Loading...
13-1163-014FIRE PROTECTION r' - • • e i- rr - -i .�r,r .- • ii -r • r • - .r! .•. ! ! it �, - •- r. ! • r r • -t •- •i •- r. t r • s • ! ! •- f i f iii. , , i i - FIRE PROTECTION SYMBOL LEGEND SYMBOL DESCRIPTION OUTSIDE SCREW & YOKE AUTOMATIC FIRE SPRINKLER LINE -- - - - - -- EXIST AUTOMATIC FIRE SPRINKLER LINE / /r4�HfNhrrYA EXIST AUTOMATIC FIRE SPRINKLER LINE FLOOR TO BE DEMOLISHED FIRE PROTECTION EXISTING SPRINKLER HEAD FIRE HOSE VALVE FHC FIRE HOSE CABINET EXISTING SPRINKLER HEAD TO BE REMOVED AND CAPPED E R.M, EN EXISTING HEAD RELOCATED AND PROVIDED NEW 0 EN EXISTING SPRINKLER HEAD TO BE REPLACED NEW Q T TEMPORARY SPRINKLER HEAD INSTALLED WHILE TEMPORARY UNDERGROUND CONSTRUCTION WALL IS IN PLACE AND REMOVED THEREAFTER. - -11f-- BUTTERFLY VALVE W/ TAMPER SWITCH 4 FLOW SWITCH 4t-- 4 FIRE DEPARTMENT CONNECTION -�� CHECK VALVE C!� O.S.& Y. GATE VALVE W/ TAMPER SWITCH ® RISER TEE CN O a ELBOW 90 u -+-D PIPE DOWN W L..1. => CAP -t-(3 PIPE UP . r F FIRE OS &Y OUTSIDE SCREW & YOKE D.I.P. DUCTILE IRON PIPE SP SPRINKLER FL FLOOR F.P. FIRE PROTECTION FHV FIRE HOSE VALVE FHC FIRE HOSE CABINET FDC FIRE DEPARTMENT CONNECTION R.M, ROOM DN. DOWN EXIST. EXISTING U/G UNDERGROUND FIRE PROTECTION GENERAL NOTES 1. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS AND EQUIPMENT NECESSARY FOR THE COMPLETE INSTALLATION OF THE FIRE PROTECTION SYSTEM, ALL IN ACCORDANCE WITH THESE CONSTRUCTION DOCUMENTS. ALL WORK PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH LATEST EDITION OF THE FLORIDA BUILDING CODE (2010). OSHA, NFPA 13,14,20,24,30,72 AND 101. 2. THE CONTRACTOR SHALL PAY ALL INSPECTION FEES, ALL COSTS OF PERMITS AND ALL OTHER COST INCIDENTAL TO THE COMPLETION AND TESTING OF THIS WORK UPON FINAL ACCEPTANCE, A CERTIFICATE FROM THE LOCAL INSPECTION AUTHORITY SHALL BE FURNISHED TO THE OWNER. 3. THE DRAWINGS ARE GENERALLY DIAGRAMMATIC AND DEPICT A PERFORMANCE DESIGN ONLY. THEY DO NOT SHOW EVERY BEND, OFFSET OR OTHER FITTINGS WHICH MAY BE REQUIRED FOR THE INSTALLATION IN THE SPACE ALLOCATED, OR FOR COORDINATION WITH OTHER TRADES. 4. COORDINATE THE LOCATION OF RISER, DRAINS, TEST CONNECTIONS, AND OTHER SPRINKLER SYSTEM COMPONENTS WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL SYSTEMS OF THE BUILDING. VERIFY ALL SPACE CONDITIONS AND DIMENSIONS AT JOBSITE PRIOR TO FABRICATION OF PIPING AND INSTALLATION OF EQUIPMENT AND MATERIALS. ANY CONFLICTS SHALL BE REPORTED IMMEDIATELY TO THE ARCHITECT /ENGINEER PRIOR TO BEGINNING OF CONSTRUCTION. 