Loading...
12-984-023I !� - v I ;" tN • 0 N T 2 i V) L A M LO 0 I x cu a_ F V) V V) V) W 1 co (n CN Cat 0 CNN Q0 t U_ 0 :11 10 V■ �I L SECTION 011000 - SUMMARY 11 PROJECT INFORMATION A. PROJECT IDENTIFICATION: INTERIOR RENOVATIONS FOR CENTRAL MONITORING B. PROJECT LOCATION: 6200 SLuthwest 73rd Street South Miami, FL 33143 C. OWNER: BAPTIST HEALTH SOUTH FLORIDA 1. OWNER'S REPRESENTATIVE: Chris Dusvitch, Project Manager, 7164624651 C. ARCHITECT: ARRAY HFS, 6100 BROKEN SOUND PARKWAY NW, SUITE 125, BOCA RATAN, FL, 33437. (561) 995 -1700, D. WORK OF THE PROJECT: RENOVATION TO BUILD CENTRAL MONITORING ROOM FOR PATIENT ROOM IN PAVILION E. TYPE OF CONTRACT: SINGLE PRIME CONTRACT. F. PHASED CONSTRUCTION: ONE PHASE. G. WORK BY OWNER: REMOVALIiNSTALLATION OF MOVEABLE EQUIPMENT 1. PRECEDING WORKAEMOVAL OF E UIPMENT 2, SUBSEQUENT WORK: INSTALLATION OF EQUIPMENT E. USE OF SITE: LIMITED TO WORK IN AREAS INDICATED ON THE DRAWINGS. 1. OWNER OCCUPANCY AND USE BY PUBLIC ALLOWED. 2. AREAS ADJACENT TO THE WORK AREA WILL CONTINUE TO BE OCCUPIED AND PERFORM THEIR REGULAR ACTIVITIES. J, OWNER'S OCCUPANCY REQUIREMENTS: FULL OWNER OCCUPANCY. 1. OWNER OCCUPANCY OF COMPLETED AREAS OF CONSTRUCTION. K. WORK RESTRICTIONS: FOLLOW ALL OF THE OWNER'S SECURITY AND SITE RESTRICTIONS. L. MISCELLANEOUS PROVISIONS: PROJECT IS AHCA REVIEWABLE, 1.2 EACH BIDDER SHALL VISIT THE SITE AT THE APPOINTED TIME AND FULLY ACQUAINT AND FAMILIARIZE HIMSELF WITH THE CONDITIONS AND MATERIALS AS THEY EXIST AND SHALL MAKE SUCH INVESTIGATIONS AS HE SEES FIT TO FULLY UNDERSTAND THE FACILITIES, CONDITIONS AND RESTRICTIONS PERTAINING TO THE A WORK. NO ADDITIONAL COMPENSATION WILL RE ALLOWED FOR THE FAILURE OF THE BIDDER TO PROPERLY APPRAISE AND VERIFY THE EXISTING CONDITIONS. 1.3 THE OUTLINE SPECIFICATIONS RE NOT INTENDED T A O COVER ALL NECESSARY ITEMS BUT ARE TO SERVE ONLY AS A GUIDE, THE CONTRACTOR IS REQUIRED TO FURNISH ALL LABOR, MATERIAL, EQUIPMENT AND PERFORM ALL OPERATIONS COMPLETE AS SPECIFIED, SHOWN ON THE DRAWINGS OR AS IMPLIED AND REQUIRED FOR THE COMPLETE AND PROPER INSTALLATION OF THE WORK. ALL WORK SHALL BE PERFORMED BY SKILLED MECHANICS IN THEIR RESPECTIVE TRADES ALL OF THE MAN ACTURERS WRITTEN SPECIFICATIONS AND RECOMMENDATIONS T ONS IN ORDER TO PRODUCE A FIRST CLASS INSTALLATION. 1.4. IT IS INTENDED THAT WHEN THE PROJECT IS COMPLETE, THAT ALL SMOKE BARRIER WALLS, FIRE WALLS AND CORRIDOR WALLS WITHIN THE SCOPE OF THIS PROJECT WILL PROVIDE THE NOTED FIRE RESISTANCE AND ALL UNPROTECTED OPENING, HO' ES, ETC. SHALL BE SEALED; EXISTING WALLS SHALL BE PATCHED AND REPAIRED AS REQUIRED TO MEET THE REQUIRED FIRE RATING. WALLS SHALL BE TIGHT AROUND NEW AND EXISTING PENETRATIONS AT PIPES, DUCTS, CONDUIT, ETC.; TYPICAL FROM FLOOR TO BOTTOM OF DECK ABOVE. AT REMOVED OR NEW PIPE, ETC. THRU THE FLOOR SLAB FILL ALL HOLES WITH CONCRETE TO PROVIDE THE REQUIRED FIRE RATING. 1.5 PORTIONS OF THE FLOORS ABOVE, BELOW AND OUTSIDE THE FLOOR AREAS SHOWN ON THE ARCHITECTURAL PLANS ARE TOME INCLUDED WITHIN THE SCOPE OF THIS PROJECT. SEE LIFE SAFETY DRAWINGS, MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL DRAWINGS; REMOVE AND REPLACE EXISTING CONSTRUCTION IN AREAS AFFECTED BY NEW PIPING, DUCTS, CONDUIT, ETC. END OF SECTION 011000 SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION 1.1 SUMMARY A. SECTION INCLUDES ADMINISTRATIVE PROVISIONS FOR COORDINATING CONSTRUCTION OPERATIONS ON PROJECT INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING: 1. COORDINATION DRAWINGS. 2. REQUESTS FOR INFORMATION (RFIS). 3. PROJECT MEETINGS. 1.2 COORDINATION DRAWINGS A. GENERAL: PREPARE COORDINATION DRAWINGS IN ACCORDANCE WITH REQUIREMENTS IN INDIVIDUAL SECTIONS, WHERE INSTALLATION 1S NOT COMPLETELY SHOWN ON SHOP DRAWINGS, WHERE LIMITED SPACE AVAILABILITY NECESSITATES COORDINATION, OR IF COORDINATION IS REQUIRED TO FACILITATE INTEGRATION OF PRODUCTS AND MATERIALS FABRICATED OR INSTALLED BY MORE THAN ONE ENTITY. 1. CONTENT: PROJECT - SPECIFIC INFORMATION, DRAWN ACCURATELY TO A SCALE LARGE ENOUGH TO INDICATE AND RESOLVE CONFLICTS. DO NOT BASE COORDINATION DRAWINGS ON STANDARD PRINTED DATA. INCLUDE THE FOLLOWING INFORMATION, AS APPLICABLE: a. INDICATE FUNCTIONAL AND SPATIAL RELATIONSHIPS OF COMPONENTS OF ARCHITECTURAL, STRUCTURAL, CIVIL, MECHANICAL, AND ELECTRICAL SYSTEMS. b. INDICATE DIMENSIONS SHOWN ON THE DRAWINGS. SPECIFICALLY NOTE DIMENSIONS THAT APPEAR TO BE IN CONFLICT WITH SUBMITTED EQUIPMENT AND MINIMUM CLEARANCE REQUIREMENTS, PROVIDE ALTERNATE SKETCHES TO ARCHITECT INDICATING PROPOSED RESOLUTION OF SUCH CONFLICTS. MINOR DIMENSION CHANGES AND DIFFICULT INSTALLATIONS WILL NOT BE CONSIDERED CHANGES TO THE CONTRACT. 