Loading...
13-62 (2)-002SOUTH MIAMI HOSPITAL - S N CAFE SET Ui� CAFETERIA -R-EN OVATION _62006W73rcl STREET MIAMI, FL 33143 LNwwww/_% WMLI IN"TEIRMOIRISII� 0 EST. 1915 5200 Blue Lagoon Drive, suite 700 Miami Florida 33126 USA T: 305.461.9480 F: 305.461.3686 Architect �TiZ�Zc3 KT" DEMOLITION PLAN 4% 0 4% 8' �_03 SCALE. 1/8*--1*-0* 11 0 N 3 km kmomw SCALE: 118"--1'-O" DEMOLITION NOTES SCOPE OF WORK LEGEND REMOVE FLOORING WITHIN DESIGNATED AREA, INCLUDING APPLICABLE ADHESIVES, COORDINATE RELOCATION OF SPRINKLER HEADS TO ACCOMMODATE NEW LAY OUT. 1 THIS DRAWING INDICATES GENERAL SCOPE FOR DEMOLITION. IT IS NOT INTENDED TO 9 PATCH AND REPAIR ALL EXISTING SURFACES DAMAGED BY DEMOLITION AND/OR ANY TRANSITION STRIP AND WALL BASES DOWN TO BARE SUBSTRATE. PREPARE REFER TO FIRE PROTECTION PLAN. EXISTING PARTITION TO REMAIN DEPICT ALL THE DEMOLITION REQUIRED TO COMPLETE THE JOB. NEW WORK AS REQUIRED TO MATCH ADJACENT SURFACES AND/OR AS REQUIRED SURFACE FOR NEW FINISH. FOR NEW SCHEDULED FINISHES. REMOVE SUPPLY AND RETURN AR DIFFUSERS. COORDINATE WITH NEW CEILING 2 GENERAL CONTRACTOR TO PROVIDE PERMITS AND NOTICES AUTHORIZING DEMOLITION. REMOVE PARTITION ENTIRELY AS INDICATED BY DASHED LINES. COORDINATE WITH PLAN AND MECHANICAL DRAWINGS FOR NEW LOCATIONS. COORDINATE WITH BLDG. EXISTING NOT IN THE SCOPE OF WORK 10 GENERAL CONTRACTOR SHALL PERFORM DEMOLITION IN ACCORDANCE WITH CONSTRUCTION FLOOR PLAN FOR NEW LAYOUT. MANAGEMENT FOR FINAL DESTINATION OF UNUSED FIXTURES. 3 GENERAL CONTRACTOR SHALL COORDINATE DEMOLITION WORK WITH OFFICE MANAGEMENT. PRIOR TO START OF DEMOLITION WORK, CONTRACTOR SHALL NOTIFY APPLICABLE AUTHORITIES HAVING JURISDICTION. REMOVE HEADER ENTIRLEY AS INDICATED BY DASHED LINES. COORDINATE WITH 11 REMOVE MILLWORK AS INDICATED BY DASHED LINES. ----------------------- EXISTING PARTITION TO BE REMOVED ADMINISTRATION OF INTENT TO START AND PROVIDE SUFFICIENT ADVANCE NOTICE 11 IF THERE ARE DOORS AND FRAMES, FIXTURES, ETC. TO REMOVE, SHOULD BE CONSTRUCTION FLOOR PLAN FOR NEW LAYOUT. FOR APPROVAL COORDINATED WITH BLDG. MANAGEMENT FOR DETERMINATION OF RE–USE AND/OR REMOVE ALL UNUSED/ABANDONED DUCTWORK, CHASES, PIPING & CONDUIT ABOVE @ REMOVE AND RELOCATE EXISTING FIRE EXTINGUISHERS. – — — — — — — — — — — – EXISTING MILLWORK TO BE REMOVED FINAL DESTINATION. 