13-1163-004ROOM FINISH SCHEDULE RM. NO. ROOM DESCRIPTION FLOOR BASE WALLS CEILING REMARKS NORTH EAST SOUTH WEST MAT./COL. MAT./COL. MAT. FIN. COL. MAT. FIN. COL. MAT. FIN. COL. MAT. FIN. COL. MAT. FIN. COL. HEIGHT 001 WOMEN'S RESTROOM PCT-3 W5_I ETRA=`CT-I/PCT-2 MRWA=CT-I/PC'T-2 MRW/F"CT-I/PCT-2 MRWA=CT-I/PCT-2 MRW/PT-2 002 MEN'S RESTROOM PCT-3 U)5_1 ETRA=rT-I/PCT-2 MRW/PCT-I/PCT-2 MRW/PCT-I/PCT-2 MRW/PCT-I/PCT-2 MRW/PT-2 �vo�� 003 ONCOLOGY WAITING AREA ETR W0/PT# G11j5/PT• ETR ETR ETR ETR *MATCH EXISTING WAITING ROOM FINISHES COLORS �o FINISH/MATERIAL ABBREVIATIONS: ATC - ACOUSTICAL TILE CEILING ATMR -ACOUST.TILE-MOIST.RESIST. 55 - BACKER BOARD CMU - CONCRETE MASONRY UNIT CON - CONCRETE CT -CERAMIC TILE CT5 - CERAMIC TILE BASE EPQ - EPDXY EPS - ENAMEL FAINT-SATIN EPXP- EPDXY PAINT ESP - EGGSHELL PAINT ETR - EXISTING TO REMAIN EXP - EXPOSED PF -PLAT PAINT GM - GYPSUM WALLBOARD G65 - GYPSUM SOFFIT BOARD HM -HOLLOW METAL INT - INTEGRAL COVE BASE MRW - MOISTURE RESIST. GJJJB. N.I.C. - NOT IN CONTRACT PT -FAINT PL - STUCCO PLASTER FINISH NOTES - FLOORING OT QUARRY TILE QT5 QUARRY TILE BASE R5 RUBBER BASE FS-F RESILIENT SHEET FLOORING SC SPECIAL COATINGS SGP SEMI-GLOSS FAINT ST - STONE T - TILE VCT - VINYL COMPOSITION TILE V-SP - VINYL SHEET FLOORING VWC - VINYL WALL COVERING W5 - WALL BASE WD - WOOD NOTE: ALL FINISHES TO HAVE 0-25 CLASS 'A' FLAME SPREAD RATING. 1. PROVIDE TRANSITION THRESHOLDS IN CHANGES OF ELEVATION. 2. PROPERLY CLEAN 4 SEAL MATERIAL FOLLOWING MANUFACTURER'S RECOMMENDATION 3. CONTRACTOR MUST FOLLOW MANUFACTURER'S INSTALLATION RECOMMENDATION 4. PRIOR TO GROUTING, APPLY GROUT RELEASE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. 5. REFER TO MANUFACTURER'S RECOMMENDATION FOR PROPER ADHESIVE. FAINT COLOR FT-15: SW-6141 SOFTER TAN (PROVIDE HARMONY INTERIOR ACRYLIC LATEX) FINISH: SEMI-GLOSS 5-10 900 SERIES FT-2: SW-1006 EXTRA WHITE (PROVIDE WATER BASED CATALYZED EPDXY 51OW211) FINISH: SEMI-GLOSS SOO SERIES PORCELAIN CERAMIC TILE PCT-1: ILVA ECOLAND DUNE (POLISHED) 12"XI211 PCT-2: ILVA ECOLAND JUNGLES (POLISHED) 3"X311 PCT-3: ILVA ECOLAND DUNE (UNPOLISHED) 12"XI211 W15-1: ILVA ECOLAND DUNE (UNPOLISHED) COVE SASE PC-T-4: CROSSVILLE EMPIRE PALAIS TAUPE VS8I-UP (UNPOLISHED) 1 "X111 USE W1 COORDINATING 3"X14" WALL SASE TRIM STONE TRIM STR-1: QUESTECH DORSET CAST STONE QTSL202-03 SAND DOME OGEE 2"XI211 STR-2. QUESTECH DORSET CAST STONE QTSL402-03 SAND 0.15"X12" GROUT MAPS GROUT: KERAPDXY 039 IVORY SOLID SURFACE 56-1: CORIAN TUMBLEWEED (300 SERIES VANITY TOP) 55-2: CORIAN BISQUE (300 SERIES SINGLE BOWL) FTR-I-. CORIAN SAND (FLOOR