13 REQUESTS FOR INFORMATION (RFIS) A. GENERAL: IMMEDIATELY ON DISCOVERY OF THE NEED FOR ADDITIONAL INFORMATION OR INTERPRETATION OF THE CONTRACT DOCUMENTS, CONTRACTOR SHALL PREPARE AND SUBMIT AN RFI VIA EMAIL AS PDF FILES. 1. ARCHITECT WILL RETURN RFIS SUBMITTED TO ARCHITECT BY OTHER ENTITIES CONTROLLED BY CONTRACTOR WITH NO RESPONSE. 2. COORDINATE AND SUBMIT RFIS IN A PROMPT MANNER SO AS TO AVOID DELAYS IN CONTRACTOR'S WORK OR WORK OF SUBCONTRACTORS. B. CONTENT OF THE RFI: INCLUDE A DETAILED, LEGIBLE DESCRIPTION OF ITEM NEEDING INFORMATION OR INTERPRETATION AND THE FOLLOWING: PROJECT NAME, PROJECT NUMBER, DATE, NAME OF CONTRACTOR, NAME OF ARCHITECT, RFI NUMBER, NUMBERED SEQUENTIALLY, RFI SUBJECT. C. ARCHITECT'S ACTION: ARCHITECT WILL REVIEW EACH RFI, DETERMINE ACTION REQUIRED, AND RESPOND. ALLOW FIVE WORKING DAYS FOR ARCHITECT'S RESPONSE FOR EACH RFI. RFIS RECEIVED BY ARCHITECT AFTER 1:00 P.M. WILL BE CONSIDERED AS RECEIVED THE FOLLOWING WORKING DAY. 1. THE FOLLOWING RFIS WILL BE RETURNED WITHOUT ACTION: REQUESTS FOR APPROVAL OF SUBMITTALS, REQUESTS FOR APPROVAL OF SUBSTITUTIONS. REQUESTS FOR COORDINATION INFORMATION ALREADY INDICATED IN THE CONTRACT DOCUMENTS. REQUESTS FOR ADJUSTMENTS IN THE CONTRACT TIME OR THE CONTRACT SUM. REQUESTS FOR INTERPRETATION OF ARCHITECTS ACTIONS ON SUBMITTALS. INCOMPLETE RFIS OR INACCURATELY PREPARED RFIS. ARCHITECT'S ACTION MAY INCLUDE A REQUEST FOR ADDITIONAL INFORMATION, IN WHICH CASE ARCHITECT'S TIME FOR RESPONSE WILL DATE FROM TIME OF RECEIPT OF ADDITIONAL INFORMATION. 1 ARCHITECTS ACTION ON RFIS THAT MAY RESULT IN A CHANGE TO THE CONTRACT TIME OR THE CONTRACT SUM MAY BE ELIGIBLE FOR CONTRACTOR TO SUBMIT CHANGE PROPOSAL ACCORDING TO CONTRACT MODIFICATION PROCEDURES. a. IF CONTRACTOR BELIEVES THE RFI RESPONSE WARRANTS CHANGE IN THE CONTRACT TIME OR THE CONTRACT SUM, NOTIFY ARCHITECT IN WRITING WITHIN 10 DAYS OF RECEIPT OF THE RFI RESPONSE. / 1.4 PROJECT MEETINGS A. GENERAL: CONDUCTING OF MEETINGS IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. SCHEDULE AND CONDUCT MEETINGS AND CONFERENCES AT PROJECT SITE, UNLESS OTHERWISE INDICATED. 1. ATTENDEES: INFORM PARTICIPANTS AND OTHERS INVOLVED, AND INDIVIDUALS WHOSE PRESENCE IS REQUIRED, OF DATE AND TIME OF EACH MEETING. NOTIFY OWNER AND ARCHITECT OF SCHEDULED MEETING DATES AND TIMES. 2. AGENDA: PREPARE THE MEETING AGENDA. DISTRIBUTE THE AGENDA TO ALL INVITED ATTENDEES. 3, , MINUTES: ENTITY RESPONSIBLE FOR CONDUCTING MEETING WILL RECORD SIGNIFICANT DISCUSSIONS AND AGREEMENTS ACHIEVED. DISTRIBUTE THE MEETING MINUTES TO EVERYONE CONCERNED, INCLUDING OWNER AND ARCHITECT, WITHIN THREE WORKING DAYS OF THE MEETING. END OF SECTION 013100 3 SECTION 013300 - SUBMITTAL PROCEDURES . 1,1 DEFINITIONS A. ACTION SUBMITTALS: INFORMATION THAT REQUIRES ARCHITECTS RESPONSIVE ACTION, B. INFORMATIONAL SUBMITTALS: INFORMATION THAT DOES NOT REQUIRE ARCHITECT'S APPROVAL. SUBMITTALS MAY BE REJECTED FOR NOT COMPLYING WITH REQUIREMENTS, 12 PROCEDURES A. ELECTRONIC COPIES OF CAD DRAWINGS OF THE CONTRACT DOCUMENTS WILL NOT BE PROVIDED BY ARCHITECT FOR CONTRACTOR'S USE. 1. SHOP DRAWINGS: PREPARE PROJECT - SPECIFIC INFORMATION, DRAWN ACCURATELY TO SCALE. DO NOT BASE SHOP DRAWINGS ON REPRODUCTIONS OF THE CONTRACT DOCUMENTS OR STANDARD PRINTED DATA, UNLESS SUBMITTAL BASED UPON ARCHITECTS DIGITAL DATA DRAWING FILES IS OTHERWISE PERMITTED. 1, PROCESSING TIME: 1. INITIAL REVIEW, 15 DAYS. 2. RESUBMITTAL REVIEW: 15. 3. SEQUENTIAL REVIEW: 21 DAYS. 4. CONCURRENT CONSULTANT REVIEW; 15. C. TRANSMITTAL FORM: AIA DOCUMENT G110 D. SUBMITTAL PROCEDURES: 1. SUBMIT VIA EMAIL AS PDF FILES. 2, ACTION SUBMITTALS: SUBMIT THREE PAPER COPIES. 3. INFORMATIONAL SUBMITTALS: SUBMIT TWO PAPER COPIES. 