Loading...
12-984-042cl LZ 0 ci CIO. r cs� CN a. 0 CN LO N I I. E 1111 C.. v 0 2 PLUMBING ABBREVIATIONS C.W COLD WATER X= MIN. I/2 H (PREFERRED X =H) H- NEGATIVE STATIC PRESSURE +1" OFCI AHU IDENTIFICATION OWNER FURNISHED CONTRACTOR INSTALLED H.W. HOT WATER FAN STATIC PRESSURE (INCHES) R.D. H (INCHES) ROOF DRAIN H.W.R. HOT WATER RECIRC Ll F.D. NA FLOOR DRAIN V.T.R. VENT THRU ROOF P.R.V. PRESSURE REDUCING VALVE A.V.T.R. ACID VENT THRU ROOF R.P.d.P. REDUCED PRESSURE BACKFLOW PREVENTER W. WASTE (INTERIOR) A.F.F. ABOVE FINISHED FLOOR R.W.L. RAIN WATER LEADER A.F.G. ABOVE FINISHED GRADE S.W. STORM WATER A.W. ACID WASTE I.E. INVERT ELEVATION A.P. ACCESS PANEL C.O. CLEANOUT W.C.O. WALL CLEANOUT C.D. CONDENSATE S.S. SANITARY SEWER C.F.C.I. CONTRACTOR FURNISHED CONTRACTOR INSTALLED V.I.V. VALVE IN VERTICAL A.H.0 AIR HANDLING UNIT F.C.0 FAN COIL UNIT PLUMBING LEGEND SYMBOL DESCRIPTION SYMBOL DESCRIPTION - COLD WATER - BALL VALVE - - -- HOT WATER CHECK VALVE - - - - -- HOT WATER RECIRCULATION UNION IN PIKE W WASTE LINE ---- *4-- SECTIONAL CONTROL VALVE -V--- _ VENT PIPE ( ABOVE OR BELOW GROUND) UT EXTERIOR CLEANOUT -RWL RAIN WATER LEADER P -I,ETC FIXTURE INDENTIFICATION CLEANOUT (ABOVE CEILING) CONNECTION TO EXISTING -41' _ BALANCING VALVE CIRCUIT SETTER WITH CHECK VALVE CAP ON LINE -o PIPE TURNED UP SHOCK ARRESTOR PIPE TURNED DOWN N 0 T E : ELEVATE A/C UNIT SUFFICIENT DISTANCE ABOVE FLOOR OR ROOF TO ALLOW FOR INSTALLATION OF TRAP WITH ADEQUATE DIMENSIONS TO WITHSTAND SYSTEM OPERATING PRESSURE. COORDINATE WITH DETAIL FOR A \C UNIT MOUNTING. PERFORATED VENT CAP 12" FROM BOTTOM OF HIGHEST DRAIN PAN OR RISER rSEE SPECIFIATIONS I FOR PIPING MATERIAL. CLEAN -OUT DRAIN PAN PLUG CONNECTION 12' 1 1 TEE I rUNION = H TEE L MINIMUM FULL L CONNECTION SIZE a X ELBOW UNI N BOTTOM LOOR OR ROOF PIPE SUPPORT TURN PIPE DOWN AT NEAREST CONDENSATE DRAIN, WITH MIN OF 1 -INCH AIR GAP UNLESS SHOWN OTHERWISE ON PLANS. SEE PLUMBING PLANS FOR CONTINUATION. 3 0 PLUMBING DEMOLITION NOTES I. EXISTING SERVICES INDICATED ON THESE DRAWINGS WERE DERIVED FROM EXISTING DRAWINGS AND LIMITED FIELD OBSERVATIONS. THESE DRAWINGS MAY NOT BE ALL INCLUSIVE OF SERVICES THAT EXIST IN THE PROJECT AREA. CONTRACTOR SHALL VERIFY SERVICES, LOCATION, TYPE, AND SIZE PRIOR TO ANY CONSTRUCTION. ANY DEVIATIONS IMPACTING WORK SHOWN ON THESE DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT FOR COORDINATION PRIOR TO CONSTRUCTION. 