TRANSITION THRESHOLD) PLASTIC LAMINATE PL-1: WILSONART I924K-01 5ILTMORE CHERRY WALL BASE R15-1: JOHNSONITE MILLWORK CONTOURED MW-09 -F CLAY REVEAL PROFILE t5 3/4" 10 I ISA 1 15/16 01 10 HM. DOOR FRAME W1 3 ANCHORS PER JAMB SEALANT (BOTH SIDES) DOUBLE STUDS AT JAMB AND ANCHOR TO STRUCTURE ABOVE 5/8' GYP. 50. ON EA. SIDE OF 3 5/8'MTL. STUDS AT 16"O.C. FINISH (SEE FINISH SCHEDULE) 3 HINGES I PRIVACY SET (WI EMERGENCY UNLOCKING CAPABILITY) ICLOSER I KICXPLATE I WALL STOP 3 DOOR SILENCERS CORNER BEAD (TYR) SELF- TAPPING DRYWALL SC COMPOUND AND SAND (TYF. I' GYP. 13D. (FNT) INSULATION WHEM NOTED ON PLANS FIN. FLP_ 3 5/6, MTL_ STUDS TAPE AND JOINT COMPOUND o Iu ru kkz� so W. re 1 on- P.m Dili 0 M Q MKS", pn- M-E v CD C2, I a jai Me n es a rom • sm :a il mrorl-I "Tw Cn to 5 • Cq Lamm o :3 CL M Cq �vo�� C e� �o r s a. t5 3/4" 10 I ISA 1 15/16 01 10 HM. DOOR FRAME W1 3 ANCHORS PER JAMB SEALANT (BOTH SIDES) DOUBLE STUDS AT JAMB AND ANCHOR TO STRUCTURE ABOVE 5/8' GYP. 50. ON EA. SIDE OF 3 5/8'MTL. STUDS AT 16"O.C. FINISH (SEE FINISH SCHEDULE) 3 HINGES I PRIVACY SET (WI EMERGENCY UNLOCKING CAPABILITY) ICLOSER I KICXPLATE I WALL STOP 3 DOOR SILENCERS CORNER BEAD (TYR) SELF- TAPPING DRYWALL SC COMPOUND AND SAND (TYF. I' GYP. 13D. (FNT) INSULATION WHEM NOTED ON PLANS FIN. FLP_ 3 5/6, MTL_ STUDS TAPE AND JOINT COMPOUND o Iu ru kkz� so WAITING ROOM SIDE NEW DOOR (SEE DOOR SCHEDULE) NEW CORIAN THRESHOLD (CUSTOM) EXISTING TILE FLOOR TO REMAIN (SEE PLAN) RESTROOM SIDE Gyp. ED. (Fw.) NEW PCT FINISH FLOOR ON T14INSET (SEE FIN. SCHED) SELF TAPPING CONCRETE T) SCREWS (TYPJ r_ tu SLAB (E XIS �_j INSULATION WHERE tu NOTED ON K" DOUBLE MTL. STUDS TAPE AND JOINT COMPOUND *W14 z I ITLl ky, I _=& Irg ;Ii HW1 BOTTOM OF DECK ABOVE SMOKE TIGHT SEALANT_ PROVIDE CONt 611 HIGH METAL PLATE (20 GA.) AT WALLBOARD HORIZONTAL JOINTS CEILING REFER TO FINISH SCHEDULE FOR HEIGHT 5/811 FIRE RATED GYPSUM WALLBOARD EA. SIDE. EXTEND ONE SIDE UP TO UNDERSIDE OF STRUCTURAL DECK (AT CORRIDOR CONDITION, PROVIDE ON CORRIDOR SIDE. 411 SOUND ATTENUATION ]BLANKET FINISH AS SCHEDULED ACOUSTICAL SEALANT (50TH SIDES) CONC. FLOOR SLAB WALL TYPE FAI SMOKE TIGHT PARTITION • log (D EXISTING GM CEILIN63/50RIT AND SUBSTRATE TO BE REMOVED TO STRUCTURE ABOVE. REFER TO MEFF DRAWINGS FOR REMOVAL OF ALL MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, ETC. ITEMS. PRIOR TO 510, CONTRACTOR TO VERIFY THAT ALL REMAINING EXISTING, DUCTWORK CONDUITS, FIRE SPRINKLER LINES, 4 OTHER UTILITIES IN NEW CEILING AREAS ARE NOT IN CONFLICT WITH NEW CONSTRUCTION. ANY CONFLICTING ITEMS SHALL BE RAISED OR RELOCATED AS REQUIRED. COORDINATE