4. CERTIFICATES AND CERTIFICATIONS SUBMITTALS: INCLUDES SIGNATURE OF ENTITY RESPONSIBLE FOR PREPARING CERTIFICATION. PROVIDE A DIGITAL SIGNATURE ON ELECTRONICALLY SUBMITTED CERTIFICATES AND CERTIFICATIONS WHERE INDICATED. E. DELEGATED DESIGN SERVICES CERTIFICATION: IN ADDITION TO OTHER REQUIRED SUBMITTALS, SUBMIT DIGITALLY- SIGNED PDF ELECTRONIC FILE AND THREE PAPER COPIES OF CERTIFICATE, SIGNED AND SEALED BY THE RESPONSIBLE DESIGN PROFESSIONAL. F, CONTRACTOR'S REVIEW: 1, SUBMITTALS: MARKED WITH APPROVAL STAMP BEFORE SUBMITTING TO ARCHITECT. G. ARCHITECTS/ ACTION 1. GENERAL: ARCHITECT WILL NOT REVIEW SUBMITTALS THAT DO NOT BEAR CONTRACTOR'S APPROVAL STAMP AND WILL RETURN THEM WITHOUT ACTION. 2. ACTION SUBMITTALS: ARCHITECT WILL REVIEW EACH SUBMITTAL, MAKE MARKS TO INDICATE CORRECTIONS OR MODIFICATIONS REQUIRED AND RETURN IT. ARCHITECT WILL STAMP EACH SUBMITTAL WITH AN ACTION STAMP AND WILL MARK STAMP APPROPRIATELY TO INDICATE ACTION TAKEN, AS FOLLOWS: 3, FINAL UNRESTRICTED RELEASE: WHEN THE ARCHITECT MARKS A SUBMITTAL "REVIEWED," THE WORK COVERED BY THE SUBMITTAL MAY PROCEED PROVIDED IT COMPLIES WITH REQUIREMENTS OF THE CONTRACT DOCUMENTS. FINAL PAYMENT DEPENDS ON THAT COMPLIANCE. 4. FINAL - BUT - RESTRICTED RELEASE: WHEN THE ARCHITECT MARKS A SUBMITTAL "REVIEWED AS NOTED," THE WORK COVERED BY THE SUBMITTAL MAY PROCEED PROVIDED IT COMPLIES WITH NOTATIONS OR CORRECTIONS ON THE SUBMITTAL AND REQUIREMENTS OF THE CONTRACT DOCUMENTS. FINAL PAYMENT DEPENDS ON THAT COMPLIANCE. 5. RETURNED FOR RESUBMITTAL: WHEN THE ARCHITECT MARKS A SUBMITTAL "REJECTED, REVISE AND RESUBMIT," DO NOT PROCEED WITH WORK COVERED iY THE SUBMITTAL, INCLUDING PURCHASING, FABRICATION, DELIVERY, OR OTHER ACTIVITY. REVISE OR PREPARE A NEW SUBMITTAL ACCORDING TO THE NOTATIONS; RESUBMIT WITHOUT DELAY. REPEAT IF NECESSARY TO OBTAIN DIFFERENT ACTION MARK. 6. INFORMATIONAL SUBMITTALS: REVIEWED BUT NOT RETURNED, OR REJECTED IF IT DOES NOT COMPLY WITH REQUIREMENTS. 7. INCOMPLETE SUBMITTALS WILL BE RETURNED WITHOUT REVIEW. 8. SUBMITTALS NOT REQUIRED: MAY NOT BE REVIEWED AND MAY BE DISCARDED. H. SAMPLES: SUBMIT SAMPLES FOR REVIEW OF KIND, COLOR, PATTERN, AND TEXTURE FOR A CHECK OF THESE CHARACTERISTICS WITH OTHER ELEMENTS AND FOR A COMPARISON OF THESE CHARACTERISTICS BETWEEN SUBMITTAL AND ACTUAL COMPONENT AS DELIVERED AND INSTALLED. 1. PRODUCT SCHEDULE: AS REQUIRED IN INDIVIDUAL SPECIFICATION SECTIONS, PREPARE A WRITTEN SUMMARY INDICATING TYPES OF PRODUCTS REQUIRED FOR THE WORK AND THEIR INTENDED LOCATION, INCLUDE THE FOLLOWING INFORMATION IN TABULAR FORM: SUBMIT PRODUCT SCHEDULE IN THE FOLLOWING FORMAT: PDF ELECTRONIC FILE. J. APPLICATION FOR PAYMENT: COMPLY WITH OWNER'S REQUIREMENTS FOR PAYMENT PROCEDURES, K. SCHEDULE OF VALUES: COMPLY WITH OWNER'S REQUIREMENTS FOR PAYMENT PROCEDURES. L. SUBCONTRACT LIST: PREPARE A WRITTEN SUMMARY IDENTIFYING INDIVIDUALS OR FIRMS PROPOSED FOR EACH PORTION OF THE WORK, INCLUDING THOSE WHO ARE TO FURNISH PRODUCTS OR EQUIPMENT FABRICATED TO A SPECIAL DESIGN. 1.3 DELEGATED - DESIGN SERVICES A. PERFORMANCE AND DESIGN CRITERIA: WHERE PROFESSIONAL DESIGN SERVICES OR CERTIFICATIONS BY A DESIGN PROFESSIONAL ARE SPECIFICALLY REQUIRED OF CONTRACTOR BY THE CONTRACT DOCUMENTS, PROVIDE PRODUCTS AND SYSTEMS COMPLYING WITH SPECIFIC PERFORMANCE AND DESIGN CRITERIA INDICATED. 1. IF CRITERIA INDICATED ARE NOT SUFFICIENT TO PERFORM SERVICES OR CERTIFICATION REQUIRED, SUBMIT A WRITTEN REQUEST FOR ADDITIONAL INFORMATION TO ARCHITECT. B. DELEGATED - DESIGN SERVICES CERTIFICATION: IN ADDITION TO SHOP DRAWINGS, PRODUCT DATA, AND OTHER REQUIRED SUBMITTALS, SUBMIT THREE PAPER COPIES OF CERTIFICATE, SIGNED AND SEALED BY THE RESPONSIBLE DESIGN PROFESSIONAL, FOR EACH PRODUCT AND SYSTEM SPECIFICALLY ASSIGNED TO CONTRACTOR TO BE DESIGNED OR CERTIFIED BY A DESIGN PROFESSIONAL. 1. INDICATE THAT PRODUCTS AND SYSTEMS COMPLY WITH PERFORMANCE AND DESIGN CRITERIA IN THE CONTRACT DOCUMENTS. INCLUDE LIST OF CODES, LOADS, AND OTHER FACTORS USED IN PERFORMING THESE SERVICES, END OF SECTION 013300 SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS 1.1 USE CHARGES A. GENERAL: INSTALLATION AND REMOVAL OF AND USE CHARGES FOR TEMPORARY FACILITIES SHALL BE INCLUDED IN THE CONTRACT SUM UNLESS OTHERWISE INDICATED. ALLOW OTHER ENTITIES TO USE TEMPORARY SERVICES AND FACILITIES WITHOUT COST, INCLUDING, BUT NOT LIMITED TO, OWNER'S CONSTRUCTION FORCES, ARCHITECT, OCCUPANTS OF PROJECT, TESTING AGENCIES, AND AUTHORITIES HAVING JURISDICTION. 12 PROJECT CONDITIONS A. TEMPORARY USE OF PERMANENT FACILITIES: ENGAGE INSTALLER OF EACH PERMANENT SERVICE TO ASSUME RESPONSIBILITY FOR OPERATION, MAINTENANCE, AND PROTECTION OF EACH PERMANENT SERVICE DURING ITS USE AS A CONSTRUCTION FACILITY BEFORE OWNER'S ACCEPTANCE, REGARDLESS OF PREVIOUSLY ASSIGNED RESPONSIBILITIES. 