13-1163-006WPIRK. PHASES: A THE WORK SHALL BE CONDUCTED IN TWO SUB- PHASES IN THE FOLLOWING ORDER PHASE I WILL BEGIN UPON ISSUANCE OF NOTICE TO PROCEED. PHASE 2 ON -SITE WORK MAY BEGIN UPON SUBSTANTIAL COMPLETION OF PHASE 1. ALL WORK TO BE COMPLETED UPON COMPLETION OF PHASE 2. IA PHASE 1: INSTALLATION OF PHASE 1 CONSTRUCTION BARRIERS, DEMOLITION OF INTERIOR PARTITIONS, PARTIAL CONSTRUCTION OF PERMANENT PARTITION, RENOVATION OF EXISTING WOMEN'S RESTROOM, INSTALLATION OF NEW EWC, WAITING ROOM CASEWORK 4 FINISHES. a. THE WORK OF PHASE i MAY BE PERFORMED DURING OFF -PEAK HOURS. (SCHEDULE WORK AT NIGHT) R) UTILITY SHUTDOWNS, NOISY OPERATIONS (SUCH AS SAW CUTTING) ARE CONSIDERED TO ADVERSELY AFFECT THE OPERATIONS OF THE EXISTING FACILITY AND SHALL BE SCHEDULED DURING TIMES WHEN THE FACILITY IS NOT OPERATIONAL AS NOTED HEREIN FOR UTILITY SHUTDOWNS. b. UTILITY SHUTDOWNS TO BE SCHEDULED WITH THE HOSPITAL STAFF 4 COORDINATED WITH AND APPROVED BY THE SMH PROJECT MANAGER IN ADVANCE IN ACCORDANCE WITH BHSF POLICY. 15. PHASE 1: INSTALLATION OF PHASE 2 CONSTRUCTION BARRIERS, DEMOLITION OF INTERIOR PARTITIONS, CONSTRUCTION OF PERMANENT PARTITION, RENOVATION OF EXISTING MEN'S RESTROOM, WAITING ROOM FINISHES. a. THE WORK OF PHASE I MAY BE PERFORMED DURING OFF -PEAK HOURS. (SCHEDULE WORK AT NIGHT) I) UTILITY SHUTDOWNS, NOISY OPERATIONS (SUCH AS SAW CUTTING) ARE CONSIDERED TO ADVERSELY AFFECT THE OPERATIONS OF THE EXISTING FACILITY AND SHALL BE SCHEDULED DURING TIMES WHEN THE FACILITY IS NOT OPERATIONAL AS NOTED HEREIN FOR UTILITY SHUTDOWNS. b. UTILITY SHUTDOWNS TO BE SCHEDULED WITH THE HOSPITAL STAFF 4 COORDINATED WITH AND APPROVED BY THE SMH PROJECT MANAGER IN ADVANCE IN ACCORDANCE WITH BHSF POLICY. 1. FOR ALL PHASES: STRICTLY FOLLOW ICRA PROCEDURES TO PREVENT CONTAMINATION OF SYSTEMS AND TO FULLY RESTORE SANITARY AND CLEAN CONDITIONS AT THE END OF THE WORK PERIOD. a. WORK IN PUBLIC AREAS NOT WITHIN THE PROJECT LIMITS TO BE SCHEDULED TO ALLOW FOR OWNER AND PUBLIC OPERATIONS TO CONTINUE WITHOUT DISRUPTION. B. BEFORE COMMENCING WORK OF EACH PHASE, SUBMIT A SCHEDULE SHOWING THE SEQUENCE, COMMENCEMENT AND COMPLETION DATES, AND MOVE -OUT AND -IN DATES OF OWNER'S PERSONNEL FOR ALL PHASES OF THE WORK. PHASING NOTES: 1. ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE RESTORED TO THEIR ORIGINAL CONDITION. 2. PHASE SEQUENCE OF WORK AND TAKE NECESSARY MEASURES TO MAINTAIN FACILITY FUNCTIONALITY AND TO PROVIDE FOR THE SAFETY OF PERSONS AND PROPERTY AT THE FACILITY. 3. CONTINUOUSLY MAINTAIN ALL NECESSARY UTILITIES TO THE OCCUPIED FACILITIES DURING CONSTRUCTION 4. ALL EXISTING EXITS AND EXISTING FIRE PROTECTION SHALL BE CONTINUOUSLY MAINTAINED. OR IN LIEU THEREOF, OTHER MEASURES SHALL BE TAKEN WHICH PROVIDE EQUIVALENT SAFETY. 