Loading...
12-965-040I _0 2 0 a N 0 N 0 N a N to E t� F v C 4) NE FIRE PROTECTION AS- GUILTS NOTE FIRE PROTECTION CONTRACTOR IS REQUIRED TO SUBMIT FIRE PROTECTION AS BUILT PLANS UPON COMPLETION OF THE PROJECT. COMPLETION IS DEFINED AS THE OWNER RECEIVING A 'CO' AND FIRE PROTECTION INSPECTOR HAS FINALIZED AND APPROVED THE INSTALLATION. AS GUILTS SHALL BE SUBMITTED IN ELECTRONIC FASHION IN EITHER AUTOCAD FORMAT OR SCANNED FILES IN PDF FORMAT. AS BUILTS SHALL BE LEGIBLE AND NEAT. AS BUILTS WILL BE RETAINED BY ARCHITECT AND ENGINEER FOR RECORDS OF CHANGES TO THE SYSTEM. AS BUILTS WILL BE SUBMITTED TO OWNER THROUGH ARCHITECT AND ENGINEER. SPRINKLER NOTES I. ALL FIRE PROTECTION SYSTEMS SHALL BE IN COMPLIANCE WITH THE STATE AND LOCAL FIRE CODES AND ORDINANCES AND AS PER NFPA 13 - 2007, NFPA 14 -2007, NFPA 20 - 2007 & NFPA 24 - 2007 EDITION REQUIREMENTS. 2. MAKE ALL OFFSETS REQUIRED AS PER JOB CONTIONS. 3. CONTRACTOR TO PROVIDE AND TURN OVER TO THE OWNER AT LEAST (12) SPARE SPRINKLERS OF SAME TYPE AND TEMPERATURE RATING BEING INSTALLED. 4. PROVIDE SPRINKLER GUARDS ON HEADS IN ELECTRICAL ROOMS, IT ROOMS, MECHANICAL ROOMS, AND ALL EXPOSED CEILINGS. 5. ALL SPRINKLER HEADS SHALL BE CENTERED AND PRESENT A NEAT AND BALANCED PATTERN UNLESS SHOWN OTHERWISE. 6. PROVIDE AND MAINTAIN A MINIMUM CLEARANCE OF 18' BETWEEN THE BOTTOM OF THE SPRINKLER DEFLECTOR AND THE TOP OF STORAGE, FILE, SHELVING, ETC. 7. SPRINKLER HEADS SHALL BE A MINIMUM OF 12' FROM ANY DIFFUSER PER NFPA 13. 8. CONTRACTOR SHALL COORDINATE WITH STRUCTURE AND OTHER TRADES BEFORE INSTALLING SPRINKLER WORK. 9. SPRINKLER HEAD %2' ORIFICE WITH 5.6 K- FACTOR, QUICK RESPONSE. 10. INSTALL PIPING TIGHT TO STRUCTURE WHERE POSSIBLE. 11. SPRINKLER SYSTEM TO BE INSTALLED BY A STATE CERTIFIED FIRE PROTECTION CONTRACTOR. 12. SPRINKLER PIPING SHALL BE UL LISTED THREADABLE THINWALL AND /OR ALLIED XL I' THROUGH 3' AND SCHEDULE 10 BLACK STEEL ASTM /A.135, UL LISTED FOR PIPING 4' AND LARGER. SEE SPECIFICATIONS FOR MORE INFORMATION. 13. SYSTEM DESIGNED FOR LIGHT HAZARD OCCUPANCY EXCEPT FOR ORDINARY HAZARD GROUP I OCCUPANCY IN ELECTRICAL, MECHANICAL, AND STORAGE ROOMS SYSTEM CALCULATED TO THE STREET MAIN UTILIZING A FLOW TEST TAKEN NO MORE THAN 180 DAYS BEFORE INSTALLATION. 14. PAINT RED ALL EXPOSED FIRE RISERS, INSPECTORS TESTS ASSEMBLIES & DRAIN RISERS. 15. CONTRACTOR SHALL COORDINATE WITH ALL DISCIPLINES INVOLVED SO AS TO AVOID ANY PIPE ROUTING PROBLEMS. 