Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
12-965-041
R PAI "0r Z 0 a N a N h N v 0 0 a. N I O CL U_ E 0 d O (0 0 N r'] N / N N M E a: FIRE PROTECTION SECTION 15300 PART 1 -GENERAL 1.01 WORK INCLUDED A. Provide materials and labor required to completely execute the sprinkler and fire protection work for this project, as Indicated on the drawings and as herein specified. B. Scope of work: 1. Shop drawings. 2. Interior pipe, flttings, and valves. 3. Hangers, supports and sleeves. 4. Sprinkler heads and extra sprinkler cabinet. S. Fire extinguishers cabinets. 6. Testing and flushing. 1.02 RELATED WORK A. Division 7: Through - Penetration Firestop Systems B. Section 09900: Painting C. Section 15010: General Requirements D. Section 15050: Basic Materials and Methods E. Division 16: Electrical 1.03 INSTALLER QUALIFICATIONS A. Comply with local and state licensure requirements for Installation of fire protection systems. 1.04SYSTEM DESIGN 1.05 QUALITY ASSURANCE A. Underwriters Laboratories (U.L.) listed and Factory Mutual (F.M.) approved material. B. Comply with local fire department standards for hose threads, operating nuts and accessories for hydrants and siamese connections. C. The automatic sprinkler system Installer shall provide a permanently attached nameplate located at the controlling alarm, indicating the location and the discharge densities over designed areas of discharge including gallons per minute and residual pressure, and hose stream demand supplied by the sprinkler piping. 1.06 SUBMITTALS AND SHOP DRAWINGS A. Prepare complete detailed working shop drawings for fire protection system based on the contract documents pipe sizes, general routing, and hydraulic calculations. B. After receiving shop drawing approval from Engineer, Contractor shall submit approved shop drawings to State, Local Fire Marshal and Owner's Insuring Agent. Submit shop drawings to architect and engineer for review and approval prior to purchasing material and submittal to Building Department and before the start of Installation. If discrepancies are found on shop drawings prior to approval, contractor shall fix plans and installation to match engineer's contract drawings. C. Include the following manufacturer's product data with shop drawings: 1. Sprinkler Heads. 2. Valves. 3. Fire extinguishers and cabinets. 4. Pipe and fittings. 5. Hangers and hanging method. 6. Equipment D. Include the following information on sprinkler shop drawings: 1. Complete fire sprinkler system layout. 2. Piping and sizes based on contract documents. 3. Pipe elevation. 4. Sprinkler head type and locations fully coordinated with lights and diffusers. Provide head schedule. S. Hanger locations. 6. Drain lines and termination. 7. Fire department valve locations. S. Valve locations and elevations. 9. Standpipes 10. All required construction notes, details including details for hanging pipe. 11. Sprinkler zone served. 12. Node identification for the calculated areas. 13. Provide hydraulic data nameplate and locate at fire standpipe and control valve which serves remote area. E. Purpose of shop drawing Is to convey that contractor understands Intent of Contract Documents and to facilitate coordination of sprinkler system with HVAC ductwork and other trades. F. Submit shop drawing and submittals to Owner's Insuring Agency for approval. G. Sprinkler fabrication and installation shall not commence prior to approval by the listed authorities. H. Contractor shall provide copy of MIC - Microbiological Influenced Contusion Test. PART 2 - PRODUCTS 2.01 VALVES A. Acceptable Manufacturers: Nibco, Wilklns,Victaulic, Grinnell. Nibco model numbers are used to establish required level of product quality. 2.02 PIPE AND FITTINGS A. Interior Pipe and Fittings: 1. Schedule 10 ASTM -135, electric - resistance welded steel pipe suitable for roll grooving for piping 3" and larger. Provide ABF coating on pipe. Piping shall be rated for 300 psi. 2. Thlnwall, ASTM -A -795 Type E, Grade A, electric resistance welded by Allied -Dyna Thread with a CRR = 1.0 for threaded pipe ends and Allied XL /BLT for unthreaded thinwall pipe. Provide ABF coating on piping. For piping up to 3 ". Piping shall be rated for 300 psi. 3. Schedule 5 piping shall not be approved or permitted. 4. Fittings: a. Mechanical couplings: Roll groove rigid type by Victaulic, or Grinnell U.L. listed for 300 psi. b. Class 250 cast iron sprinkler fittings U.L. listed - screwed flanged. c. All fittings shall be by the same manufacturer and shall be UL /FM approved. d. Straps shall not be permitted. e. Flexible sprinkler drops shall not be approved or permitted. f. Mechanical couplings shall be manufactured in two segments of cast ductile iron, conforming to ASTM A -536, Grade 65- 45 -12. Gaskets shall be pressure responsive synthetic rubber, grade to suite the Intended service, conforming to ASTM D -2000. Mechanical couplings bolts shall be zinc plated (ATSM B -6330) heat treated carbon steel track head conforming to physical properties of ASTM A -449, minimum tensile strength 110,000 psi as provided. 