Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
12-984-048
E ni CI B CV 110 0 n 0o o.. co N -:A 0 c N LO CN 3:, SEVENTH SYMBOL FLOOR PLAN - DEMOLITION - ELECTRICAL .......... .... ... .... . ... ... ............ EXISTING TO REMAIN 07 -03 -12 NO. EXISTING TO BE REMOVED PeF� DEMOLITION LEGEND SYMBOL DESCRIPTION 1 EXISTING TO REMAIN 07 -03 -12 NO. EXISTING TO BE REMOVED - -� REMOVE EXISTING TO THIS POINT rol •••• 0 •r• . i r•i ii ••• ••• r•• • • / •111 • c • • fee • Y i • • • • f • •i iii Y•• IL •••• ••Y•• •ee 6:009 0 • • • • GENERAL DEMOLITION NOTES IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE EXISTING EQUIPMENT AS REQUIRED TO ACCOMPLISH THE NEW WORK AS SHOWN OR REASONABLY IMPLIED. THE CONTRACTOR SHALL REFER TO THE NEW ARCHITECTURAL, PLUMBING, FIRE PROTECTION, MECHANICAL AND ELECTRICAL WORK SHOWN ON THE OTHER DRAWINGS OF THIS SET TO DETERMINE THE EXTENT OF DEMOLITION REQUIRED. WHEN REMOVING ELECTRICAL EQUIPMENT AND SYSTEMS, ALL PRECAUTIONS SHALL BETAKEN TO PREVENT STRUCTURAL DAMAGE TO THE BUILDING. THE CONTRACTOR SHALL COORDINATE INSTALLATION OF ANY STRUCTURAL SUPPORTS REQUIRED, TEMPORARY OR PERMANENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL DEMOLITION AND CONSTRUCTION DEBRIS GENERATED FROM WORK ON ALL FLOORS. TAKING CARE TO PREVENT EXCESSIVE LOADING OF FLOOR ASSEMBLIES. THE CONTRACTOR SHALL MAINTAIN CONTINUITY OF CIRCUITS WHERE EXISTING EQUIPMENT IS TO BE REMOVED AND DOWN STREAM DEVICES MAY BE EFFECTED. THE CONTRACTOR SHALL COORDINATE ALL POWER INTERRUPTIONS WITH OWNER. SEE SPECIFICATIONS. WHEN EXISTING ELEMENTS OF ELECTRICAL EQUIPMENT AND SYSTEMS ARE REMOVED, ALL REMAINING OPENINGS IN THE SLAB AND WALLS SHALL BE FILLED IN BY THE CONTRACTOR. THE FIRE RATING OF THE EXISTING STRUCTURE SHALL BE MAINTAINED. REMOVE ALL MISCELLANEOUS FIXTURES AND EQUIPMENT RETAINING ITEMS TO BE IDENTIFIED FOR SALVAGE AND STORAGE AT THE DIRECTION OF THE OWNER. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO MAINTAIN THE INTEGRITY AND OPERATION OF EXISTING LIFE SAFETY AND EMERGENCY EGRESS EQUIPMENT. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO MAINTAIN ACCESS TO ALL MEANS OF EGRESS CORRIDORS, DOORWAYS AND STAI RS. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO PERMIT EFFECTED AREAS TO CONTINUE TO FUNCTION TO THE GREATEST EXTENT POSSIBLE. THIS EFFORT SHALL INCLUDE SCHEDULED COORDINATION WITH OWNER OF ELECTRICAL SHUTDOWNS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL FLUORESCENT AND HID TYPE LAMPS AND PROPER DISPOSAL OF SAID LAMPS AND SHALL PROVIDE VERIFICATION OF LAMP DISPOSAL TO THE OWNER UPON REQUEST. REMOVE ALL LIGHTING FIXTURES, RECEPTACLES AND DEVICES IN THE AREA OF DEMOLITION AND PULL ALL CIRCUITS BACK TO NEXT ACTIVE DEVICE OR SOURCE OF POWER. ALL CONDUIT, JUNCTION BOXES