Loading...
12-965-0156 C a� v a� 0 a. 0 N Iq ai v 0 0 n 0 cn 0 N M N / N 0 N N M E i a� 0 C Q) PLUMBING DEMOLITION NOTES PLUMBING NEW CONSTRUCTION NOTES I. EXISTING SERVICES INDICATED ON THESE DRAWINGS WERE DERIVED FROM EXISTING 1. PLUMBING INSTALLATION OF ALL FIXTURES, EQUIPMENT, AND PIPING MODEL DRAWINGS AND LIMITED FIELD OBSERVATIONS. THESE DRAWINGS MAY NOT BE ALL INCLUSIVE OF SERVICES THAT EXIST IN THE PROJECT AREA. CONTRACTOR SHALL EAD SHOWN ON THESE DRAWINGS SHALL BE INSTALLED IN ACCORDANCE H P. VERIFY SERVICES, LOCATION, TYPE, AND SIZE PRIOR TO ANY CONSTRUCTION. ANY REMARKS WITH ALL APPLICABLE STATE, LOCAL AND HEALTH CODES REQUIREMENTS. HOT WATER DEVIATIONS IMPACTING WORK SHOWN ON THESE DOCUMENTS SHALL BE REPORTED No. H.W.R. FT. TO THE ARCHITECT FOR COORDINATION PRIOR TO CONSTRUCTION. 2. CONTRACTOR SHALL FIELD VERIFY EXISTING INVERT ELEVATIONS, SIZES AND 2. EXISTING SERVICES, EQUIPMENT, AND FIXTURES TO REMAIN OR TO BE RELOCATED, PRESSURE REDUCING VALVE LOCATIONS OF EXISTING PLUMBING PRIOR TO BIDDING. IF DISCREPANCIES ARE FOUND, THEY ARE TO NOTIFY ENGINEER. ACID VENT THRU ROOF SHALL BE REPAIRED TO ORIGINAL OPERATION 611 REPLACED, SHOULD THEY BE REDUCED PRESSURE BACKFLOW PREVENTER W. WASTE (INTERIOR) DAMAGED DURING CONSTRUCTION. 3. ALL PLUMBING FIXTURES TO COMPLY WITH TABLE 604.3 OF THE FLORIDA RAIN WATER LEADER A.F.G. ABOVE FINISHED GRADE BUILDING CODE - 2010 3. ALL EXISTING WORK NOT SHOWN ON THESE DRAWINGS (UNLESS NOTED OTHERWISE) ACID WASTE I.E. ADJACENT TO CRAC -1. WIRE SHALL REMAIN AS IS. 4. CONTRACTOR SHALL COORDINATE EQUIPMENT CONNECTIONS &MOUNTING CLEANOUT W.C.O. WALL CLEANOUT HEIGHTS WITH KITCHEN EQUIPMENT, EQUIPMENT AND ARCHITECTURAL DRAWINGS 4. ALL PENETRATIONS OR OPENINGS FROM REMOVED PIPES THROUGH EXISTING SAFETY SWITCH TO SHUTDOWN AND SUPPLIER. INSTALL EQUIPMENT AND MAKE FINAL CONNECTIONS FURNISHING RESERVIOR BUILDING WALLS AND FLOORS SHALL BE SLEEVED AND /OR PATCHED TO MATCH VCL -24ULS CUTOFF VALVES, P- TRAPS, FITTINGS, P.R.V.'S, AND PIPING AS REQUIRED. 15 ORIGINAL. SEE ARCHITECTURAL DRAWINGS FOR FINAL FINISHES. 1118 CONTRACTOR SHALL OBTAIN A SET OF THE EQUIPMENT DRAWINGS PRIOR CRAC -1. INSTALL UNIT CHECK SYMBOL DESCRIPTION - TO BIDDING IN ORDER TO DETERMINE ALL REQUIRED CONNECTIONS. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING PIPING FIXTURES, MED GAS OUTLETS OR QUIPMENT DUE TO NEW CONSTRUCTION AND 5. CONTRACTOR SHALL PROVIDE TRAP PRIMERS ON ALL FLOOR DRAINS AND ice- SHALL RESTORE EXISTING WORK TO ITS ORIGINAL CONDITION AT NO COST TO VALVE. PIPE CONDENSATE UP SHOWER DRAINS AND AS REQUIRED BY STATE AND LOCAL CODES. -41F- THE OWNER. 