16. CONTINUITY OF SERVICE: INTERRUPTIONS OF EXISTING SERVICES OR FACILITIES SHALL BE KEPT TO A MINIMUM AND THE CONTRACTOR SHALL FURNISH ALL MATERIALS AND LABOR REQUIRED WHENEVER TEMPORARY CONNECTIONS ARE NECESSARY TO MAINTAIN CONTINUITY OF SERVICE. INTERRUPTIONS OF THE EXISTING SERVICES, THE INSTALLATION OF TEMPORARY FACILITIES, AND THE WORK OF MAKING FINAL CONNECTIONS TO NEW WORK SHALL BE DONE ONLY AT SUCH TIMES AS PERMITTED AND SCHEDULED BY THE OWNER. ALL SUCH CONNECTIONS AND TIE -INS SHALL BE COORDINATED THROUGH THE OWNERS PROJECT MANAGER. I. THE DURATION OF EACH SHUTDOWN SHALL BE LIMITED TO NIGHTS AND /OR WEEKENDS WITH THE TIME FRAME FOR SHUTDOWNS AS SPECIFIED BY THE OWNER. THE CONTRACTOR SHALL NOTIFY THE OWNER IN WRITING FORTY -EIGHT (48) HOURS IN ADVANCE OF EACH REQUIRED INTERRUPTION OF EXISTING SERVICE. 2. THE CONTRACTOR SHALL INCLUDE IN BID PRICE ALL PREMIUM TIME CHARGES FOR LABOR AND EQUIPMENT REQUIRED FOR ALL NIGHT AND WEEKEND OVERTIME WORK, AS NECESSARY, TO COMPLETE THE SCOPE OF THE CONTRACT. 17. SEAL PENETRATIONS OF FIRE RATED WALLS, CEILINGS AND FLOORS IN ACCORDANCE WITH U.L. FIRE RESISTANCE INDEX FOR THROUGH PENETRATION FIRE STOP SYSTEMS. COORDINATE REQUIREMENTS WITH ARCHITECTURAL PLANS AND SPECIFICATIONS. 18. FIRE PROTECTION CONTRACTOR SHALL PREPARE A SET OF COORDINATION SHOP DRAWINGS BASED ON PIPE SIZES SHOWN FOR ALL LEVELS COORDINATED WITH ALL THE ENGINEERING DISCIPLINES AND FIRE PROTECTION PIPING. THESE SHOP DRAWINGS SHALL BE SUBMITTED TO SSR ENGINEER FOR APPROVAL PRIOR TO FABRICATION, INSTALLATION OR SUBMITTAL TO BUILDING DEPARTMENT. 19. ALL GROOVED AND SCREWED FITTING SHALL BE APPROVED BY AN ENGINEER WHO RESERVES THE RIGHT TO DISAPPROVE ANY FITTING. ALL FITTING TYPES SHALL BE FROM THE SAME MANUFACTURER. 20. PRESSURE TEST PIPING AT 200 PSIG FOR A MINIMUM OF TWO HOURS. IF LEAKS ARE FOUND THEN CONTRACTOR SHALL FIX LEAKS AND TEST AGAIN. CONTRACTOR SHALL ALSO PROVIDE ALLOWANCE IN BID FOR PRESSURE TESTING OF EXISTING PIPING SHOWN TO REMAIN 200 PSIG FOR A MINIMUM OF 2 HOURS. ALLOWANCE SHALL INCLUDE FIXING LEAKS AND RETESTING. 21. PROVIDE SPRINKLERS ABOVE AND BELOW DUCTWORK, CONDUIT, PIPING, ETC. 48' IN WIDTH AND LARGER. THIS INCLUDES SYSTEMS LOCATED ADJACENT TO EACH OTHER WHICH THEIR COMBINED WIDTH IS 48' OR LARGER. 22. SCHEDULE 5 PIPING AND FLEXIBLE SPRINKLER HEAD DROPS ARE NOT APPROVED OR ACCEPTED PRODUCTS. 23. VISIT THE SITE TO CHECK AND VERIFY ALL EXISTING CONDITIONS PRIOR TO BIDDING TO INSURE THE COORDINATION OF THE FIRE SERVICES WITH EXISTING CONDITIONS. 24. CUTTING OF STRUCTURAL AND /OR ARCHITECTURAL MEMBERS TO BE DONE ONLY WITH THE WRITTEN APPROVAL OF THE ARCHITECT AND STRUCTURAL ENGINEER. 