Loading...
13-445-010REPLACE I6CW MAKE-UP AND FLOAT SWITCH WITH FULL SIZE 21/x' LINE a 2"CW DN 3 ROOF PLAN - DEMOLITION - PLUMBING KEYED NOTES: (D EXISTING COOLING TOWER TO BE REMOVED ALONG WITH ALL ASSOCIATED COLD WATER MAKE-UP PIPING, VALVE AND FLOAT SWITCH. SEE NEW WORK PLANS. REMOVE EXISTING 21/j CW BACK TO MAIN AND CAP. 1. CONTRACTOR SHALL COORDINATE SHUTDOWN OF SYSTEMS WELL IN ADVANCE WITH OWNER PRIOR TO SHUTDOWN. E. CONTRACTOR SHALL COORDINATE WITH OWNER FOR PROPER DISPOSAL OF EXISTING PIPING TO BE DEMOLISHED, AND SHALL FOLLOW ALL OSHA AND STATE REQUIREMENTS. T 600 West Hillsboro, Suite 300 Deerfield Beach, FL 33441 (954) 421-1260 FAX: (954) 421-1466 www.ssr-inc.com Firm Certification - EB-0000857 John E. Madder PE. 332oo Michael A. Steward PE - 65701 SSR JOB # 1232017.0 Rm�•