6. PROVIDE 12'X12' ACCESS PANELS FOR ALL VALVES LOCATED ABOVE HARD 6. CONTINUITY OF SERVICES: EXISTING BUILDING WILL REMAIN IN USE DURING - -V -- CEILINGS. INSTALL VALVES SO AS TO BE WITHIN REACH OF ACCESS DOOR. TO OVERHEAD LINE PER CONSTRUCTION OPERATIONS. WHEN AN INTERRUPTION OF AN EXISTING SERVICE 7. CONTRACTOR SHALL PROVIDE ROUGH -INS AND MAKE FINAL CONNECTIONS P -I,ETC IS NECESSARY, CONTRACTOR SHALL COORDINATE WITH AUTHORIZED HOSPITAL FOR EACH PIECE OF EQUIPMENT REQUIRING PLUMBING CONNECTION, a. PERSONNEL BEFORE MAKING THE NECESSARY INTERRUPTION. MFGR'S RECOMMNEDATIONS. INCLUDING TAILPIECES, TRAPS, LINE STRAINERS, STOP VALVES, GAUGES, 7. CONTRACTOR TO REMOVE EXISTING STACKS AND RISERS LOCATED IN EXISTING N VACUUM BREAKERS, REDUCING VALVES, SPECIAL FITTINGS, THERMOMETERS, GLOBE SOLENOID VALVES, INSULATION, AND ALL NECESSARY DEVICES o WALLS TO BE DEMOLISHED AND PROVIDE NEW OFFSETS AT CEILING ABOVE AND (ov FOR A COMPLETE AND OPERATIVE SYSTEM. COORDINATE EXACT REQUIRED BELOW FLOOR SLAB. COORDINATE LOCATION FOR NEW STACK OR RISER DROP KINGSTON PLUMBING ROUGH -INS WITH VENDOR SUPPLIER DRAWINGS. 5' BACKSPLASH THROUGH FLOOR. *155WC GRID DRAIN B. CONTRACTOR TO FIELD VERIFY THAT ALL EXISTING PLUMBING AND MEDICAL GAS 8. THE CONTRACTOR SHALL INSTALL PLUMBING PIPING IN LOCATIONS INDICATED ON THE CONTRACT DOCUMENTS. THE ONLY DEVIATION FROM THIS WOULD BE TO BE REMOVED DOES NOT AFFECT OTHER AREAS OF THE HOSPITAL THAT IF ADDITIONAL OFFSETS ARE REQUIRED TO COORDINATE WITH OTHER TRADES. P -13 ARE NOT IN CONSTRUCTION AND MUST STAY OPERATIONAL. IF DISCREPENCIES K -2005 IF THE THE CONTRACTOR DESIRES TO CHANGE THE PLUMBING ROUTING FOR 21' X 18' ARE FOUND THE CONTRACTOR IS TO NOTIFY THE ENGINEER. WITH PROWRAP a ANY OTHER REASON, HE SHALL COMPENSATE THE ENGINEER AT A RATE OF 9. CONTRACTOR SHALL REMOVE EXISTING PLUMBING AND MEDICAL GAS TO FIXTURES. ZURN DPE x 2.75 TO REVISE THE PLUMBING DRAWINGS, RISER DIAGRAMS AND FOR THE TIME INVOLVED IN REISSUING DRAWINGS TO THE AUTHORITY HAVING %�• MEDICAL GAS OUTLETS. ZONE VALVE BOXES. ALARM PANELS AND EQUIPMENT �, JURISDICTION. CONTRACTOR SHALL CONTACT ENGINEER FOR ESTIMATED TIME TO BE REMOVED AS SHOWN ON DRAWINGS OR AS REQUIRED. CONTRACTOR SHALL REQUIRED AND SCHEDULE FOR PERFORMING WORK. 4 FAUCET CTR CAP SERVICES NEXT TO SERVICE MAINS IN CEILINGS WALLS OR BELOW FLOOR. CONTRACTOR 9. CHAIR USE SHALL REROUTE ALL ACTIVE PLUMBING SERVICES IN CHASES OR EXISTING UTILITIES, WHICH ARE NOT SHOWN, THAT ARE DISCOVERED WALLS TO BE REMOVED, TO NEW CHASE AREAS OR NEW WALLS AS REQUIRED. DURING EXCAVATION SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE BY THE CONTRACTOR FOR PROPER CO- 10. CONTRACTOR SHALL SUBMIT A COMPLETE LIST OF PLUMBING FIXTURES, MED GAS ORDINATION. CONTRACTOR SHALL REMOVE, REWORK AND /OR REROUTE OUTLETS AND /OR EQUIPMENT THAT ARE TO BE REMOVED TO THE LOCAL OWNER'S THE EXISTING UTILITIES AS DIRECTED BY THE OWNER'S REPRESENTATIVE. REPRESENTATIVE. ALL ITEMS THAT THE LOCAL OWNER'S REPRESENTATIVE WISHES TO RETAIN SHALL BE TURNED OVER TO THE OWNER AND THE REMAINDER SHALL 10. ALL MATERIALS, EQUIPMENT, AND APPARATUS SHALL BE NEW, EXCEPT THAT BE REMOVED FROM THE SITE AND LEGALLY DISPOSED. PROWRAP *PW1151WC CALLED FOR AS BEING RE -USED OR FURNISHED BY OTHERS. PLUMBING AS- BUILTS NOTE PLUMBING CONTRACTOR IS REQUIRED TO SUBMIT PLUMBING AS BUILT PLANS UPON COMPLETION OF THE PROJECT. COMPLETION IS DEFINED AS THE OWNER RECEIVING A 'CO' AND PLUMBING INSPECTOR HAS FINALIZED AND APPROVED THE INSTALLATION. AS