4a. ALL TEMPORARY DOORS TO BE S.C1U. 'C- LABEL" (l -HOUR FIRE RATED) W/ SELF - CLOSER LATCH, AND LOCKSET) 5. PROVIDE TEMPORARY CONSTRUCTION FENCE OR WALLS AROUND CONSTRUCTION AREAS AND CONTRACTOR'S STAGING AREA PROVISIONS SHALL BE MADE TO MAINTAIN ALL REQUIRED FIRE EXITS FROM THE EXISTING FACILITY. 6. EACH CONSTRUCTION PHASE SHALL INCLUDE ALL WORK WITHIN THE CONSTRUCTION AREA BOUNDARIES AND ALL RELATED SITE AND UTILITY WORK REQUIRED FOR THAT PARTICULAR PHASE UNLESS NOTED OTHERWISE. 1. EXCEPT FOR THOSE SPACES WITHIN WORK AREA, (WHICH WILL BE VACATED DURING CONSTRUCTION ACTIVITIES EXCEPT AS INDICATED OTHERWISE), THE FACILITY SHALL BE MAINTAINED FIT FOR OCCUPANCY AND BE FUNCTIONAL AT ALL TIMES, TOGETHER WITH ALL ELECTRICAL, HVAC MECHANICAL, PLUMBING, SAFETY, AND COMMUNICATION SYSTEMS. 8. COORDINATE AND SCHEDULE OWNER PERSONNEL FOR RELOCATION AND STORAGE OF OWNER'S MATERIALS, SUPPLIES, EQUIPMENT, AND FURNITURE AS NECESSARY TO ALLOW CONSTRICTION OPERATIONS OF EACH WORK AREA 3 WORK AT ANY GIVEN AREA SHALL NOT COMMENCE UNTIL ALL REQUIRED PRODUCTS, MATERIALS, AND EQUIPMENT ARE AVAILABLE, OR SCHEDULED TO BE AVAILABLE, AS NECESSARY TO ALLOW COMPLETION OF THE WORK IN A TIMELY MANNER AND WITHOUT UNNECESSARY DELAYS. THIS IS REQUIRED IN ORDER TO MINIMIZE INTERRUPTION OF ACTIVITIES AND USE OF THE FACILITY. 10. UPON COMPLETION OF WORK AT EACH PHASE, REQUIRED ACCEPTANCE INSPECTIONS AND PUNCH LIST INSPECTIONS SHALL BE PERFORMED AND WORK DETERMINED TO BE SUBSTANTIALLY COMPLETED PRIOR TO COMMENCEMENT OF WORK AT THE SUBSEQUENT PHASE. IL PUNCH LIST WORK FOR EACH PHASE SHALL BE PEED IMMEDIATELY UPON SUBSTANTIAL COMPLETION IN A PER PHASE BASIS AND WITHOUT IMPACTING OWNER'S OCCUPANCY AND USE OF 6PACES WITHIN SUBJECT PHASE. 12. WHEN APPROPRIATE DURING DEMOLITION, PROVIDE WATER MIST DAMPING OF ITEMS TO BE DEMOLISHED AS NECESSARY FOR DUST AND AIRBORNE PARTICLE CONTROL. 13. MAINTAIN ACCESS TO CHILLERS, GENERATOR SWITCH GEAR, F.P.L. AT ALL TIME. 14. AVOID CUTTING EXISTING PIPE, CONDUIT OR DUCTWORK SERVING BUILDING AND SCHEDULED TO BE REMOVED OR RELOCATED UNTIL PROVISIONS HAVE BEEN MADE TO BYPASS THE SYSTEM. 15. COORDINATE SHUTDOWNS WITH OWNER'S PROJECT MANAGER PROVIDE 10 DAYS NOTICE MINIMUM.. -NOTE: UIHERECONCEALED SPACE ABOVE CEILING IS CONTINUOUS WITH NON - PROJECT AREAS, PROVIDE CONTINUOUS DUST BARRIER - 6 MIL. POLY DUST BARRIER FULLY SEALED AT JOINTS AND PERIMETER WITH FIRE RETARDANT DUCT TAPE - SEE DETAIL BELOW (CONTRACTOR TO REMOVE ALL TRACES OF BARRIER UPON COMPLETION OF WORK. CONTRACTOR TO PATCH