Loading...
13-1288-001U V V U V U v V V'U V V V U U V VVUra ABBREVIATIONS GENERAL NOTES GENERAL_ DEMOLITION N VJyV u V SHEET DESCRIPTION A ACOUS. ACOUSTICAL L LAV LAVATORY 01, ALL WORK TO BE PERFORMED UNDER THIS CONTRACT SHALL COMPLY NTH CODES LISTED ON THIS SHEET AND SHEET 01. CONTRACTOR SHALL SUBMIT A SCHEDULE INDICATING PROPOSED SEQUENCE OF OPERATIONS FOR SELECTIVE DEMOLITION J U V A J U i1 it V U U U V P U U V U U U U ADA AMERICANS WITH DISABILITIES ACT LAM LAMINATED LS1.0, THE FLORIDA BUILDING CODE (LATEST EDITION), CITY LABOR LAWS, CITY ORDINANCES CITY /COUNTY ZONING WORK TO OWNER'S REPRESENTATIVE AND ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO START OF WORK. INCLUDE - -- - - - -- V J V - - U.,„ ADJ ADJUSTABLE LT LIGHT CODES, NATIONAL ELECTRICAL CODE, N.F.P.A. 101, O.S.H.A., A.D.A. & ALL OTHER APPLICABLE CODES, RULES AND COORDINATION FOR SHUTOFF, CAPPING, AND CONTINUATION OF UTILITY SERVICES AS REQUIRED, TOGETHER WITH DETAILS �► REVISION J L V V V J J V U ' AFF ABOVE FINISH FLOOR LTWT LIGHT WEIGHT REGULATIONS. FOR DUST AND NOISE CONTROL PROTECTION. INCLUDE SCHEDULE OF OPERATIONS TO INCLUDE HOURS PER DAY AND ` NEW SHEET V U V V U U V U U AGG AGGREGATE LF OR LIN FT LINEAR DAYS OF WEEK TO BE WORKED. X ELIMINATED SHEET A.C. AIR CONDITIONING 02. THE CONTRACTOR SHALL FAMILIARIZE HIM/HERSELF WITH THE PROJECT THROUGH INSPECTION OF THE SITE, THE - PROVIDE DETAILED SEQUENCE OF DEMOLITION AND REMOVAL WORK TO ENSURE UNINTERRUPTED ALUM ALUMINUM M MAT MATERIAL DRAWINGS AND SPECIFICATIONS, SO AS TO THOROUGHLY UNDERSTAND THE NATURE AND SCOPE OF THE WORK. , ML MATCH LINE REFERENCE TO SPECIFICATIONS IS LIMITED TO THE EXTENT AS DEFINED WITHIN THESE DRAWINGS AND NOT BY A PROGRESS OF OWNERS ON SITE OPERATIONS. GENERAL B BM BEAM MAX MAXIMUM SEPARATE PROJECT MANUAL. ANY AMBIGUITIES OR CONFLICTS WITH THE CONSTRUCTION DOCUMENTS SHALL BE - COORDINATE WITH OWNER'S CONTINUING OCCUPATION OF PORTIONS OF EXISTING BUILDING AND BLK BLOCK MECH MECHANICAL REPORTED TO THE ARCHITECT IN WRITING PRIOR TO SUBMISSION OF BID. BLKG BLOCKING MET OR MT1. METAL WITH OWNER'S PARTIAL OCCUPANCY OF COMPLETED REFURBISHED AREA, AO..0 ............... COVER...SHEET _.._..... ............................... . BOT BOTTOM . -... MIN MINIMUM 03. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL REQUIRED PERMITS TO CARRY OUT - COORDINATE CONSTRUCTION ENTRY AND EXIT LOCATIONS WITH OWNER. ! ..7 ............._.._INDEX OF DRAWINGS AND GENERAL NOTES Q C ... BLDG BUILDING MISC MISCELLANEOUS THE WORK DESCRIBED IN THE CONSTRUCTION DOCUMENTS. ALL REQUIRED PERMITS SHALT- BE OBTAINED PRIOR TO THE BLKHD BULKHEAD MACH MACHINE COMMENCEMENT OF WORK. 02. CONTRACTOR SHALL SUBMIT PHOTOGRAPHS OR VIDEO OF EXISTING CONDITIONS OF STRUCTURE AND BUILDING SURFACES, C