2. EXISTING SERVICES, EQUIPMENT, AND FIXTURES, TO REMAIN OR TO BE RELOCATED, SHALL BE REPAIRED TO ORIGINAL OPERATION OR REPLACED, SHOULD THEY BE DAMAGED DURING CONSTRUCTION. I 3. ALL EXISTING WORK NOT SHOWN ON THESE DRAWINGS (UNLESS NOTED OTHERWISE) SHALL REMAIN AS IS. 4. ALL PENETRATIONS OR OPENINGS FROM REMOVED PIPES THROUGH EXISTING BUILDING WALLS AND FLOORS SHALL BE SLEEVED AND /OR PATCHED TO MATCH ORIGINAL. SEE ARCHITECTURAL DRAWINGS FOR FINAL FINISHES. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING PIPING FIXTURES, MED GAS OUTLETS OR QUIPMENT DUE TO NEW CONSTRUCTION AND SHALL RESTORE EXISTING WORK TO ITS ORIGINAL CONDITION AT NO COST TO I. 6. CONTINUITY OF SERVICES: EXISTING BUILDING WILL REMAIN IN USE DURING CONSTRUCTION OPERATIONS. WHEN AN INTERRUPTION OF AN EXISTING SERVICE IS NECESSARY, CONTRACTOR SHALL COORDINATE WITH AUTHORIZED HOSPITAL PERSONNEL BEFORE MAKING THE NECESSARY INTERRUPTION. 7. CONTRACTOR TO REMOVE EXISTING STACKS AND RISERS LOCATED IN EXISTING WALLS TO BE DEMOLISHED AND PROVIDE NEW OFFSETS AT CEILING ABOVE AND BELOW FLOOR SLAB. COORDINATE LOCATION FOR NEW STACK OR RISER DROP THROUGH FLOOR., B. CONTRACTOR TO FIELD VERIFY THAT ALLII EXISTING PLUMBING TO BE REMOVED DOES NOT AFFECT OTHER AREA'S OF THE HOSPITAL THAT ARE NOT IN CONSTRUCTION AND MUST STAY OPERATIONAL. IF DISCREPENCIES ARE FOUND THE CONTRACTOR IS TO NOTIFY THE ENGINEER. li 9. CONTRACTOR SHALL REMOVE EXISTING PLUMBING TO FIXTURES. TO BE REMOVED AS SHOWN ON DRAWINGS OR AS REQUIRED. CONTRACTOR SHALL CAP SERVICES NEXT TO SERVICE MAINS IN CEILINGS, WALLS OR BELOW FLOOR. CONTRACTOR SHALL REROUTE ALL ACTIVE PLUMBING SERVICES IN CHASES OR WALLS TO BE REMOVED, TO NEW CHASE AREAS OR NEW WALLS AS REQUIRED. fI 10. CONTRACTOR SHALL SUBMIT A COMPLETE' LIST OF PLUMBING FIXTURES, THAT ARE TO BE REMOVED TO THE LOCAL OWNER'S REPRESENTATIVE. ALL ITEMS THAT THE LOCAL OWNER'S REPRESENTATIVE WISHES TO RETAIN SHALL BE TURNED OVER TO THE OWNER AND THE REMAINDER SHALL BE REMOVED FROM THE SITE AND LEGALLY DISPOSED. PLUMBING AS- BUILTS NOTE PLUMBING CONTRACTOR IS REQUIRED TO SUBMIT PLUMBING AS BUILT PLANS UPON COMPLETION OF THE PROJECT. COMPLETION IS DEFINED AS THE OWNER RECEIVING A 'CO' AND PLUMBING INSPECTOR HAS FINALIZED AND APPROVED THE INSTALLATION. AS BUILTS SHALL BE SUBMITTED IN ELECTRONIC FASHION IN EITHER AUTOCAD FORMAT OR SCANNED FILES IN PDF FORMAT. (1 AS BUILTS SHALL BE LEGIBLE AND NEAT. AS BUILTS WILL BE RETAINED BY ARCHITECT AND ENGINEER FOR RECORDS OFICHANGES TO THE SYSTEM. AS BUILTS WILL BE SUBMITTED TO OWNER THROUGH ARCHITECT AND ENGINEER. CONDENSATE TRAP SCHEDULE TOTAL HEIGHT OF TRAP = X +H +0 12 x PIPE DIAMETER) FOR DRAW THRU UNITS FOR BLOW THRU UNITS X= MIN. I/2 H (PREFERRED X =H) H- NEGATIVE STATIC PRESSURE +1" X= FAN STATIC PRESSURE +1" H- MIN. I" AHU IDENTIFICATION TONNAGE PIPE DIA. (INCHES) AHU NEGATIVE STATIC PRESS. (INCHES) FAN STATIC PRESSURE (INCHES) X (INCHES) H (INCHES) TOTAL HEIGHT (INCHES) CRAC -I 2 Ll 211 NA 3° G' B' NOTE: 1. CONDENSATE TRAPS SHALL BE MADE UP OF UNIONS IN EACH SIDE OF TRAP, AND SHALL BE COMPLETELY REMOVABLE FOR CLEANING. CONTRACTOR SHALL DEMONSTRATE TRAP REMOVAL PRIOR TO FINAL ACCEPTANCE. 