1.3 FIRE EXTINGUISHERS: PORTABLE, UL RATED; WITH CLASS "A" EXTINGUISHING AGENT AS REQUIRED BY LOCATIONS AND CLASSES OF FIRE EXPOSURES. 1.4 TEMPORARY UTILITY INSTALLATION A. GENERAL, INSTALL TEMPORARY SERVICE OR CONNECT TO EXISTING SERVICE. ARRANGE WITH UTILITY COMPANY, OWNER, AND EXISTING USERS FOR TIME WHEN SERVICE CAN BE INTERRUPTED, IF NECESSARY, TO MAKE CONNECTIONS FOR TEMPORARY SERVICES. B. VENTILATION AND HUMIDITY CONTROL: PROVIDE TEMPORARY VENTILATION REQUIRED BY CONSTRUCTION ACTIVITIES FOR CURING OR DRYING OF COMPLETED INSTALLATIONS OR FOR PROTECTING INSTALLED CONSTRUCTION FROM ADVERSE EFFECTS OF HIGH HUMIDITY, SELECT EQUIPMENT THAT WILL NOT HAVE A HARMFUL EFFECT ON COMPLETED INSTALLATIONS OR ELEMENTS BEING INSTALLED. COORDINATE VENTILATION REQUIREMENTS TO PRODUCE AMBIENT CONDITION REQUIRED AND MINIMIZE ENERGY CONSUMPTION. C. ELECTRIC POWER SERVICE: COORDINATE ELECTRIC POWER SERVICE WITH OWNER. D, LIGHTING: PROVIDE TEMPORARY LIGHTING WITH LOCAL SWITCHING THAT PROVIDES ADEQUATE ILLUMINATION FOR CONSTRUCTION OPERATIONS, OBSERVATIONS, INSPECTIONS, AND TRAFFIC CONDITIONS. E, PROJECT SIGNS: PROVIDE PROJECT SIGNS AS INDICATED. UNAUTHORIZED SIGNS ARE NOT PERMITTED. 1. TEMPORARY SIGNS: PROVIDE OTHER SIGNS AS INDICATED AND AS REQUIRED TO INFORM PUBLIC AND INDIVIDUALS SEEKING ENTRANCE TO PROJECT. COORDINATE SIGNAGE WITH OWNER. a. PROVIDE TEMPORARY, DIRECTIONAL SIGNS FOR CONSTRUCTION PERSONNEL AND VISITORS. 1.5 SECURITY AND PROTECTION FACILITIES INSTALLATION A. ENVIRONMENTAL PROTECTION: PROVIDE PROTECTION, OPERATE TEMPORARY FACILITIES, AND CONDUCT CONSTRUCTION AS REQUIRED TO COMPLY WITH ENVIRONMENTAL REGULATIONS THAT MINIMIZE POSSIBLE AIR, WATERWAY, AND SUBSOIL CONTAMINATION OR POLLUTION OR OTHER UNDESIRABLE EFFECTS. B. TEMPORARY EROSION AND SEDIMENTATION CONTROL: PROVIDE MEASURES TO PREVENT SOIL EROSION AND DISCHARGE OF SOIL - REARING WATER RUNOFF AND AIRBORNE DUST TO UNDISTURBED AREAS AND TO ADJACENT PROPERTIES AND WALKWAYS, ACCORDING TO REQUIREMENTS OF 2003 EPA CONSTRUCTION GENERAL PERMIT OR AUTHORITIES HAVING JURISDICTION, WHICHEVER IS MORE STRINGENT. C. STORMWATER CONTROL: COMPLY WITH REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION. PROVIDE BARRIERS IN AND AROUND EXCAVATIONS AND SUBGRADE CONSTRUCTION TO PREVENT FLOODING BY RUNOFF OF STORMWATER FROM HEAVY RAINS. 1.6 OPERATION, TERMINATION, AND REMOVAL A. SUPERVISION: ENFORCE STRICT DISCIPLINE IN USE OF TEMPORARY FACILITIES. TO MINIMIZE WASTE AND ABUSE, LIMIT AVAILABILITY OF TEMPORARY FACILITIES TO ESSENTIAL AND INTENDED USES. B. MAINTENANCE: MAINTAIN FACILITIES IN GOOD OPERATING CONDITION UNTIL REMOVAL. 1. MAINTAIN OPERATION OF TEMPORARY ENCLOSURES, HEATING, COOLING, HUMIDITY CONTROL, VENTILATION, AND SIMILAR FACILITIES ON A 24 -HOUR BASIS WHERE REQUIRED TO ACHIEVE INDICATED RESULTS AND TO AVOID POSSIBILITY OF DAMAGE. C. TEMPORARY FACILITY CHANGEOVER: DO NOT CHANGE OVER FROM USING TEMPORARY SECURITY AND PROTECTION FACILITIES TO PERMANENT FACILITIES UNTIL SUBSTANTIAL COMPLETION. D. TERMINATION AND REMOVAL: REMOVE EACH TEMPORARY FACILITY WHEN NEED FOR ITS SERVICE HAS ENDED, WHEN IT HAS BEEN REPLACED BY AUTHORIZED USE OF A PERMANENT FACILITY, OR NO LATER THAN SUBSTANTIAL COMPLETION. COMPLETE OR, IF NECESSARY, RESTORE PERMANENT CONSTRUCTION THAT MAY HAVE BEEN DELAYED BECAUSE OF INTERFERENCE WITH TEMPORARY FACILITY. REPAIR DAMAGED WORK, CLEAN EXPOSED SURFACES, AND REPLACE CONSTRUCTION THAT CANNOT BE SATISFACTORILY REPAIRED, 1. MATERIALS AND FACILITIES THAT CONSTITUTE TEMPORARY FACILITIES ARE PROPERTY OF CONTRACTOR. OWNER RESERVES RIGHT TO TAKE POSSESSION OF PROJECT IDENTIFICATION SIGNS. 2. AT SUBSTANTIAL COMPLETION, REPAIR, RENOVATE, AND CLEAN PERMANENT FACILITIES USED DURING CONSTRUCTION PERIOD. END OF SECTION 015000 5 SECTION 015010 - INTERIM LIFE SAFETY 1.1 DESCRIPTION OF REQUIREMENTS A. IMPLEMENTATION OF THE INTERIM LIFE SAFETY MEASURES SHALL BE REQUIRED IN OR ADJACENT TO ALL CONSTRUCTION AREAS. ILSM APPLY TO ALL PERSONNEL. IMPLEMENTATION OF ILSM SHALL BEGIN UPON PROJECT COMMENCEMENT, AND BE CONTINUOUS THROUGH PROJECT COMPLETION. S. THE ILSM ARE INTENDED TO PROVIDE A LEVEL OF LIFE SAFETY COMPARABLE TO THAT DESCRIBED IN CHAPTERS 1-7,31 AND THE APPLICABLE OCCUPANCY CHAPTERS OF LATEST ADOPTED EDITION OF THE LIFE SAFETY CODE (NFPA 101). 