Loading...
13-1163-012PLUMBING - . • HANGERS AND SUPPORTS A. PROVIDE ADJUSTABLE HANGERS, INSERTS, BRACKETS, ROLLS, TRAPEZE, CLAMPS AND SUPPLEMENTARY STEEL AS REQUIRED FOR PROPER SUPPORT OF PIPE LINES. B. HANGERS SHALL ALLOW FOR EXPANSION AND CONTRACTION OF PIPE LINES AND OF ADEQUATE SIZE TO PERMIT COVERING TO RUN CONTINUOUSLY THROUGH HANGERS. C, COORDINATE LOCATION OF HANGERS WITH OTHER TRADES. D. HANGERS SHALL BE PLACED WITHIN 18 INCHES OF HUB OR JOINT FOR HORIZONTAL CAST IRON PIPE. HUBLESS JOINTS MUST BE SUPPORTED AT EVERY OTHER JOINT EXCEPT THAT WHEN THE LENGTH BETWEEN SUPPORTS EXCEEDS FOUR FEET THEY SHALL BE PROVIDED AT EACH JOINT. E. HANGERS SHALL BE PLACED AT EACH CHANGE OF DIRECTION, WITHIN ONE FOOT OF VALVES AND OTHER APPURTENANCES INSTALLED IN HORIZONTAL PIPING AND NOT MORE THAN THREE FEET FROM END OF EACH BRANCH RUNOUT. F. HANGERS SHALL BE ADJUSTABLE CLEVIS TYPE WITH CONTINUOUS THREADED RODS. SANITARY WASTE AND VENT PIPING A. ALL HORIZONTAL BRANCHES, SEWER AND DRAIN LINES SHALL BE SLOPED A MINIMUM OF 1/8 INCH PER FOOT UNLESS OTHERWISE INDICATED ON PLANS. B. EVERY FIXTURE CONNECTED TO THE DRAINAGE SYSTEM SHALL BE EQUIPPED WITH A WATER SEAL TRAP. C. VENT STACKS SHALL NOT PASS THROUGH ROOF AT VALLEYS, ROOF CRICKETS, IN FRONT OF WINDOWS OR WITHIN 6-0" OF ROOF EDGE. D. MATERIALS SHALL BE AS FOLLOWS: 1) DRAINAGE AND VENT PIPING (BELOW GRADE): a. SHALL BE HUB AND SPIGOT SERVICE WEIGHT CAST IRON WITH GASKETED PUSH -ON JOINTS, 2) DRAINAGE AND VENT PIPING (ABOVE GRADE): a. HUBLESS SERVICE WEIGHT CAST IRON WITH NEOPRENE GASKETS AND STAINLESS STEEL BAND JOINTS.. b. LESS THEN 2" - COPPER DRAINAGE TUBE, TYPE DWV ASTM B306 WITH WROUGHT COPPER FITTINGS AND 95 -5 SOLDERED JOINTS. DOMESTIC COLD AND HOT WATER PIPING A. PROVIDE WATER HAMMER ARRESTERS SIZED AS INDICATED ON THE DRAWINGS. B. PROVIDE DIELECTRIC UNIONS WHERE DISSIMILAR METALS ARE JOINED. C. ESCUTCHEONS SHALL BE CHROME PLATED BRASS WITH LOCKING SCREWS WHERE PIPES PASS THROUGH FINISHED WALLS. D. EACH HOSE BIBB SHALL BE FURNISHED WITH A VACUUM BREAKER AND SHUT -OFF VALVE, E. PROVIDE PIPING AS FOLLOWS 1) WATER PIPING (BELOW GRADE): SHALL BE COPPER TYPE "K "° ASTM B -88 WITH WROUGHT COPPER FITTINGS AND 95 -5 SOLDERED JOINTS. PAINT WITH BITUMASTIC WHEN INSTALLED IN GRADE. 2) WATER PIPING (ABOVE GRADE):COPPER TYPE "L" ASTM B -88 WITH WROUGHT COPPER FITTINGS AND 95 -5 SOLDERED JOINTS. COPPER TYPE "K "° ASTM B -88 UNDER GROUND. 3) PRESSURE AND TEMPERATURE RELIEF LINES: SHALL BE TYPE "M" COPPER WITH WROUGHT COPPER FITTINGS AND 95 -5 SOLDERED JOINTS. A. PROVIDE CONTROL VALVES WHERE NOTED ON PLANS, AND AS REQUIRED FOR COMPLETE REGULATION OR CONTROL OF ALL SYSTEM MAINS, BRANCHES TO GROUP OF FIXTURES, AND TO EACH PIECE OF EQUIPMENT. B. PROVIDE ACCESS PANELS AS REQUIRED TO VALVES, OR GROUP OF VALVES, WHERE CONCEALED AND FOR PROPER MAINTENANCE AND OPERATION OF SYSTEM. C. GATE VALVES: 1) 2 -1/2 INCHES AND SMALLER SHALL BE BRONZE BODY, SCREWED BONNET, NON - RISING STEM, SOLID WEDGE, CLASS 125,200 PSI NON -SHOCK WATER; THREADED END WATTS WGV- SERIES, SOLDERED END WATTS WGVS- SERIES. FILLED