1) Installation ready rigid joints shall be Victaulic Fire Lock E2 Style 009, In sizes 1 -1/4" through 4 ", which shall be designed for direct stab Installation onto grooved pipe without prior disassembly of the coupling. Housings shall be cast with offsetting, angle - pattem bolt pads. 2) Standard rigid joints shall be Victualic Style 005 Firelock 005 or 07 (zero- flex), Ins sizes 1 -1/4" through 8 ". Housing shall be cast with offsetting, angle- pattern bolt pads, to provide system rigidity and support and hanging in accordance with NFPA 13. Provide with Vlcplus flush seal gasket. g. Mechanical coupling gaskets shall be pressure responsive, synthetic rubber listed for use with the housings. h. Flange adapters shall be for use with grooved end pipe and fittings, for mating to ANSI Class 125 /150 flanges. Victaulic Style 741 or 744. For mating to ANSI Class 300 Flanges use Victaulic Style 743. 1. Grooved end fittings shall be cast of ductile Iron conforming to ASTM -A536, Grade 65 -45 -12 (fire lock), forged steel conforming to ASTM A -234, Grade WPB 0.375" wall or fabricated from STD, wt carbon steel pipe conforming to ASTM A -53, Type F, E or S, Grade B. Fittings provided with an alkyd enamel finish or hot dipped galvanized to ASTM A -153, zinc electroplated fittings and couplings shall conform to ASTM B633. J. Hole cut branch outlets shall have bolted branch outlets with branch reductions on 2" through 8" header piping. Bolted branch outlets shall be manufactured from ductile iron conforming to ASTM A -536, Grade 65- 45 -12, with synthetic rubber gasket and heat treated carbon steel zinc plated bolts and nuts conforming to physical properties of ASTM A -183, Victualic Style 920/920N. B. Drain Piping: 1. Schedule 40, A53 grade B, galvanized pipe. 2. Fittings: Class 250 cast Iron, screwed with galvanized coating. 2.03 HANGERS AND SUPPORTS A. Acceptable manufacturers: Grinnell, Bllne, Viking, Reliable Empire, Fee and Mason. Grinnell model numbers are used to establish level of product quality. B. Provide U.L. Listed and F.M. approved hangers. All hangers, hanger rods, and nuts shall be galvanized. C. Hangers: 1. Grinnel #260 MSS, Type 1 for pipe 2" through 12" 2. Grinnell Figure #104, Type 6, adjustable split ring for pipe less than 2 ". 3. Grinnell #69 for pipe 1/2" through 2 ". D. Clamps: 1. Riser Clamps: Grinnell #261, MSS Type 8, at floor slab penetrations to support risers. 2. C- Clamps: Grinnell #92 with retainer clip, MSS Type 23. 3. Mailable Beam Clamps: Grinnell Figure #218, MSS Type 30. E. Inserts: 1. Concrete Insert: Grinnell Figure #281, MSS Type 18, universal concrete Insert, adequately sized and correctly positioned to support full load. 2. Lightweight concrete: Grinnell #285. 3. Continuous Concrete Insert: Grinnell Powerstrut #PS -349, pregalvanized. 4. Power Insert: HILTI KWIK -Bolt, zinc plated HDI metal expansion anchor. Use In conjunction with all thread rods. To be used on existing construction only. S. Power Inserts shall not be used In post tension construction unless approved by Structural Engineer. 6. All hangers, Including nuts, bolts, rods, trapeze hangers, clevis and swivel ring hangers shall be hot dipped galvanized where used at exterior applications. 2.04 SPRINKLER HEADS A. Acceptable Manufacturers: Reliable Sprinkler Company, Viking, Victaulic. B. Slip -type escutcheons will not be accepted. C. Extended coverage heads systems will not be acceptable. D. Sprinkler heads shall be U.L. Listed and F.M. approved. Concealed type quick response sprinkler head may be U.L. listed only. E. Concealed Viking Horizon Mirage VK404, bulb type, 1/2" orifice. Quick Response, 5.6 "K" Factor. F. Provide quick response heads In all areas. G. Provide the following sprinkler heads of the proper type, rating and spacing. Appropriate must be compatible with room finishes. Slip -type escutcheons will not be accepted. H. Provide one sprinkler cabinet with 12 extra sprinkler heads and sprinkler wrench for emergency use. Locate cabinet in maintenance area. Provide a minimum of two extra sprinkler heads of each type sprinkler head used for the project. Add an extra sprinkler cabinet If necessary to house the spare heads. PART 3 - EXECUTION 3.01 COORDINATION A. Coordinate installation to avoid interference with other systems. B. Provide power and Interlock wiring under Division 16. Coordinate with Division 16 for all requirements. 