Loading...
13-445-004I � .4 12"CWS 0 M • 111110 Mw r ------------- I I' 11 0 I' LA ICI LIJ r, I SECOND FLOOR - NEW WORK - HVAC :A: KEYED NOTES: PROVIDE 900 TON COOLING TOWER LOCATED ON STRUCI'UJRAL BEk__MS' OVER EXISTING SUMP. REFER TO STRUCTURAL DRAWINGS. CONNECT 121 TO 101 SIDE INLET RUBBER SLEEVE. AND CI�AMFS. TRANISTION FROM 121 TO 10' IN RISER. CONNECT ABOVE EXISTING 14' BUTTERFLY VALVE. REDUCE TO 12, CWR. PROVIDE FULL PORT PLUG VALVE IN 121 CWR. REMOVE TEMPORARY DAM IN SUMP BEFORE START-UP. COORDINATE MOTOR SERVICE FOR CT-4 AND EXISTING CT-5. NOTES: 1. CORDINATE ALL SHUTDOWNS WITH HOSPITAL FACILITIES DEPT. IN WRITING. ALL SHUTDOWNS SHALL BE BID AS PREMIUM TIME, CONTINUOUS SHIFTS TO MINIMIZE EACH SHUT DOWN. 2. ELEVATION OF CT-4 BASIN SHALL BE AT THE SAME ELEVATION AS EXISTING CT-I, CT-2 AND CT-5 BASIN. COORDINATE WITH STRUCTURAL. ADJUSTABLE PIPE SADDLE SUPPORT GRINNELL FIG. 264 THREAD PIPE SUPPORT TO ALLOW HEIGHT ADJUSTMENT mlmr PIPE SUPPORT REFER TO ROOF MOUNTED PIPE SUPPORT DETAIL. ROOF N 0 T E: 1. USE WHERE SHOWN ON PLANS AND WHERE REQUIRED FOR SUPPORTING PIPING. 2. PAINT ALL PIPING SUPPORTS WITH PRIMER AND ZINC RICH GREY PAINT. ROOF MOUNTED PIPE STAND OMM9, INSULATION--/ 4-3/8' EXPANSION BOLTS PER SUPPORT LEG WITH 3'IMBEDMENT 1. PIPE SURFACE MUST BE FREE OF ALL RUST, GREASE, ETC. 2. 00 NOT INSTALL CLAMPING RING AROUND TOP OF FLASHING.. 3. DETAIL SHOWN IS FOR E.P.D.M. ROOF. FOR 4 PLY CONVENTIONAL ROOF, PROVIDE COPPER PITCH POCKET AROUND BASE OF PIPE SUPPORT. 4. LOCATE SUPPORTS OVER ROOF BEAMS. ROOF MOUNTED PIPE SUPPORT DETAIL Deeffield Beach, FL 33441 (954) 421-1260 FAX: (954) 421-1466 www.ssr-inc.com Firro Certification - EB-0000857 John E. Moulder PE -33200 Michael A- Steward PE - 65701 SSR JOB # 1232017.0 DRAWN CHECKED DATE 12/03/12 REVISED gi L----- ---- i I � .4 12"CWS 0 M • 111110 Mw r ------------- I I' 11 0 I' LA ICI LIJ r, I SECOND FLOOR - NEW WORK - HVAC :A: KEYED NOTES: PROVIDE 900 TON COOLING TOWER LOCATED ON STRUCI'UJRAL BEk__MS' OVER EXISTING SUMP. REFER TO STRUCTURAL DRAWINGS. CONNECT 121 TO 101 SIDE INLET RUBBER SLEEVE. AND CI�AMFS. TRANISTION FROM 121 TO 10' IN RISER. CONNECT ABOVE EXISTING 14' BUTTERFLY VALVE. REDUCE TO 12, CWR. PROVIDE FULL PORT PLUG VALVE IN 121 CWR. REMOVE TEMPORARY DAM IN SUMP BEFORE START-UP. COORDINATE MOTOR SERVICE FOR CT-4 AND EXISTING CT-5. NOTES: 1. CORDINATE ALL SHUTDOWNS WITH HOSPITAL FACILITIES DEPT. IN WRITING. ALL SHUTDOWNS SHALL BE BID AS PREMIUM TIME, CONTINUOUS SHIFTS TO MINIMIZE EACH SHUT DOWN. 2. ELEVATION OF CT-4 BASIN SHALL BE AT THE SAME ELEVATION AS EXISTING CT-I, CT-2 AND CT-5 BASIN. COORDINATE WITH STRUCTURAL. ADJUSTABLE PIPE SADDLE SUPPORT GRINNELL FIG. 264 THREAD PIPE SUPPORT TO ALLOW HEIGHT ADJUSTMENT mlmr PIPE SUPPORT REFER TO ROOF MOUNTED PIPE SUPPORT DETAIL. ROOF N 0 T E: 1. USE WHERE SHOWN ON PLANS AND WHERE REQUIRED FOR SUPPORTING PIPING. 2. PAINT ALL PIPING SUPPORTS WITH PRIMER AND ZINC RICH GREY PAINT. ROOF MOUNTED PIPE STAND OMM9, INSULATION--/ 4-3/8' EXPANSION BOLTS PER SUPPORT LEG WITH 3'IMBEDMENT 1. PIPE SURFACE MUST BE FREE OF ALL RUST, GREASE, ETC. 2. 00 NOT INSTALL CLAMPING RING AROUND TOP OF FLASHING.. 3. DETAIL SHOWN IS FOR E.P.D.M. ROOF. FOR 4 PLY CONVENTIONAL ROOF, PROVIDE COPPER PITCH POCKET AROUND BASE OF PIPE SUPPORT. 4. LOCATE SUPPORTS OVER ROOF BEAMS. ROOF MOUNTED PIPE SUPPORT DETAIL Deeffield Beach, FL 33441 (954) 421-1260 FAX: (954) 421-1466 www.ssr-inc.com Firro Certification - EB-0000857 John E. Moulder PE -33200 Michael A- Steward PE - 65701 SSR JOB # 1232017.0 DRAWN CHECKED DATE 12/03/12 REVISED