A. COMPLETE WATER PIPING SYSTEM SHALL BE PRESSURE TESTED BY CAPPING OR PLUGGING OPENINGS, FILLING SYSTEM WITH WATER AND APPLYING HYDROSTATIC PRESSURE OF 200 PSI FOR PERIOD OF NOT LESS THAN 2 HOURS. B. SOIL, WASTE AND VENT PIPING SHALL BE TESTED BY CAPPING OR PLUGGING THE ENDS OF THE SYSTEM AND ALL LINES WATER TO 10 FEET OF 1! AND ALLOW TO STAN ! UNTIL INSPECTION IS MADE AND WATER LEVEL REMAINS CONSTANT FOR A PERIOD OF NOT LESS THAN HOURS. INSULATION k INSULATION SHALL RUN CONTINUOUS THROUGH WALLS, FLOORS AND CEILINGS. B. WHERE INSULATION PASSES THROUGH HANGERS IT SHALL BE PROVIDED WITH A PROTECTIO SHIELD, 180 DEGREE ARC GALVANIZED SHEET METAL COVERING 12 INCHES LONG. C. ALL A/C CONDENSATE DRAIN LINES ABOVE GRADE SHALL BE INSULATED WITH 1/21, ARMAFLE� PIPE INSULATION. SEAL ALL SEAMS WITH INSULATION MANUFACTURER'S SOLVENT. NO TAPES 1 ' ALLOWED. D. GLASS CLOTH .. #r SIZED WHITE, STANDARD WEIGHT, WITH 1-1/2 INCH MINIMUN ADHESIVE. LONGITUDINAL PRESSURE SEALING LAP, AND SEAL STRIPS FOR BUTT JOINTS. E VAPOR BARRIER JACKET: FLAME RESISTANT GLASS FIBER ADHERED TO OUTSIDE OF A 1-MIL ALUMINUM FOIL SHEET WITH LONGITUDINAL PRESSURE SEALING LAP AND SEAL STRIPS FOF BUTT JOINTS. END JOINT CEMENT PERM RATING NOT TO EXCEED.05. F. DOMESTIC HOT WATER SUPPLY AND RETURN PIPING UP TO 1 1/2" NOMINAL SIZE: 1/2 INCH THICK GLASS FIBER MOLDED INSULATION WITH PRE-SIZED FACTORY APPLIED FIRE RATED JACKET OF GLASS CLOTH WITH LONGITUDINAL LAP AND BUTT JOINT STRIPS WITH G. CONDENSATE DRAINING, DRINKING FOUNTAIN AND ELECTRIC WATER COOLER DRAINS: ELASTOMERIC (FOAM PLASTIC) THERMAL INSULATION 1/2 INCH THICK WITH BUILT-IN VAPOR BARRIER RATED SELF- EXTINGUISHING. INSULATION SHALL HAVE A MAXIMUM THERMAL CONDUCTIVITY OF 0.26K FACTOR AT 70 DEGREES F. MEAN TEMPERATURE, DENSITY OF 5-6 POUNDS PER CUBIC FOOT AND 1 WATER VAPOR r+ i OF 0.1 PERMS. STERILIZATION A. AFTER WATER PIPING HAS BEEN THOROUGHLY FLUSHED OUT, STERILIZE THE LINES BY INTRODUCING INTO THEM A SOLUTION OF CALCIUM HYPOCHLORITE OR CHLORIDE OF LIME. OPEN AND CLOSE ALL . LVES WHILE SYSTEM IS BEING CHLORINAT STERILIZING AGENT HAS BEEN APPLIED FOR 24 HOURS, FOR RESIDUAL CHLORINE NECESSARY THE ENDS OF THE LINES. IF LESS THAN 5 PARTS PER MILLION IS INDICATED, REPEAT THE PROCESS. WHEN THE TESTS SHOW AT LEAST 5 PARTS PER MILLION OF RESIDUAL CHLORIN FLUSH OUT THE SYSTEM UNTIL ALL TRACES OF THE CHEMICAL USED ARE REMOVED. MAKE CONNECTIONS • STERILIZE PIPING. PLUMBING GENERAL NOTES 1. ALL WORK PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH THE FLORIDA BUILDING CODE 2010 AND ALL APPLICABLE STATE, COUNTY AND LOCAL ORDINANCES. 2. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS AND EQUIPMENT NECESSARY FOR THE COMPLETE INSTALLATION OF THE PLUMBING SYSTEMS, ALL IN ACCORDANCE WITH THESE CONSTRUCTION DOCUMENTS. 3. THE CONTRACTOR IS RESPONSIBLE FOR VISITING THE SITE OF THE WORK AND BECOMING FAMILIAR WITH THE CONDITIONS OF THE WORK PRIOR TO SUBMITTING A BID. THE CONTRACTOR IS REQUIRED TO BECOME FAMILIAR WITH ALL THE CONTRACT DOCUMENTS PERTAINING TO THE PROPOSED WORK. THE SUBMISSION OF A BID SHALL BE SUFFICIENT TO ESTABLISH THAT THE CONTRACTOR HAS INVESTIGATED THE SITE OF THE WORK AND IS SATISFIED AS TO ALL REASONABLE CONDITIONS TO BE ENCOUNTERED, THE WORK TO BE PERFORMED AND THE MATERIALS TO BE PROVIDED IN THE COMPLETION OF THE PROJECT. 