5. CONTRACTOR SHALL PROTECT AND SEAL ALL OPENINGS AND PIPE PENETRATIONS THROUGH FIRE RATED WALLS AND CEILINGS WITH ADEQUATE FIRESTOPPING MATERIALS TO MAINTAIN THE INDICATED FIRE RATINGS OF THE ASSEMBLIES BEING PENETRATED. 6, PROVIDE AUXILIARY DRAINAGE DRUM DRIP FOR ALL TRAPPED SECTION OF PIPE. 7. SPRINKLER PIPE SHALL BE NEW CONFORMING TO ASTM SPECIFICATIONS AND SHALL BEAR ASTM STANDARD MARKED ON EACH LENGTH OF PIPE. A. FOR SIZES ABOVE 2 ", PIPE MAY BE BLACK STEEL, SCHEDULE 10, IN ACCORDANCE WITH ASTM A135 GRADE A OR ASTM A53 GRADE A. B. FOR SIZES 2" AND UNDER, PIPE SHALL BE BLACK STEEL, SCHEDULE 40, IN ACCORDANCE WITH ASTM A135 GRADE A OR ASTM A53 GRADE A. C. THERMOPLASTIC, UL LISTED, CPVC FIRE SPRINKLER PIPES AND FITTING SHALL BE ALLOWED FOR USE IN HORIZONTAL RUNS AS DEFINED BY NFPA 13. D. PIPING THAT IS EXPOSED TO WEATHER OR INSTALLED IN A CORROSIVE ATMOSPHERE SHALL BE GALVANIZED. 8. CONTRACTOR SHALL PAINT ALL ABOVE GROUND EXPOSED FIRE SPRINKLER PIPING, FITTINGS, AND VALVES WITH A MIN. OF 10 MIL RUST PROOF FIRE PROTECTION RED PAINT IN MECHANICAL / ELECTRICAL EQUIPMENT ROOMS. DO NOT PAINT SPRINKLER HEADS OR COVER PLATES. EXPOSED PIPING IN ALL OTHER AREAS (CORRIDORS, STAIRWELLS, LABS, OFFICES, ECT.) SHALL BE PAINTED TO MATCH ADJACENT COLOR SCHEMES. 9. ALL EXPOSED PIPING AND HEAD SHALL BE INSTALLED AS HIGH AS POSSIBLE TO MAINTAIN HEAD CLEARANCE. SPRINKLER HEADS LESS THAN 7 FEET IN HEIGHT SHALL BE PROVIDED WITH GUARDS. 10. ALL PIPING, HANGERS SUPPORT METHODS AND SPRINKLER HEADS TO BE INSTALLED IN STRICT ACCORDANCE WITH N.F.P.A. 13, AND ALL LOCAL CODES AND ORDINANCES. 11. HANG ALL PIPING USING SPLIT RING HANGERS AND RISER CLAMPS, SUPPORT FROM GALVANIZED HANGER RODS FROM BEAM CLAMPS OR PRE -SET INSERT ONLY, SHOOTING ANCHORS IS NOT ACCEPTABLE. 12. ALL SPRINKLER FLOW AND TAMPER SWITCHES SHALL BE FURNISHED AND INSTALLED UNDER DIVISION 15, AND WIRED UNDER DIVISION 16. 13. TEST 100% OF PIPING SYSTEM AT 200 PSI PRESSURE FOR A PERIOD OF 2 HOURS WITHOUT PRESSURE LOSS. 14. HYDROSTATIC TEST PRESSURE SHALL BE MEASURED AT LOW POINT OF SYSTEM OR ZONE BEING TESTED. 15. THE CONTRACTOR IS TO COORDINATE FINAL LOCATION OF ALL FIRE SPRINKLER HEADS AS SHOWN IN THE ARCHITECTURAL REFLECTING CEILING PLANS. 16. WATER SUPPLIES AND ENVIRONMENTAL CONDITIONS SHALL BE EVALUATED FOR THE EXISTENCE OF MICROBES AND CONDITIONS THAT CONTRIBUTE TO MICROBIOLOGICALLY INDUCED CORROSION (MIC). WHERE CONDITIONS ARE FOUND THAT CONTRIBUTE TO MIC, THE SPRINKLER CONTRACTOR SHALL TREAT THE SYSTEMS USING ONE OF THE FOLLOWING METHODS: A. INSTALL A STEEL PIPE SCHEDULE THAT WILL NOT BE AFFECTED BY THE MIC MICROBES. B. TREAT ALL WATER THAT ENTERS THE SYSTEM USING AN APPROVED BIOCIDE. C. IMPLEMENT AN APPROVED PLAN FOR MONITORING THE INTERIOR CONDITIONS OF THE PIPE AT ESTABLISHED TIME INTERVALS AND LOCATIONS. 