BUILTS SHALL BE SUBMITTED IN ELECTRONIC FASHION IN EITHER AUTOCAD FORMAT OR SCANNED FILES IN PDF FORMAT. AS BUILTS SHALL BE LEGIBLE AND NEAT. AS BUILTS WILL BE RETAINED BY ARCHITECT AND ENGINEER FOR RECORDS OF CHANGES TO THE SYSTEM. AS BUILTS WILL BE SUBMITTED TO OWNER THROUGH ARCHITECT AND ENGINEER. PUMP SCHEDULE SYSTEM TYPE MFGR MODEL G.P.M. EAD PUMP H P. VOLTAGE REMARKS H.W. HOT WATER R.D. No. H.W.R. FT. BOOST FLOOR DRAIN V.T.R. VENT THRU ROOF P.R.V. PRESSURE REDUCING VALVE A.V.T.R. ACID VENT THRU ROOF R.P.B.P. REDUCED PRESSURE BACKFLOW PREVENTER W. WASTE (INTERIOR) A.F.F. COORDINATE MOUNTING R.W.L. RAIN WATER LEADER A.F.G. ABOVE FINISHED GRADE S.W. STORM WATER A.W. ACID WASTE I.E. ADJACENT TO CRAC -1. WIRE CONDENSATE 1 GAL LITTLE CLEANOUT W.C.O. WALL CLEANOUT C.D. CONDENSATE S.S. SAFETY SWITCH TO SHUTDOWN PUMP CP -1 RESERVIOR GIANT VCL -24ULS 3 15 NA 1118 115 CRAC -1. INSTALL UNIT CHECK SYMBOL DESCRIPTION - COLD WATER 6 BALL VALVE - - -- HOT WATER ice- CHECK VALVE VALVE. PIPE CONDENSATE UP HOT WATER RECIRCULATION -41F- UNION IN PIPE W WASTE LINE ---- *4__ SECTIONAL CONTROL VALVE - -V -- VENT PIPE (ABOVE OR BELOW GROUND) TO OVERHEAD LINE PER EXTERIOR CLEANOUT -RWL RAIN WATER LEADER P -I,ETC FIXTURE INDENTIFICATION CLEANOUT (ABOVE CEILING) a. CONNECTION TO EXISTING MFGR'S RECOMMNEDATIONS. NOTE: 1. CONTRACTOR SHALL COORDINATE INSTALLATION WITH OWNER & MANUFACTURER. II. SEAL PENETRATIONS OF FIRE RATED WALLS AND FLOORS IN ACCORDANCE WITH U.L. FIRE RESISTANCE INDEX FOR THROUGH PENETRATION FIRE STOP SYSTEMS. COORDINATE REQUIREMENTS WITH ARCHITECTURAL PLANS AND SPECIFICATIONS. 12. CONTRACTOR SHALL FURNISH AND INSTALL SHOCK ABSORBERS ON FLUSH VALVE FIXTURES AND ALL LINES SERVING QUICK CLOSING VALVES AND AS INDICATED ON PLUMBING PLANS AND RECOMMENDED BY THE MANUFACTURER. 13. CLEANOUT COVERS SHALL NOT BE INSTALLED ON THE CORRIDOR SIDE OF ANY WALL. IF DISCREPANCIES ARE FOUND ON PLANS CONTRACTOR SHALL NOTIFY PLUMBING ENGINEER PRIOR TO INSTALLATION. 14. PIPING SHALL NOT BE RUN OVER ANY ELECTRICAL EQUIPMENT, PANELS AND PHONE PANELS. 15. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE LOCATIONS AND MOUNTING HEIGHTS. 16. ALL EXPOSED PIPE AND FITTINGS IN FINISHED AREAS SHALL BE CHROME PLATED. 17. THE PLUMBING CONTRACTOR SHALL KEEP A SET OF MARKED UP DRAWINGS AS THE JOB PROGRESSES. NO MAJOR CHANGE SHALL BE MADE TO PLUMBING DESIGN ENGINEERING UNLESS IT HAS BEEN COORDINATED, DRAWN AND SUBMITTED FOR APPROVAL. 18. MOUNT EXTERIOR HOSE BIBBS AT 24' ABOVE FINISH GRADE AND INTERIOR HOSE BIBBS AT 9' ABOVE FINISHED FLOOR UNLESS OTHERWISE NOTED. 19. HUB DRAINS SHALL BE A MINIMUM OF 2' ABOVE FINISHED FLOOR IN MECHANICAL ROOMS. 20. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGES TO EXISTING PIPING AND FIXTURES DUE TO NEW CONSTRUCTION AND SHALL RESTORE EXISTING WORK DISTURBED TO IT'S ORIGINAL CONDITION AT NO COST TO THE OWNER. 21. CONTRACTOR SHALL COORDINATE WITH ALL DISCIPLINES INVOLVED SO AS TO AVOID ANY PIPE ROUTING PROBLEMS. 22. PROVIDE OFFSETS AND FITTINGS AS REQUIRED. 