4. FAILURE OF BIDDERS TO MAKE REQUIRED VISITATIONS AND /OR INVESTIGATIONS TO INFORM THEMSELVES FULLY OF EXISTING CONDITIONS, AND TO INCLUDE IN THEIR PROPOSALS A SUM SUFFICIENT TO COVER ALL POSSIBLE FIELD CONDITIONS, WILL NOT IN ANY WAY ENTITLE THEM TO ANY EXTRA CHARGES OVER AND ABOVE THEIR ORIGINAL PROPOSALS. 5. IT IS THE INTENT OF THE PLANS AND GENERAL NOTES TO PROVIDE A COMPLETE AND OPERATING INSTALLATION INCLUDING ALL NECESSARY ITEMS REQUIRED, EVEN THOUGH ITEMS ARE NOT INDICATED ON THE DRAWINGS OR IN THE NOTES. ALL WORK CONSIDERED NECESSARY FOR THE COMPLETION OF THE WORK IN PROPER MANNER NOT SHOWN ON THE PLANS OR NOTES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IN WRITING PRIOR TO BIDS OTHERWISE WORK SHALL NOT BE ADDITIONALLY CHARGED AFTER BID IS AWARDED, 6. UPON COMPLETION, CONTRACTOR SHALL CLEAN ALL DUST AND DEBRIS IN AREAS WHERE WORK WAS CONDUCTED. 7. ALL WORK SHALL BE COORDINATED WITH ALL OTHER TRADES AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION OF EQUIPMENT. 8. THE WORK THAT IS TO BE DONE UNDER THIS CONTRACT INCLUDES THE FURNISHING OF ALL LABOR, MATERIALS AND EQUIPMENT REQUIRED FOR THE COMPLETION OF THE SYSTEMS SHOWN ON DRAWINGS. 9. THE DRAWINGS ARE GENERALLY DIAGRAMMATIC. THEY DO NOT SHOW EVERY BEND, OFFSET, ELBOW OR OTHER FITTINGS WHICH MAY BE REQUIRED FOR THE INSTALLATION IN THE SPACE ALLOCATED. 10. DRAWINGS ARE NOT TO BE SCALED. UNLESS SPECIFIC DIMENSIONS ARE SHOWN, THE ARCHITECTURAL AND /OR SITE CONDITIONS SHALL GOVERN EXACT LOCATION OF PIPING AND EQUIPMENT TO BE INSTALLED. 11. ALL MATERIALS AND EQUIPMENTS SHALL BE NEW AND OF GOOD QUALITY OF RESPECTIVE KIND AND GRADE AND MUST BE FURNISHED SO AS TO PREVENT ANY DELAY IN THE PROGRESS OF THE WORK. ALL WORK THROUGHOUT SHALL BE PERFORMED IN A WORKMANLIKE MANNER BY SUFFICIENT NUMBER OF SKILLED WORKMEN. 12. FOR EXACT LOCATION OF ALL PLUMBING FIXTURES, SEE ARCHITECTURAL DRAWINGS. DO NOT ROUGH -IN ANY PLUMBING FIXTURE AND /OR EQUIPMENT WITHOUT AN APPROVED COPY OF THE CORRESPONDING SHOP DRAWINGS. 13. FURNISH AND INSTALL CONNECTIONS TO EQUIPMENT PROVIDED BY THE OWNER UNDER THIS CONTRACT, COORDINATE INSTALLATION WITH MANUFACTURER'S RECOMMENDATION, 14. PLUMBING CONTRACTOR SHALL GURANTEE ALL WORK FREE OF DEFECTS IN MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF ACCEPTANCES, 15. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE ALL ROUGH INS WITH EQUIPMENT AND FIXTURES MANUFACTURER BEFORE MAKING ANY INSTALLATION. 16. ALL EXPOSED TRIM SHALL BE CHROME PLATED FINISH FOR ALL WATER SUPPLY AND WASTE ASSEMBLIES. 17. CONTRACTOR SHALL PROTECT AND FIRE SEAL ALL OPENINGS AND PIPE PENETRATIONS THROUGH FIRE RATED WALLS AND CEILINGS WITH ADEQUATE FIRESTOPPING MATERIALS TO MAINTAIN THE INDICATED FIRE RATINGS OF THE ASSEMBLIES BEING PENETRATED. 