CAB CABINET MANUF MANUFACTURER 04. OMISSIONS: IN THE EVENT THAT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT FULLY SHOWN ON THE PERATIONS.ACONTRACTOR TSHALL ALSO SCHEDULE MIGHT ITEEVISIT MISCONSTRUED TO SINCLUDE OWNER'S REPRESENTATIVE, ENGINEER AND ARCHITECTURAL CARP CARPET N NFPA NATIONAL FIRE DRAWINGS, THEN THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE ARCHITECT FOR VERIFICATION OF THE WORKING CONDITION OF BUILDING SYSTEMS AFFECTED BY DEMOLITION WORK, FILE LS1,0 LIFE SAFETY FIRST FLOOR CONSTRUCTION AND CORRIDOR AREAS CLG CEILING PREVENTION ASSOCIATION SHOWN OR NOTED AND SHALL BE INCLUDED AS PART OF THE BID SUBMISSION. WITH ARCHITECT PRIOR TO START OF WORK. ....... .......... .. ............................... _ -.. CEM CEMENT NIC NOT IN CONTRACT LS1.1 LIFT= _SAFETY FIRST FLOOR PLAN CA CENTER LINE NOM NOMINAL 05. EXISTING FACILITY ITEMS AND EQUIPMENT THAT ARE NOT PART OF SCOPE OF WORK ARE TO REMAIN IN TACT. 03, OCCUPANCY: OWNER WILL OCCUPY PORTIONS OF THE BUILDING IMMEDIATELY ADJACENT TO AREAS OF PROJECT AD1.1 DEMOLITION FIRST FLOOR PLAN WILL MINIMIZE THE NEED FOR DISRUPTION OF .......... ............................... . ........................... . . .. .......................... .--------------- .. ............................... ........ - ....... CER CERAMIC NTS NOT TO SCALE HOWEVER, CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF SOME ADJACENT ITEMS AND EQUIPMENT WHICH ARE DEMOLITION. CONDUCT SELECTIVE DEMOLITION WORK IN MANNER THAT WI_ _ MINIM - -- - - -- - " - " "" " " " " " " " " " "�" _ PH1,1 PHASING PLAN C.T. CERAMIC TILE NOT PART OF THE SCOPE OF WORK IN ORDER TO ACCOMPLISH DEMOLITION AND NEW CONSTRUCTION WORK. FU S --- ... - - -" - - --- - - - -- --- -.. - ............... - . - - - - -- - - -- -W CT10 WO FURTHER, OWNERS NORMAL OPERATIONS. ALL REQUESTS MUST BE MADE 72 HOURS IN ADVANCE PRIOR TO DEMOLITION ACTIVATE .. - - ..__..... _ A1.1 ARCHITECTURAL FLOOR PLAN CO CLEAN OUT D OC ON CENTER THE CONTRACTOR SHALL BE RESPONSIBLE FOR E REINSTALLATION 0 OS _ ............... ............................... ..............................' TH R I ALLATION F THOSE ADJACENT ITEMS AND EQUIPMENT AND THAT WILL AFFECT OWNERS NORMAL OPERATIONS INCLUDING BUT NOT LIMITED TO LOUD NOISES AND PRODUCTS WITH "" "" " " - "" � - -- CL OR CLOS CLOSET OH OR PP.HD. OPPOSITE HAND THEY SHALL BE IN PROPER WORKING CONDITION. STRONG ODORS AND ANY PROCEEDURES CREATING EXCESSIVE DUST. A2,1 REFLECTED CEILING PLAN ......... COL COLUMN OD OUTSIDE DIAMETER � - -- - ..... .................. ----------------------------------------------- ............................. --- .................................................. A3.1 PROJECT DETAILS CONC CONCRETE OFF OFFICE 04. CONDITION OF STRUCTURES: OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITION OF ITEMS OR STRUCTURES _ .............................. CMU CONCRETE MASONRY UNIT OPNG OPENING TO BE DEMOLISHED. CONDITIONS EXISTING AT TIME OF INSPECTION FOR BIDDING PURPOSES WILL BE MAINTAINED BY A3,2 WALL SECTION AND DETAILS • OSHA OCCUPATIONAL SAFETY OWNER INSOFAR AS PRACTICABLE. HOWEVER, MINOR VARIATIONS WITHIN STRUCTURE MAY OCCUR. A5.1 GIFT SHOP & INTERIOR ELEVATIONS • � CONST CONSTRUCTION AND HEALTH ADMINISTRATION ...... ............................... ...................... . ............................... SCHEDULES AND DETAILS CONT CONTINUOUS 06. ALL DIMENSIONS PROVIDED ARE APPROXIMATE, CONTRACTOR SHALL VERIFY DIMENSIONS WITH EXISTING FIELD A7,1 ..................SCHED -- ----... ... . ............................... .. .................... -.......... .......................... ..... --- - - - - -- - - -- -- CG CORNER GUARD CONDITIONS. ANY DISCREPANCIES SHALL BE BROUGHT TO ARCHITECT ATTENTION BEFORE PROCEEDING WITH THE WORK. 05. PARTIAL DEMOLITION AND REMOVAL: STORAGE P REMOVED ITEMS ON SITE WILL NOT BE PERMITTED, UNLESS CR CRASH RAIL P PR PAIR AUTHORIZED BY OWNER. ...................................... . ............... _ _- .......... ... PASS PASSENGER ................... .......... - - ............... .... Cu CUBIC 07, CONTRACTOR SHALL PROVIDE A MINIMUM 72 HOUR WRITTEN REQUEST TO THE OWNER'S REPRESENTATIVE IN ADVANCE 06. PROTECTIONS: PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF PROTECTION TO PROTECT OWNER'S PENT PENTHOUSE D DEPT DEPARTMENT PC PRECAST OF ANY ACTIVITY WHICH WILL AFFECT EXISTING BUILDING OPERATIONS. DETERMINE OWNERS REPRESENTATIVE PRIOR TO PERSONNEL AND GENERAL PUBLIC FROM INJURY DUE TO SELECTIVE DEMOLITION WORK. SEE PLANS FOR MORE INFO. PiPANEL JOINT STARTING WORK. ....................... _ ..... ...................... - "........ .. ............................... -- - -- - .. -- ..............._ .. . DET./DTL DETAIL A. PROVIDE PROTECTIVE MEASURES AS REQUIRED TO PROVIDE FREE AND SAFE PASSAGE OF OWNER'S PERSONNEL ..... - ............................. ............................... - ............ ...---------------------- - -.... DIA DIAMETER PLAS PLASTER ... . " O$, CONTRACTOR SHALL PROTECT ALL EXISTING FLOOR SURFACES WITH A MEANS OF CONTAINMENT TO PREVENT SOILING OF AND GENERAL PUBLIC TO OCCUPIED PORTIONS OF BUILDING, DIM DIMENSION POL POLISHED THE FLOOR. IN ADDITION, THE CONTRACTOR SHALL PROVIDE SHEATHING OVER THE FLOOR AT ALL TRAFFIC AREAS AND DN DOWN PMLD PREMOULDED THOSE AREAS EXPOSED TO EQUIPMENT, SCAFFOLDING AND CONSTRUCTION DEBRIS. B. PROTECT FROM DAMAGE EXISTING FINISH WORK THAT IS TO REMAIN IN PLACE AND BECOMES EXPOSED DURING DS DOWN SPOUT PNL PANEL DEMOLITION OPERATIONS. DFG DRINKING FOUNTAIN 