17. CONTRACTOR SHALL MAINTAIN DETAILED AS -BUILT DRAWINGS (UPDATED DAILY) OF THE WORK PERFORMED ON SITE. PRIOR TO SUBSTANTIAL COMPLETION WALK THROUGH, CONTRACTOR SHALL PROVIDE CADD AS- BUILTS TO A/E TEAM ON CD REFLECTING ALL CHANGES TO SYSTEM LAYOUT DURING CONSTRUCTION. FLAT IRON HANGER MAXIMUM DISTANCE HANGERS NOMINAL i �ae��e�e�s��■e -•r DISTANCE BETWEEN HANGERS - STEEL PIPE N/A 1 3/8 " 1 3/8" 1 3/8" 1 3/8" 1 1/2" 1 1/2" 1 1/2" 1 5/8" 1 5/8" 1 3/4" 1 7/8" 1 NOTE: TABLE 9.2.2.1 (NFPA 13 2007 EDITION) i DESCRIPTION ORIFICE r RATING O r' i • 1 • • +'':r • • • i *.NOTES: 1. PROVIDE QUICK RESPONSE SPRINKLERS AT ALL LIGHT HAZARD OCCUPANCIES AS DEFINED IN NFPA 13. INFECTION CONTROL CONTRACTOR f OBTAIN A COPY OF • N CONTROL RISK ASSESMENT FOR PROJECT. WORK SHALL BE ! - + WITH THE REPORT. ALL WORK OUTSIDE THE SCOPE OF WORK AREA REQUIRED FOR THIS PROJECT, SHALL BE COORDINATED WITH OWNER AND BE IN COMPLIANCE WITH THE ICRA REPORT AND BE SUPERVISED BY THE OWNER'S REPRESENTATIVE. THE DRAWINGS DO NOT INDICATE EXISTING INSTALLATIONS OTHER THAN TO IDENTIFY MODIFICATIONS OR EXTENSIONS THERETO. VISIT THE SITE AND ASCERTAIN THE EXISTING CONDITIONS. REVIEW CONSTRUCTION DETAILS OF THE EXISTING PORTION OF THE BUILDING DURING THE SITE INSPECTION. INCLUDE ALL WORK REQUIRED TO REMOVE OR MODIFY PORTIONS OF THE EXISTING INSTALLATION IN ORDER TO ACCOMMODATE THE NEW WORK . FAILURE TO COMPLY WITH THIS WILL NOT BE CONSIDERED GROUNDS FOR ADDITIONAL PAYMENT IN CONNECTION WITH REMOVING OR MODIFYING ANY PART OF THE EXISTING INSTALLATION OR INSTALLING ANY NEW OR TEMPORARY WORK. COORDINATION DRAWINGS 1. THE CONTRACTOR SHALL SUBMIT COORDINATION DRAWINGS TO ARCHJENG AND OWNER'S PROJECT MANAGER FOR APPROVAL PRIOR TO ANY FABRICATION AND INSTALLATION. 2. CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL NEW PIPING, DUCTWORK, CONDUITS, ECT. WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL SYSTEMS OF THE BUILDING. VERIFY ALL SPACE CONDITIONS AND DIMENSIONS AT JOBSITE PRIOR TO FABRICATION AND INSTALLATION OF EQUIPMENT AND MATERIALS. ANY CONFLICTS SHALL BE REPORTED IMMEDIATELY TO THE ARCHITECT /ENGINEER PRIOR TO BEGINNING OF CONSTRUCTION. COORDINATION NOTE PROCESS, AS PART OF TAIS CONTRACT, THE SUB-CONTRACTOR AND THE CONTRACTOR ARE RESPONSIBLE FOR COORDINATION