18. PROVIDE CEILING / WALL ACCESS PANELS WHERE INDICATED IN THE DRAWINGS AND WHERE REQUIRED TO ACCESS PLUMBING EQUIPMENT. PANELS SHALL BE RECESSED TYPE, FIRE RATED IF IN FIRE RATED WALLS OR CEILINGS. LOCATIONS OF PANELS SHALL BE COORDINATED WITH ALL THE OTHER TRADES. PLUMBING DEMOLITION NOTES 1. SITE INVESTIGATION: THE CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE HIMSELF WITH THE LOCATION OF ALL EXISTING UTILITIES STUB -OUTS, PIPING, EQUIPMENT, ETC,, AND /OR ANY CONDITION THAT MAY AFFECT HIS WORK. ALL THE NECESSARY RE- ROUTING, RELOCATING AND /OR REMOVAL OF EXISTING PIPING, EQUIPMENT, ETC., SHALL BE INCLUDED IN THE SCOPE OF WORK. IGNORANCE ON THE PART OF THE CONTRACTOR WILL IN NO WAY RELIEVE HIM OF THE OBLIGATIONS AND RESPONSIBILITIES ASSUMED UNDER THIS CONTRACT. 2. THE NATURE OF THE REMODEL TYPE CONSTRUCTION POSES SPECIAL PROBLEMS FOR THE DESIGNER ENGINEERS AS WELL AS THE PLUMBING CONTRACTOR. EVERY EFFORT HAS BEEN MADE BY THE ENGINEERS TO SHOW AND VERIFY, WHERE POSSIBLE, THE LOCATION OF THE EXISTING PLUMBING SYSTEMS, THE MAJOR PORTION OF THE PLUMBING SYSTEMS ARE AS SHOWN ON THE DRAWINGS: HOWEVER MINOR DEVIATIONS MAY BECOME EVIDENT AS THE JOB PROGRESSES. NO ADVANTAGE IS TO BE TAKEN BY THE PLUMBING CONTRACTOR BECAUSE THESE MINOR DIFFERENCES. THE PLUMBING CONTRACTOR SHALL PERFORM A FIELD VERIFICATION BEFORE BIDDING THIS PROJECT. 3. CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATING HIS DEMOLITION WORK WITH OTHER TRADES, AND TO PROTECT FROM DAMAGE EXISTING PIPES USED FOR FUTURE CONNECTIONS. 4. EXISTING PIPES SERVING AREAS REMAINING IN SERVICE AT THIS TIME SHALL NOT BE INTERRUPTED UNLESS A TEMPORARY INTERRUPTION IS COORDINATED WITH THE OWNER. 5. ALL SERVICE INTERRUPTIONS SHALL BE SCHEDULED WITH THE AUTHORIZED REPRESENTATIVE OF THE OWNER. ALL REMOVAL AND DISPOSAL WORK SHALL BE COORDINATED WITH THE AUTHORIZED REPRESENTATIVE OF THE OWNER. 6. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT PROPERTY IN AREAS WHERE WORK IS BEING CONDUCTED. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGES CAUSED TO BUILDING COMPONENTS DUE TO WORK OPERATIONS. PATCH AND REPAIR EXISTING SURFACES DAMAGED AS REQUIRED TO MATCH ADJACENT SURFACES. 7. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR ALL EXISTING CONSTRUCTION, INCLUDING EXISTING TO REMAIN AND TO BE REMOVED. ITEMS AND DEBRIS TO BE REMOVED WILL BE PROPERLY DISPOSED OF BY THE CONTRACTOR, WITHIN HIS CONTRACT, AT NO COST TO THE OWNER. 8, ANY UTILITY LINES TO REMAIN AND THAT ARE BROKEN OR DAMAGED DURING DEMOLITION OPERATIONS SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL CHARGE TO THE CONTRACT PRICE, OR SHALL BE REPAIRED BY THE OWNER AT THE CONTRACTOR'S EXPENSE. 9. ANY DISCREPANCIES BETWEEN THE WORK DEPICTED ON THESE DOCUMENTS AND THE ACTUAL CONDITIONS ENCOUNTERED SHALL BE BROUGHT PROMPTLY TO THE ENGINEER FOR REVIEW AND CLARIFICATION. SPECIFICATIONS MEDICAL . (AIR, OXYGEN NOTE: ALL WORK PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH NFPA •• 10 • i DISTRIBUTION", CODES "PIPE LABELING" IN THEIR ENTIRETY AND ALL OTHER APPLICABLE i ! 