0 QT QUARRY TILE 09. ALL WALL /CEILING SURFACES WITHIN THE LIMITS OF CONSTRUCTION ARE TO BE REPAIRED /REPLACED TO MATCH C. PROTECT FLOORS /CARPETS WITH SUITABLE COVERINGS WHEN NECESSARY. STRUCTURAL QTM QUARRY TILE MINIATURES EXISTING ADJACENT SURFACES, THIS SHALL INCLUDE BUT NOT BE LIMITED TO, WATER AND OR MILDEW DAMAGE, CRACKED WALLBOARD, DAMAGED TAPE JOINTS, ETC. ALL DAMAGED WALLBOARD SHALL BE REPLACED. _.N A -- ---- N.OT--- APPLICAB .LIE ......................... - - - - - - - -- E E.A. EXPOSED AGGREGATE D. CONSTRUCT TEMPORARY INSULATED DUSTPROOF PARTITIONS WHERE SHOWN TO SEPARATE AREAS WHERE NOISY f - -- - - - - -- ........................ ............... ............................... EA EACH R RAD RADIUS OR EXTENSIVE DIRT OR DUST OPERATIONS ARE PERFORMED. EQUIP PARTITIONS WITH DUSTPROOF DOORS AND SECURITY -- ............... . . . .. ---.---....-.-......................................... ... ... ...............---------- - -.... - -------_------ - - -- --- ......... 10. ALL STAINED SURFACES ARE TO BE KILZ PRIMER COATED IN ADVANCE OF PAINT FINISH. " " " " "" - - - - EL ELEVATION GRADE) R RISER LOCKS, ALL TEMPORARY PARTITIONS ARE TO BE BEDDED AND RECEIVE ONE COAT OF FINISH PAINT. PROVIDE ELE ELEVATION FACADE) REINF REINFORCED 11, THE CONTRACTOR SHALL PROVIDE A MEANS OF CONTAINMENT TO PREVENT DUST AND DEBRIS MIGRATION TO ADJACENT WALK -OFF MATS AT ALL DOORS LEADING OUT OF SCOPE OF WORK AREA. /� ELEV ELEVATOR REQD REQUIRED AREAS. CONTRACTOR SHALL NOT COMPROMISE THE EXISTING FIRE /FLAME SPREAD RATINGS OR MEANS OF EGRESS MECHANICAL EP ELECTRICAL PANEL RF ROOF E. TEMPORARY PARTITIONS ANCHORED WITH TWO -WAY TAPE. SCREWS, NAILS, ETC, WILL NOT BE PERMITTED. (SEE EQ EQUAL RD ROOF DRAIN WITHIN THE CONSTRUCTION AREAS AND ADJACENT AREAS AFFECTED BY CONSTRUCTION ACTIVITIES, DRAWING FOR DETAIL) MO.00 SYMBOL___ LEGEND AND GENERAL NOTES HVAC _ ................................ ............................... -- .... ..... ............................... ................. . EQUIP EQUIPMENT RM ROOM 12, THE CONTRACTOR SHALL MAINTAIN ALL COMPONENTS FOR MEANS OF EGRESS FREE OF OBSTRUCTIONS AND - M3.00 FLOOR PLANS HVAC EXIST EXISTING RO ROUGH OPENING F. REMOVE PROTECTIONS AT COMPLETION OF WORK. - - -- .......................................................................................................... ............................... ACCESSIBLE AT ALL TIMES. ................... - - - - - - - - ...........