Loading...
12-939-041111 1 a q N9um0�1 uw p III III ��, I - ,- - - - - -- v SEE PART PLAN BELOW FOR CONTINUATION ®' 1' 2" 4' 9' RZ, --J- -7 i: ................ . SYMBOL DESCRIPTION t. EXISTING TO REMAIN NEW CONSTRUCTION I ®' 1' 2" 4' 9' RZ, --J- -7 i: ................ . SYMBOL DESCRIPTION -- EXISTING TO REMAIN NEW CONSTRUCTION I CONNECT TO EXIST. AT THIS POINT FIRST FLOOR PLAN -NEW CONSTRUCTION - PLUMBING jyijlj I OP IP 71 41? gy GENERAL NOTES-. I. CONTRACTOR SHALL PATCH WALLS, FLOORS, CEILINGS AND LANDSCAPING TO MATCH EXISTING FINISHES FOR DEMOLITION AND INSTALLATION OF PIPING, FIXTURES, EQUIPMENT, ETC UNLESS NOTED OTHERWISE ON ARCH. DRAWINGS. 2. THE HOSPITAL IS OPEN 24 HOURS A DAY, 7 DAYS A WEEK. THE CONTRACTOR SHALL HAVE TO PERFORM WORK WITHIN ACTIVE PATIENT CARE AREAS. CONTRACTOR SHALL: A. COORDINATE SHUTDOWN OF EXISTING SYSTEMS WELL IN ADVANCE WITH OWNER. B. PERFORM WORK AT SUCH TIMES AND UNDER SUCH CONDITIONS AS PRESCRIBED BY OWNER. C. PERFORM WORK WITHIN THE GUIDELINES OF THE ICRA REPORT PREPARED FOR THIS PROJECT BY THE OWNER. D. SEQUENCE DEMOLITION AND NEW CONSTRUCTION TO MINIMIZE NUMBER & DURATION OF SHUTDOWNS REQUIRED. 3. CONTRACTOR SHALL COORDINATE WORK WITH EXISTING CONDITIONS (STRUCTURE, DUCTWORK, PIPING, CONDUIT, ETC.). PROVIDE OFFSETS AS REQUIRED TO INSTALL NEW WORK. 4. CONTRACTOR SHALL LOCATE ALL NEW VALVES AT ACCESSIBLE LOCATIONS. PROVIDE ACCESS PANELS, AS REQUIRED, FOR VALVES LOCATED ABOVE HARD CEILINGS. 5. ALL WASTE AND CONDENSATE PIPING 2" & LESS TO BE SLOPED @ 1 /4' /FT. ALL WASTE AND CONDENSATE PIPING 2/2" & LARGER TO BE SLOPED Q %8' /FT. 6. WORK MAY NOT BE LIMITED TO SCOPE OF WORK OR PHASING AREAS INDICATED, BUT ALSO MAY INCLUDE WORK OUTSIDE OF THE SCOPE OF WORK OR PHASING AREAS AS INDICATED BY CONTRACT DOCUMENTS. 7. CONTRACTOR SHALL FIELD VERIFY WITH HOSPITAL LOCATION OF EXISTING SERVICE VALVES FOR SHUTDOWN OF CW. COORDINATE TIMING, DURATION AND AREA AFFECTED BY SHUTDOWN WITH HOSPITAL. 8. PIPING SHOWN IS ROUTED AT FIRST FLOOR CEILING UNLESS NOTED OTHERWISE. 9, CONTRACTOR SHALL SAW CUT CONCRETE FLOOR SLAB AS REQUIRED TO ACCOMMODATE DEMOLITION AND NEW WORK SHOWN. PATCH WITH SIMILAR MATERIALS TO MATCH EXISTING. SEE ARCH. DRAWINGS. KEYED NOTES-. ORUN 2' VENT 6' ABOVE FLOOD RIM. O3' VENT LINE TO CONNECT TO EXISTING 3' VENT RISER. CONTRACTOR SHALL VERIFY IN FIELD EXACT SIZE AND LOCATION. OI' DOMESTIC COLD WATER LINE FROM EXISTING 2' COLD WATER RISER. CONTRACTOR SHALL VERIFY IN FIELD EXACT SIZE AND LOCATION. (4) CONDENSATE DRYWELL. SEE DETAIL. 7 EXISTING 2" CW AND %' HW UP. i NEW CONSTRUCTION LEGEND SYMBOL DESCRIPTION -- EXISTING TO REMAIN NEW CONSTRUCTION ® CONNECT TO EXIST. AT THIS POINT j! ARRAY healthcar` facilities solutions 6800 Broken Sound Boulevard NW Suite 125 Boca Raton, FL 33487 t:561.995.1700 f:561,995.1701 firm license number www.arrayhfs.com AA26000880 SEAL: MO OF`e o CONSULTANTS: Smith Seckman Reid, Inc. 600 West Hillsboro, Suite 300 Deerfield Beach, FL 33441 (954) 421 -1260 FAX: (954) 421 -1466 www,ssr- inc.com Finn Certification - EB- 0000857 Michael A. Steward PE - 65701 John E. Moulder PE - 33200 SS.R JOB # 1232003.0 OWNER: BAPTIST HEALTH HOSPITAL: SOUTH MIAMI HOSPITAL PROJECT: Info Desk and Coffee Shop ADDRESS: 6200 Southwest 73rd Street South Miami, FL 33143 1 FBID AND PERMIT SET 07 -30 -12 N0. DESCRIPTION DATE REVISIONS/ISSUES SHEET TITLE: FIRST FLOOR PLAN NEW CONSTRUCTION PLUMBING DRAWN: FL CHECKED: CON /REF No. 00000 PROJECT No. 3601 DATE: 07/30/12 SCALE: As indicated SHEET N0, P2.1 4 Tni do�:�.un ?nl. is u � �f�ii��'nl !i 'es led inst nr �n` of i �� � +; a: f of PfvNA'f un,l is rlSf,d for L.ise in the titled proj=:t only. of Ilia d o;mn' —d oul. 'ra i',en perwission al' AFINAY p; 1,,�l Hill the I'ia. COPYRIGHT - 2012 ARRAY HFS