1 A. HARD-DRAWN SEAMLESS COPPER ASTM ■ B. WROUGHT COPPER CAPILLARY FITTINGS ASTM B 16.22 OR BRAZED FITTINGS ASTM B i WITHOUT C. SILVER BRAZING MATERIALS: 1. MELTING POINT: ABOVE 1000 DEGREES F. 2. COPPER-PHOSPHORUS OR COPPER-PHOSPHORUS-SILVER BRAZING STERILIZATION: D. ALL PIPES SHALL BE CLEANED, CAPPED AND NITROGEN CHARGED. 2. A. CLEAN ALL TUBING, FITTINGS AND VALVES OF OIL, GREASE AND OTHER DEPOSITS BY WASHING A 180 DEGREES F. SOLUTION OF CARBONATE OR TRISODIUM PHOSPHATE MIXED: ONE POUND TO 3 GALLONS OF WATER. B. RINSE THOROUGHLY WITH CLEAN C. WHILE BEING BRAZED, JOINTS SHALL BE CONTINUOUSLY PURGED WITH OIL -FREE, DRY NITROGEN NF TO PREVENT THE FORMATION OF COPPER OXIDE ON THE INSIDE SURFACE OF THE JOINT, THE FLOW OF THE PURGE GAS SHALL BE MAINTAINED UNTIL THE JOINT IS COOL TO THE TOUCH. D. INTERNAL CLEANING OF SYSTEMS AFTER INSTALLATION NOT PERMITTED. E. SUBMIT CERTIFICATE TO A/E OF COMPLIANCE PRIOR TO INSTALLATION, F. PIPING MAY BE PURCHASED PRE - CLEANED FOR OXYGEN SERVICE. 3. TESTING A. TESTING COMPLETE BEFORE ANY WORK IS COVERED OR CONCEALED. B. PIPING MAY BE TESTED A SECTION AT A TIME TO FACILITATE CONSTRUCTION. C. MAINTAIN 150 PSI (1040 KPA) OF OIL -FREE NITROGEN ON SYSTEM AND CHECK EACH JOINING WITH LIQUID SOAP OR THICK SOAPY WATER. D. AFTER COMPLETION OF 3.05C, PERFORM 2 HOUR STANDING PRESSURE TEST WITH 150 PSI (1040 KPA) OF OIL -FREE NITROGEN OR AIR. NO PRESSURE DROP PERMITTED ON 4 -1/2 INCHES DIAMETER GAGE CALIBRATED TO 1/4 OF ONE PERCENT E. AFTER COMPLETION OF SUBPARAGRAPH 3.05.D, REDUCE PRESSURE ON SYSTEM TO 50 PSA (350 KPA) AND PLACE "WARNING-DO NOT OPEN - PRESSURE SEALED ", TAGS ON ALL VALVES, OUTLETS AND CAPPED ENDS. F. LEAKS DEVELOPING AT THESE TEST REPAIRED AND RE- TESTED AT NO ADDITIONAL COST TO OWNER OF A/E. G. AT COMPLETION OF WORK, OR WHEN SYSTEM OR SECTION IS MADE AVAILABLE, COMPLETELY FLUSH SYSTEMS WITH GAS TO BE USED IN THE PARTICULAR SYSTEM. H. TEST EACH DESIGNATED AND LABELED MEDICAL GAS OUTLET TO CONFIRM THE PRESENCE OF THE DESIRED CONCENTRATION OF MEDICAL GAS. I. CERTIFICATION: 1. THE CONTRACTOR SHALL PROVIDE THE SERVICES OF THE AUTHORIZED REPRESENTATIVE OF THE MANUFACTURER OF THE OXYGEN, AIR AND VACUUM SYSTEM EQUIPMENT TO INSPECT THE COMPLETED INSTALLATION AND FURNISH CERTIFICATION ON THE MANUFACTURER'S LETTERHEAD THAT THESE SYSTEMS ARE WITHOUT CROSS CONNECTION, THAT THE EQUIPMENT IS INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS, AND THAT ONLY OXYGEN IS AVAILABLE FROM OXYGEN OUTLETS AND VACUUM IS AVAILABLE FROM THE VACUUM OUTLETS. 2. THE CONTRACTORS SHALL FURNISH A LETTER SIGNED BY A PRINCIPAL OF THE CONTRACTING FIRM ADDRESSED TO OWNER AND DELIVERED PRIOR TO FINAL INSPECTION WHICH CERTIFIED THAT A, ALL MEDICAL GAS PIPING ARE LABELED CORRECTLY AND ALL MEDICAL GAS VALVES AND MANIFOLDS ARE LABELED CORRECTLY AND THAT ALL ZONE VALVES AND ALARM PANEL INDICATE ITS CONTROLLING AREAS B. THERE ARE NO CROSS CONNECTIONS. C. ONLY OXYGEN IS AVAILABLE FROM OXYGEN OUTLETS, ONLY AIR IS AVAILABLE FROM AIR PIPE AND ALL VACUUM OPERATE AT A VACUUM. 