1.2 WORK SITE SAFETY A, IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN INTERIM LIFE SAFETY MEASURES (ILSM) IN AND AROUND THE JOB SITE TO PROTECT THE HOSPITAL, ITS STAFF, PATIENTS AND VISITORS FROM POTENTIAL HARM INCIDENTAL TO THE WORK. THIS INCLUDES CONTROLLING ACCESS, MAINTAINING FIRE SAFETY MEASURES AND EQUIPMENT AND SECURING TOOLS, EQUIPMENT AND MATERIALS. IN ADDITION TO COMPLYING WITH ALL STATE, FEDERAL AND LOCAL LAWS AND REGULATIONS. ANY ILSM ISSUES WHICH THE CONTRACTOR IDENTIFIES BUT WITH WHICH HE IS NOTABLE, BY VIRTUE OF CAPABILITY OR AUTHORITY, TO CONTROL MUST BE DOCUMENTED AND BROUGHT TO THE ATTENTION OF THE FACILITIES MANAGEMENT IMMEDIATELY. B. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE AND MAINTAIN INFECTION CONTROL MEASURES WITHIN THE PROJECT AREA LIMIT OF WORK AND ALL AREAS ADJACENT TO AND AFFECTED BY CONSTRUCTION. THIS INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING KEY ELEMENTS: 1. THE IMPACT OF DISRUPTING ESSENTIAL SERVICES TO PATIENTS AND EMPLOYEES.. 2. PLACEMENT OF EFFECTIVE BARRIERS TO PROTECT SUSCEPTIBLE PATIENTS FROM AIRBORNE CONTAMINANTS SUCH AS ASPERGILLUS SP, 1.3 PURPOSE A. TO PROVIDE A SAFE ENVIRONMENT DURING CONSTRUCTION. B. TO MAKE STAFF AWARE OF THE INCREASED HAZARD POTENTIAL WITHIN THE CONSTRUCTION AREA. C. TO MiNiMIZE 5XPOSURE CIE PATIENTS 1"O CONSTRUCTION HAZARDS AND AIRBORNE CONTAMINANTS. D, ENSURE FREE AND UNOBSTRUCTED EXITS. PERSONNEL TO RECEIVE ADDITIONAL TRAINING N NG WHEN ALTERNATIVE EXITS ARE DESIGNATED. BUILDINGS OR AREAS UNDER CONSTRUCTION MUST MAINTAIN ESCAPE ROUTES FOR CONSTRUCTION WORKERS AT ALL TIMES EXITING CONSTRUCTION . MEANS OF EXITI AREAS ARE INSPECTED DAILY. E. ENSURE FREE AND UNOBSTRUCTED ACCESS TO EMERGENCY SERVICES AND FOR FIRE, POLICE, AND OTHER EMERGENCY FORCES. F. ENSURE FIRE ALARM, DETECTION, AND SUPPRESSION SYSTEMS ARE IN GOOD WORKING ORDER. A TEMPORARY BUT EQUIVALENT SYSTEM SHALL BE PROVIDED WHEN ANY FIRE SYSTEM IS IMPAIRED. TEMPORARY SYSTEMS MUST BE INSPECTED AND TESTED MONTHLY. 1.4 EXECUTION A. ALL EXITS WILL REMAIN UNOBSTRUCTED AND USABLE. ALL PERSONNEL WILL RECEIVE TRAINING IF ALTERNATIVE EXITS MUST BE UTILIZED. SUCH EXITS WILL BE CLEARLY MARKED WITH APPROVED SIGNS, B. CONSTRUCTION AREA WILL BE PROPERLY RESTRICTED FROM THE REST OF THE BUILDING OPERATIONS. C. CONSTRUCTION AREA WILL RE MAINTAINED IN A CLEAN AND FIRE SAFE MANNER. TRASH SHALL BE REMOVED ON A DAILY BASIS AND PROVIDE ADDITIONAL FIRE - FIGHTING EQUIPMENT AND TRAIN PERSONNEL IN ITS USE. D. ALTERNATE ROUTES FOR PUBLIC ACCESS AND EGRESS WILL BE PROVIDED IF NORMAL ACCESS ROUTES ARE AFFECTED. MAINTAIN FREE AND UNOBSTRUCTED ACCESS TO EMERGENCY DEPARTMENT SERVICES. E. ROADS AND WALKWAYS WILL BE KEPT PASSABLE AND SAFE, FIRE LANES WILL BE MAINTAINED FOR EMERGENCY VEHICLE ACCESS AT ALL TIMES. F, BEFORE ANY LIFE SAFETY SYSTEMS ARE REMOVED OR PUT OUT OF SERVICE, CONTINGENCY PLANS WILL BE IMPLEMENTED. G, ALL PENETRATIONS OF FIRE AND SMOKE WALLS, AND FLOOR SLABS SHALL BE PROPERLY SEALED AT THE END OF EACH WORK SHIFT. H. WHERE REQUIRED, TEMPORARY LIFE SAFETY SYSTEMS WILL BE PROVIDED, EQUIVALENT TO THE PERMANENT SYSTEMS. THESE SYSTEMS MUST BE INSPECTED AND TESTED MONTHLY. I. TEMPORARY CONSTRUCTION PARTITIONS MUST BE SMOKE TIGHT, BUILT OF NONCOMBUSTIBLE MATERIALS, AND BE OF THE SAME OR GREATER SMOKE AND /OR FIRE RATING AS PERMANENT CONSTRUCTION IN THE AREA. J. OPENINGS IN TEMPORARY PARTITIONS SHALL BE PROTECTED WITH SOLID CORE WOOD OR HOLLOW METAL DOORS WITH CLOSERS. K. CONTRACTOR SHALL STRICTLY ENFORCE A NO SMOKING POLICY IN ALL WORK SITES. ALL EMPLOYEES OF CONTRACTORS SHALL STRICTLY OBSERVE THE HOSPITAL SMOKING POLICY. SMOKING SHALL BE PROHIBITED IN OR ADJACENT TO ALL CONSTRUCTION AREAS BY ALL PERSONNEL. L, DEVELOP AND ENFORCE STORAGE, HOUSEKEEPING, AND DEBRIS REMOVAL POLICIES AND PROCEDURES, WHICH REDUCE FLAMMABLE AND COMBUSTIBLE FIRE LOAD. M. A MINIMUM OF TWO FIRE DRILLS PER SHIFT PER QUARTER WILL BE HELD, AT LEAST ONE IN THE CONSTRUCTION AREA. N. HAZARD SURVEILLANCE OF GROUNDS, BUILDINGS, CONSTRUCTION AREAS, STORAGE AND FIELD OFFICES WILL BE CONDUCTED DAILY. 