Loading...
13-1163-008�. ....• FLEX. DUCT ---. CONSTRUCTION AREA TEE FITTING .mi. A . a .11L ♦U 'r -.1 n d a' wI m ONE - 6X6 WALL MAGNETIC D12AFT GAUGE ALL EXISTING A/C RESTROOMS TO . . �. ♦ • i- 1 j Phase 1 Plan - HVAC M1.00 A Scale: 1/4 " =1' -0" VD I TRANSFER AIR BACK NTS. r I EQUIPMENT SPECIFICATIONS: SUPPLY, RETURN, TRANSFER, AND EXHAUST AIR DUCTWORK: SHALL BE GALVANIZED SHEET STEEL, DESIGNED, CONSTRUCTED AND INSTALLED PER SMACNA °S "HVAC DUCT CONSTRUCTION STANDARDS- METAL AND FLEXIBLE" MANUAL, LATEST EDITION. STATIC PRESSURE CLASSIFICATION AS FOLLOWS: 3" STATIC PRESSURE: SUPPLY AIR AND RETURN AIR DUCTWORK. 2" STATIC PRESSURE: OUTSIDE AIR, TRANSFER DUCTS AND EXHAUST AIR DUCTWORK. FLEXIBLE DUCTWORK: SHALL BE CLASS 1, UL STANDARD 181, INSULATED ROUND DUCT BY THERMAFLEX MKE OR FLEXMASTER 8M; R -6 MINIMUM. FACTORY FABRICATED WITH AN OUTER JACKET ENCLOSING 1 -1/2 INCH THICK GLASS FIBER INSULATION AROUND A CONTINUOUS METAL INNER LINER. GLASS- REINFORCED SILVER MYLAR OUTER JACKET WITH A CONTINUOUS HANGING TAB. RECTANGULAR MANUAL VOLUME DAMPERS: SHALL BE RUSKIN MODEL MD35 OR EQUAL. MULTIPLE OPPOSED BLADE OR SINGLE BLADE, FURNISHED COMPLETE WITH FACTORY FABRICATED LOCKING HAND QUADRANT. PROVIDE WITH 2" STAND -OFF WHEN INSTALLED ON EXTERNALLY INSULATED DUCT. DEMOLITION NOTES: 1. AREA OF CONSTRUCTION SHALL BE MAINTAINED UNDER NEGATIVE PRESSURE IN RELATION TO SURROUNDING AREAS. THE CONSTRUCTION AREAS TO BE TESTED WEEKLY TO ASSURE A NEGATIVE PRESSURE OF 0.03 INCHES WATER GAUGE IN BEING MAINTAINED WHEN ALL DOORS AND WINDOWS ARE CLOSED. ALL AIR OUTLETS AND WALL PENETRATIONS SHALL BE BLOCKED OF TO MAINTAIN NEGATIVE PRESSURE IN THE SPACE. CONTRACTOR WILL PROVIDE A TEMPORARY EXHAUST FAN TO MAINTAIN NEGATIVE PRESSURE IN THE SPACE. 2. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL DEMOLITION WORK INFORMATION. 3. WORK SHALL SCHEDULE TO MINIMIZE IMPACT TO THE NORMAL OPERATION OF THE HOSPITAL SEE ARCHITECTURAL DRAWING PLAN. COORDINATE WITH THE AUTHORIZED JMC HOSPITAL REPRESENTATIVE MINIMUM OF 72 HOURS PRIOR TO ANY SHUTDOWN REQUIRED TO PERFORM WORK ON H.V.A.C. SYSTEMS. 4. PROVIDE VISUAL NEGATIVE PRESSURE GAUGE TO MONITOR THE PRESSURE RELATIONSHIP BETWEEN THE CONSTRUCTION AREA AND THE ADJACENT SPACE TO PROVIDE NEGATIVE PRESSURE OF 0.03° W.G. WITHIN THE SPACE. ALL EXISTING A/C DISTRIBUTION OUTSIDE OF RESTROOMS TO REMAIN. 'AREA IS NOT IN SCOPE' 2 Phase 2 Plan - HVAC M1,00 Scale: 1/4"=1 1-011 DEMOLITION NOTES: 1. INSTALL AGAINST AIR DEVICE TEMPORARY BLANKET TYPE, DISPOSABLE 1" THICK SYNTHETIC MEDIA. REMOVE SYNTHETIC MEDIA AFTER DEMOLITION IS COMPLETED. 2. DOOR SHALL BE SEALED AIRTIGHT AND KEPT CLOSED DURING CONSTRUCTION. INFECTION CONTROL RISK ASSESSMENT 1. TO THE EXTEND THAT IT IS REQUIRED BY THE ICRA, THE CONTRACTOR SHALL MAINTAIN EXISTING LEVELS OF INDOOR AIR QUALITY IN SURROUNDING AND ADJACENT AREAS TO THE CONSTRUCTION AREA, AND ELSEWHERE IN THE FACILITY. IT SHOULD BE ANTICIPATED THAT THE ICRA REPORT WILL REQUIRE ERECTION OF CONSTRUCTION ZONE BARRIERS AND PROVISION OF NEGATIVE PRESSURE IN THE CONSTRUCTION ZONE RELATIVE TO SURROUNDING AREAS. 