AND VERIFICATION I HAT A EQUIPMENT, SHOWN IN THE ARCHITECTURAL DRAWINGS PARTICULARLY, BUT NOT LIMITED TO THE ARCHITECTURAL EQUIPMENT PLAN, INCLU ALL SERVICE/UTILITY REQUIRED TO OPERATE THE EQUIPMENT SHOWN. ANY DISCREPANCIES ARE TO BE POINTED OUT DURING THE BIDDIN DISCREPANCIES NOT POINTED OUT DURING THE BIDDING PROCESS WILL BE RESOLVED BY THE CONTRACTOR AS PER THE ARCHITECT DETAILS NO ADDITIONAL C• s THE ! � FIRE WATCH ., 101 SECTION • 9.76.1: WHERE A REQUIRED ALARM SYSTEM AND/OR AUTOMATIC SPRINKLER OUT OF - FOR MORE THAN 4 HOURS i PERIOD, • HAVING JURISDICTION • NOTIFIED, • ! THE BUILDING OR AN SHUTDOWN APPROVED FIRE WATCH SHALL BE PROVIDED FOR ALL PARTIES LEFT UNPROTECTED BY THE • TO APPLICABLE CODES / STANDARDS APPLICABLE CODES AND STANDARDS SHALL INCLUDE ALL STATE LAWS, LOCAL ORDINANCES, UTILITY COMPANY REGULATIONS AND THE APPLICABLE REQUIREMENTS OF THE FOLLOWING ACCEPTED CODES AND STANDARDS, WITHOUT LIMITING THE NUMBER, AS FOLLOWS- 1 . FLORIDA BUILDING CODE - 2010 2. GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH DEPARTMENT CARE FACILITIES 2010 3. AGENCY FOR HEALTH CARE ADMINISTRATION, AHCA, 59A -3. 4. NATIONAL ELECTRIC CODE (NEC 2008). 5. ENVIRONMENTAL PROTECTION AGENCY (EPA). 6. s, DEPARTMENT OF ENVIRONMENTAL REGULATION MANAGEMENT (DERM). 7. LOCAL ORDINANCES, REGULATIONS OF THE BUILDING DEPARTMENTS AND FIRE DEPARTMENTS. 8. NATIONAL ELECTRICAL SAFETY CODE 2002. 9. OCCUPATIONAL SAFETY AND HEALTH STANDARD. 10. RECOMMENDATION OF NFPA, IN GENERAL AND IN PARTICULAR: A. LIFE SAFETY, NFPA (2009) B. HAVC, NFPA 90A (2009) C. HVAC, NFPA 90B (2009) D. HVAC, NFPA 96 (2008) E. HOSPITALS, NFPA 99 (2005) F. SMOKE CONTROL, NFPA 92A (2009),92B (2009) G. MEDICAL GAS, NFPA 99 (2005) H. STANDARD FOR INSTALLATION OF EXHAUST SYSTEMS, NFPA 91 (2204) I. STANDARD FOR INSTALLATION OF SPRINKLER SYSTEM, NFPA 13 (2007) 11. RECOMMENDATION OF ASHRAE (2001), INCLUDING ASHRAE 90 -75. 12. JOINT COMMISSIONS FIRE ALARM POLICY. 13. FLORIDA WITH DISABILITIES ACCESSIBILITY ACT (2004). 14. SMACNA (2005). ® M 4 O CO C, n C 0 v *' C, c isow M Lammt9 O 0 0 QL C•1 � c rn -- CL c ' o Q 5 Eduardo A Suarez, f Licene s : 4 � 6 w=_ C!� a: O °4�Qp�a 4pQ� °a VOO/�O DOO O CN O a i L - > z O Q .� c J f=- CL n 1 LL W L..1. => ova c J = E Q- Q ®� O -4- QzEOW LL_ Q Z _ F- < % (n I- >2 O V) Q L- L� n Z c O to 7 o w Q C? C a F- Lij m O cn Z 4 V; W i� COMM. NO. 2012 -15 DRAWN BY: JS DATE: 0'3 -12 -13 ISSUED: OC3 -12 -13 SCALE: AS NOTED TITLE: GENERAL NOTES / SYMBOL LEGEND FIRE PROTECTION SHEET NO. f = 0.V-0i0 OF