0. PROPER STORAGE FACILITIES FOR FLAMMABLE AND HAZARDOUS MATERIALS SHALL BE PROVIDED. P. CONTRACTORS SHALL COMPLY WITH STATE, LOCAL AND OSHA REGULATIONS. Q. IT WILL BE THE RESPONSIBILITY OF THE PHYSICAL PLANT ENGINEERING DEPARTMENT TO INFORM ALL CONTRACTORS OF THESE LIFE SAFETY MEASURES FOR THEIR PROSPECTIVE PROJECTS AND DOCUMENT THEM IN PRECONSTRUCTION MEETING MINUTES. R. LIFE SAFETY WILL BEAN AGENDA ITEM FOR ALL PROJECT MEETINGS UNTIL THE PROJECT IS COMPLETE. S. THE CONTRACTOR WILL BE RESPONSIBLE FOR ILSM MEASURES SET FORTH IN THE PROJECT SPECIFICATIONS AND MEETING MINUTES. T. TRAIN PERSONNEL TO COMPENSATE FOR IMPAIRED STRUCTURAL OR COMPARTMENTALIZATION FEATURES OF FIRE SAFETY. U. CONDUCT ORGANIZATION WIDE SAFETY EDUCATION PROGRAMS TO PROMOTE AN AWARENESS OF LIFE SAFETY CODE DEFICIENCIES, CONSTRUCTION HAZARDS, AND INTERIM LIFE SAFETY MEASURES. V. THE HOSPITAL FIRE AND SAFETY ORGANIZATION WILL PROVIDE BACKUP MEASURES INCLUDING: 1. PERFORM SAFETY INSPECTIONS AND PROVIDE PROPER DOCUMENTATION THAT INTERIM LIFE SAFETY MEASURES ARE IN PLACE. 2. PERFORM ADDITIONAL FIRE DRILLS AND STAFF TRAINING IN AFFECTED AREAS. 3. IMPLEMENT CONTINGENCY PLANS WHEN THERE IS ANY INTERRUPTION TO A LIFE SAFETY SYSTEM. 4, CHECK TO ASSURE PROPER STORAGE OF FLAMMABLE AND HAZARDOUS MATERIALS, AND ASSURE MATERIAL SAFETY DATA SHEETS (MSDSS) ARE AVAILABLE, ALONG WITH A CHEMICAL INVENTORY "WORK PLACE CHEMICAL LIST" (WPCL). 5. DOCUMENT ANY DEFICIENCIES AND REPORT THEM TO APPROPRIATE PROJECT MANAGER FOR IMMEDIATE CORRECTION. 6. PROVIDE THE APPROPRIATE PHONE NUMBERS TO CALL TO REPORT ANY EMERGENCY, AND OBTAIN EMERGENCY PHONE NUMBERS OF ALL CONTRACTORS. 7. FAMILIARIZE CONTRACTORS WITH THE LOCATION OF FIRE ALARM PULL STATIONS, FIRE EXTINGUISHERS, AND CHEMICALS THAT THEY MAY COME IN CONTACT WITH WHILE WORKING IN THE HOSPITAL. END OF SECTION 015010 7 SECTION 015650 - INFECTION CONTROL REQUIREMENTS 1.1 SUMMARY A. THIS SECTION INCLUDES INFECTION CONTROL REQUIREMENTS AND PROCEDURES, INCLUDING BUT NOT LIMITED TO, DUST BARRIERS, NEGATIVE AIR PRESSURE, DEBRIS REMOVAL, CONSTRUCTION PERSONNEL TRAFFIC, AND AIRFLOW AND FILTRATION REQUIREMENTS. B. OWNER'S "INFECTION CONTROL RISK ASSESSMENT` (ICRA) FOR CONSTRUCTION ACTIVITY AS PREPARED BY THE OWNER. THE CONTRACTOR SHALL OBTAIN THE ICRA DIRECTLY FROM THE OWNER. 1.2 GENERAL INFECTION CONTROL REQUIREMENTS A. THE PURPOSE OF THESE REQUIREMENTS IS TO PROTECT PATIENTS FROM ACQUIRING FUNGAL INFECTIONS ASSOCIATED WITH INHALING DUST, CEILINGS AND WALLS IN AREAS ADJACENT TO AND WITHIN OCCUPIED AREAS MUST BE SECURE AT ALL TIMES. IF ACCESS INTO THE CEILING IN OCCUPIED AREAS IS REQUIRED, PROCEDURES AS DESCRIBED HEREIN MUST BE FOLLOWED, AREAS TO BE PROTECTED INCLUDE ALL AREAS ADJACENT TO ANDIOR CONNECTED TO VIA DUCT WORK THAT ARE OCCUPIED BY PATIENTS /STAFF. 13 QUALITY ASSURANCE A. REGULATORY STANDARDS: COMPLY WITH PROVISIONS OF THE FOLLOWING CODES AND STANDARDS, 1. AIA 2001 PUBLICATION "GUIDELINES FOR DESIGN AND CONSTRUCTION OF HOSPITAL AND HEALTHCARE FACILITIES" -CHAPTER 5. 2. ANSI Z92 - FUNDAMENTALS GOVERNING THE DESIGN AND OPERATION OF LOCAL EXHAUST SYSTEMS 3. ASTM E90 - METHOD FOR LABORATORY MEASUREMENTS OF AIRBORNE SOUND TRANSMISSION LOSS OF BUILDING PARTITIONS AND ELEMENTS 4. ASTM E413 - CLASSIFICATION FOR RATING SOUND ISOLATION 5. CDC "GUIDELINES FOR ENVIRONMENTAL INFECTION CONTROL IN HEALTH -CARE FACILITIES ", SECTION II CONSTRUCTION, RENOVATION, REMEDIATION, REPAIR AND DEMOLITION. 6. HHS - U.S. DEPARTMENT OF HEALTH AND HUMAN SERVICES 7. NFPA 101 -LIFE SAFETY CODE 3. NFPA 701 - METHODS OF FIRE TESTS FOR FLAME PROPAGATION OF TEXTILES AND FILMS B. TRAIN CONSTRUCTION C ION S TAFF IN INFECTION CONTROL PROCEDURES AS REQUIRED BY THE OWNER'S ICRA AND BY THIS SPECIFICATION SECTION. 1.4 CONSTRUCTION SEPARATION REQUIREMENTS - INFECTION CONTROL PROCEDURE AND PROTECTIVE ENCLOSURES AND BARRICADES A. INSTALL DUSTPROOF ENCLOSURES FOR WORK AS INDICATED AND WHEN REQUIRED TO PROTECT AREAS OCCUPIED BY THE OWNER FROM DUST, DEBRIS AND DAMAGE. 1. INFECTION CONTROL IS CRITICAL IN ALL HOSPITAL AREAS SINCE MANY PATIENTS HAVE HIGH "AT -RISK" CONDITIONS. CONSTRUCTION MUST BE CONDUCTED E IN TIGHT ENCLOSURES CUTTING OFF ANY FLOW OF PARTICLES INTO PATIENT AREAS. B. REVIEW AND COMPLY WITH THE REQUIREMENTS OF THE OWNER'S "INFECTION CONTROL RISK ASSESSMENT (ICRA) ". C. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE WHEN A DUST PROOF ENCLOSURE IS REQUIRED TO PROTECT AN ADJOINING AREA; HOWEVER, THE CONTRACTOR SHALL PROVIDE A DUSTPROOF ENCLOSURE WHERE INDICATED AND WHENEVER REQUESTED BY THE OWNER. 