AND REPAIR AREAS OF WALL, CEILING, AND FLOORING DISTURBED BY BARRIER TO MATCH EXISTING) SLAB /STRUCTURE ABOVE CONSTRUCTION SIDE +-DOORS 4 WALL - I HOUR CONSTRUCTION, HARDWARE AND FINISH TO MATCH EXISTING WAITING ROOM DOORS "PAINT TEMP. WALL TO MATCH EXISTING WAITING ROOM FINISHES EXISTING TILE FLOOR TO REMAIN - EVERY ATTEMPT SHALL BE MADE TO INSTALL TEMP. BARRIER WITHOUT DAMAGING EXISTING TILE FLOOR FASTEN BARRIER THROUGH NEAREST EXISTING TILE GROUT LINE DUCT TAPE / AT PERIMETER (p MIL. POLY DUST BARRIER FULLY SEALED AT JOINTS —,,,, EXIST. CEILING –, 2 X 2 FIRE RETARDANT WD. CONCEALED CEILING SPACE EXIST. CEILING p< EXIST. OR WAITING ROOM P TEM. WALL SIDE TYPE X TYPE X GWB GWBss SOUND INSULATIO PROVIDE WALL BASE TO MATG -I EXIST. a- S- 10- 12- 13- 14- 15- Iro - STANDARD PRECAUTIONS: 17.1 GLOVES, IMPERVIOUS GOWNS, GOGGLES, MASK AND SIMILAR PROTECTIVE GEAR MUST BE USED WHEN POTENTIAL CONTACT WITH PATIENT'S BLOOD OR OTHER FLUID IS ANTICIPATED. 1'12 REPORT TO YOUR IMMEDIATE SUPERVISOR AND EMPLOYEE HEALTH SERVICES IF YOU HAVE ANY OF THE FOLLOWING: A - GENERALIZED RASHES OR SKIN LESIONS THAT ARE VESICULAR (WITH FLUID), PUSTULAR (RAISED) OR WEEPING. B - JAUNDICE (YELLOW EYES) C - COUGH THAT PERSISTS FOR MORE THAN 2 WEEKS. D - ACUTE GASTROINTESTINAL ILLNESS (3 LOOSE STOOLS IN 24 HRS. WITH OR WITHOUT ASSOCIATED SYMPTOMS SUCH AS FEVER, NAUSEA AND ABDOMINAL PAIN). E - HOSPITALIZATION DUE TO AN INFECTIOUS DISEASE. G - EXPOSED TO A COMMUNICABLE DISEASE IN THE COMMUNITY (I.E. CHICKENPDX, MEASLES, MUMPS, RUBELLA, PULMONARY TUBERCULOSIS). ATTIRE: 16.1 HEAVY BOOTS, IMPERVIOUS OVERALLS, FACESHIELDS, HEAVY DUTY GLOVES MUST BE WORK WHEN EXPOSED TO GROSS CONTAMINATED WASTE (I.E. DUMPSTERS, BROKEN SEWAGE LINES). 182 A CONE MASK MUST BE WORK WHEN CHANGING AN AIR CONDITIONING FILTER 183 HANDS MUST BE WASHED AFTER COMPLETING WORK INVOLVING PLUMBING. PLACE SIGNAGE TO IDENTIFY CONSTRUCTION SITE AND CONSTRUCTION TRAFFIC ROUTE. SEE SPECIFICATION SECTION FOR OTHER APPLICABLE PROVISIONS. ENVIRONMENTAL SERVICES DEPARTMENT. INFECTION CONTROL GUIDELINES: ERECT TEMPORARY FIRE RETARDANT PLYWOOD PARTITIONS AT EXTERIOR (UPON COMPLETION OF PROJECT) TO MAINTAIN A WATERPROOF ENVIRONMENT DURING CONSTRUCTION INFECTION CONTROL GUIDELINES: CLASS III (DURING CONSTRUCTION) 1 - ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT 1i- CONTAMINATION OF DUCT SYSTEM. (SEE M -DWGS) 2- COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO DURING DEMOLITION AND CONSTRICTION ACTIVITIES. SEAL AREA FROM NON -WORK AREA OR IMPLEMENT CONTROL CUBE METHOD Scale: N.T.S. (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE TRAFFIC MUST BE