2. INSTALL PER MANUFACTURER'S WRITTEN INSTRUCTIONS. COOL ING_C OIL _CONDENSATE_DRAIN 5 0 9 PLUMBING NEW CONSTRUCTION NOTES • . w 21. CONTINUITY OF SERVICE: INTERRUPTIONS OF EXISTING SERVICES OR rACILMES •�• SHALL BE KEPT TO A MINIMUM AND THE CONTRACTOR SHALL FURNISH ALL MATERIALS AND LABOR REQUIRED WHENEVER TEMPORARY CONNECTIONS ARF •• " NECESSARY TO MAINTAIN CONTINUITY OF SERVICE. INTERRUPTIONS•OF- •THE - ••. EXISTING SERVICES, THE INSTALLATION OF TEMPORARY FACILITIES, :`AND THE-WORK- OF MAKING FINAL CONNECTIONS TO NEW WORK SHALL BE DONE ONLY AT SOCJ4 .. TIMES AS PERMITTED AND SCHEDULED BY THE OWNER. ALL SUCH CftECYIONS AND TIE -INS SHALL BE COORDINATED THROUGH THE OWNERS PROJECT MANAGER. I. THE DURATION OF EACH SHUTDOWN SHALL BE LIMITED TO NIGHTS AND /OR WEEKENDS WITH THE TIME FRAME FOR SHUTDOWNS AS SPECIFIED BY THE OWNER. THE CONTRACTOR SHALL NOTIFY THE OWNER IN WRITING FORTY -EIGHT (48) HOURS IN ADVANCE OF EACH REQUIRED INTERRUPTION OF EXISTING SERVICE. 2. THE CONTRACTOR SHALL INCLUDE IN BID PRICE ALL PREMIUM TIME CHARGES FOR LABOR AND EQUIPMENT REQUIRED FOR ALL NIGHT AND WEEKEND OVERTIME WORK, AS NECESSARY, TO COMPLETE THE SCOPE OF THE CONTRACT. 22. ALL STORM PIPING AND CONDENSATE PIPING SHALL BE INSULATED THROUGHOUT ENTIRE SYSTEM. 23. PROVIDE A MINIMUM OF G INCHES BETWEEN ALL PIPING AND FIRE RATED AND SMOKE TIGHT PARTITIONS FOR REQUIRED INSPECTIONS. ANY PIPING WITHIN THIS 6 INCHES SPACE SHALL BE REQUIRED TO BE MOVED AND REROUTED. ANY COST IMPACT TO OTHER TRADES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. 24. PROVIDE THE REQUIRED CLEARANCES AND SPACE FOR ALL PLUMBING FIXTURES. PLUMBING CONTRACTOR SHALL VERIFY AND COORDINATE PRIOR TO THE START OF CONSTRUCTION. 25. INSULATION, FITTINGS COVERS AND ALL FINISHES AND MATERIALS SHALL HAVE A MAXIMUM FLAME SPREAD RATING OF 25 AND A MAXIMUM SMOKE DEVELOPED RATING OF 50. 26. DRAWINGS ARE DIAGRAMMATIC. DO NOT SCALE FROM DRAWINGS. BUT FIT WORK TO ACTUAL CONDITION AND SPACE REQUIREMENTS. 27. ALL WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR IN A FIRST CLASS WORKMANLIKE MANNER. THE COMPLETE SYSTEM SHALL BE FULLY AND PROPERLY OPERATIVE, AND IN COMPLIANCE WITH APPLICABLE CODES AND GOVERNING AUTHORITIES AND SUBJECT TO ACCEPTANCE BY OWNER /ENGINEER. 28. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, FEES, INSPECTIONS AND TESTS. 29. ALL REQUIRED INSURANCES SHALL BE PROVIDED AND MAINTAINED BY THE CONTRACTOR FOR THE PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY DAMAGE, AND OTHER INSURANCES REQUIRED BY THE OWNER, FOR THE DURATION OF THE WORK. 30. GENERAL NOTE: TEMPERATURE OF HOT WATER TO PUBLIC REST ROOMS SHALL NOT EXCEED I10^F, PER FLORIDA ENERGY CONSERVATION CODE 504.8.2 (2). CONTRACTOR SHALL VERIFY TEMPERATURE OF HOT WATER SYSTEM WITH OWNER. INSTALL TEMPERING VALVES AS REQUIRED, FOR A MAXIMUM TEMPERATURE OF HOT SUBJECT TO REVIEW BY ENGINEER. 31. CONTRACTOR SHALL OBTAIN FROM THE OWNER A COPY OF THE INFECTION CONTROL RISK ASSESSMENT (ICRA) PREPARED FOR THIS PROJECT. CONTRACTOR SHALL REVIEW THE REQUIREMENTS IN THE REPORT AND PERFORM ALL WORK IN ACCORDANCE WITH THOSE REQUIREMENTS. SEE MECHANICAL DRAWINGS FOR COORDINATION OF VENTILATION REQUIREMENTS REQUIRED BY ICRA. 32. REFER TO DIVISION 15 SPECIFICATIONS FOR MORE INFORMATION. 33. CONTRACTOR SHALL SAW CUT CONCRETE FLOOR SLAB TO INSTALL NEW BELOW SLAB PIPING AND SHALL PATCH THE SLAB TO MATCH THE EXISTING CONCRETE SLAB. 34. CONTRACTOR SHALL TEST WATER FROM DOMESTIC COLD AND HOT WATER SYSTEMS WHICH WILL BE MODIFIED BY THE RENOVATION PRIOR TO COMMENCING MODIFICATIONS AND AFTER MODIFICATIONS ARE COMPLETED FOR CONTAMINANTS. PROVIDE COPY OF INITIAL TEST REPORT UPON COMPLETION. PROVIDE COPY OF FINAL TEST REPORT ONE WEEK PRIOR TO THE FINAL AHCA INSPECTION. 35. CONTRACTOR SHALL USE TEFLON TAPE AT THREADED FITTINGS. PIPE DOPE IS NOT ACCEPTABLE. YYY V U . ......... wl.�Arc'hiect of Record: I. PLUMBING INSTALLATION OF ALL FIXTURES, EQUIPMENT, AND PIPING SHOWN ON THESE DRAWINGS SHALL BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE STATE, LOCAL AND HEALTH CODES REQUIREMENTS. 2. CONTRACTOR SHALL FIELD VERIFY EXISTING INVERT ELEVATIONS, SIZES AND LOCATIONS OF EXISTING PLUMBING PRIOR TO BIDDING. IF DISCREPANCIES ARE FOUND, THEY ARE TO NOTIFY ENGINEER. 3. ALL PLUMBING FIXTURES TO COMPLY WITH TABLE 604.3 OF THE FLORIDA BUILDING CODE - 2010 4. CONTRACTOR SHALL COORDINATE EQUIPMENT CONNECTIONS & MOUNTING HEIGHTS WITH KITCHEN EQUIPMENT, EQUIPMENT AND ARCHITECTURAL DRAWINGS AND SUPPLIER. INSTALL EQUIPMENT AND MAKE FINAL CONNECTIONS FURNISHING CUTOFF VALVES, P- TRAPS, FITTINGS, P.R.V.'S, AND PIPING AS REQUIRED. CONTRACTOR SHALL OBTAIN A SET OF THE EQUIPMENT DRAWINGS PRIOR TO BIDDING IN ORDER TO DETERMINE ALL REQUIRED CONNECTIONS. 5. CONTRACTOR SHALL PROVIDE TRAP PRIMERS ON ALL FLOOR DRAINS AND SHOWER DRAINS AND AS REQUIRED BY STATE AND LOCAL CODES. 