25. SPRINKLER HEADS ARE TO BE COORDINATED WITH ALL LIGHTING FIXTURES AND STRUCTURAL SYSTEM. 26. INDICATE CENTER TO CENTER DIMENSIONS AND /OR PIPE CUT LENGTHS AND NOMINAL PIPE DIAMETERS OF ALL PIPING ON SHOP DRAWINGS. 27. INDICATE PIPE TYPE, SCHEDULE OF WALL THICKNESS AND METHOD OF JOINING ON SHOP DRAWING. 28. CAUTION: MATERIAL SUBMITTALS AND SHOP DRAWINGS SHALL BE SUBMITTED TO ARCHITECT /ENGINEER FOR APPROVAL AND SHALL BE APPROVED BEFORE ANY INSTALLATION. 29. CONTRACTOR SHALL PROVIDE ALLOWANCE IN BID FOR AN ADDITIONAL 12 CONCEALED HEADS WITH 10 FOOT 1' ARMOVER, I TEE AND 2 ELBOWS TO EACH HEAD. PROVIDE LINE ITEM COST PER HEAD WITH ASSOCIATED ARMOVER, FITTINGS AND HANGERS. INSTALL HEADS WHERE REQUIRED BY TEMPORARY WALLS, LOCAL AHJ, UNFORSEEN CONDITIONS, ETC. 30. PROVIDE A MINIMUM OF 6 INCHES IN BETWEEN ALL PIPING AND FIRE RATED AND SMOKE TIGHT PARTITIONS FOR REQUIRED INSPECTIONS. ANY PIPING WITHIN THIS 6 INCHES SPACE SHALL BE REQUIRED TO BE MOVED AND REROUTED. ANY COST IMPACT TO OTHER TRADES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. 31. PROVIDE A PERMANENTLY ATTACHED NAME TAG STATING THE REQUIRED DESIGN CRITERIA FOR EACH HYDRAULICALLY DESIGNED SYSTEM. 32. IMMEDIATELY NOTIFY THE ARCHITECT/ ENGINEER OF ANY DISCREPANCIES FOUND BETWEEN THESE PLANS, OTHER ENGINEERING PLANS, THE ARCHITECTURAL PLANS AND /OR FIELD CONDITIONS PRIOR TO FINAL BID PRICE OR FINAL PERMITTING. 33. IN CASE OF DISPUTE OR DOUBT AS TO INTENT OF DRAWINGS OR SPECIFICATIONS, OBTAIN ARCHITECT /ENGINEER'S DECISION BEFORE PROCEEDING WITH WORK OR BID INVOLVED. FAILURE TO FOLLOW THIS INSTRUCTION SHALL CONSTITUTE LIABILITY FOR DAMAGE TO OTHER WORK AND FOR REMOVING AND REPAIRING DEFECTIVE OR MISLOCATED WORK IN PROPER MANNER. 34. BEFORE SUBMITTING PROPOSAL OR BID, EXAMINE ALL DRAWINGS AND SPECIFICATIONS RELATING TO THIS PROJECT, THE AMOUNT OF SPACE AVAILABLE FOR PIPING, EQUIPMENT AND CONNECTING SERVICES, THE SITE OF THE WORK, THE REQUIREMENTS TO CORRELATE THE FIRE PROTECTION WORK WITH THAT OF OTHER TRADES AND THE TIME SCHEDULE NECESSARY TO PERFORM THAT WORK. 35. ALL SPRINKLER HEADS MOUNTED IN CEILING SHALL BE LOCATED A MINIMUM OF 4' AWAY FROM ANY WALLS, CEILING HEIGHT CHANGES OR ANY OTHER VERTICAL INTERSECTING STRUCTURAL SURFACE. 36. PIPE SHALL BE REAMED AND CLEANED BEFORE ASSEMBLY, AND AFTER ASSEMBLY. THE ENTIRE PIPING SYSTEM SHALL BE FLUSHED CLEAN. 37. PROVIDE SYSTEM(S) WITH FLUSHING CONNECTION(S). 38. INDICATE THE TOTAL SQUARE FOOT AREA PROTECTED BY FIRE PROTECTION SYSTEM. 39. CONTRACTOR SHALL COORDINATE EXACT LOCATION OF FIRE EXTINGUISHERS WITH THE ARCHITECTURAL LIFE SAFETY DRAWINGS, PRIOR TO INSTALLATION. 