GENERAL DEMOLITION NOTES
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE EXISTING EQUIPMENT AS
REQUIRED TO ACCOMPLISH THE NEW WORK AS SHOWN OR REASONABLY IMPLIED. THE
CONTRACTOR SHALL REFER TO THE NEW ARCHITECTURAL, PLUMBING, FIRE PROTECTION,
MECHANICAL AND ELECTRICAL WORK SHOWN ON THE OTHER DRAWINGS OF THIS SET TO
DETERMINE THE EXTENT OF DEMOLITION REQUIRED.
WHEN REMOVING ELECTRICAL EQUIPMENT AND SYSTEMS, ALL PRECAUTIONS SHALL BE TAKEN
TO PREVENT STRUCTURAL DAMAGE TO THE BUILDING. THE CONTRACTOR SHALL COORDINATE
INSTALLATION OF ANY STRUCTURAL SUPPORTS REQUIRED, TEMPORARY OR PERMANENT.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL DEMOLITION AND
CONSTRUCTION DEBRIS GENERATED FROM WORK ON ALL FLOORS. TAKING CARE TO PREVENT
EXCESSIVE LOADING OF FLOOR ASSEMBLIES.
THE CONTRACTOR SHALL MAINTAIN CONTINUITY OF CIRCUITS WHERE EXISTING EQUIPMENT IS
TO BE REMOVED AND DOWN STREAM DEVICES MAY BE EFFECTED.
THE CONTRACTOR SHALL COORDINATE ALL POWER INTERRUPTIONS WITH OWNER. SEE
SPECIFICATIONS.
WHEN EXISTING ELEMENTS OF ELECTRICAL EQUIPMENT AND SYSTEMS ARE REMOVED, ALL
REMAINING OPENINGS IN THE SLAB AND WALLS SHALL BE FILLED IN BY THE CONTRACTOR.
THE FIRE RATING OF THE EXISTING STRUCTURE SHALL BE MAINTAINED.
REMOVE ALL MISCELLANEOUS FIXTURES AND EQUIPMENT RETAINING ITEMS TO BE IDENTIFIED
FOR SALVAGE AND STORAGE AT THE DIRECTION OF THE OWNER.
THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND
CONSTRUCTION TO MAINTAIN THE INTEGRITY AND OPERATION OF EXISTING LIFE SAFETY AND
EMERGENCY EGRESS EQUIPMENT.
THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND
CONSTRUCTION TO MAINTAIN ACCESS TO ALL MEANS OF EGRESS CORRIDORS, DOORWAYS AND
STAIRS.
THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND
CONSTRUCTION TO PERMIT EFFECTED AREAS TO CONTINUE TO FUNCTION TO THE GREATEST
EXTENT POSSIBLE. THIS EFFORT SHALL INCLUDE SCHEDULED COORDINATION WITH OWNER OF
ELECTRICAL SHUTDOWNS,
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL FLUORESCENT AND HID
TYPE LAMPS AND PROPER DISPOSAL OF SAID LAMPS AND SHALL PROVIDE VERIFICATION
OF LAMP DISPOSAL TO THE OWNER UPON REQUEST.
REMOVE ALL LIGHTING FIXTURES, RECEPTACLES AND DEVICES IN THE AREA OF DEMOLITION
AND PULL ALL CIRCUITS BACK TO NEXT ACTIVE DEVICE OR SOURCE OF POWER.
ALL CONDUIT, JUNCTION BOXES AND WIRING DEVICES THAT ARE NOT INTENDED TO RE -USED
MUST BE DEMOLISHED BACK TO THE SOURCE.
PROVIDE PANEL SCHEDULES, TO THE ENGINEER, INDICATING THE CIRCUITS MADE SPARE BY
DEMOLITION AND THE EXISTING CIRCUITS THAT REMAIN ACTIVE.
IT SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION MANAGER (CM) , GENERAL
CONTRACTOR (GC), AND THE SUB - CONTRACTORS (SC) TO STUDY ALL THE DRAWINGS AND
DETAILS SO THAT THE INSTALLATION OF ALL NEW WORK CAN BE FULLY COORDINATED.