3. COPIES OF THE CERTIFICATION LETTER SHALL ALSO BE FURNISHED TO THE ARCHITECT /ENGINEER AT TIME OF COMPLETION OF PROJECT. WATER HAMMER ARRESTER SCHEDULE MARK "P.D.I. SIZE CONN. SIZE A A (1 - 11 F.U.) 1/2" B B (12 - 32 F.U.) 3/4" C C (33 - 60 F.U.) 1" D D (61 - 113 F.U.) 1" E E (114 - 154 F.U.) F F (155 - 330 F.U.) aNILIJAMIN SANITARY PIPE ------ - - - - -- VENT PIPE CD CONDENSATE DRAIN PIPE DOMESTIC COLD WATER PIPE - -- - -- DOMESTIC HOT WATER PIPE - -- DOMESTIC HOT WATER RETURN PIPE 0 NEW OXYGEN PIPE _____02 - - - - -- EXISTING OXYGEN PIPE -- A - - - - -- EXISTING MEDICAL AIR PIPE A NEW MEDICAL AIR PIPE - - - -- V - - - - -- EXISTING MEDICAL VACUUM PIPE V NEW MEDICAL VACUUM PIPE VLA_� SENSOR IN I DIRECTION OF FLOW COIL CLEANOUT HI WCO WALL CLEANOUT FLOOR CLEANOUT I Ell it FLOOR !- • R AREA DRAIN OR -•• DRAIN WITH FULL GRATE 'It FLOOR DRAIN WITH TRAP RESEAL PROD. No. 22059 CA 924 LOUIS J. AGUIRRE & ASSOCIATES P.A. CONSULTING ENGINEERS 9150 SOUTH DADELAND BLVD. SUITE 900 M MIAMI FLORIDA 33156 � I TELEPHONE: (305) 670 -0141 m FAX: (305) 670 -0144 I www.ijoapa.com APPLICABLE CODES / STANDARDS APPLICABLE CODES AND STANDARDS SHALL INCLUDE ALL STATE LAWS, LOCAL ORDINANCES, UTILITY COMPANY REGULATIONS AND THE APPLICABLE REQUIREMENTS OF THE FOLLOWING ACCEPTED CODES AND STANDARDS, WITHOUT LIMITING THE NUMBER, AS FOLLOWS: 1. FLORIDA BUILDING CODE - 2010 2. GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH DEPARTMENT CARE FACILITIES 2010 3. AGENCY FOR HEALTH CARE ADMINISTRATION, AHCA, 59A -3. 4, NATIONAL ELECTRIC CODE (NEC 2008). 5. ENVIRONMENTAL PROTECTION AGENCY (EPA). 6. DEPARTMENT OF ENVIRONMENTAL REGULATION MANAGEMENT (DERM). 7. LOCAL ORDINANCES, REGULATIONS OF THE BUILDING DEPARTMENTS AND FIRE DEPARTMENTS. 8. NATIONAL ELECTRICAL SAFETY CODE 2002. 9. OCCUPATIONAL SAFETY AND HEALTH STANDARD, 10. RECOMMENDATION OF NFPA, IN GENERAL AND IN PARTICULAR: A. LIFE SAFETY, NFPA (2009) B. HAVC, NFPA 90A (2009) C. HVAC, NFPA 90B (2009) D. HVAC, NFPA 96 (2008) E. HOSPITALS, NFPA 99 (2005) F. SMOKE CONTROL, NFPA 92A (2009),92B (2009) G. MEDICAL GAS, NFPA 99 (2005) AND NFPA 50 (2001) H. STANDARD FOR INSTALLATION OF EXHAUST SYSTEMS, NFPA 91 (2004) L STANDARD FOR INSTALLATION OF SPRINKLER SYSTEM, NFPA 13 (2007) 11. RECOMMENDATION OF ASHRAE (2001), INCLUDING ASHRAE 90 -75. 12. JOINT COMMISSIONS FIRE ALARM POLICY. 13. FLORIDA WITH DISABILITIES ACCESSIBILITY ACT (2004). 14. SMACNA (2005). INFECTION CONTROL NOTE IN A - THE DRAWINGS DO NOT INDICATE EXISTING INSTALLATIONS OTHER THAN TO IDENTIFY MODIFICATIONS OR EXTENSIONS THERETO. VISIT THE SITE AND ASCERTAIN THE EXISTING CONDITIONS. REVIEW CONSTRUCTION DETAILS OF THE EXISTING PORTION OF THE BUILDING DURING THE SITE INSPECTION. INCLUDE ALL WORK REQUIRED TO REMOVE OR MODIFY PORTIONS OF THE EXISTING INSTALLATION IN ORDER TO ACCOMMODATE THE NEW WORK . FAILURE TO COMPLY WITH THIS WILL NOT BE CONSIDERED GROUNDS FOR ADDITIONAL PAYMENT IN CONNECTION WITH REMOVING OR MODIFYING ANY PART OF THE EXISTING INSTALLATION OR INSTALLING ANY NEW OR TEMPORARY WORK. COORDINATION DRAWINGS 1. THE CONTRACTOR SHALL SUBMIT COORDINATION DRAWINGS TO ARCH. /ENG AND OWNER'S PROJECT MANAGER FOR APPROVAL PRIOR TO ANY FABRICATION AND INSTALLATION. 2. CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL NEW PIPING, DUCTWORK, CONDUITS, ECT, WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL SYSTEMS OF THE BUILDING. VERIFY ALL SPACE CONDITIONS AND DIMENSIONS AT JOBSITE PRIOR TO FABRICATION AND INSTALLATION OF EQUIPMENT AND MATERIALS. ANY CONFLICTS SHALL BE REPORTED IMMEDIATELY TO THE ARCHITECT /ENGINEER PRIOR TO BEGINNING OF CONSTRUCTION. COORDINATION • AS PART OF THIS CONTRACT, THE SUB-CONTRACTOR AND THE CONTRACTOR ARE RESPONSIBLE FOR COORDINATION AND VERIFICATION THAT ALL 1 i EQUIPMENT, i ARCHITECTURAL DRAWINGS PARTICULARLY, BUT NOT LIMITED TO THE ARCHITECTURAL EQUIPMENT PLAN, INCLUDE ALL SERVICE/UTILITY REQUIRED TO OPERATE THE EQUIPMENT SHOWN. ANY DISCREPANCIES ARE TO BE POINTED OUT DURING THE BIDDING PROCESS. DISCREPANCIES NOT POINTED OUT DURING THE BIDDING PROCESS WILL BE RESOLVED BY THE CONTRACTOR AS PER THE ARCHITECT DETAILS AT NO ADDITIONAL COST TO THE OWNER. BACTERIOLOGICAL TEST BACTERIOLOGICAL TEST SHALL BE PEFORMED UPON COMPLETION OF WORK TO INDICATE THAT THE WATER IS EITHER COLIFORM NEGATIVE OR COLIFORM POSITIVE. IF THE TEST IS COLIFORM POSITIVE, THEN ACTION SHALL BE TAKEN IMMEDIATELY TO DETERMINE THE SOURCE OF CONTAMINATION AND /OR DISINFECT THE WATER BEFORE USE. 0 m: Q Ej a_ ,q v � N IA Q 4°. Lamm ' t7 M O � CL ............. .:.::.: rn a a �- c N E E Edusrdcp,A SSu , PE Li cPri�ex. +� cn 4 °OOQp4© (D(��C,JaoOQ�j�4 O t/u ©Q 0 CK CN C-4 O ♦� i - > r C7 V) 0 ►�' 0._ c: J F- cl ®rW- 0 Q < E 0 �-- Qz 0W ® > _0 = Q W � �c 0 0 0 (or) �w Of 0° < z 0 c� cn O Z O N_ W fit Ill ill COMM. NO. 2012-15 DRAWN BY: J5 DATE: 0'5-12-13 ISSUED: 09 -12 -13 SCALE: AS NOTED TITLE: GENERAL NOTES / SYMBOL LEGEND PLUMBING SHEET N D0,0 V-0-OF ol GATE VALVE VALVE IN VERTICAL --I�I BALL VALVE -+ v CHECK VALVE - -ill- COUPLING OR UNION -�� HOSE BIBB 0---C WATER HAMMER ARRESTOR POINT OF CONNECTION BETWEEN EXIST AND NEW �J DEMOLITION TERMINATION POINT ABV. ABOVE AFF ABOVE FINISHED FLOOR LEVEL BLW. BELOW CEIL., CLG. CEILING DN DOWN EXIST. EXISTING FA FROM ABOVE FB FROM BELOW VTR VENT THRU ROOF WS WASTE STACK PROD. No. 22059 CA 924 LOUIS J. AGUIRRE & ASSOCIATES P.A. CONSULTING ENGINEERS 9150 SOUTH DADELAND BLVD. SUITE 900 M MIAMI FLORIDA 33156 � I TELEPHONE: (305) 670 -0141 m FAX: (305) 670 -0144 I www.ijoapa.com APPLICABLE CODES / STANDARDS APPLICABLE CODES AND STANDARDS SHALL INCLUDE ALL STATE LAWS, LOCAL ORDINANCES, UTILITY COMPANY REGULATIONS AND THE APPLICABLE REQUIREMENTS OF THE FOLLOWING ACCEPTED CODES AND STANDARDS, WITHOUT LIMITING THE NUMBER, AS FOLLOWS: 1. FLORIDA BUILDING CODE - 2010 2. GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH DEPARTMENT CARE FACILITIES 2010 3. AGENCY FOR HEALTH CARE ADMINISTRATION, AHCA, 59A -3. 4, NATIONAL ELECTRIC CODE (NEC 2008). 5. ENVIRONMENTAL PROTECTION AGENCY (EPA). 6. DEPARTMENT OF ENVIRONMENTAL REGULATION MANAGEMENT (DERM). 7. LOCAL ORDINANCES, REGULATIONS OF THE BUILDING DEPARTMENTS AND FIRE DEPARTMENTS. 8. NATIONAL ELECTRICAL SAFETY CODE 2002. 