23. ALL VENTS SHALL BE A MINIMUM OF 25' -0' AWAY FROM A/C INTAKES, AND OPERABLE WINDOWS. 24. CONTRACTOR SHALL PROVIDE ALL LOW VOLTAGE WIRING AND CONDUIT FOR SENSOR OPERATED FIXTURES AND MEDICAL GAS ALARM PANELS AND SHALL COORDINATE WITH DIVISION 16. CONTRACTOR SHALL HOLD A LOW VOLTAGE WIRING LICENSE. 25. DO NOT PENETRATE WALL FOOTINGS WITH PIPING, COORDINATE WITH GENERAL CONTRACTOR TO DROP FOOTINGS AS REQUIRED TO CLEAR PLUMBING SERVICES WHERE ABSOLUTELY NECESSARY. ALL PIPING PENETRATING A BEARING WALL OR FOOTING MUST BE SLEEVED AND LOCATION APPROVED BY STRUCTURAL ENGINEER PRIOR TO INSTALLATION. 26. WHEN BEAM SLEEVE PENETRATIONS ARE NECESSARY, NOTIFY AND COORDINATE PENETRATIONS WITH ALL TRADES, THE ARCHITECT AND STRUCTURAL ENGINEER PRIOR TO PENETRATING ANY BEAMS. 27. COORDINATE INSTALLATION OF PLUMBING SYSTEMS WITH ALL CASEWORK. CONTRACTOR SHALL OBTAIN ARCHITECTURAL DRAWINGS AND REVIEW PRIOR TO INSTALLATION. 28. CHANGES IN THE DIRECTION OF SANITARY PIPING SHALL NOT BE MADE WITH FITTINGS WHICH WILL CAUSE EXCESSIVE REDUCTION IN THE VELOCITY OF FLOW OR CREATE ANY OTHER ADVERSE EFFECT UNLESS PHYSICALLY IMPOSSIBLE UE: USE OF SANITARY TEE IN A HORIZONTAL CONNECTION, USE OF A DOUBLE SANITARY TEE IN A VERTICAL STACK, IN GENERAL, USE OF SHORT- RADIUS FITTING FOR BRANCH TO HOUSE DRAIN OR STACK CONNECTION). 29. WHERE SANITARY SEWER LINES CROSS UNDERGROUND WATER SUPPLY LINES WITH LESS THAN Be MINIMUM VERTICAL CLEARANCE, THE SANITARY SEWER SHALL BE CONSTRUCTED OF DUCTILE IRON PIPE (10' EACH SIDE OF WATER MAIN) OR THE WATER LINES SHOULD BE MODIFIED TO PROVIDE 8' MINIMUM CLEARANCE. 30. COORDINATE EXACT LOCATION OF EQUIPMENT ROOM FLOOR DRAINS FOR HVAC EQUIPMENT & HUB DRAINS WITH MECHANICAL CONTRACTOR. CONDENSATE PIPING SHALL NOT DISCHARGE INTO SANITARY SYSTEM. 31. THIS CONTRACTOR SHALL BASE HIS PROPOSAL UPON THE EQUIPMENT AS SCHEDULED OR SPECIFIED, USING THE MANUFACTURERS AND MODEL NUMBERS AS CALLED FOR IN THE SPECIFICATIONS AND SCHEDULED ON THE DRAWINGS. IF MORE THAN ONE MANUFACTURER OF EQUIPMENT IS SPECIFIED, ANY ONE OF THE MANUFACTURERS OF EQUIPMENT MAY BE USED IN THIS CONTRACTOR'S PROPOSAL. IF THIS CONTRACTOR WISHES TO USE EQUIPMENT NOT SPECIFIED HE MUST, AT THE TIME OF BIDDING, SUBMIT SEPARATELY ON LETTERHEAD STATIONARY OF THE BIDDER, THE EQUIPMENT HE WOULD SUBSTITUTE AND THE COST TO BE ADDED OR TO BE DEDUCTED FROM HIS PROPOSAL. 32. THE CONTRACTOR IS EXPECTED TO ORDER ALL MATERIALS IN SUFFICIENT TIME TO AVOID DELAYING THE COMPLETION OF THE PROJECT. DELAY IN DELIVERIES WILL NOT BE CONSIDERED A JUSTIFIABLE REASON FOR SUBMISSION OF SUBSTITUTE MATERIALS. 33. WARRANTY /GUARANTEE A. THE CONTRACTOR SHALL WARRANTY /GUARANTEE AND MAINTAIN THE STABILITY OF WORK AND MATERIALS AND KEEP SAME IN PERFECT REPAIR AND CONDITION FOR THE PERIOD OF ONE YEAR. B. DEFECTS OF ANY KIND DUE TO FAULTY WORK OR MATERIALS, APPEARING DURING THE ABOVE MENTIONED PERIOD, MUST BE IMMEDIATELY REPAIRED BY THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE OWNER AND ENGINEER. SUCH RECONSTRUCTION AND REPAIRS SHALL INCLUDE DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE ORIGINAL DEFECT OR REPAIR THERETO. 