2. IN ADDITION TO MEETING THE REQUIREMENTS OF THE ICRA REPORT, THE CONTRACTOR SHALL PROVIDE THE EQUIPMENT NECESSARY TO CREATE A NEGATIVE PRESSURE IN THE CONSTRUCTION AREA, RELATIVE TO THE ADJACENT AREA. EXISTING HVAC SYSTEM AND COMPONENTS SHALL NOT BE USED FOR THIS FUNCTION, UNLESS SPECIFICALLY APPROVED BY THE OWNER'S INFECTION CONTROL OFFICER. THE CONCEPT AND ALL ASPECTS OF THIS WORK SHALL BE DONE IN ACCORDANCE WITH THE ICRA REQUIREMENTS AND AS A MINIMUM THE FOLLOWING: A. VERIFY ALL EXISTING DUCTWORK WHICH PASSES THROUGH THE CONSTRUCTION ZONE, AND IS TO REMAIN, IS SEALED AND PROTECTED DURING CONSTRUCTION. B. AIR REMOVED FROM THE CONSTRUCTION ZONE SHALL BE FILTERED AND /OR DISCHARGED AS DIRECTED BY THE ICRA REPORT. C. PRESENT THE NEGATIVE AIR PRESSURE PLAN TO THE OWNER FOR APPROVAL BY THE INFECTION CONTROL OFFICER. D. PROVIDE MEANS TO MONITOR AND VERIFY NEGATIVE PRESSURE IS BEING MAINTAINED IN ACCORDANCE WITH THE ICRA REPORT, AND PROVIDE DOCUMENTS TO THE OWNER AS REQUIRED RELATIVE PRESSURE (0) = EQUAL PRESSURE ( -} = NEGATIVE PRESSURE ( +} = POSITIVE PRESSURE ICRA TYPE 'C° CLASS - III PROD. No. 22059 CA 924 4 LOUIS J. AGUIRRE & ASSOCIATES P.A. CONSULTING ENGINEERS 9150 SOUTH DADELAND BLVD. SUITE 9n' MIAMI, FLORIDA 331 5Z�- - TELEPHONE: (305) 670 -0141 FAX: (305) 670 -0144 www.Ijoapa.com TEMPORARY" MAI-�NC i 6X6 WALL DRAFT GRILLE. i GAUGE UTILITY FAN WITH I -EPA FILTER (99.99% EFF.) AND SPEED CONTROL (375 CFM) TO CLEAN AND RECIRCULATE THE AIR IN THE CONSTRUCTION AREA, MAINTAINING NEGATIVE PRESSURE OF 0.03' W.G. I BETWEEN CONSTRUCTION I I I I I AREA AND ADJACENT SPACES. EQUIPMENT SPECIFICATIONS: SUPPLY, RETURN, TRANSFER, AND EXHAUST AIR DUCTWORK: SHALL BE GALVANIZED SHEET STEEL, DESIGNED, CONSTRUCTED AND INSTALLED PER SMACNA °S "HVAC DUCT CONSTRUCTION STANDARDS- METAL AND FLEXIBLE" MANUAL, LATEST EDITION. STATIC PRESSURE CLASSIFICATION AS FOLLOWS: 3" STATIC PRESSURE: SUPPLY AIR AND RETURN AIR DUCTWORK. 2" STATIC PRESSURE: OUTSIDE AIR, TRANSFER DUCTS AND EXHAUST AIR DUCTWORK. FLEXIBLE DUCTWORK: SHALL BE CLASS 1, UL STANDARD 181, INSULATED ROUND DUCT BY THERMAFLEX MKE OR FLEXMASTER 8M; R -6 MINIMUM. FACTORY FABRICATED WITH AN OUTER JACKET ENCLOSING 1 -1/2 INCH THICK GLASS FIBER INSULATION AROUND A CONTINUOUS METAL INNER LINER. GLASS- REINFORCED SILVER MYLAR OUTER JACKET WITH A CONTINUOUS HANGING TAB. RECTANGULAR MANUAL VOLUME DAMPERS: SHALL BE RUSKIN MODEL MD35 OR EQUAL. MULTIPLE OPPOSED BLADE OR SINGLE BLADE, FURNISHED COMPLETE WITH FACTORY FABRICATED LOCKING HAND QUADRANT. PROVIDE WITH 2" STAND -OFF WHEN INSTALLED ON EXTERNALLY INSULATED DUCT. DEMOLITION NOTES: 1. AREA OF CONSTRUCTION SHALL BE MAINTAINED UNDER NEGATIVE PRESSURE IN RELATION TO SURROUNDING AREAS. THE CONSTRUCTION AREAS TO BE TESTED WEEKLY TO ASSURE A NEGATIVE PRESSURE OF 0.03 INCHES WATER GAUGE IN BEING MAINTAINED WHEN ALL DOORS AND WINDOWS ARE CLOSED. ALL AIR OUTLETS AND WALL PENETRATIONS SHALL BE BLOCKED OF TO MAINTAIN NEGATIVE PRESSURE IN THE SPACE. CONTRACTOR WILL PROVIDE A TEMPORARY EXHAUST FAN TO MAINTAIN NEGATIVE PRESSURE IN THE SPACE. 2. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL DEMOLITION WORK INFORMATION. 3. WORK SHALL SCHEDULE TO MINIMIZE IMPACT TO THE NORMAL OPERATION OF THE HOSPITAL SEE ARCHITECTURAL DRAWING PLAN. COORDINATE WITH THE AUTHORIZED JMC HOSPITAL REPRESENTATIVE MINIMUM OF 72 HOURS PRIOR TO ANY SHUTDOWN REQUIRED TO PERFORM WORK ON H.V.A.C. SYSTEMS. 4. PROVIDE VISUAL NEGATIVE PRESSURE GAUGE TO MONITOR THE PRESSURE RELATIONSHIP BETWEEN THE CONSTRUCTION AREA AND THE ADJACENT SPACE TO PROVIDE NEGATIVE PRESSURE OF 0.03° W.G. WITHIN THE SPACE. ALL EXISTING A/C DISTRIBUTION OUTSIDE OF RESTROOMS TO REMAIN. 'AREA IS NOT IN SCOPE' 2 Phase 2 Plan - HVAC M1,00 Scale: 1/4"=1 1-011 DEMOLITION NOTES: 1. INSTALL AGAINST AIR DEVICE TEMPORARY BLANKET TYPE, DISPOSABLE 1" THICK SYNTHETIC MEDIA. REMOVE SYNTHETIC MEDIA AFTER DEMOLITION IS COMPLETED. 2. DOOR SHALL BE SEALED AIRTIGHT AND KEPT CLOSED DURING CONSTRUCTION. INFECTION CONTROL RISK ASSESSMENT 1. TO THE EXTEND THAT IT IS REQUIRED BY THE ICRA, THE CONTRACTOR SHALL MAINTAIN EXISTING LEVELS OF INDOOR AIR QUALITY IN SURROUNDING AND ADJACENT AREAS TO THE CONSTRUCTION AREA, AND ELSEWHERE IN THE FACILITY. IT SHOULD BE ANTICIPATED THAT THE ICRA REPORT WILL REQUIRE ERECTION OF CONSTRUCTION ZONE BARRIERS AND PROVISION OF NEGATIVE PRESSURE IN THE CONSTRUCTION ZONE RELATIVE TO SURROUNDING AREAS. 2. IN ADDITION TO MEETING THE REQUIREMENTS OF THE ICRA REPORT, THE CONTRACTOR SHALL PROVIDE THE EQUIPMENT NECESSARY TO CREATE A NEGATIVE PRESSURE IN THE CONSTRUCTION AREA, RELATIVE TO THE ADJACENT AREA. EXISTING HVAC SYSTEM AND COMPONENTS SHALL NOT BE USED FOR THIS FUNCTION, UNLESS SPECIFICALLY APPROVED BY THE OWNER'S INFECTION CONTROL OFFICER. THE CONCEPT AND ALL ASPECTS OF THIS WORK SHALL BE DONE IN ACCORDANCE WITH THE ICRA REQUIREMENTS AND AS A MINIMUM THE FOLLOWING: A. VERIFY ALL EXISTING DUCTWORK WHICH PASSES THROUGH THE CONSTRUCTION ZONE, AND IS TO REMAIN, IS SEALED AND PROTECTED DURING CONSTRUCTION. B. AIR REMOVED FROM THE CONSTRUCTION ZONE SHALL BE FILTERED AND /OR DISCHARGED AS DIRECTED BY THE ICRA REPORT. C. PRESENT THE NEGATIVE AIR PRESSURE PLAN TO THE OWNER FOR APPROVAL BY THE INFECTION CONTROL OFFICER. D. PROVIDE MEANS TO MONITOR AND VERIFY NEGATIVE PRESSURE IS BEING MAINTAINED IN ACCORDANCE WITH THE ICRA REPORT, AND PROVIDE DOCUMENTS TO THE OWNER AS REQUIRED RELATIVE PRESSURE (0) = EQUAL PRESSURE ( -} = NEGATIVE PRESSURE ( +} = POSITIVE PRESSURE ICRA TYPE 'C° CLASS - III PROD. No. 22059 CA 924 4 LOUIS J. AGUIRRE & ASSOCIATES P.A. CONSULTING ENGINEERS 9150 SOUTH DADELAND BLVD. SUITE 9n' MIAMI, FLORIDA 331 5Z�- - TELEPHONE: (305) 670 -0141 FAX: (305) 670 -0144 www.Ijoapa.com