40. ALL PENETRATIONS OR OPENINGS FROM REMOVED PIPES THROUGH EXISTING BUILDING WALLS AND FLOORS SHALL BE SLEEVED AND /OR PATCHED TO MATCH ORIGINAL. SEE ARCHITECTURAL DRAWINGS FOR FINAL FINISHES. 41. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING PIPING OR EQUIPMENT DUE TO NEW CONSTRUCTION AND HE SHALL RESTORE EXISTING WORK TO ITS ORIGINAL CONDITION AT NO COST TO THE OWNER. 42. PROVIDE HANGERS ON ALL ARMOVERS OF 12' OR MORE IN LENGTH AND PER NFPA 13. 43. WARRANTY /GUARANTEE A. THE CONTRACTOR SHALL WARRANTY /GUARANTEE AND MAINTAIN THE STABILITY OF WORK AND MATERIALS AND KEEP SAME IN PERFECT REPAIR AND CONDITION FOR THE PERIOD OF ONE YEAR. B. DEFECTS OF ANY KIND DUE TO FAULTY WORK OR MATERIALS, APPEARING DURING THE ABOVE MENTIONED PERIOD, MUST BE IMMEDIATELY REPAIRED BY THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE OWNER AND ENGINEER. SUCH RECONSTRUCTION AND REPAIRS SHALL INCLUDE DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE ORIGINAL DEFECT OR REPAIR THERETO. 44. PIPING SHALL NOT BE RUN OVER ANY ELECTRICAL PANELS, ELECTRICAL EQUIPMENT AND PHONE PANELS. 45. THE FIRE PROTECTION CONTRACTOR SHALL KEEP A SET OF MARKED UP DRAWINGS AS THE JOB PROGRESSES. NO MAJOR CHANGE SHALL BE MADE TO FIRE PROTECTION DESIGN ENGINEERING UNLESS IT HAS BEEN COORDINATED, DRAWN AND SUBMITTED FOR APPROVAL. 46. SPRINKLERS IN AREAS WITH EXPOSED STRUCTURE (OBSTRUCTED CONSTRUCTION) SHALL BE INSTALLED WITH DEFLECTOR In BELOW BOTTOM OF THE BEAM (MAXIMUM 22' BELOW ROOF DECK) PER NFPA 13. 47. DEFLECTORS OF SPRINKLERS UNDER CONCRETE TEE CONSTRUCTION WITH STEMS SPACED LESS THAN 7 FEET BUT MORE THAN 3 FEET ON CENTER SHALL, REGARDLESS OF THE EPTH OF THE TEE, BE PERMITTED TO BE LOCATED AT OR ABOVE A HORIZONTAL PLANE I' BELOW THE BOTTOM OF THE STEMS OF THE TEES AND SHALL COMPLY WITH TABLE 8.6.5.1.2 OF NFPA 13. CONTRACTOR SHALL COORDINATE WITH STRUCTURAL DRAWINGS. 48. CONTRACTOR SHALL COORDINATE WITH FIRE ALARM CONTRACTOR FOR ALL FIRE ALARM DEVICES INCLUDING FLOW AND TAMPER SWITCHES. 49. CONTRACTOR SHALL PROVIDE PROVISIONS FOR FLUSHING SPRINKLER PIPING PER NFPA 13, 8.14.16. SHOW LOCATIONS OF FLUSHING CONNECTIONS ON SPRINKLER SHOP DRAWINGS. 50. SSR IS CONTRACTED BY THE HOSPITAL /OWNER TO BE THE ENGINEER OF RECORD FOR THIS PROJECT. CONTRACTOR SHALL PRODUCE SHOP DRAWINGS WHICH MATCH THESE DRAWINGS IN DESIGN INTENT (PIPE ROUTING, PIPE SIZING, SPRINKLER HEAD LAYOUT, ETC.). CONTRACTOR SHALL COORDINATE FIRE PROTECTION INSTALLATION WITH SITE CONDITIONS (STRUCTURE, CEILING, DUCTWORK, PIPING, CONDUIT, ETC.), AND PROVIDE OFFSETS TO PIPE ROUTING OR DEVIATIONS FROM DESIGN INTENT ONLY WHERE REQUIRED BY SITE CONDITIONS OR APPLICABLE CODES. 