4 CUT, REMOVE, PATCH, ALTER AND REFINISH EXISTING CONSTRUCTION AS RESULT OF EXISTING CEILING TO ACCOMMODATE NEW "OPEN TO DECK" LAYOUT. GENERAL @ REMOVE ALL WALL FINISHES. PATCH AND REPAIR FOR NEW DEMOLITION AND AS REQUIRED TO LEAVE WORK COMPLETE AND IN SATISFACTORY 12 GENERAL CONTRACTOR SHALL REMOVE FROM SITE. CONTAMINATED, CONTRACTOR TO COORDINATE W/ BUILDING MANAGEMENT THE STATUS OF ALL SCHEDULED FINISHES. CONDITION. VERMIN–INFESTED OR DANGEROUS MATERIALS ENCOUNTERED AND DISPOSE OF BY ITEMS TO BE REMOVED TO NOT INTERRUPT SERVICE THROUGHOUT THE BUILDING. CAREFULLY REMOVE EXISTING KITCHEN EQUIPMENT. COORDINATE SAFE MEANS SO AS NOT TO ENDANGER HEALTH OF WORKERS OR PUBLIC. SE MEP DWGS. FOR ADDITIONAL INFORMATION. U4 STORAGE AND RELOCATION WITH BHSF PRIOR TO DEMOLITION. 5 PROVIDE SAFETY FEATURES DURING WORK AS REQUIRED BY APPLICABLE CODES, RULES AND REGULATIONS. 13 CONTRACTOR SHALL INSPECT CEILINGS AND CHASES TO ASSURE PROPER REMOVE DOOR, FRAME AND ASSOCIATED HARDWARE. CLEAN, REFURBISH AND STORE SCHEDULED FINISH. IDENTIFICATION OF UTILITIES (MECHANICAL, PLUMBING AND/OR ELECTRICAL). FOR POSSIBLE RE–USE. COORDINATE WITH BLDG. MANAGEMENT. SAND. PRIME AND PAINT EXISTING DOOR WITH 6 GENERAL CONTRACTOR SHALL CEASE OPERATIONS AND NOTIFY THE ARCHITECT SAND, PRIME AND PAINT EXISTING FRAME WITH SCHEDULED FINISH. ENGINEER IMMEDIATELY IF SAFETY OF STRUCTURE APPEARS TO BE ENDANGERED. 14 FOR MECHANICAL, PLUMBING, ELECTRICAL AND FIRE PROTECTION SCOPE OF WORK REMOVE UNUSED ELECTRICAL/DATA AND ASSOCIATED BOXES, WIRING AND CONDUIT TAKE PRECAUTIONS TO PROPERLY SUPPORT STRUCTURE. DO NOT RESUME OPERATION UNTIL SAFETY IS RESTORED. REFER TO MECHANICAL, PLUMBING, ELECTRICAL AND FIRE PROTECTION DRAWINGS. BACK TO ORIGIN. SEE ELECTRICAL DWGS. FOR ADDITIONAL INFORMATION. @ REMOVE DECORATIVE PANEL SURROUNDING TRAY RETURN WINDOW. 15 CONTRACTOR TO X–RAY SLAB PRIOR TO ANY PENETRATIONS IF APPLICABLE. REMOVE PLUMBING FIXTURE AND ACCESSORIES. CAP WATER SANITARY AND VENT IF 17 REMOVE HOLLOW METAL FRAME. ..Mdft 7 ALL DEMOLITION IS DENOTED BY BROKEN LINES. SEE LEGEND COORDINATE WITH BLDG.. MANAGEMENT. REQUIRED. REFER TO PLUMBING DRAWING FOR ADDITIONAL INFORMATION. 8 GENERAL CONTRACTOR SHALL DEMOLISH IN AN ORDERLY AND CAREFUL MANNER, AS REMOVE ACOUSTICAL CEILING TILE AND SUSPENSION CEILING SYSTEM. SE MEP QJ8 5 EXISTING EXPANSION JOINT. REMOVED COVER, CLEAN AND REQUIRED TO ACCOMMODATE NEW WORK INCLUDING THAT REQUIRED FOR DWGS. FOR ADDITIONAL INFORMATION PREPARE TO RECEIVE NEW COVER. CONNECTION TO THE EXISTING BUILDING. PROTECT EXISTING FOUNDATIONS AND @ EXISTING EXPANSION JOINT COVER TO REMAIN. CLEAN SUPPORTING STRUCTURAL MEMBERS. REMOVE LIGHT FIXTURES. COORDINATE WITH BLDG. MANAGEMENT FOR FINAL DESTINATION OF UNUSED FIXTURES. SOUTH MIAMI HOSPITAL - S N CAFE SET Ui� CAFETERIA -R-EN OVATION _62006W73rcl STREET MIAMI, FL 33143 LNwwww/_% WMLI IN"TEIRMOIRISII� 0 EST. 1915 5200 Blue Lagoon Drive, suite 700 Miami Florida 33126 USA T: 305.461.9480 F: 305.461.3686 Architect �TiZ�Zc3