W1 MEFF DRAWINGS. PATCH AND REPAIR AREAS OF CEILING DISTURBED BY CONSTRUCTION TO MATCH EXISTING. EXISTING TO REMAIN CONTRACTOR TO INSURE A SAFE MEANS OF EGRESS EXISTS AT ALL TIMES FROM OCCUPIED PORTIONS OF THE FACILITY WITHIN OR THROUGH THE CONSTRUCTION AREA CONTRACTOR TO PATCH ANY EXISTING SURFACE ITEM SCHEDULED TO REMAIN THAT HAS BEEN DISTURBED BY CONSTRUCTION BACK TO ITS ORIGINAL CONDITION EXISTING WALL TO BE REMOVED EXISTING TILE FINISH To BE Fmmovm. EXISTING FLOOR FINISH TO BE REMOVED. EXISTING DOOR 4 FRAME TO BE REMOVED. CONTRACTOR TO REMOVE PORTIONS OF WALL TO STUDS FOR INSTALLATION OF 5ACKIWx/F;SNFORCEMENT AND / OR PLUMBING /ELECTRICAL WORK AS NEEDED. CONTRACTOR TO PATCH SURFACE BACK TO ITS ORIGINAL CONDITION. CONTRACTOR TO REMOVE EXISTING WALL FINISHES ALONG WITH CORRESPONDING SUBSTRATES (GM, PLYWOOD, MORTAR BED, ETCJ PREPARE SURFACES TO RECEIVE NEW FINISHES AS NOTED IN DRAWINGS. EXIST, FLOOR FINISH To REMAIN. CONTRACTOR To PROTECT FLOOR FROM DAMAGE DURING CONSTRUCTION. PATCH AND REPAIR AREAS OF WALLS, CEILING AND FLOORING DISTURBED BY WALL"REMOVAL TO MATCH EXISTING. REFER TO MEFF DRAWINGS FOR REMOVAL OF ALL MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, ETC. ITEMS. @ CONTRACTOR IS RESPONSIBLE FOR MAINTAINING FIRE RATING INTEGRITY OF WALL ASSEMBLY (TYP) @ REFER TO SHEET PH -101 FOR PHASING OF WOW, CONTRACTOR To CAREFULLY REMOVE EXISTING ROOM SIGNAGE AND STORE FOR REINSTALLATION LATER CONTRACTOR TO CAREFULLY REMOVE EXISTING TELEPHONE 4 SIGNAGE AND STORE FOR REINSTALLATION LATER DEMOLITION PLAN LEGEND - — — — — — — — — - EXISTING TO BE REMOVED EXISTING TO REMAIN 2 Demolition Reflected Ceiling Plan A-201 Scale: 1/4"=1'_0" W. re 1 on- P.m M Q MKS", pn- M-E v CD C2, I a jai WAITING ROOM SIDE NEW DOOR (SEE DOOR SCHEDULE) NEW CORIAN THRESHOLD (CUSTOM) EXISTING TILE FLOOR TO REMAIN (SEE PLAN) RESTROOM SIDE Gyp. ED. (Fw.) NEW PCT FINISH FLOOR ON T14INSET (SEE FIN. SCHED) SELF TAPPING CONCRETE T) SCREWS (TYPJ r_ tu SLAB (E XIS �_j INSULATION WHERE tu NOTED ON K" DOUBLE MTL. STUDS TAPE AND JOINT COMPOUND *W14 z I ITLl ky, I _=& Irg ;Ii HW1 BOTTOM OF DECK ABOVE SMOKE TIGHT SEALANT_ PROVIDE CONt 611 HIGH METAL PLATE (20 GA.) AT WALLBOARD HORIZONTAL JOINTS CEILING REFER TO FINISH SCHEDULE FOR HEIGHT 5/811 FIRE RATED GYPSUM WALLBOARD EA. SIDE. EXTEND ONE SIDE UP TO UNDERSIDE OF STRUCTURAL DECK (AT CORRIDOR CONDITION, PROVIDE ON CORRIDOR SIDE. 411 SOUND ATTENUATION ]BLANKET FINISH AS SCHEDULED ACOUSTICAL SEALANT (50TH SIDES) CONC. FLOOR SLAB WALL TYPE FAI SMOKE TIGHT PARTITION • log (D EXISTING GM CEILIN63/50RIT AND SUBSTRATE TO BE