13-445-014AIR
SEPARATOR/
MIXER
EXP.
TANK
/:11� .. n•t.
MCCN
MCCo
q I I
EDPi
C
EDP2 -- - l v vru
G
,.
EDP3 _
E -3
Ca
ATS -2
NMSD2
NSD2�
MAIN
T1 7
ATS -1
FIRST FLOOR PLAN WORK • •
CI
A. CONTRACTOR SHALL COORDINATE O i PHASING WITH MECHANICAL
CONTRACTOR AND HOSPITAL.
WEATHERPROOF B. ALL WIRING TO COOLING TOWER AND VFD (BOTH INTERIOR AND EXTERIOR) SHALL
BE - i CONDUIT OR RIGID GALVANIZED
STEEL CONDUIT.
0 CONNECT i! LING TOWER AS INDICATED. ON SHEET i
FOR FEEDER INFORMATION.
COORDINATE EXACT LOCATION OF DISCONNECT i TO MAINTAIN
PROVIDE i STEEL SUPPORT FOR MOUNTING
OF DISCONNECT
APPROXIMATE i . i FOR NEW COOLING i i COORDINATE EXACT
LOCATION IN FIEi.
COOLING i PROTECTED BY PROTECTION ON ADJACENT
STRUCTURES. BOND NEW COOLING ! i EXISTING LIGHTNING PROTECTION
MAIN CONDUCTORS ON ROOF.
PROVIDE CONDUIT CONTROL .! DISCONNECT
AUXILLARY CONTACT TO REMOTE !• CONTACT OF ! COORDINATE CONTACTS
i TERMINATIONS WITH DIV 15 SUCH THAT VFD IS DISABLED UPON
THE
DISCONNECT # THE OFF POSITION.
PROVIDE 1/21 CONDUIT WITH CONTROL WIRING TO CONNECT VIBRATION SWITCH
ON ii ! i ! i' i i i. i!`i
i TERMINATIONS COOLING TOWER DOES NOT RUN
UPON ACTIVATION OF R •
ROOF , ` WORK - ELECTRICAL
W i i
600 West Hillsboro, suite 300
Deerfield Beach, FL 33441
(954) 421 -1260
FAX: (954) 421 -1466
www.ssr- inc.com
Firm certification - EB- 0000857
John E. Moulder PE - 33200
Michael A. steward PE - 65701
SSR JOB # 1282017.0