6. PROVIDE 12'X12' ACCESS PANELS FOR ALL VALVES LOCATED ABOVE HARD CEILINGS. INSTALL VALVES SO AS TO BE WITHIN REACH OF ACCESS DOOR. 7. CONTRACTOR SHALL PROVIDE ROUGH -INS AND MAKE FINAL CONNECTIONS FOR EACH PIECE OF EQUIPMENT REQUIRING PLUMBING CONNECTION, INCLUDING TAILPIECES, TRAPS, LINE STRAINERS, STOP VALVES, GAUGES, VACUUM BREAKERS, REDUCING VALVES, SPECIAL FITTINGS, THERMOMETERS, GLOBE SOLENOID VALVES, INSULATION, AND ALL NECESSARY DEVICES FOR A COMPLETE AND OPERATIVE SYSTEM. COORDINATE EXACT REQUIRED PLUMBING ROUGH -INS WITH VENDOR SUPPLIER DRAWINGS. 8. THE CONTRACTOR SHALL INSTALL PLUMBING PIPING IN LOCATIONS INDICATED ON THE CONTRACT DOCUMENTS. THE ONLY DEVIATION FROM THIS WOULD BE IF ADDITIONAL OFFSETS ARE REQUIRED TO COORDINATE WITH OTHER TRADES. IF THE THE CONTRACTOR DESIRES TO CHANGE THE PLUMBING ROUTING FOR ANY OTHER REASON, HE SHALL COMPENSATE THE ENGINEER AT A RATE OF DPE x 2.75 TO REVISE THE PLUMBING DRAWINGS, RISER DIAGRAMS AND FOR THE TIME INVOLVED IN REISSUING DRAWINGS TO THE AUTHORITY HAVING JURISDICTION. CONTRACTOR SHALL CONTACT ENGINEER FOR ESTIMATED TIME REQUIRED AND SCHEDULE FOR PERFORMING WORK, 9. ALL MATERIALS, EQUIPMENT, AND APPARATUS SHALL BE NEW, EXCEPT THAT CALLED FOR AS BEING RE -USED OR FURNISHED BY OTHERS. 10. SEAL PENETRATIONS OF FIRE RATED WALLS AND FLOORS IN ACCORDANCE WITH U.L. FIRE RESISTANCE INDEX FOR THROUGH PENETRATION FIRE STOP SYSTEMS. COORDINATE REQUIREMENTS WITH ARCHITECTURAL PLANS AND SPECIFICATIONS. II. CLEANOUT COVERS SHALL NOT BE INSTALLED ON THE CORRIDOR SIDE OF ANY WALL. IF DISCREPANCIES ARE FOUND ON PLANS CONTRACTOR SHALL NOTIFY PLUMBING ENGINEER PRIOR TO INSTALLATION. 12. PIPING SHALL NOT BE RUN OVER ANY ELECTRICAL EQUIPMENT, PANELS AND PHONE PANELS. 13. THE PLUMBING CONTRACTOR SHALL KEEP A SET OF MARKED UP DRAWINGS AS THE JOB PROGRESSES. NO MAJOR CHANGE SHALL BE MADE TO PLUMBING DESIGN ENGINEERING UNLESS IT HAS BEEN COORDINATED, DRAWN AND SUBMITTED FOR APPROVAL. 14. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGES TO EXISTING PIPING AND FIXTURES DUE TO NEW CONSTRUCTION AND SHALL RESTORE EXISTING WORK DISTURBED TO IT'S ORIGINAL CONDITION AT NO COST TO THE OWNER. 15. CONTRACTOR SHALL COORDINATE WITH ALL DISCIPLINES INVOLVED SO AS TO AVOID ANY PIPE ROUTING PROBLEMS. 16. PROVIDE OFFSETS AND FITTINGS AS REQUIRED. 17. COORDINATE EXACT LOCATION OF EQUIPMENT ROOM FLOOR DRAINS FOR HVAC EQUIPMENT & HUB DRAINS WITH MECHANICAL CONTRACTOR. CONDENSATE PIPING SHALL NOT DISCHARGE INTO SANITARY SYSTEM. 