34. CONTINUITY OF SERVICE: INTERRUPTIONS OF EXISTING SERVICES OR FACILITIES SHALL BE KEPT TO A MINIMUM AND THE CONTRACTOR SHALL FURNISH ALL MATERIALS AND LABOR REQUIRED WHENEVER TEMPORARY CONNECTIONS ARE NECESSARY TO MAINTAIN CONTINUITY OF SERVICE. INTERRUPTIONS OF THE EXISTING SERVICES, THE INSTALLATION OF TEMPORARY FACILITIES, AND THE WORK OF MAKING FINAL CONNECTIONS TO NEW WORK SHALL BE DONE ONLY AT SUCH TIMES AS PERMITTED AND SCHEDULED BY THE OWNER. ALL SUCH CONNECTIONS AND TIE -INS SHALL BE COORDINATED THROUGH THE OWNERS PROJECT MANAGER. I. THE DURATION OF EACH SHUTDOWN SHALL BE LIMITED TO NIGHTS AND /OR WEEKENDS WITH THE TIME FRAME FOR SHUTDOWNS AS SPECIFIED BY THE OWNER. THE CONTRACTOR SHALL NOTIFY THE OWNER IN WRITING FORTY -EIGHT (48) HOURS IN ADVANCE OF EACH REQUIRED INTERRUPTION OF EXISTING SERVICE. 2. THE CONTRACTOR SHALL INCLUDE IN BID PRICE ALL PREMIUM TIME CHARGES FOR LABOR AND EQUIPMENT REQUIRED FOR ALL NIGHT AND WEEKEND OVERTIME WORK, AS NECESSARY, TO COMPLETE THE SCOPE OF THE CONTRACT. 35. ALL WATER PIPING INSTALLED BELOW SLAB SHALL BE SOFT COPPER TYPE 'K', WITH NO FITTINGS BELOW SLAB AND RUN WITHIN PVC SLEEVE. 36. PROVIDE FOUNDATION PAD PENETRATION SLEEVES. ALLOW 1' MINIMUM CLEARANCE BETWEEN SLEEVE INSIDE SURFACE AND PIPE EXTERIOR. 37. CONTRACTOR SHALL PROVIDE DRY CONTACTS AND RELAYS ON ALL EQUIPMENT, INTERFACES, MODBUS, SIGNAL WIRING AND CONDUIT FOR CONNECTION INTO BMS (BUILDING MANAGMENT SYSTEM). COORDINATE WITH SIEMENS CONTROLS AND PROVIDE SHOP DRAWINGS OF COMPLETE SYSTEM FOR REVIEW AND APPROVAL. 38. ALL STORM PIPING, OVERFLOW STORM AND CONDENSATE PIPING SHALL BE INSULATED THROUGHOUT ENTIRE SYSTEM. 39. PROVIDE A MINIMUM OF 6 INCHES BETWEEN ALL PIPING AND FIRE RATED AND SMOKE TIGHT PARTITIONS FOR REQUIRED INSPECTIONS. ANY PIPING WITHIN THIS 6 INCHES SPACE SHALL BE REQUIRED TO BE MOVED AND REROUTED. ANY COST IMPACT TO OTHER TRADES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. 40. THE MAXIMUM VERTICAL DISTANCE FROM THE FIXTURE OUTLET TO THE TRAP WEIR SHALL NOT EXCEED 24- INCHES AND THE HORIZONTAL DISTANCE SHALL NOT EXCEED 30- INCHES MEASURED FROM THE CENTER LINE OF FIXTURE OUTLET TO THE CENTERLINE OF THE INLET OF THE TRAP AS PER SECTION 1002 OF THE FLORIDA PLUMBING CODE 2010. 41. PROVIDE THE REQUIRED CLEARANCES AND SPACE FOR ALL PLUMBING FIXTURES. PLUMBING CONTRACTOR SHALL VERIFY AND COORDINATE PRIOR TO THE START OF CONSTRUCTION. 42. ALL FLUSH VALVES, FIXTURE STOPS, VALVES, ETC., ALL PIPING SHALL BE RIGIDLY SECURED (NO MOVEMENT WHEN OPERATED). INSTALL PERMANENT STAMPED BRASS VALVE TAG ON EACH VALVE, COORDINATE WITH OWNER'S IDENTIFICATION SYSTEM. 43. INSULATION, FITTINGS COVERS AND ALL FINISHES AND MATERIALS SHALL HAVE A MAXIMUM FLAME SPREAD RATING OF 25 AND A MAXIMUM SMOKE DEVELOPED RATING OF 50. 44. DRAWINGS ARE DIAGRAMMATIC. DO NOT SCALE FROM DRAWINGS. BUT FIT WORK TO ACTUAL CONDITION AND SPACE REQUIREMENTS. 