DIRECTED FROM CONSTRUCTION AREAS AWAY FROM WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION PATIENT CARE AREAS TO LIMIT DUST DISPERSION, ENTRY OF CONTAMINATED BEGINS. AIRTIGHT BARRIERS OF PLASTIC OR WALLBOARD MUST BE AIR OR TRACKING OF DUST INTO PATIENT CARE AREA CONSTRUCTED PRIOR TO CONSTRUCTION/RENOVATION BETWEEN PATIENT CLEANING OF VENTILATION SYSTEM DURING AND AFTER CONSTRUCTION MUST CARE AND CONSTRUCTION AREAS TO PREVENT DUST FROM ENTERING OCCUR IF IT GETS CONTAMINATED. PATIENT CARE ALAS. RENOVATED /CONSTRUCTION AREA MUST BE CLEANED PRIOR TO PATIENT A) DOORS MUST BE KEPT CLOSED RE- ENTERING AREA B) DUST AT CONSTRUCTION SITE DOORWAYS 4 ALONG CONSTRUCTION REPORT HAZARDS TO THE APPROPRIATE DEPARTMENT ROUTE MUST BE CLEANED INTERMITTENTLY AND ROUTINELY. C) MATS MUST BE PLACED AT EXIT OF CONSTRUCTION FOR WIPING FEET. 3- MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. MAINTAIN NEGATIVE PRESSURE IF A SIGN STATING "AIRBORNE" OR "DROPLET" PRECAUTION IS POSTED ON DIFFERENTIAL OF 0.01" WAG. IN RELATION TO ADJOINING OCCUPIED SPACES. 15- A PATIENT DOOR WEAR THE MASK AVAILABLE BY THE DOOR BEFORE CONTINUITY OF DIFFERENTIAL PRESSURE SHALL BE DOCUMENTED BY ENTERING THE ROOM. DISCARD THE MASK AFTER LEAVING THE ROOM AND CONTINUOUS MONITORING AND RECORDING EQUIPMENT. PROVIDE HVAC CLOSE DOOR TEST 4 BALANCE REPORT INDICATING COMPLIANCE PRIOR TO WASH HANDS: COMMENCEMENT OF WORK (SEE MECH. DWGS FOR ADDITIONAL NOTES) 4- CONTAIN CONSTRUCTION WASTE IN TIGHTLY COVERED CONTAINERS BEFORE WHEN CHANGING GLOVES TRANSPORTING. 5- COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS ,ANY TIME HANDS ARE SOILED SOLID LID. 19- 6 - SEAL HOLES, PIPES, CONDUITS AND PUNCTURES APPROPRIATELY. 7- DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT 20- 16 INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S a- S- 10- 12- 13- 14- 15- Iro - STANDARD PRECAUTIONS: 17.1 GLOVES, IMPERVIOUS GOWNS, GOGGLES, MASK AND SIMILAR PROTECTIVE GEAR MUST BE USED WHEN POTENTIAL CONTACT WITH PATIENT'S BLOOD OR OTHER FLUID IS ANTICIPATED. 1'12 REPORT TO YOUR IMMEDIATE SUPERVISOR AND EMPLOYEE HEALTH SERVICES IF YOU HAVE ANY OF THE FOLLOWING: A - GENERALIZED RASHES OR SKIN LESIONS THAT ARE VESICULAR (WITH FLUID), PUSTULAR (RAISED) OR WEEPING. B - JAUNDICE (YELLOW EYES) C - COUGH THAT PERSISTS FOR MORE THAN 2 WEEKS. D - ACUTE GASTROINTESTINAL ILLNESS (3 LOOSE STOOLS IN 24 HRS. WITH OR WITHOUT ASSOCIATED SYMPTOMS SUCH AS FEVER, NAUSEA AND ABDOMINAL PAIN). E - HOSPITALIZATION DUE TO AN INFECTIOUS DISEASE. G - EXPOSED TO A COMMUNICABLE DISEASE IN THE COMMUNITY (I.E. CHICKENPDX, MEASLES, MUMPS, RUBELLA, PULMONARY TUBERCULOSIS). ATTIRE: 16.1 HEAVY BOOTS, IMPERVIOUS OVERALLS, FACESHIELDS, HEAVY DUTY GLOVES MUST BE WORK WHEN EXPOSED TO GROSS CONTAMINATED WASTE (I.E. DUMPSTERS, BROKEN SEWAGE LINES). 