Loading...
13-445-015RATED PENETRATION DETAIL SOLID CONCRETE WALL CONSTRUCTION A (D 4B CONCRETE BLOCK . CONSTRUCTION THROUGH- PENETRATION FIRESTOP SYSTEMS SYSTEM NO .0 -AJ -1064 SECTION A -A APRIL IT, 2006 F RATINGS 2, 3 & 4 HR (SEE ITEM 4 ) T RATING 0 HR W Rating -CLASS 1 (See ITEMS 2 AND 4) 1. FLOOR OR WALL ASSEMBLY - REINFORCED LIGHTWEIGHT OR NORMAL WEIGHT (100 -150 PCF (1600 -2400 KG /CU METER)) CONCRETE AS SPECIFIED IN THE TABLE IN ITEM 4 BELOW. FLOOR MAY ALSO BE CONSTRUCTED OF ANY UL CLASSIFIED HOLLOW -CORE PRECAST CONCRETE UNITS*. WALL MAY ALSO BE CONSTRUCTED OF ANY UL CLASSIFIED CONCRETE BLOCKS*. MAX DIAM OF SLEEVED OPENING IS 32 IN. (813 MM). MAX DIAM OF SLEEVED OPENING IN FLOORS CONSTRUCTED OF HOLLOW -CORE PRECAST CONCRETE UNITS IS 7 IN. (178 MM). SEE CONCRETE BLOCKS (CAZT) AND PRECAST CONCRETE UNITS (CFTV) CATEGORIES IN THE FIRE RESISTANCE DIRECTORY FOR NAMES OF MANUFACTURERS. 2. STEEL SLEEVE (OPTIONAL) -- NOM 32 IN. (813 MM) DIAM (OR SMALLER) SCHEDULE 10 (OR HEAVIER) STEEL PIPE SLEEVE CAST OR GROUTED INTO FLOOR OR WALL ASSEMBLY, FLUSH WITH BOTH SURFACES OF FLOOR OR WALL. AS AN OPTION, SLEEVE MAY EXTEND MAX 2 IN. ABOVE TOP SURFACE OF FLOOR OR BEYOND ONE OR BOTH SURFACES OF WALL. STEEL SLEEVE MAY BE USED IN 2 AND 3 HR F RATED SYSTEMS ONLY. W RATING APPLIES ONLY WHEN STEEL SLEEVE IS USED. 3. THROUGH PENETRANTS - ONE METALLIC PIPE, CONDUIT OR TUBING TO BE INSTALLED EITHER CONCENTRICALLY OR ECCENTRICALLY WITHIN THE FIRESTOP SYSTEM. PIPE, CONDUIT OR TUBING TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF FLOOR OR WALL ASSEMBLY. SEE TABLE IN ITEM 4 FOR SIZES OF PENETRANTS A, B, D AND E THAT MAY BE USED. SEE ITEM 3C BELOW FOR SIZE OF CONDUIT THAT MAY BE USED. THE ANNULAR SPACE SHALL BE AS SPECIFIED IN TABLE IN ITEM 4 BELOW. THE FOLLOWING TYPES AND SIZES OF METALLIC PIPES, CONDUITS OR TUBING MAY BE USED: A. STEEL PIPE - SCHEDULE 10 (OR HEAVIER) STEEL PIPE. B. IRON PIPE - CAST OR DUCTILE IRON PIPE. C. CONDUIT - NOM 4 IN. (102 MM) DIAM (OR SMALLER) STEEL ELECTRICAL METALLIC TUBING OR NOM 6 IN. (152 MM) DIAM (OR SMALLER) STEEL CONDUIT. D. COPPER TUBING - TYPE L (OR HEAVIER) COPPER TUBING. E. COPPER PIPE - REGULAR (OR HEAVIER) COPPER PIPE. 4. FIRESTOP SYSTEM - THE F RATING OF THE SYSTEM IS DEPENDENT UPON THE TYPE OF CONCRETE, THICKNESS OF CONCRETE, ANNULAR SPACE, FILL AND PACKING MATERIAL THICKNESS, PACKING MATERIAL DENSITY AND PENETRANT SIZE AS SHOWN IN THE TABLE BELOW: F MIN ANNULAR MIN MIN MIN PENETRANT RATING THICK SPACE THICK DENSITY THICK SIZE, HR CONCRETE IN. (MM) PACKING PACKING FILL IN. (MM) IN. (MM) 3 MTL MTL PCF MTL, DIAM 77 60 3 IN. (MM) (KG /CU IN. (MM) (OR SMALLER) 65 125 3 2A METER) 3 2B SPARE D, E (COPPER) A, B (STEEL IRON) 2 4 -1/2 1/2 - 3 -3/8 3 -1/2 6 (96) 1/2 (13) 4 (102) 16 (406) 3 (114) (13 TO 86) (89) 3 2 5 -1/2 0- 1 -7/8 5 4 (64) 1/2 (13) 4 (102) 16 (406) SHWP -3 (140) (0 TO 48) (127) 70 3 3C EF -4 3 4 -1/2 1/2 - 3 -3/8 3 -1/2 6 (96) 1/2 (13) 4 (102) 8 (203) (114) (13 TO 86) (89) 3E SPACE 3 4-1/2 0 - 2 -1/8 4 -1/4 4 (64) 1/4 (6) 6 (152) 30 (762) (114) (0 TO 54) (108) TOTAL DEMAND 143.10 172.2 4 5 -1/2 0- 1 -7/8 5 4 (64) 1f4 t13) 4 (102) $ (203) (140) (0 TO 48) (127) A. PACKING MATERIAL - MIN 3 -1/2, 4 -1/4 OR 5 IN. (89,108 OR 127 MM) THICKNESS OF MIN 4.0 