45. ALL WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR IN A FIRST CLASS WORKMANLIKE MANNER. THE COMPLETE SYSTEM SHALL BE FULLY AND PROPERLY OPERATIVE AND IN COMPLIANCE WITH APPLICABLE CODES AND GOVERNING AUTHORITIrS AND SUBJECT TO ACCEPTANCE BY OWNER /ENGINEER. 46. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, FEES, INSPECTIONS AND TESTS. 47. ALL REQUIRED INSURANCES SHALL BE PROVIDED AND MAINTAINED BY THE CONTRACTOR FOR THE PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY DAMAGE, AND OTHER INSURANCES REQUIRED BY THE OWNER, FOR THE DURATION OF THE WORK. 48. GENERAL NOTE: TEMPERATURE OF HOT WATER TO PUBLIC REST ROOMS SHALL NOT EXCEED I10^F, PER FLORIDA ENERGY CONSERVATION CODE 504.8.2 (2). CONTRACTOR SHALL VERIFY TEMPERATURE OF HOT WATER SYSTEM WITH OWNER. INSTALL TEMPERING VALVES AS REQUIRED, FOR A MAXIMUM TEMPERATURE OF 110^F SUBJECT TO REVIEW BY ENGINEER. 49. SHORT SWEEPS AT BASE OF SANITARY, STORM AND CONDENSATE STACKS ARE NOT PERMITTED. 50. CONTRACTOR SHALL OBTAIN FROM THE OWNER A COPY OF THE INFECTION CONTROL RISK ASSESSMENT (ICRA) PREPARED FOR THIS PROJECT. CONTRACTOR SHALL REVIEW THE REQUIREMENTS IN THE REPORT AND PERFORM ALL WORK IN ACCORDANCE WITH THOSE REQUIREMENTS. SEE MECHANICAL DRAWINGS FOR COORDINATION OF VENTILATION REQUIREMENTS REQUIRED BY ICRA. 51. REFER TO DIVISION 15 SPECIFICATIONS FOR MORE INFORMATION. 52. CONTRACTOR SHALL SAW CUT CONCRETE FLOOR SLAB TO INSTALL NEW BELOW SLAB PIPING AND SHALL PATCH THE SLAB TO MATCH THE EXISTING CONCRETE SLAB. 53. CONTRACTOR SHALL TEST WATER FROM DOMESTIC COLD AND HOT WATER SYSTEMS WHICH WILL BE MODIFIED BY THE RENOVATION PRIOR TO COMMENCING MODIFICATIONS AND AFTER MODIFICATIONS ARE COMPLETED FOR CONTAMINANTS. PROVIDE COPY OF INITIAL TEST REPORT UPON COMPLETION. PROVIDE COPY OF FINAL TEST REPORT ONE WEEK PRIOR TO THE FINAL AHCA INSPECTION. 54. CONTRACTOR SHALL USE TEFLON TAPE AT THREADED FITTINGS. PIPE DOPE IS NOT ACCEPTABLE. MEDICAL GAS LEGEND SYMBOL DESCRIPTION A MEDICAL COMPRESSED AIR O Q °C VACUUM 02 - Uj _ Q PLUMBING ABBREVIATIONS C.W COLD WATER OFCI OWNER FURNISHED CONTRACTOR INSTALLED H.W. HOT WATER R.D. ROOF DRAIN H.W.R. HOT WATER RECIRC F.D. FLOOR DRAIN V.T.R. VENT THRU ROOF P.R.V. PRESSURE REDUCING VALVE A.V.T.R. ACID VENT THRU ROOF R.P.B.P. REDUCED PRESSURE BACKFLOW PREVENTER W. WASTE (INTERIOR) A.F.F. -ABOVE FINISHED FLOOR R.W.L. RAIN WATER LEADER A.F.G. ABOVE FINISHED GRADE S.W. STORM WATER A.W. ACID WASTE I.E. INVERT ELEVATION A.P. ACCESS PANEL C.O. CLEANOUT W.C.O. WALL CLEANOUT C.D. CONDENSATE S.S. SANITARY SEWER C.F.C.I. CONTRACTOR FURNISHED CONTRACTOR INSTALLED V.I.V. VALVE IN VERTICAL A.H.0 AIR HANDLING UNIT F.C.0 FAN COIL UNIT PLUMBING LEGEND SYMBOL DESCRIPTION SYMBOL DESCRIPTION - COLD WATER 6 BALL VALVE - - -- HOT WATER ice- CHECK VALVE - - - -- HOT WATER RECIRCULATION -41F- UNION IN PIPE W WASTE LINE ---- *4__ SECTIONAL CONTROL VALVE - -V -- VENT PIPE (ABOVE OR BELOW GROUND) 1� EXTERIOR CLEANOUT -RWL RAIN WATER LEADER P -I,ETC FIXTURE INDENTIFICATION CLEANOUT (ABOVE CEILING) a. CONNECTION TO EXISTING O BALANCING VALVE CIRCUIT SETTER WITH CHECK VALVE 0 CAP ON LINE PIPE TURNED UP N SHOCK ARRESTOR o