------..... ............................... EXP.JT, OR EJ EXPANSION JOINT REEL OR REF REFLECTED G. ROOMS UNDER CONSTRUCTION MUST BE BROUGHT TO A 100% NEGATIVE PRESSURE BY USE OF SUITABLE FANS EXP EXPOSED RWL RAIN WATER LEADER 13. THE CONTRACTOR SHALL MAINTAIN ALL LIFE SAFETY AND FIRE PROTECTION SYSTEMS OPERATIONAL AT ALL TIMES. EQUIPPED WITH HEPA FILTRATION UNITS EXHAUSTING TO THE EXTERIOR OF THE BUILDING, EXT EXTERIOR ELEC ELECTRICAL 14, CONTRACTOR SHALL MAINTAIN ALL EXISTING FIRE RATINGS AT NEW CONSTRUCTION. EWC ELECTRIC WATER COILER 8 SECT SECTION H. CONTRACTOR SHALL REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT SHT SHEET 15• CONTRACTOR SHALL PROVIDE ALLOWANCES IN SPECIFICATIONS /DRAWINGS WITH STIPULATED DOLLAR AMOUNTS FOR ALL CONTAMINATION OF DUCT SYSTEM, AS SHOWN IN THE MEP DRAWINGS, F FT FEET SHT MET OR SM SHEET METAL WORK WHICH IMPACTS THE DAILY OPERATIONS OF THE FACILITY AND WHICH MUST BE ACCOMPLISHED AT THE TIMES FIN FINISH SIM SIMILAR OTHER THAN NORMAL WEEKDAY WORKING HOURS. USERS TO DETERMINE. 07. DAMAGES: PROMPTLY REPAIR DAMAGES TO ADJACENT FACILITY ITEMS CAUSED BY CONTRACTOR WORK. FE FIRE EXTINGUISHER SQ SQUARE 16. CONTRACTOR SHALL PROVIDE ALLOWANCES IN BID WITH STIPULATED DOLLAR AMOUNTS FOR ALL WORK STOPPAGES FEC FIRE EXTINGUISHER CABINET STD STANDARD ORDERED BY THE OWNER DUE TO WORK IMPACTING THE DAILY OPERATIONS OF THE FACILITY. 08. MAINTAIN EXISTING BUILDING SYSTEMS /UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST FL FIRE CABINET SS STAINLESS E STEEL DAMAGE DURING DEMOLITION OPERATIONS OR PROVIDE FlREWATCH. ELECTRICAL FD FLOOR DRAIN STL STORAGE 17. CONSTRUCTION ACTIVITY AFTER REGULAR WORKING HOURS MUST BE DONE PER HOSPITAL DIRECTED HOURS. FLUOR FLUORESCENT - DO NOT INTERRUPT BUILDING SYSTEMS /UTILITIES SERVING OCCUPIED OR USED FACILITIES EXCEPT WHEN E0.00 SYMBOL LEGEND AND GENERAL NOTES ELECTRICAL STRUCT STRUCTURAL AUTHORIZED IN WRITING BY AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS _ ........................... ......... ......... ............................... ............................... F.R. FIRE RATING SUSP SUSPENDED 18. ALL EQUIPMENT USED ON THE JOB SHALL BE OPERATED PER OSHA REGULATIONS. TO EXISTING BUILDING SYSTEMS/UTILITIES AS ACCEPTABLE TO GOVERNING AUTHORITIES. E3.00 LIGHTING PLAN - ELECTRICAL FS FULL SIZE SPECS SPECIFICATIONS Elio1 POWER AND —SYSTEMS PLAN L� cTRICAL ..... ............................... FV FIELD VERIFY .................. 19. CONTRACTOR AND ALL SUBCONTRACTORS SHALL FIELD CHECK AND VERIFY ALL EXISTING CONDITIONS AND SHALL BE - MAINTAIN FIRE PROTECTION SERVICES DURING SELECTIVE DEMOLITION OPERATIONS. E5,00 POWER RISER DIAGRAM AND PANEL SCHEDULE ELECTRICAL FVC FIRE VALVE CABINET RESPONSIBLE FOR THEIR PRESERVATION, ANY DAMAGE TO EXISTING SHALL BE REPAIRED AND /OR REPLACED AT NO ----------------------- - - - - -- ------- "...................... - - - - .................... ............................... . -- ................. T TEL TELEPHONE ADDITIONAL COST TO OWNER. 