3.02 PIPE INSTALLATION A. Install sprinkler pipe a minimum of 12" above top of ceiling to allow for removal of ceiling the and lighting fixtures and for access to equipment above the ceiling. B. Support vertical pipe risers at 12' maximum distance or at least once at each floor. C. Use hanger types as specified In Part 2 above. This shall overrule hanger types outlined in NFPA 13. D. Hanger spacing shall be in accordance with NFPA 13. Maximum spacing of 12 " -0" on center per FM requirements. E. Provide hangers on all arm outs of 12" or more In all cases. F. Seal penetrations of fire rated walls and floors In accordance with U.L. Fire Resistance Index for Through - Penetration Flrestop Systems. Coordinate requirements with Division 7. G. Provide trapeze type hangers where necessary to support pipe when structural steel Is not directly above for support. H. Provide 8 -1/2" x 11" floor plan In color at each sprinkler control valve within stairwell on wall of area served by sprinkler system. Coordinate with contract documents and Life Safety drawings for areas served. I. Pipe ends shall be clean and free from indentations, projections and roll marks in the area from pipe end to groove. J. The gasket style and elastomeric material (grade) shall be verified as suitable for the intended service as specified. K. All grooved components (couplings, fittings, valves, gaskets and specialities) shall be of one manufacturer. L. Grooved coupling manufacturer's factory trained field representative shall provide on site training for contractor's field personnel In the proper use of grooving tools, application of grooved, and Installation of grooved piping products. 1. Minimum excess pressure of 10 psi Including required hose stream allowance and sprinkler requirements. 2. Maximum pipe velocity of 20 feet /second or as limited by insuring agent. 3.03 SPRINKLERS A. Install sprinkler heads and required piping In areas such as concealed spaces, kitchen hoods, lab hoods, dietary freezer and chill boxes and other special areas and spaces as required by NFPA 13 and NFPA 101. B. Provide drain valves, pipes and test connections as required by NFPA 13. Pipe drain lines and test connections to outside building or as shown and detailed on Drawings. Originate test lines from most hydraulically remote point of each sprinkler zone. C. Install sprinkler heads centerline of corridors and locate In the center of the ceiling tiles. Install sprinkler heads In other designated spaces In the center of the ceiling tiles and symmetrically locate with other heads within the ceiling. Do not Install sprinkler heads In other locations any closer than six inches to any ceiling grid or wall. D. Sprinklers shall be installed a minimum of 12" from any HVAC diffuser. 3.04 FIRE EXTINGUISHER AND CABINETS A. Mount top of extinguisher 48" (ADA) above finished floor or as required for ADA compliance. B. Identify on cabinet with 1 -1/4" high red lettering "Fire Extinguisher ". C. Provide with signage as required. BASIC FIRE PROTECTION REQUIREMENTS SECTION 15010 PART 1-GENERAL 1.01 SECTION INCLUDES A. Basic Fire Protection requirements specifically applicable to Division 15 Sections. B. Requirements of Division 1 Specifications, General Provisions of the Contract and General and Supplementary Conditions apply to this Division. 1.02 REFERENCES A. FM: Factory Mutual B. IRI: Industrial Risk Insurers C. MSS: Manufacturer's Standardization Society of the Valve and Fitting Industry. o r m o to CD M 0�0 r- � ti � � N 0 a)~ �TN T -oN mp10.0pcs� v c O 0 CD o m M >waBZo.0 Y q wLL - f°Oau)t` -°a r 0) 05/22/12 Drawn: = No. Revised: k%11 Reid, Inc. TM T - c>± a LL. Deerfield Beach, FL 33441 (954) 421 -1260 O �� R oe•` ����,' i� ••.,, ". "•" �!�'` Auk ©2 AtQD�L�Y, INC -.v _w LL Q Michael A. Steward PE - 65701 John E. Moulder FE - 33200 `rj. FPO. w � W o r m o to CD M 0�0 r- � ti � � N 0 a)~ �TN T -oN mp10.0pcs� v c O 0 CD o m M >waBZo.0 Y q wLL - f°Oau)t` -°a Comm. No: 12007.00 0) 05/22/12 Drawn: = No. Revised: k%11 Reid, Inc. TM T - c>± a LL. Deerfield Beach, FL 33441 (954) 421 -1260 O �� R oe•` ����,' i� ••.,, ". "•" �!�'` FAX: (954) 421 -1466 ©2 AtQD�L�Y, INC www.ssr- inc.com _w LL Q Michael A. Steward PE - 65701 John E. Moulder FE - 33200 `rj. FPO. w � W t � T iH D 0 w 0Z Cl) Cl) _ CA W =i' H WU 2 O F_ .� z TW .i O E- W CO U C0 _ CC ♦��� Vj (- = o z Q�No m 0) w U Comm. No: 12007.00 Date: 05/22/12 Drawn: = No. Revised: V Smith = No. Seckman k%11 Reid, Inc. T - c>± 600 West Hillsboro, Suite 300 ��� '• Deerfield Beach, FL 33441 (954) 421 -1260 �� R oe•` ����,' i� ••.,, ". "•" �!�'` FAX: (954) 421 -1466 ©2 AtQD�L�Y, INC www.ssr- inc.com Firm Certification - EB- 0000 857 Michael A. Steward PE - 65701 John E. Moulder FE - 33200 `rj. FPO. w SSR JOB # 1232016.0