51. PROVIDE A MINIMUM OF 6 INCHES IN BETWEEN ALL PIPING AND FIRE RATED AND SMOKE TIGHT PARTITIONS FOR REQUIRED INSPECTIONS. ANY PIPING WITHIN THIS 6 INCHES SPACE SHALL BE REQUIRED TO BE MOVED AND REROUTED. ANY COST IMPACT TO OTHER TRADES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. 52. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR SOFFIT LOCATIONS AND CEILING HEIGHTS. 53. ENGINEERING SERVICES TO BE REMOVED SHALL BE CAPPED AND PLUGGED. 54. REFER TO DIVISION 15 SPECIFICATIONS FOR MORE INFORMATION. 55. CONTRACTOR SHALL REMOVE EXISTING SPRINKLER HEADS AS SHOWN AND ADJUST PIPING TO NEW CEILING PATERN. 56. EXISTING SERVICES INDICATED ON THESE DRAWINGS WERE DERIVED FROM EXISTING DRAWINGS AND LIMITED FIELD OBSERVATIONS. THESE DRAWINGS MAY NOT BE ALL INCLUSIVE OF SERVICES THAT EXIST IN THE PROJECT AREA. CONTRACTOR SHALL VERIFY SERVICES, LOCATION, TYPE AND SIZE PRIOR TO ANY CONSTRUCTION. ANY DEVIATIONS IMPACTING WORK SHOWN ON THESE DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT FOR COORDINATION PRIOR TO CONSTRUCTION. 57. CONTRACTOR IS RESPONSIBLE FOR RELOCATING ALL EXISTING FIRE MAINS AND SPRINKLER PIPING TO FACILITATE THE INSTALLATION OF NEW ELECTRICAL; MECHANICAL AND PLUMBING SYSTEMS. THIS INCLUDES ALL CEILING SPACES, SHAFTS, WALLS, ETC. 58. CONTRACTOR SHALL RAISE ALL EXISTING SPRINKLER PIPING WITHIN SCOPE TIGHT TO STRUCTURE AND PROVIDE NEW FITTINGS THROUGHOUT. 59. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING PIPING INCLUDING FITTINGS & SPRINKLERS ARE RATED FOR 175 PSI PRIOR TO BIDDING. IF DISCREPANCIES ARE FOUND THEY ARE TO BE BROUGHT TO THE ENGINEERS ATTENTION. 60. ALL PENETRATIONS OR OPENINGS FROM REMOVED PIPES THROUGH EXISTING BUILDING WALLS AND FLOORS SHALL BE SLEEVED AND /OR PATCHED TO MATCH ORIGINAL. SEE ARCHITECTURAL DRAWINGS FOR FINAL FINISHES. 61. ENGINEERING SERVICES TO BE REMOVED SHALL BE CAPPED AND PLUGGED. 62. CONTRACTOR SHALL OBTAIN FROM THE OWNER A COPY OF THE INFECTION CONTROL RISK ASSESSMENT (ICRA) PREPARED FOR THIS PROJECT. CONTRACTOR SHALL REVIEW THE REQUIREMENTS IN THE REPORT AND PERFORM ALL WORK IN ACCORDANCE WITH THOSE REQUIREMENTS. SEE MECHANICAL DRAWINGS FOR COORDINATION OF VENTILATION REQUIREMENTS REQUIRED BY ICRA. 63. CONTRACTOR SHALL PROVIDE 24/7 FIRE WATCH FOR ALL AREAS OF THE HOSPITAL THAT HAVE THE FIRE PROTECTION SYSTEM SHUTDOWN FOR 4 HOURS OR MORE IN A 24 HOUR PERIOD AS REQUIRED PER THE FLORIDA FIRE PREVENTION CODE 2010. COORDINATE REQUIREMENTS