18. THIS CONTRACTOR SHALL BASE HIS PROPOSAL UPON THE EQUIPMENT AS SCHEDULED OR SPECIFIED, USING THE MANUFACTURERS AND MODEL NUMBERS AS CALLED FOR W THE SPECIFICATIONS AND SCHEDULED ON THE DRAWINGS. IF MORE THAN ONE MANUFACTURER OF EQUIPMENT IS SPECIFIED, ANY ONE OF THE MANUFACTURERS OF EQUIPMENT MAY BE USED IN THIS CONTRACTOR'S PROPOSAL. IF THIS CONTRACTOR WISHES TO USE EQUIPMENT NOT SPECIFIED HE MUST, AT THE TIME OF BIDDING, SUBMIT SEPARATELY ON LETTERHEAD STATIONARY OF THE BIDDER, THE EQUIPMENT HE WOULD SUBSTITUTE AND THE COST TO BE ADDED OR TO BE DEDUCTED FROM HIS PROPOSAL. 19. THE CONTRACTOR IS EXPECTED TO ORDER ALL MATERIALS IN SUFFICIENT TIME TO AVOID DELAYING THE COMPLETION OF THE PROJECT. DELAY IN DELIVERIES WILL NOT BE CONSIDERED A JUSTIFIABLE REASON FOR SUBMISSION OF SUBSTITUTE MATERIALS. 20. WARRANTY /GUARANTEE A. THE CONTRACTOR SHALL WARRANTY /GUARANTEE AND MAINTAIN THE STABILITY OF WORK AND MATERIALS AND KEEP SAME IN PERFECT REPAIR AND CONDITION FOR THE PERIOD OF ONE YEAR. B. DEFECTS OF ANY KIND DUE TO FAULTY WORK OR MATERIALS, APPEARING DURING THE ABOVE MENTIONED PERIOD, MUST BE IMMEDIATELY REPAIRED BY THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE OWNER AND ENGINEER. SUCH RECONSTRUCTION AND REPAIRS SHALL INCLUDE DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE ORIGINAL DEFECT OR REPAIR THERETO. DRAWING INDEX SNOT SHEET TITLE PO.1 PLUMBING SCHEDULES, LEGENDS, DETAILS AND DRAWING INDEX PO.2 PLUMBING SPECIFICATIONS PO.3 PLUMBING SPECIFICATIONS P2.0 SIXTH FLOOR PLAN - NEW CONSTRUCTION - PLUMBING P2.1 SEVENTH FLOOR PLAN - NEW CONSTRUCTION - PLUMBING 0 E. &v A R P A Y �ILU Architects P.C. bt-81[theare facilities solutions 6800 Broken Sound Boulevard NVV Suite 125 Boca Raton, FL 33487 t: 561.555.1700 f: 561.995.1701 firm license number www.arrayhfs.com AA2600880 SEAL: / ,``rrrrr�yzrrrrr� , �• • r � �- OF : w r � 0R IV" `,: ,fj;0NA l � %, CONSULTANTS: �.,�✓ \1 Smith Seckman Reid, Inc. 600 West Hillsboro, Suite 300 Deerfield Beach, FL 33441 (954) 421 -1260 FAX: (954) 421 -1466 www.ssr- ine.com Firm Certification - EB- 0000857 Dennis O. Davis PE - 58588 John E. Moulder PE - 33200 SSR JOB* 1232010.0 HOSPITAL: SOUTH MIAMI HOSPITAL AHCA: CLIENT CODE /FILE NUMBER: 23/100154 PROJECT ID /SUBMISSION NUMBER: 187 -1 2 Bid and Permit Set 07 -18 -12 1 AHCA Stage III 07 -03 -12 NO. DESCRIPTION DATE REVISIONS /ISSUES SHEET TITLE: PLUMBING SCHEDULES, LEGENDS, DETAILS AND DRAWING INDEX DRAWN: CHECKED: CON /REF No. 0000 PROJECT No. 3606 DATE: 07 -03 -12 SCALE: As Indicated SHEET NO. P This document in n co,-)yrght yr tF +;i in;hunner- Y ser,ice, p op, r) at ARF%' and liceneed for use it the titled 711 a d °u ^i�r without writ'?n perm ^ -ici of AP ie ilkpl nn I will t �rrse,-_0 d .rder F? low, COPYRIGHT - 2012 ARRAY HFS