09. OWNER HAS THE RIGHT TO STOP WORK IF CONSTRUCTION ACTIVITY INTERFERES WITH PATIENT SAFETY OR NORMAL Q GALV GALVANIZED TEMP TEMPERED OPERATIONS. DEMOLITION WORK IS TO BE COORDINATED WITH THE PHASING PLAN. DO NOT EXCEED THE LIMITS OF THE GA GAUGE TILT. OR TOT. TOILET PHASE UNDER CONSTRUCTION, WITHOUT APPROVAL FROM THE OWNER. GC GENERAL CONTRACTOR T TREADS 20. CONTRACTOR SHALL BE RESPONSIBLE OF INTERIM LIFE SAFETY MEASURES AS REQUIRED ON LIFE SAFETY DRAWINGS. GL GLASS TYP TYPICAL 10. ENVIRONMENTAL CONTROLS: USE WATER SPRINKLING, TEMPORARY DEBRIS ENCLOSURES, AND OTHER METHODS TO LIMIT GB GRAB BAR TR TELEPHONE RECEPTACLE 21. PROVIDE WALK -OFF MATS AT ALL ENTRY/EXITS OF THE CONSTRUCTION SITE. WALK -OFF MATS MUST BE CLEANED OR DUST AND DIRT MIGRATION. COMPLY WITH GOVERNING REGULA11ONS PERTAINING TO ENVIRONMENTAL PROTECTION. GYP GYPS;M THK THICK CHANGED DAILY TO AVOID DISPERSION OF DUST OUTSIDE WORK AREA. - DO NOT USE WATER WHEN IT MAY CREATE HAZARDOUS OR OBJECTIONABLE CONDITIONS SUCH AS FLOODING, PLUMBING GYP BD GYPSUM WALLBOARD U UL UNDERWRITER LABORATORIES 22. CONTRACTOR MAY NEED TO PENETRATE OR OTHERWISE MODIFY FIRE RATED PARTITIONS. COORDINATE SCOPE OF POLLUTION AND DAMAGE TO EXISTING FINISHES. P L I V I I N MECHANICAL, ELECTRICAL AND PLUMBING WITH LIFE SAFETY PLAN TO DETERMINE LOCATIONS. RATING OF THE WALL A-- __ -__- H HC HANDICAPPED U.N.O. UNLESS NOTED OTHERWISE N f . NOT ..APPLICABLE - .. ...... ..........................._.._ __ _.. _ - _ . _ - ....... U.O.N. UNLESS OTHERWISE NOTED SHOULD BE PRESERVED AT ALL TIMES. FOLLOW DETAILS PROVIDED IN DRAWINGS FOR SEALING FIRE PENETRATIONS. 11. IF UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS THAT CONFLICT WITH INTENDED FUNCTION OR HRDW HARDWARE HT HEIGHT ALL DUCTS CROSSING FIRE RATED ASSEMBLIES SHALL HAVE FIRE DAMPERS TO MATCH THE RATING OF THE WALL.. DESIGN ARE ENCOUNTERED, INVESTIGATE AND MEASURE BOTH NATURE AND EXTENT OF THE CONFLICT. SUBMIT REPORT ........................ . . . .. --------------------------------------- --- - - - - -- --- - - - - -- - -- -. - -- . ............... V VERT VERTICAL FLOOR PENETRATIONS SHALL BE PROPERLY SEALED, TO OWNERS REPRESENTATIVE N WRITTEN, ACCURATE DETAIL. PENDING RECEIPT OF DIRECTIVE FROM OWNERS , ....................... ..................... - _. _................................... ............................... ......... ......... ........ .......... ......... ........ .... .. HM HOLLOW ME TA L VT VINYL TILE REPRESENTATIVE, REARRANGE SELECTIVE DEMOLITION SCHEDULE AS NECESSARY TO CONTINUE OVERALL JOB PROGRESS HORIZHORIZONTAL ..................... .........................------------------------------------------------------ -_ VBVAPOR BARRIER WITHOUT UNDUE DELAY. .............................. ... ............................... . . . ............................... ............................... .. ... ..... ..... ........ .... ..... ............. VWC VINYL WALL COVERING 23• IT SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR (GC), AND THE SUB - CONTRACTORS (SC) TO STUDY I IN INCH ALL THE DRAWINGS AND DETAILS SO THAT WORK CAN BE FULLY COORDINATED. THE CM, GC, AND SC SHALL VISIT THE .... .. ............ ............................... - ............ - INCAND INCANDIESCENT SITE DURING BIDDING TO BECOME FAMILIAR WITH THE PROJECT AND DETERMINE IF ANY OTHER ACTION SHOULD BE .. .. 12. REMOVE FROM BUILDING SITE ON A DAILY BASIS, ALL DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM ....... ............................... .................................................................. ...................... ......_.. W VWC -GYP WALL COVERING - GYPSUM BOARD DEMOLITION OPERATIONS. TRANSPORT AND LEGALLY DISPOSE OF OFF SITE. DEBRIS REMOVAL TO BE DONE AFTER ...... ......... ......... ......... ............... ............................... - . ................................... ............................... ......... ID INSIDE iDIAMETER SPECIFIED ON DRAWINGS. IF DISCREPANCIES EXIST BETWEEN DRAWINGS AND SITE CONDITIONS, THE CM, GC, AND SC x r ; x.; INSUL INSULATION VWC -PLAS WALL COVERING - PLASTER SHALL NOTIFY THE OWNER IN WRITING PRIOR TO BID DUE DATE. REGULAR WORKING HOURS. INT INTERIOR WC WET COLUMN 8 r pp INV INVERT WP WATERPROOFING 24, CONTRACTOR SHOULD PROVIDE A DOLLAR AMOUNT IN BID /PRICE OF CONSTRUCTION COST TO COVER MECHANICAL AND - OWNER TO SURVEY AND REMOVE AND PROVIDE CERTIFICATION TO GENERAL CONTRACTOR. IF HAZARDOUS FIRE PROTECTION WD WOOD MATERIALS ARE ENCOUNTERED DURING DEMOLITION OPERATIONS COMPLY WITH APPLICABLE REGULATIONS, LAWS, AND OTHER METHODS OF FIRE STOPPING DEVICES. FPO 00 FLOOR PLAN AND GENERAL NOTES FIRE PROTECTION J JT JOINT W/ �� ORDINANCES CONCERNING REMOVAL, HANDLING AND PROTECTION AGAINST EXPOSURE OR ENVIRONMENTAL POLLUTION, .............. .... .. - -...- ....... ............................ __ . ....................................................................... ............................... JST JOIST W/0 WITHOUT FP3.001 -- - -- .FLaOR ".- .PLAN -- SI E -- P O.TECTION _ - JC JANITOR'S CLOSET WC WATER CLOSET - BURNING OF REMOVED MATERIALS IS NOT PERMITTED ON PROJECT SITE. 13, UPON COMPLETION OF DEMOLITION WORK, REMOVE TOOLS, EQUIPMENT, AND DEMOLISHED MATERIALS FROM SITE. REMOVE - - .......... ............................... ------ - - - -- ... ............................... ............................. Y YD YARD PROTECTIONS AND LEAVE INTERIOR PER CONDITIONS DOCUMENTED IN SUBMITTED PHOTOGRAPWS/VIDEO. �_, -- - REPAIR DEMOLITION PERFORMED IN EXCESS OF THAT REQUIRED. RETURN ELEMENTS OF CONSTRUCTION AND SURFACES TO