WITH OWNER. FIRE PROTECTION LEGEND A SYMBOL DESCRIPTION SYMBOL DESCRIPTION F FIRE LINE OR MAIN F.E. FIRE DEPARTMENT VALVE CABINET -A/S- AUTOMATIC SPRINKLER MAIN FP -I, ETC FIXTURE INDENTIFICATION D DRAIN LINE QD CONNECTION TO EXISTING * PIPE TURNED UP • FIRE EXTINGUISHER * PIPE TURNED DOWN T.S. FLOW SWITCH j BALL VALVE F.S. CAP ON LINE �-'�- CHECK VALV <jL> HYDRAULIC CALCULATION PIPE NODE --F{I- UNION IN PIPE Q HYDRAULIC CALCULATION SPRINKLER -►�- SECTIONAL CONTROL VALVE FIRE HYDRANT WITH VALVE - -( REMOVE EXISTING HEAD AND PLUG FITTING _ O.S. &Y. GATE OR BUTTERFLY VALVE W /TAMPER SWITCH. 01 REMOVE EXISTING HEAD & EXTEND I' BRANCH LINE TO NEW HEAD LOCATION -� FIRE DEPARTMENT CONNECTION ?w PIPING TO BE REMOVED --�I -- CHECK VALVE SPRINKLER HEAD BELOW DUCT WORK FIRE PROTECTION ABBREVIATIONS F.H.C. FIRE HOSE CABINET O.S. & Y. OUTSIDE STEM AND YOKE F.E. FIRE EXTINGUISHER S.C.V. SECTIONAL CONTROL VALVE A/S AUTOMATIC SPRINKLER F.H. FIRE HYDRANT F.SP. FIRE STANDPIPE R.P.B.P. REDUCED PRESSURE BACKFLOW PREVENTER P.I.V. POST INDICATOR VALVE A.F.F. ABOVE FINISHED FLOOR T.S. TAMPER SWITCH V.I,V, VALVE IN VERTICAL F.S. FLOW SWITCH B.V. BUTTERFLY VALVE R.C.V. RISER CONTROL VALVE SPRINKLER HEAD LEGEND TYPE K -FACT TEMP LOCATION I. CONCEALED - QRS (W/WHITE C.P.) 5.6 155^ ALL SPACES UNLESS OTHERWISE NOTED 2. UPRIGHT GENERAL - ORS 5.6 155^ MECH. ROOMS AND ROOMS W /NO CEILINGS FP5.1 FIRE PROTECTION DETAILS SEE SPECIFICATIONS FOR MODEL NUMBERS. �E PLUG ALL UNUSED OUTLETS. DRAWING INDEX SHEET NUMBER SHEET TITLE FPO.1 FIRE PROTECTION SCHEDULES, LEGENDS, AND DRAWING INDEX FPO.2 FIRE PROTECTION SPECIFICATIONS FPO.3 FIRE PROTECTION SPECIFICATIONS FP1.1 FIRST FLOOR PLAN - DEMOLITION - FIRE PROTECTION FP2.1 FIRST FLOOR PLAN - NEW CONSTRUCTION - FIRE PROTECTION FP5.1 FIRE PROTECTION DETAILS DpMT It_ `S_TA him N S pW.11I,S DRANA71T4G! . FIRE FI20'CCCTION CONTRAC'i'Ofi' ; t+rGRKi1vG PLANS SHALL BE SUn\, ,1ITTED FOR APPROVAL TO MIAMI DAI)(3 Cot NTY F,RB NT BEFORE f4 fit,. „t. _` t•, :<'.,'�. °,. 1. r 1o�-/. Smith SSAL Seckman Reid, Inc. 600 West Hillsboro, Suite 300 Deerfield Beach, FL 33441 (954) 421 -1260 FAX: (954) 421 -1466 www.ssr- inc.com Firm Certification - EB- 0000857 Michael A. Steward PE - 65701 John E. Moulder PE - 33200 SSR JOB # 1232016.0 Q W z U ipB O r r* cg cg C 4� r. ~0�o co0 U M l h. t �} "L c'1 :1 w -6 C' ch ° r,, ca � N rn ' _ O - d 2 Z °o r- 00 ° o co con- E cc = ° »r coQ i i ti LL. SQ G o� V) Z F. 2 W 0 cc H o co � Z • �. Q M U C o (� 4 Z CND U Comm. No: 12007,00 Date: 05/22/12 Drawn: ' No. Revised: THE E ' No. 9;L91