheet Number