REMOVED TO STRUCTURE ABOVE. REFER TO MEFF DRAWINGS FOR REMOVAL OF ALL MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, ETC. ITEMS. PRIOR TO 510, CONTRACTOR TO VERIFY THAT ALL REMAINING EXISTING, DUCTWORK CONDUITS, FIRE SPRINKLER LINES, 4 OTHER UTILITIES IN NEW CEILING AREAS ARE NOT IN CONFLICT WITH NEW CONSTRUCTION. ANY CONFLICTING ITEMS SHALL BE RAISED OR RELOCATED AS REQUIRED. COORDINATE W1 MEFF DRAWINGS. PATCH AND REPAIR AREAS OF CEILING DISTURBED BY CONSTRUCTION TO MATCH EXISTING. EXISTING TO REMAIN CONTRACTOR TO INSURE A SAFE MEANS OF EGRESS EXISTS AT ALL TIMES FROM OCCUPIED PORTIONS OF THE FACILITY WITHIN OR THROUGH THE CONSTRUCTION AREA CONTRACTOR TO PATCH ANY EXISTING SURFACE ITEM SCHEDULED TO REMAIN THAT HAS BEEN DISTURBED BY CONSTRUCTION BACK TO ITS ORIGINAL CONDITION EXISTING WALL TO BE REMOVED EXISTING TILE FINISH To BE Fmmovm. EXISTING FLOOR FINISH TO BE REMOVED. EXISTING DOOR 4 FRAME TO BE REMOVED. CONTRACTOR TO REMOVE PORTIONS OF WALL TO STUDS FOR INSTALLATION OF 5ACKIWx/F;SNFORCEMENT AND / OR PLUMBING /ELECTRICAL WORK AS NEEDED. CONTRACTOR TO PATCH SURFACE BACK TO ITS ORIGINAL CONDITION. CONTRACTOR TO REMOVE EXISTING WALL FINISHES ALONG WITH CORRESPONDING SUBSTRATES (GM, PLYWOOD, MORTAR BED, ETCJ PREPARE SURFACES TO RECEIVE NEW FINISHES AS NOTED IN DRAWINGS. EXIST, FLOOR FINISH To REMAIN. CONTRACTOR To PROTECT FLOOR FROM DAMAGE DURING CONSTRUCTION. PATCH AND REPAIR AREAS OF WALLS, CEILING AND FLOORING DISTURBED BY WALL"REMOVAL TO MATCH EXISTING. REFER TO MEFF DRAWINGS FOR REMOVAL OF ALL MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, ETC. ITEMS. @ CONTRACTOR IS RESPONSIBLE FOR MAINTAINING FIRE RATING INTEGRITY OF WALL ASSEMBLY (TYP) @ REFER TO SHEET PH -101 FOR PHASING OF WOW, CONTRACTOR To CAREFULLY REMOVE EXISTING ROOM SIGNAGE AND STORE FOR REINSTALLATION LATER CONTRACTOR TO CAREFULLY REMOVE EXISTING TELEPHONE 4 SIGNAGE AND STORE FOR REINSTALLATION LATER DEMOLITION PLAN LEGEND - — — — — — — — — - EXISTING TO BE REMOVED EXISTING TO REMAIN 2 Demolition Reflected Ceiling Plan A-201 Scale: 1/4"=1'_0" C A 0 Doi M Q MKS", pn- M-E v CD C2, I a jai Me n es a rom • sm :a il Cn to C A M Q v CD C2, Cn to 5 • Cq Lamm o :3 CL M Cq C .0 r s a. 0 NatIvIdad,S0tdARa945 0 'A �v 0 L .0 o_ C:) C14 0 C�4 Co v) > 0 Z o.. C: LL_ CL 0) < :2 LLJ Lij 0 CD of I _r E :2 < Lu LL, o Cu C of F . V) < > (D C) V) 0 _T_ z Lli 4_4 0 cn ow 0 0 V) Fr 0 0 F_ Lij 0- < M C: 0 Cn < 2 Ai z - 2 < (n > uj I I I I I IL COMM. NO. 2012-15 DRAWN BY: DATE: 08-OC3-13 ISSUED: SCALE: AS NOTED TITLE: ELEVATIONS, SCHEDULES, DEMO PLANS 4 DETAILS SHEET NO. ,� -2.�1 OF