1. COMPLY WITH THE SITE SPECIFIC CONSIDERATIONS /REQUIREMENTS OF THE OWNER'S ICRA. D. INFECTION CONTROL GENERAL REQUIREMENTS: PROVIDE FLOOR TO STRUCTURE, AIR -TIGHT BARRIERS CONSTRUCTED AS SPECIFIED IN THIS SECTION. 1. TRAFFIC BETWEEN BARRICADE AREAS AND OPEN AREAS SHALL BE KEPT TO A MINIMUM. KEEP DOOR TO SUCH AREAS CLOSED AT ALL TIMES. TRANSPORT MATERIALS AND REFUSE INTO AREA FROM AN EXTERNAL SITE, WITHOUT VIOLATING PATIENT CARE AREA, BY TRANSPORTING IN COVERED CONTAINERS. 2. PROVIDE NEGATIVE PRESSURE IN CONSTRUCTION AREA BY BLOCKING SUPPLY VENTILATION IN DUST TIGHT MANNER AND EITHER BY HEPA FILTRATION OF THE EXISTING RETURN VENTILATION DUCTS OR BY USING A NEGATIVE AIR MACHINE, AS SPECIFIED IN THIS SECTION, DO NOT RECIRCULATE AIR FROM CONSTRUCTION AREA TO REMAINDER OF HOSPITAL. 3. PROVIDE ADEQUATE FORCED VENTILATION OF ENCLOSED AREAS TO CURE INSTALLED MATERIALS, TO PREVENT EXCESSIVE HUMIDITY, AND TO PREVENT HAZARDOUS ACCUMULATIONS OF DUST, FUMES, VAPORS, OR GASES. E. ALL BARRICADED CONSTRUCTION AREAS SHALL BE VENTILATED BY USE OF NEGATIVE AIR MACHINES EXHAUSTED THROUGH FILTERS TO THE OUTSIDE OF THE BUILDING. NEGATIVE AIR MACHINES SHALL BE MICRO -TRAP 2000 NEGATIVE AIR FILTRATION UNITS BY M -TEC CORPORATION, 1300 W. STEEL ROAD, UNIT 1r2, MORRISVILLE, PENNSYLVANIA 19067, OR EQUAL. 1. FILTERS SHALL BE CHANGED DAILY DURING DEMOLITION AND SHALL FILTER PARTICLES TO 0.12 MICRONS. CONTRACTOR SHALL PROVIDE A MINIMUM OF TWO NEGATIVE AIR MACHINES AND SHALL CEASE ANY DEMOLITION IN AREAS NOT SERVICED BY NEGATIVE AIR MACHINES. MAINTAIN AIRFLOW OF APPROXIMATELY 100 F.P.M. AT BARRICADE ENTRANCE DOOR OPENINGS. 2. VENT NEGATIVE AIR MACHINES TO OUTSIDE BY REMOVING EXISTING WINDOWS AND REPLACING THEM WITH VENTED SHEET METAL PANELS. 3. PROVIDE CONSTANT MONITOR TO ENSURE NEGATIVE AIR PRESSURE IS MAINTAINED. F. PROVIDE ALL BARRICADES, WARNING SIGNS AND WARNING LIGHTS TO PROTECT THE PUBLIC, THE EXISTING BUILDING, STORAGE AREAS AND MATERIALS OR EQUIPMENT, BARRICADES SHALL BE APPROVED BY OWNER. 1.5 CONSTRUCTION BARRIERS: A. PARTITIONS: MINIMUM 1 -HOUR FIRE RATED GYPSUM BOARD ON METAL STUDS, WITH 3 -U2 INCH R11 INSULATION BATTS TO REDUCE NOISE. PARTITIONS SHALL EXTEND TO BOTTOM OF CEILING OR TO 80TTOM OF DECK, WHERE THERE IS NO CEILING. PROVIDE POLYETHYLENE BARRIERS ABOVE CEILINGS, COMPLYING WITH NFPA 701. PAINT OCCUPIED SIDE OF PARTITIONS. 9, DOORS: 34" MINIMUM WIDTH, WITH MINIMUM 314- HOUR'C' LABEL, SOLID CORE WOOD WITH METAL FRAME AND HARDWARE, INCLUDING CLOSER, TIGHTLY WEATHER - STRIPPED TO PREVENT FLOW OF DUST. LOCATE AS DIRECTED AND SWING INTO CONSTRUCTION AREA. KEEP BARRIERS LOCKED OUTSIDE OF WORKING HOURS. THREE KEYS FOR EMERGENCY ACCESS SHALL BE FURNISHED TO THE OWNER. C. OBTAIN OWNER'S APPROVAL OF EXACT LOCATION OF BARRIERS. MATERIALS FOR BARRICADES AND BARRIERS MUST BE PRECUT IN AN UNOCCUPIED AREA. NO POWER DRIVEN FASTENERS ARE ALLOWED. PROVIDE ENTRANCE VESTIBULES. PROVIDE CARPETS OR ADHESIVE MATS INSIDE VESTIBULE AND INSIDE BARRICADE AT DOOR TO VESTIBULE. D, TEMPORARY ENCLOSURES OUTSIDE WORK AREA (INCLUDING SPACES ABOVE FURRED CEILINGS): WHENEVER WORK IS NECESSARY OUTSIDE OF THE CONSTRUCTION BARRICADES, THE SPACE WHERE WORK IS BEING DONE, INCLUDING LADDER WORK, SHALL BE CONTAINED WITHIN A FULL HEIGHT POLYETHYLENE SHEET BARRIER MINIMUM 4 MIL THICKNESS, TIGHTLY TAPED AT ALL EDGES AND ALONG SEAMS. PROVIDE OVERLAPPING FLAP AT LEAST 2 FEET WIDE FOR ACCESS. 1. ALL WORK PERFORMED OUTSIDE THE CONSTRUCTION BARRICADES, INCLUDING ALL WORK IN AND ABOVE CORRIDORS AND LOBBIES, SHALL BE PERFORMED OUTSIDE OF NORMAL WORKING HOURS AND SHALL BE SCHEDULED IN ADVANCE WITH OWNER, EXCEPT WHEN OTHERWISE SPECIFIED. 2. AT NO TIME SHALL ANY CONSTRUCTION EQUIPMENT OR MATERIAL RE STORED OUTSIDE THE CONSTRUCTION BARRICADE. 3, ANY DUST TRACKED OUTSIDE OF CONSTRUCTION AREA SHALL BE CLEANED UP IMMEDIATELY. PROVIDE NECESSARY MANPOWER AND EQUIPMENT, (HEPA FILTERED VACUUM CLEANER, ANTISEPTIC DAMP MOPS, BROOMS, BUCKETS AND CLEAN WIPING RAGS) TO KEEP ADJACENT OCCUPIED AREAS CLEAN AT ALL TIMES, 4, TOP SURFACE OF CEILING PANELS ADJACENT TO AREA OF WORK SHALL BE VACUUMED, USING A HEPA FILTER VACUUM CLEANER, TO REMOVE DUST PRIOR TO, DURING AND AFTER COMPLETION OF WORK. E. WHERE WORK OCCURS IN OCCUPIED AREAS, PROVIDE ACCESS OPENINGS THROUGH EXISTING PLASTER, GYPSUM BOARD OR ACOUSTICAL CEILINGS, AND RESTORE CEILINGS TO ORIGINAL CONDITION AFTER WORK IS COMPLETE AND TO INSURE DUST CONTROL WITHIN ACCESS AREAS. 