182 A CONE MASK MUST BE WORK WHEN CHANGING AN AIR CONDITIONING FILTER 183 HANDS MUST BE WASHED AFTER COMPLETING WORK INVOLVING PLUMBING. PLACE SIGNAGE TO IDENTIFY CONSTRUCTION SITE AND CONSTRUCTION TRAFFIC ROUTE. SEE SPECIFICATION SECTION FOR OTHER APPLICABLE PROVISIONS. ENVIRONMENTAL SERVICES DEPARTMENT. INFECTION CONTROL GUIDELINES: ERECT TEMPORARY FIRE RETARDANT PLYWOOD PARTITIONS AT EXTERIOR (UPON COMPLETION OF PROJECT) TO MAINTAIN A WATERPROOF ENVIRONMENT DURING CONSTRUCTION Temporary Barrier Detail ACTIVITIES. Proposed Construction / Patient / Staff Routing Plan r 1 ALL AIR VENTS ARE TO BE BY- PASSSED TO PREVENT CONTAMINATION Plan DURING DEMOLITION AND CONSTRICTION ACTIVITIES. PH•1.01 Scale: N.T.S. 2- TRAFFIC MUST BE DIRECTED FROM CONSTRUCTION AREAS AWAY FROM PH•1.09 PATIENT CARE AREAS TO LIMIT DUST DISPERSION, ENTRY OF CONTAMINATED 3- AIR OR TRACKING OF DUST INTO PATIENT CARE AREA L CLEANING OF VENTILATION SYSTEM DURING AND AFTER CONSTRUCTION MUST 4- OCCUR IF IT GETS CONTAMINATED. RENOVATED /CONSTRUCTION AREA MUST BE CLEANED PRIOR TO PATIENT 5- RE- ENTERING AREA REPORT HAZARDS TO THE APPROPRIATE DEPARTMENT rc, - ALWAYS READ THE SIGNS POSTED ON DOOR OF A PATIENT'S ROOM IF A SIGN STATING "AIRBORNE" OR "DROPLET" PRECAUTION IS POSTED ON A PATIENT DOOR WEAR THE MASK AVAILABLE BY THE DOOR BEFORE ENTERING THE ROOM. DISCARD THE MASK AFTER LEAVING THE ROOM AND S- F CLOSE DOOR WASH HANDS: BEFORE AND AFTER PATIENT AREA CONTACT/EXPOSURE WHEN CHANGING GLOVES AFTER USING THE RESTROOM ,ANY TIME HANDS ARE SOILED Plan Legend CONSTRUCTION — LINE OF PROPOSED CONSTRUCTION ROUTE PATIENT LINE OF PROPOSED PATIENT ROUTE — PHYSICIA PATIENT DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT 15 THOROUGHLY INSPECTED BY OWNER'S STAFF. VACUUM WORK AREA WITH I4EPA FILTERED VACUUMS WET MOP / WIPE EXPOSED SURFACES WITH APPROPRIATELY ABELED AND BHSF APPROVED HOSPITAL DISINFECTANT. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTANERS. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION. INAL CLEANING BY ENVIRONMENTAL SERVICES PRIOR TO OCCUPANCY. Phasing Plan Legend — • - , — PROVIDE TEMPORARY •— • • -- ENCLOSURE 4 PLENUM PROTECTION* (SEE DTL 2/PH -1.01) SCOPE OF WORK FOR SPECIFIED PHASE WALK-OFF MAT (STICKY) AT CONSTRUCTION ENTRANCE RE a • - Plan ' , 2 �1' , I 4 Temporary Barrier Detail 3 Proposed Construction / Patient / Staff Routing Plan r 1 Phase 1 Plan PH•1.01 Scale: N.T.S. PH•1.01 Scale: 3/32 " =1' -0" PH•1.09 Scale: 1/4 " =1' -d"