13-445-004I �
.4 12"CWS
0
M • 111110 Mw
r
------------- I
I'
11
0
I'
LA
ICI
LIJ
r, I
SECOND FLOOR - NEW WORK - HVAC
:A:
KEYED NOTES:
PROVIDE 900 TON COOLING TOWER LOCATED ON STRUCI'UJRAL BEk__MS'
OVER EXISTING SUMP. REFER TO STRUCTURAL DRAWINGS.
CONNECT 121 TO 101 SIDE INLET RUBBER SLEEVE. AND CI�AMFS.
TRANISTION FROM 121 TO 10' IN RISER.
CONNECT ABOVE EXISTING 14' BUTTERFLY VALVE. REDUCE TO 12, CWR.
PROVIDE FULL PORT PLUG VALVE IN 121 CWR.
REMOVE TEMPORARY DAM IN SUMP BEFORE START-UP.
COORDINATE MOTOR SERVICE FOR CT-4 AND EXISTING CT-5.
NOTES:
1. CORDINATE ALL SHUTDOWNS WITH HOSPITAL FACILITIES DEPT.
IN WRITING. ALL SHUTDOWNS SHALL BE BID AS PREMIUM TIME,
CONTINUOUS SHIFTS TO MINIMIZE EACH SHUT DOWN.
2. ELEVATION OF CT-4 BASIN SHALL BE AT THE SAME ELEVATION
AS EXISTING CT-I, CT-2 AND CT-5 BASIN. COORDINATE WITH
STRUCTURAL.
ADJUSTABLE PIPE
SADDLE SUPPORT
GRINNELL FIG. 264
THREAD PIPE
SUPPORT TO
ALLOW HEIGHT
ADJUSTMENT
mlmr
PIPE SUPPORT
REFER TO ROOF MOUNTED
PIPE SUPPORT DETAIL.
ROOF
N 0 T E:
1. USE WHERE SHOWN ON PLANS AND WHERE REQUIRED FOR SUPPORTING PIPING.
2. PAINT ALL PIPING SUPPORTS WITH PRIMER AND ZINC RICH GREY PAINT.
ROOF MOUNTED PIPE STAND
OMM9,
INSULATION--/
4-3/8' EXPANSION
BOLTS PER SUPPORT
LEG WITH 3'IMBEDMENT
1. PIPE SURFACE MUST BE FREE OF ALL RUST, GREASE, ETC.
2. 00 NOT INSTALL CLAMPING RING AROUND TOP OF FLASHING..
3. DETAIL SHOWN IS FOR E.P.D.M. ROOF. FOR 4 PLY CONVENTIONAL
ROOF, PROVIDE COPPER PITCH POCKET AROUND BASE OF PIPE SUPPORT.
4. LOCATE SUPPORTS OVER ROOF BEAMS.
ROOF MOUNTED PIPE SUPPORT DETAIL
Deeffield Beach, FL 33441
(954) 421-1260
FAX: (954) 421-1466
www.ssr-inc.com
Firro Certification - EB-0000857
John E. Moulder PE -33200
Michael A- Steward PE - 65701
SSR JOB # 1232017.0
DRAWN
CHECKED
DATE 12/03/12
REVISED
gi
L-----
---- i
I �
.4 12"CWS
0
M • 111110 Mw
r
------------- I
I'
11
0
I'
LA
ICI
LIJ
r, I
SECOND FLOOR - NEW WORK - HVAC
:A:
KEYED NOTES:
PROVIDE 900 TON COOLING TOWER LOCATED ON STRUCI'UJRAL BEk__MS'
OVER EXISTING SUMP. REFER TO STRUCTURAL DRAWINGS.
CONNECT 121 TO 101 SIDE INLET RUBBER SLEEVE. AND CI�AMFS.
TRANISTION FROM 121 TO 10' IN RISER.
CONNECT ABOVE EXISTING 14' BUTTERFLY VALVE. REDUCE TO 12, CWR.
PROVIDE FULL PORT PLUG VALVE IN 121 CWR.
REMOVE TEMPORARY DAM IN SUMP BEFORE START-UP.
COORDINATE MOTOR SERVICE FOR CT-4 AND EXISTING CT-5.
NOTES:
1. CORDINATE ALL SHUTDOWNS WITH HOSPITAL FACILITIES DEPT.
IN WRITING. ALL SHUTDOWNS SHALL BE BID AS PREMIUM TIME,
CONTINUOUS SHIFTS TO MINIMIZE EACH SHUT DOWN.
2. ELEVATION OF CT-4 BASIN SHALL BE AT THE SAME ELEVATION
AS EXISTING CT-I, CT-2 AND CT-5 BASIN. COORDINATE WITH
STRUCTURAL.
ADJUSTABLE PIPE
SADDLE SUPPORT
GRINNELL FIG. 264
THREAD PIPE
SUPPORT TO
ALLOW HEIGHT
ADJUSTMENT
mlmr
PIPE SUPPORT
REFER TO ROOF MOUNTED
PIPE SUPPORT DETAIL.
ROOF
N 0 T E:
1. USE WHERE SHOWN ON PLANS AND WHERE REQUIRED FOR SUPPORTING PIPING.
2. PAINT ALL PIPING SUPPORTS WITH PRIMER AND ZINC RICH GREY PAINT.
ROOF MOUNTED PIPE STAND
OMM9,
INSULATION--/
4-3/8' EXPANSION
BOLTS PER SUPPORT
LEG WITH 3'IMBEDMENT
1. PIPE SURFACE MUST BE FREE OF ALL RUST, GREASE, ETC.
2. 00 NOT INSTALL CLAMPING RING AROUND TOP OF FLASHING..
3. DETAIL SHOWN IS FOR E.P.D.M. ROOF. FOR 4 PLY CONVENTIONAL
ROOF, PROVIDE COPPER PITCH POCKET AROUND BASE OF PIPE SUPPORT.
4. LOCATE SUPPORTS OVER ROOF BEAMS.
ROOF MOUNTED PIPE SUPPORT DETAIL
Deeffield Beach, FL 33441
(954) 421-1260
FAX: (954) 421-1466
www.ssr-inc.com
Firro Certification - EB-0000857
John E. Moulder PE -33200
Michael A- Steward PE - 65701
SSR JOB # 1232017.0
DRAWN
CHECKED
DATE 12/03/12
REVISED