THE CM, GC, AND SC SHALL VISIT THE SITE, INCLUDING DOING AN ABOVE CEILING
INSPECTION, DURI NG BIDDING TO SATISFY HIM/HER SELF THAT ALL PROVISIONS HAVE
BEEN MADE FOR ALL ASPECTS OF THIS PROJECT. IF DISCREPANCIES EXIST BETWEEN
DRAWINGS AND /OR SITE CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE GENERAL
CONTRACTOR IN WRITING PRIOR TO BID DUE DATE. FAILURE TO DO SO WILL NOT BE
ALLOWED ON A BASIS FOR ADDITIONAL COMPENSATION TO CORRECT A DIFFICULTY OF
DIFFERENCE FROM CONDITIONS INFERRED OR INDICATED ON THE DRAWINGS.
DRAWINGS ARE DIAGRAMMATIC AND DO NOT INDICATE ALL DEVICES TO BE DEMOLISHED.
CONTRACTOR SHALL VISIT JOB SITE PRIOR TO BID TO FIELD CONFIRM ALL REQUIREMENTS.
GENERAL NOTES:
A. WITHIN THE PROJECT
AND /OR JUNCTION BOXES Af CONTRACTOR E EXISTING EIL G SPA RELOCATE
AS REQUIRED TO ACCOMODATE
NEW WORK INSTALLATION. TRACE EXISTING CONDUIT /WIRES AND COORDINATE
REQUIRED DOWN TIME WITH OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION.
COORDINATE WITH ALL TRADES.
KEYED NOTES:
OREMOVE ALL LIGHTING WITHIN THIS AREA AND TURN OVER FIXTURES TO OWNER.
MAINTAIN CIRCUITING FOR USE IN CONNECTING NEW FIXTURES PER NEW WORK PLAN.
OEXISTING SMOKE DETECTOR TO BE REMOVED, REPLACED AND RE- LOCATED TO NEW CEILING.
REFER TO NEW WORK PLANS.
COEXISTING TEN (10 ) 2X2 LIGHT FIXTURES AT ENTRANCE TO BE RE- LOCATED IN NEW LAYOUT.
REFER TO NEW WORK PLAN, EXTEND ALL WIRE AND CONDUIT AS NECESSARY.
U MAINTAIN EXISTING EMERGENCY CIRCUIT (EQLIB -1) FOR USE AT NEW RECEPTION DESK,
M
5 6 7
__
E'
" FIRST FLOOR PLAN - DEMOLITION - ELECTRICAL
Op 1p 2p 4' 8w 12,
J
v
L
,q
a,.
F I F
r
I
F
Y,
DEMOUTKON LIEGEND
SYMBOL
I'
—
" FIRST FLOOR PLAN - DEMOLITION - ELECTRICAL
Op 1p 2p 4' 8w 12,
J
v
L
,q
a,.
F I F
r
I
F
Y,
DEMOUTKON LIEGEND
SYMBOL
D[ESCRW it DN
—
EXISTING TO REMAIN
— — — —
EXISTING TO BE REMOVED
.. ARRAY
healthcare facilities solutions
6800 Broken Sound Boulevard NW
Suite 125
Boca Raton, FL 33487
t:561.995.1700
f:561.995.1701 firm license number
www.arrayhfs.com AA26000880
SEAL:
r� t jj
CONSULTANTS:
SRSmith
Seckman
Reid, Inc.
600 West Hillsboro, Suite 300
Deerfield Beach, FL 33441
(954) 421 -1260
FAX: (954) 421 -1466
www.ssr- inc.com
Firm Certification - EB- 0000857
Michael A. Steward PE - 65701
John E. Moulder PE - 33200
SSR JOB # 1232003.0
OWNER:
BAPTIST HEALTH
PROJECT:
nf0 Desk and Coffee
Shop
ADDRESS:
6200 Southwest 73rd Street
South Miami, FL 33.143
1 BID AND PERMIT SET 07 -30 -12
N0. DESCRIPTION DATE
REVISIONS /ISSUES
SHEET TITLE:
DRAWN: FL CHECKED:
CON/REF No. 00000
PROJECT No. 3601
DATE: 07/30/12 SCALE: As indicated
SHEET NO.
E1.1
TI I, clocunrr I, La a r. � °i.1111 Ipwl ie'l In Inune I )I --r r ", =r, I r n` ;; n d
h:eri,rr.l it r u,� its tl, a, l pr rf :` (" If. R, I i:rl Iclitri
."iIhiujl wall r Ir;nni 'i<,, .:f �R ' 1. , iIIetyII hntl dill b ,�:,o,a rrd "r IY a Ic�rr.