PIPE TURNED DOWN MEDICAL GAS LEGEND SYMBOL DESCRIPTION A MEDICAL COMPRESSED AIR V VACUUM 02 OXYGEN N 2 0 NITROUS OXIDE N 2 NITROGEN LINE PRESSURE ALARM PANEL MEDICAL GAS EQUIPMENT (SEE MED. GAS SCHEDULE) SL SLIDE WAGD WASTE ANESTHESIA GAS DISPOSAL MEDICAL GAS SCHEDULE SYMBOL DESCRIPTION EQUIPPED WITH REMARKS z� ZONE VALVE BOX Y" 02, 3/4"V EXAM ROOMS 1 -5 AND INFUSION RM. H.W. WALL OUTLET (1) -02, (1) -V, (1)-SL EXAM ROOMS 1 -5 REYAfiKS LINE PRESSURE ALARM PANEL (1)-02, (1) -V EXAM ROOMS 1 -5 AND INFUSION RM. P1.2 WALL OUTLET (1) -02, (1) -V, (1)-SL INFUSION ROOM NOTES: 1, CONTRACTOR SHALL PROVIDE PERMANENTLY ENGRAVED LABELS AT ALL ZONE VALVE BOXES AND ALARM PANELS, IDENTIFIED ABOVE IN SCHEDULE, TO INDICATE SPECIFIC ROOMS SERVED. COORDINATE LABELING WITH FINAL ROOM NAMES AND NUMBERS, AND AREA SERVED WITH HOSPITAL. 2. PROVIDE PERMANENT ENGRAVED LABELS AT ALL NEW ALARM PANELS, IDENTIFIED ABOVE IN SCHEDULE, INDICATING ELECTRICAL LIFE SAFETY CIRCUIT FEEDING ALARM PANEL. 3. NOTE: ALARM PANEL IN SCHEDULE ABOVE HAS MULTIPLE POINTS OF THE SAME SERVICE. LABELS SHALL CLEARLY IDENTIFY WHICH ALARM POINT SERVES WHICH ROOM. OWNER FURNISHED EQUIPMENT (CONTRACTOR SHALL COORDINATE ALL PLUMBING REQUIREMENTS WITH FINAL OWNER FURNISHED EQUIPMENT BROCHURE) LOCATION DIS(RIPTION C.N. H.W. Dl CA WASTE REYAfiKS PLUMBING SPECIFICATIONS PO.5 PLUMBING SPECIFICATIONS P1.2 MOUNTED p,W C.W PROVIDE 'GUY GREY' FIRE RATED METAL WHITE POWDER COATED BOX WITH SHUTOFF SEE PLANS REFRIGERATOR �%a' - - - - VALVE MODEL •FRMIBI2S. COORDINATE MOUNTING HEIGHT WITH EQUIPMENT AND ARCHITECTURAL ELEVATIONS. COORDINATE INSTALLATION OF EQUIPMENT MFGR. SUPPLY TRAP FAUCET SYMBOL CARRIER RECOMMENDED FILTER AND WATTS SD -2 BACKFLOW PREVENTER BETWEEN SHUTOFF = W Fee- �L) VALVE AND EQUIPMENT CONNECTION. = D 02 OiNNNNI C0 PROVIDE 'GUY GREY' FIRE RATED METAL WHITE POWDER COATED BOX WITH SHUTOFF C0 z P -4A KOHLER (PATIENT) HIGHCLIFF K- 4368 -L FLUSH VALVE FLOOR MOUNTED ELONGATED VALVE MODEL NNFRMIBI2S. COORDINATE MOUNTING HEIGHT WITH EQUIPMENT AND SEE PLANS COFFEE MAKER %I - - - - ARCHITECTURAL ELEVATIONS. COORDINATE INSTALLATION OF EQUIPMENT MFGR. 4 M W WATER CLOSET -HC 1.6 GALLONS VITREOUS CHINA BOWL RECOMMENDED FILTER AND WATTS SD -2 BACKFLOW PREVENTER BETWEEN SHUTOFF PER ADA Oz NA C) v 1� VALVE AND EQUIPMENT CONNECTION. MOUNT (HC) 18' A.F.F. a. = GENERAL NOTES( I. PIPE SIZES SHOWN ARE CONNECTION SIZES AT EQUIPMENT. BRANCH LINES TO EQUIPMENT SHALL BE ONE PIPE SIZE LARGER THAN EQUIPMENT CONNECTION SIZE UNLESS OTHERWISE NOTED ON PLANS. 2. PROVIDE LEAD FREE BACKFLOW PREVENTER AT EACH CONNECTION OF POTABLE WATER TO EQUIPMENT IN ACCORDANCE WITH FBC 2010. SECTION 608. 3. PROVIDE SHOCK ABSORBERS AT ALL CW & HW EQUIPMENT CONNECTIONS. 