OR 6.0 PCF (64 OR 96 KG /CU METER) MINERAL WOOL BATT INSULATION FIRMLY PACKED INTO OPENING AS A PERMANENT FORM AS SPECIFIED IN THE TABLE ABOVE. PACKING MATERIAL TO BE RECESSED FROM TOP SURFACE OF FLOOR OR FROM BOTH SURFACES OF WALL AS REQUIRED TO ACCOMMODATE THE REQUIRED THICKNESS OF FILL MATERIAL. B. FILL, VOID OR CAVITY MATERIAL* : CAULK - MIN r OR 1/2 1N. (6 OR 13 MM) THICKNESS OF FILL MATERIAL AS SPECIFIED IN THE TABLE ABOVE APPLIED WITHIN THE ANNULUS, FLUSH WITH TOP SURFACE OF FLOOR OR WITH BOTH SURFACES OF WALL. AT THE POINT CONTACT LOCATION BETWEEN PIPE AND CONCRETE OR SLEEVE , A MIN 1/2 IN. (13 MM) DIAM BEAD OF FILL MATERIAL SHALL BE APPLIED . TREMCO INC - FYRE -SIL (FLOORS OR WALLS) AND FYRE -SIL S.L. (FLOORS) *BEARING THE UL CLASSIFICATION MARK FP &L VAULT AVAILABLE FAULT CURRENT = 31,QOOA. - 5 SETS(4 *75OMCM -4 ®C.) PAVILION SWITCHBOARD MSN1 2000A. 3PH 0 4W,277/480 0 * N } t t (6 ] *�500A IMIM 11 a �) 0 1` tG 4 3 #3/0,1 #4G. IN 21C. SECTION °I" SECTION °2' mmm"o = f ma 30 HP VOLTAGE, 480Y/ 277 FAULT CURRENT(A) 20,525A NO DESCRIPTION -3 HP OC DEVICE 2OHP)SHWP EXISTING COOLING NEW COOLING 3 NEW CT -4 �.,,.:! SPARE IA EF_4 TOWER #4 TOWER #4 3 (3/4HP) rA2# r # MODIFY EXISTING SQUARE D MODEL 5 MOTOR 0 REMOVE ABANDONED MOTOR STARTER AND MOTOR CIRCUIT PROTECTOR AND PROVIDE NEW 3P,200A SQUARE D TYPE JJ CIRCUIT BREAKER IN EXISTING CONTROL - NECESSARY. CUBICLE MADE DEMOLITION OF EXISTING COOLING TOWER PROVIDE ALL NEW PHENOLIC ENGRAVED NAMEPLATES FOR MCC INCLUDING EACH CUBICLE AND LABEL SPARES APPROPRIATELY. REMOVE EXISTING NAMEPLATES NO LONGER APPLICABLE. PROVIDE 3#14AWG INSULATED WIRES IN 1/21 CONDUIT FOR VIBRATION SWITCH CONTROL. CONNECT TO VFD AND COOLING TOWER VIBRATION SWITCH PER MANUFACTURER INSTRUCTIONS. VERIFY EXACT WIRING REQUIREMENTS PRIOR TO INSTALLATION. PROVIDE 3*14AWG INSULATED WIRES IN 1/21CONDUIT FOR AUX INTERLOCK WIRING TO DISABLE VFD UPON TURNING OFF OF DISCONNECT SWITCH. PROVIDE INTERLOCK AUXILLARY CONTACT KIT FOR DISCONNECT SWITCH TO BREAK THE CONTROL CIRCUIT PRIOR TO THE MAIN SWITCH BLADES.CONNECT TO VFD AND PROGRAM PER MANUFACTURER INSTRUCTIONS. VERIFY EXACT WIRING REQUIREMENTS PRIOR !' INSTALLATION. EXISTING LONG TIME DELAY AND ! FOR BREAKER ADJUSTED HIGHER PER THE COORDINATION STUDY. TO SHEET 110.01. PUMP SCWP -3 SPARE SPARE (50 HP) - INCOMING SPARE SECTION SPACE 48OY /277V,3PH,3W,8OOA. M.L.O. ELEVATION MCCN PANEL, MCCN ENCLOSURE, NEMA 1 MA I NS(A) , MLO BUS RAT I NG(A) , 800A LOCATION, CEP MOUNTING, Free Standing WIRING, 3 -Ph, 4 -W W I THSTAND(A) , 42,OOOA VOLTAGE, 480Y/ 277 FAULT CURRENT(A) 20,525A NO DESCRIPTION NOTES OC DEVICE HP FLA AMPS P IA SPARE NOTE 1 3 IB COOLING TOWER #4 NOTE 2 60 77 60 3 IC SCWP -3 50 65 125 3 2A SPARE 3 2B SPARE 3 2C SPARE 3 2D SPARE 3 3A EF -5 .75 1.6 15 3 3B SHWP -3 20 27 70 3 3C EF -4 .75 1.6 15 3 3D SPARE 3 3E SPACE 3 3F SPACE 3 ALL CONNECTED KVA MAX PH AMPS TOTAL CONNECTED 143.10 172.2 TOTAL DEMAND 143.10 172.2 ! TE 1: CUBICLE MADE SPARE DEMOLITION OF !! LING TOWER NOTE 2: REMOVE EXISTING ABANDONED MOTOR STARTER AND REPLACE WITH NEW 3P,200A CIRCUIT BREAKER .ii ��' •• r Ii Deeffield Beach, FL 33441 ` •i FAX: (954) 421-1466 Firm Certification i1ii: Michael A. Steward PE - + SSR O. , i SHEET NO. ELECTRICAL ISLmad-Alaft1k.1116