13-445-003I
f -)I 1 11 (A
I
18" CHR DOWN
I
W
�--i
18"CWR kl: v %,-/
V11 f
'all
11*414141=011"JAW12 I
13,1111=1111Z
am=
m
00
SECOND FLOOR - DEMOLITION- MECHANICAL
ai
09
nil
eil
KEYED NOTES:
REMOVE EXISTING WOOD COOLING TOWER IN ITS-ENT,,RETY,
OREMOVE EXISTING CONDENSER WATER RETURN PIPING FROM BUTTERFLY VALVES
IN RISER TO VALVES.
PROVIDE TEMPORARY DAM AT COMMON SUMP-'-T(� AVO.'D CONSTRUC71ON- DEBRIS
FROM ENTERING SUMP. DO NOT OBSTRUCT FLOOW FROM' �%�T-5"INTO -CO-MM ON
SUMP.
NOTES:
1. CORDINATE ALL SHUTDOWNS WITH HOSPITAL FACILITIES DEPT.
IN WRITING. ALL SHUTDOWNS SHALL BE BID AS PREMIUM TIME,
CONTINUOUS SHIFTS TO MINIMIZE EACH SHUT DOWN.
ri
600)
Deerfield Beach, FL 33441
(954) 421-1260
FAX: (954) 421-1466
www.ssr-inc.com
Firm Certification - EB-0000857
John E. Moulder PE - 33200
Michael A. Steward PE - 65701
SSR JOB # 1232017.0
SHEET NO.
SECO
9 • 0
ky, 19 -01 M