4. COORDINATE INSTALLATION OF FILTERS WITH CASEWORK AND EQUIPMENT. PROVIDE CLEARANCES TO ALLOW FILTER SERVICE PER FILTER MFGR. PLUMBING FIXTURE SCHEDULE SHEET NUMBER SHEET TITLE FIXTURE FITTING FLOOR PLUMBING SPECIFICATIONS PO.3 PLUMBING SPECIFICATIONS POA PLUMBING SPECIFICATIONS PO.5 PLUMBING SPECIFICATIONS P1.2 MOUNTED p,W C.W H.W. WASTE REMARKS MANUFACTURER MODEL TYPE SIZE MANUFACTURER TYPE SUPPLY TRAP FAUCET SYMBOL CARRIER Z = W Fee- �L) = D 02 OiNNNNI C0 3: C0 z P -4A KOHLER (PATIENT) HIGHCLIFF K- 4368 -L FLUSH VALVE FLOOR MOUNTED ELONGATED SLOAN ROYAL WES BPW -1100- 1.6/1.1 FLUSH VALVE WITH � T. INSTALL NA INTEGRAL °C�� NA __ __ 4 K -4670C WHITE SEAT, W WATER CLOSET -HC 1.6 GALLONS VITREOUS CHINA BOWL PER ADA Oz NA C) v 1� MOUNT (HC) 18' A.F.F. a. = O Z C0 Q CHICAGO FAUCET N O MCn (ov KOHLER (HC) KINGSTON WALL HUNG 5' BACKSPLASH *155WC GRID DRAIN • �902 II /' INLET TO II ' OUTLET P -TRAP `ems -�'' RIST AD MOUNT 34' A.F.F. TO P -13 LAVATORY K -2005 CONCEALED ARM 21' X 18' McGUIRE WITH PROWRAP a H -2165 FSET FOR WHEEL COORDINATE � � ZURN _ %�• 12" �, I VITREOUS CHINA 4 FAUCET CTR PW2125 -WC CHAIR USE AERATOR FLOW CONTROL DEVICE WITH WGR. JUST - (STAFF) #SL -ADA- SINGLE COMP. (S.S.) 18 GAUGE PROWRAP *PW1151WC PROWRAP °PW2150 I%2' P -TRAP OFFSET CHICAGO FAUCET ' ZURN #Z -1236 P -20A S.S. SINK 2019 -A -GR 14' X 16' X 6%2' MCGUIRE H -2165 786- GN2FCCP WITH 11' -- %2' %2' I%2' ADA SELF - RIMMING OFFSET STRAINER FOR WHEEL CHAIR USE (1.5 GPM) LONG ARM JUST - (STAFF) "SL -ADA- SINGLE COMP. PROWRAP PROWRAP •PW2150 CHICAGO FAUCET ZURN *Z -1236 P -20B S.S. SINK 2019 -A -GR (S.S.) 18 GAUGE 14' X 16' X 61/2' McGUIRE °PWI152WC H -2165 1%2' P -TRAP OFFSET *786- GN2FCCP WITH II' -- Y2 %' I%2' ADA SELF - RIMMING OFFSET STRAINER FOR WHEEL CHAIR USE (1.5 GPM) LONG ARM NOTES: I. CONTRACTOR SHALL PROVIDE ALL REQUIRED MATERIAL FOR A COMPLETE INSTALLATION OF PLUMBING FIXTURES. INSTALL PER MANUFACTURER'S WRITTEN INSTRUCTIONS. 2. PROVIDE SYMMONS THERMOSTATIC MIXING VALVE •5- 210 -CK )j GPM MIN, 2 GPM MAX ON ALL FAUCETS. SET AT 110 "F. SEE DETAILS. INSTALL PER MANUFACTURERS WRITTEN INSTRUCTIONS. 3. INSTALLATION OF FIXTURES SHALL BE FULLY COORDINATED WITH GRAB BARS. PROVIDE FLUSH VALVES WITH OFFSETS AS REOUIRED. DRAWING INDEX SHEET NUMBER SHEET TITLE POA PLUMBING LEGENDS, SCHEDULES AND DRAWING INDEX PO.2 PLUMBING SPECIFICATIONS PO.3 PLUMBING SPECIFICATIONS POA PLUMBING SPECIFICATIONS PO.5 PLUMBING SPECIFICATIONS P1.2 FIRST FLOOR PLAN - DEMOLITION - MEDICAL GAS P2.0 UNDERGROUND PLAN - NEW CONSTRUCTION - PLUMBING P2.1 FIRST FLOOR PLAN - NEW CONSTRUCTION - PLUMBING P2.2 FIRST FLOOR PLAN - NEW CONSTRUCTION - MEDICAL GAS P4.1 PLUMBING RISER DIAGRAMS P5.1 PLUMBING DETAILS Smith SR Seckman Reid, Inc. 600 West Hillsboro, Suite 300 Deerfield Beach, FL 33441 (954) 421 -1260 FAX: (954) 421 -1466 www.ssr - inc.com Firm Certification - EB- 0000857 Dennis Davis PE-58588 John E. Moulder PE - 33200 SSR JOB # 1232016.0 o `- M r- rn o oco o q CO o 0 M W rnN mch 0r2 rn -2 N= O-2 M M r Q 0) i2 c'T o t�coo ro o (g 2 J � w m C E a. EO Y � u LL 1-3 0 0_ co l- Q Comm. No: 12007.00 Date: M Drawn: Revised: 0 T Q M 0 M LL O� = .1 W U. ~ a Z = W Fee- �L) = D 02 OiNNNNI C0 3: C0 z =i- I- wU g J = a °C�� OC O W I- .0 Z Oz W C) v a. = O Z C0 Q N O MCn (ov Comm. No: 12007.00 Date: 05/22/12 Drawn: Revised: 0 05/08/13 S�� No. 3 200 = 0 • S : W, . ra �• ��LLY, IN 130.1