AND WIRING DEVICES THAT ARE NOT INTENDED TO RE -USED MUST BE DEMOLISHED BACK TO THE SOURCE. PROVIDE PANEL SCHEDULES, TO THE ENGINEER, INDICATING THE CIRCUITS MADE SPARE BY DEMOLI TI ON AND THE EXI STI NG CI RCUI TS THAT REMAI N ACTI VE. IT SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION MANAGER (CM), GENERAL CONTRACTOR (GC), AND THE SUB - CONTRACTORS (SC) TO STUDY ALL THE DRAWINGS AND DETAILS SO THAT THE INSTALLATION OF ALL NEW WORK CAN BE FULLY COORDINATED. THE CM, GC, AND SC SHALL VI SI T THE SI TE, I NCLUDI NG DOI NO AN ABOVE CEI LI NG I NSPECTI ON, DURI NG BI DDI NG TO SATISFY HIM /HER SELF THAT ALL PROVISIONS HAVE BEEN MADE FOR ALL ASPECTS OF THIS PROJECT. IF DISCREPANCIES EXIST BETWEEN DRAWINGS AND /OR SITE CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE GENERAL CONTRACTOR IN WRITING PRIOR TO BID DUE DATE. FAILURE TO DO SO WILL NOT BE ALLOWED ON A BASIS FOR ADDITIONAL COMPENSATION TO CORRECT A DIFFICULTY OF DIFFERENCE FROM CONDITIONS INFERRED OR INDICATED ON THE DRAWINGS. DRAWINGS ARE DIAGRAMMATIC AND DO NOT INDICATE ALL DEVICES TO BE DEMOLISHED. CONTRACTOR SHALL VISIT JOB SITE PRIOR TO BID TO FIELD CONFIRM ALL REQUIREMENTS. GENERAL NOTES: A. COORDINATE EXTENT OF DEMOLITION WITH ARCHITECTURAL AND ALL TRADES PRIOR TO START OF CONSTRUCTION, KEYED NOTES: Q� EXISTING RECEPTACLES IN ROOM AND NOT AFFECTED BY DEMOLITION AND NOT IN CONFLICT WITH NEW WORK SHALL REMAIN, TRACE OUT CIRCUIT AND PROVIDE NEW ENGRAVED DEVICE PLATES. Architect of Record: A R R A Y Architects P.C. healthcare facilities solutions 6800 Broken Sound Boulevard NW Suite 125 Boca Raton, FL 33487 t: 561.995.1700 f: 561.995.1701 firm license number www.2rrayhfs.com AA2600120 SEAL' ``1 %%111 1 11117 C E /V ' %�4"' r,O,. = N °- 5858 s � o -� a7T/ �~ � • l ONAfL, 16. CONSULTANTS: Smith Seckman Reid, Inc. 600 'West Hillsboro, Suite 300 Deerfield Beach, FL 33441 (954) 421 -1260 FAX: (954) 421 -1466 www.ssr- ine.com Firm Certification - EB- 0000857 Dennis O. Davis PE - 58588 John E. Moulder PE - 33200 SSR JOB # 1232010.0 OWNER: BAPTIST HEALTH SOUTH FLORI DA HOSPITAL: SOUTH MIAMI HOSPITAL PROJECT: INTERIOR RENOVATIONS FOR CENTRAL MONITORING ADDRESS: 6200 Southwest 73rd Street South Miami, FL 33143 AHCA: CLIENT CODE /FILE NUMDER: 23/100154 PROJECT ID /SUBMISSION NUMBER: 187 -1 2 Bid and Permit Set 07-18-12 1 AHCA Stage III 07 -03 -12 NO. DESCRIPTION DATE REVISIONS /ISSUES DRAWN: CHECKED: CON/REF No. 0000 PROJECT No. 3606 DATE: 07 -03 -12 SCALE: As Indicated SHEET NO. E1.1 This lour cn` is n copyright pretegteJ Instrume-, of seni;.c, p'oparti et AFFA' and b r of for 1.0 1, , th 0pil pm ply. K p �.Ju,aier, c` Tli d uri�r, wi hoar written pprrrissi,r of AMAY i- illegal on] will t grr e, if.-d .irder 1- law. ©COPYRIGHT - 2012 ARRAY HFS