REMAIN TO CONDITION EXISTING PRIOR TO START OF OPERATIONS. REPAIR ADJACENT CONSTRUCTION OR SURFACES SOILED OR DAMAGED BY SELECTIVE DEMOLITION WORK. ARCHITECTURAL SYMBOLS REFERENCE SYMBOLS CAMPUS MAP & PROJECT LOCATION VICINITY MAP SOUTH4MIAMI HOSPITAL DOOR SYMBOL WALL CONSTRUC110N A WALL TYPE N ` �/ �;�/ / .ff%,r� /r/ , %% N 331A DOOR NUMBER ,%8% 1 L ; - / ,r, AND SHOP NV11+N ELEVATION ,�, , , /� ♦: / ; "� /, ,� .,, INSULATION CONCRETE GRAVEL or CEMENT CONCRETE NUMBER ' Blanket PRECAST CRUSHED MORTAR i ...•... : .. • . ...... : ......... :.-......- . : . ., . . .,r „ ,,„, ,.„ . . , •., .•..•..,.,,,.,...... ... , s. .,..,, ... .•... . ... . z . : „ . • ; : ., : .. . . . . . . =' »:' .... ri� % : ♦ /j. fl.j! i f : .•,::. r:' : .:. !i /:'' �;: /.;ff � ' f :..% ; // ,�/EXTERiOR &INTERIOR PLASTER ROOM NAME OFFICE ROOM NAME ELEVAl10N SYMBOL %, FINISH SED ROOM NUMBER SHEET NUMBER r � � / ' r„ 8; j , .,... ....: ,. •., ,. , ,.. it .' ,,: : i /' 'f //� , � / / , ! /:s %��/ ;:%> t �.. � ice" � •�� / , EARTH TILE SOLID CONC. CONCRETE MARBLE .j, 4 / r. ,y Ceramic or MAS, UNIT MASONRY CONSTRU DETAIL NUMBER ON DETAIL i r ;,� 1 ,� 5 .,.1 UNIT .. BUILDING- AL - DETAIL NUMBER Structural `--. SHEET NUMBER & DEAL SECTON , / ! r p cr - SHEET NUMBER .:: : / .. _ :� .:,,:;, /•. ,: : >! `,`�! / ��� „ :: �� r � SYMBOL .f r fl 1. , ✓ SHEET WOOD WOOD WOOD BRICK Finished Blocking WINDOW Y rOuMN RE�- a�nr- NUMBER OR LETTER odn g g WINDOW TYPE :r r �, Continuous Intermittent Scale '.'.. f�f �i %9_f� /'� :./ .,:,. �� / /,' /r♦._/ ,' Gam. /G r o : GENE RA L NOTES ABCDEFG NOTE TP OF CONCRE1E /' � /y /. '•�' , :, > � M GLASS GLASS INSULATION ELEVATION 0.00 S- AR F - VAT- M DETAIL N UMBER <.... Smolt Large Rigid Scale DRAWING BUS 1 ABCDEF r' 19 DRAWING REVISIONS REVISION NUMBER SCALE. STEEL STEEL PLYWOOD SHEET NUMBER r ' ' '!.. / / �` '�' .�• / ii � ! Small Scale Large Scale NOTE %� /% `'! , '` !y '' / �;, Y ♦ �, �� DETAIL KEYED NOTE : KEYED NOTE 0- ARCHITECT: BERMELLO AJAMIL & PARTNERS, INC. Architecture Engineering Planning Interior Design Landscape Architecture 2601 South Bayshore Drive 10th Floor Miami, Florida 33133 (305) 859 -2050 Fax (305) 860 -3700 LOUIS J. AGUIRRE & ASSOCIATES, P.A. Consulting Engineers 9150 South Dodeland Blvd. , Suite 900 Miami F Florida 33156 9 E80000924 Telephone 305.670,0141 Facsimile 305.670.0144 wJ Igapa.ran 100% CONSTRUCTION DOCUMENTS REVISIONS: A 11/11/13 OWNER CHANGE 8 12/09/13 OWNER CHANGE PROJECT NAME: SMH - LOBBY FLOOR REPLACEMENT & GLL" r SHOP RENOVATION PROJECT ADDRESS: 7400 S.W. 62nd Ave. South Miami, Florida 33143 KEY PLAN COMM. NO. 40071.000 SCALE: AS SHOWN DATE: 11 -26 -2013 DRAWN: 3Z CHECKED: BH CADD FILE: HANSTITUTIONAL DRAWING TITLE: INDEX OF DRAWINGS AND GENERAL NOTES SHEET NO. ►l��il