1. PROVIDE TEMPORARY FIRE RETARDANT TREATED PLYWOOD PANELS ANCHORED TO EXISTING STEEL CEILING SUPPORT GRID FOR SUPPORT OF WORKERS CRAWLING ABOVE CEILING. PANEL THICKNESS SHALL SUIT SPANS BETWEEN EXISTING STEEL SUPPORTS. 2. ALL WORK OCCURRING OUTSIDE THE CONSTRUCTION BARRICADES, INCLUDING WORK IN AND ABOVE CORRIDORS AND LOBBIES, SHALL BE PERFORMED OUTSIDE OF OWNER'S NORMAL WORKING HOURS. 1.6 DEBRIS REMOVAL A. DEMOLITION MATERIAL AND DUST AND DIRT SHALL BE REMOVED IN TIGHTLY SEALED, COVERED, PLASTIC DUMP CARTS WITH RUBBER TIRES. CONTAINERS SHALL BE FITTED WITH CLEAN POLYETHYLENE COVERS, COMPLETELY SEALED AT PERIMETER BY WIRE TYING OR TAPING. BEFORE LEAVING AREA ALL CONTAINERS SHALL BE WIPED CLEAN TO PREVENT TRACKING OF DUST. PLACE RUGS INSIDE BARRIERED ENTRANCES, KEEP THEM CLEAN OR CHANGED DAILY. B. AFTER DEBRIS IS REMOVED FROM CONTAINER, THE CONTAINER SHALL BE CLEANED PRIOR TO RE- ENTERING THE FACILITY. 1.7 ROUTING A. REMOVAL OF DEBRIS AND DELIVERY OF NEW MATERIALS TO SITE SHALL BE TO HOSPITAL DOCK OR OTHER AREA COORDINATED WITH OWNER. MOVE DEBRIS AT TIMES DIRECTED BY OWNER. PROVIDE TIGHTLY COVERED, SEALED CONTAINERS AS SPECIFIED. R. CONSTRUCTION PERSONNEL SHALL ENTER AND LEAVE CONSTRUCTION AREAS ONLY THROUGH TRAFFIC CONTROL ROUTE ESTABLISHED FOR DEBRIS REMOVAL AND MATERIAL DELIVERY. 1.1 DOCUMENTATION A. PROVIDE DOCUMENTATION OF CONSTRUCTION STAFF TRAINING IN INFECTION CONTROL MEASURES DURING CONSTRUCTION. B. DOCUMENT LOCATIONS OF, AND CONSTRUCTION MATERIALS USED FOR, ALL TEMPORARY CONSTRUCTION ENCLOSURES /BARRIERS /BARRICADES. C. MONITOR AND LOG AIR FLOW AT CONSTRUCTION BARRIERS/ ENCLOSURES/ BARRICADES. D. MONITOR AND LOG INTEGRITY OF CONSTRUCTION BARRIERS /ENCLOSURES/BARRICADES. USE AIRBORNE- PARTICLE SAMPLING TO MONITOR BARRIER INTEGRITY. RECORD REMEDIAL ACTIONS TAKEN IN LOG. END OF SECTION 015650 ••• • • • • • • • i • • • • • Y • • • • Y • • i . Y• • 0000 ••••• Y Y W Y•Y• U Y • I' Y • '\ • • •i••Y • • • • Y Y �11'11 • I , "I � I ... M • h • I ', 1,1 j�'iD, A R R A ` l , �,�,,,�, u :1` - 4 U • • w Y healthdre facilities solutions 6300 Broken Sound Boulevard NW Suite 125 Boca Raton, FL 33487 t: 561.595.1700 f: 561.995.1701 firm license number www.arroyhfs.com AA2600088Q .SEAL: - - -rl CONSULTANTS: Smith Seckman €t Reid, Inc. 600 West Hillsboro Blvd, Suite 300 Deerfield Beach, FL 33441 Phone: 954.421.12.60 Fax: 954.421.1466 OWNER: BAPTIST HEALTH SOUTH FLORIDA HOSPITAL: SOUTH MIAMI HOSPITAL PROJECT: INTERIOR RENOVATIONS FOR CENTRAL MONITORING ADDRESS: 6200 Southwest 73rd Street SOLIth Miami, FL 33143 AHCA: CLIENT CODF /FILE NUMBER: 23/100154 PROJECT ID/SUBMISSION NUMBER. 187 -1 2 ' �. J f 1 r I * �` , ` t E .1 DESCRIPTION r�..,� *` RI�VISIONS /ISSUES - S TFttir L:/ pi, 6_` " /1", ", " '- . , r 1, w 4 " " �' N '?, ,� J «`• le 'left ♦F - i, j • t Ir / f MARK D. TAUDIEN AR0011 921 ^`. CONSULTANTS: Smith Seckman €t Reid, Inc. 600 West Hillsboro Blvd, Suite 300 Deerfield Beach, FL 33441 Phone: 954.421.12.60 Fax: 954.421.1466 OWNER: BAPTIST HEALTH SOUTH FLORIDA HOSPITAL: SOUTH MIAMI HOSPITAL PROJECT: INTERIOR RENOVATIONS FOR CENTRAL MONITORING ADDRESS: 6200 Southwest 73rd Street SOLIth Miami, FL 33143 AHCA: CLIENT CODF /FILE NUMBER: 23/100154 PROJECT ID/SUBMISSION NUMBER. 187 -1 2 bid and Permit Set 07 -18 -12 1 AHCA Stage III 07 -03 -12 _ NO. DESCRIPTION DATE RI�VISIONS /ISSUES DRAWN: FL CHECKED: MDT CON/REF No. 00oo0 PROJECT No. 3606 DATE: 07 -03 -12 SCALE: 12" = 1' -0" *;[4 -IM MAMR A* � a's dcr.urr c. cop.wight pre �e ! d instr_-� e,t •t szr ice, proportr . - R ' :nd used t`cr use it the title^ pmpcs only. Reproduciora ,_r use of this docurrert i t c�L. wnt e, permission of A,T,A :s ih- _l Ord *iii Le i t csea�ted ,;der tl?e law. gCOPYRIGHT - 2012 ARRAY HFS (-�� � C1� �ZIry DC -T ,T. V:,t� - _ SHEET TITLE: - S TFttir pi, 1SPECIFICATIONS /1", ", " '- , - " 1, r , „- - f DRAWN: FL CHECKED: MDT CON/REF No. 00oo0 PROJECT No. 3606 DATE: 07 -03 -12 SCALE: 12" = 1' -0" *;[4 -IM MAMR A* � a's dcr.urr c. cop.wight pre �e ! d instr_-� e,t •t szr ice, proportr . - R ' :nd used t`cr use it the title^ pmpcs only. Reproduciora ,_r use of this docurrert i t c�L. wnt e, permission of A,T,A :s ih- _l Ord *iii Le i t csea�ted ,;der tl?e law. gCOPYRIGHT - 2012 ARRAY HFS