9. OCCUPATIONAL SAFETY AND HEALTH STANDARD, 10. RECOMMENDATION OF NFPA, IN GENERAL AND IN PARTICULAR: A. LIFE SAFETY, NFPA (2009) B. HAVC, NFPA 90A (2009) C. HVAC, NFPA 90B (2009) D. HVAC, NFPA 96 (2008) E. HOSPITALS, NFPA 99 (2005) F. SMOKE CONTROL, NFPA 92A (2009),92B (2009) G. MEDICAL GAS, NFPA 99 (2005) AND NFPA 50 (2001) H. STANDARD FOR INSTALLATION OF EXHAUST SYSTEMS, NFPA 91 (2004) L STANDARD FOR INSTALLATION OF SPRINKLER SYSTEM, NFPA 13 (2007) 11. RECOMMENDATION OF ASHRAE (2001), INCLUDING ASHRAE 90 -75. 12. JOINT COMMISSIONS FIRE ALARM POLICY. 13. FLORIDA WITH DISABILITIES ACCESSIBILITY ACT (2004). 14. SMACNA (2005). INFECTION CONTROL NOTE IN A - THE DRAWINGS DO NOT INDICATE EXISTING INSTALLATIONS OTHER THAN TO IDENTIFY MODIFICATIONS OR EXTENSIONS THERETO. VISIT THE SITE AND ASCERTAIN THE EXISTING CONDITIONS. REVIEW CONSTRUCTION DETAILS OF THE EXISTING PORTION OF THE BUILDING DURING THE SITE INSPECTION. INCLUDE ALL WORK REQUIRED TO REMOVE OR MODIFY PORTIONS OF THE EXISTING INSTALLATION IN ORDER TO ACCOMMODATE THE NEW WORK . FAILURE TO COMPLY WITH THIS WILL NOT BE CONSIDERED GROUNDS FOR ADDITIONAL PAYMENT IN CONNECTION WITH REMOVING OR MODIFYING ANY PART OF THE EXISTING INSTALLATION OR INSTALLING ANY NEW OR TEMPORARY WORK. COORDINATION DRAWINGS 1. THE CONTRACTOR SHALL SUBMIT COORDINATION DRAWINGS TO ARCH. /ENG AND OWNER'S PROJECT MANAGER FOR APPROVAL PRIOR TO ANY FABRICATION AND INSTALLATION. 2. CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL NEW PIPING, DUCTWORK, CONDUITS, ECT, WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL SYSTEMS OF THE BUILDING. VERIFY ALL SPACE CONDITIONS AND DIMENSIONS AT JOBSITE PRIOR TO FABRICATION AND INSTALLATION OF EQUIPMENT AND MATERIALS. ANY CONFLICTS SHALL BE REPORTED IMMEDIATELY TO THE ARCHITECT /ENGINEER PRIOR TO BEGINNING OF CONSTRUCTION. COORDINATION • AS PART OF THIS CONTRACT, THE SUB-CONTRACTOR AND THE CONTRACTOR ARE RESPONSIBLE FOR COORDINATION AND VERIFICATION THAT ALL 1 i EQUIPMENT, i ARCHITECTURAL DRAWINGS PARTICULARLY, BUT NOT LIMITED TO THE ARCHITECTURAL EQUIPMENT PLAN, INCLUDE ALL SERVICE/UTILITY REQUIRED TO OPERATE THE EQUIPMENT SHOWN. ANY DISCREPANCIES ARE TO BE POINTED OUT DURING THE BIDDING PROCESS. DISCREPANCIES NOT POINTED OUT DURING THE BIDDING PROCESS WILL BE RESOLVED BY THE CONTRACTOR AS PER THE ARCHITECT DETAILS AT NO ADDITIONAL COST TO THE OWNER. BACTERIOLOGICAL TEST BACTERIOLOGICAL TEST SHALL BE PEFORMED UPON COMPLETION OF WORK TO INDICATE THAT THE WATER IS EITHER COLIFORM NEGATIVE OR COLIFORM POSITIVE. IF THE TEST IS COLIFORM POSITIVE, THEN ACTION SHALL BE TAKEN IMMEDIATELY TO DETERMINE THE SOURCE OF CONTAMINATION AND /OR DISINFECT THE WATER BEFORE USE. 0 m: Q Ej a_ ,q v � N IA Q 4°. Lamm ' t7 M O � CL ............. .:.::.: rn a a �- c N E E Edusrdcp,A SSu , PE Li cPri�ex. +� cn 4 °OOQp4© (D(��C,JaoOQ�j�4 O t/u ©Q 0 CK CN C-4 O ♦� i - > r C7 V) 0 ►�' 0._ c: J F- cl ®rW- 0 Q < E 0 �-- Qz 0W ® > _0 = Q W � �c 0 0 0 (or) �w Of 0° < z 0 c� cn O Z O N_ W fit Ill ill COMM. NO. 2012-15 DRAWN BY: J5 DATE: 0'5-12-13 ISSUED: 09 -12 -13 SCALE: AS NOTED TITLE: GENERAL NOTES / SYMBOL LEGEND PLUMBING SHEET N D0,0 V-0-OF ol