Loading...
13-390-0017, Fire Sprinkler Plan. A vat. sir Number of Sprinklers GENERAL NOTES* S mbol Description Total This Sheet: Total This Job, 30 1 All D*. V a I nrnf;nns are to be Field Measured Y EXIST AREA SPRINKLER HEADS ,TO REMAIN AS-IS P . rior to Fabrication and Installation by 0 Hydraulic Reference Points - ------- Symbol No. Description: - ------ COV. PLT) 8 k--i, I Sprinkler Contractor. Elev. Below Top of Steel 30 TY-3531 -RFII CON PEND Q/R 1/2" ORF, 5.6 KF, 15 5f w/WHT Fire Sprinkler Plan. A vat. sir Number of Sprinklers GENERAL NOTES* S mbol Description Total This Sheet: Total This Job, 30 1 All D*. V a I nrnf;nns are to be Field Measured Y EXIST AREA SPRINKLER HEADS ,TO REMAIN AS-IS P . rior to Fabrication and Installation by 0 Hydraulic Reference Points - ------- Symbol No. Description: - ------ COV. PLT) Drawn Ey: J. Sprinkler Contractor. Elev. Below Top of Steel 30 TY-3531 -RFII CON PEND Q/R 1/2" ORF, 5.6 KF, 15 5f w/WHT 2. All Dimensions Shown are Center to Center. 3. High Temperature Heads are to be Field E F-61 Elev. Above Finished Floor -- ---- Scale: 3116 " =1' - ®" Located Where Required. Elev. of Top of Steel — ------- --- - ---- --- 4. All Pipes and Hangers are to be Installed q�-:5) Ceiling Height - ----- Date- 4-4-2013 per NFPA #13. 5. Hangers are to be U.L. Listed and F.M. Denotes Hanger Location - ------ ------- Approved. 0 Rise up or down - ------- - ----- - Approval By: J.T. BUMEN= 1M SEAL: GENERAL NOTES mmimig "Osr-g-r-111 % GENERAL NOTES mmimig "Osr-g-r-111