FIRST FLOOR PLAN -NEW CONSTRUCTION -FIRE PROTECTION
M I
GENERAL NOTES:
I. CONTRACTOR SHALL PHASE WORK AS DIRECTED BY ARCHITECTURAL DRAWINGS AND OWNER.
2. CONTRACTOR SHALL PATCH WALLS, FLOORS, AND CEILINGS TO MATCH EXISTING
FINISHES FOR DEMOLITION AND INSTALLATION OF FIRE PROTECTION SYSTEMS. COORDINATE
WITH ARCHITECTURAL DRAWINGS.
3. THE HOSPITAL IS OPEN 24 HOURS A DAY, 7 DAYS A WEEK. THE CONTRACTOR SHALL HAVE
TO PERFORM WORK WITHIN ACTIVE PATIENT CARE AREAS. CONTRACTOR SHALL:
A. COORDINATE SHUTDOWN OF EXISTING SYSTEMS WELL IN ADVANCE WITH OWNER.
B. PERFORM WORK AT SUCH TIMES AND UNDER SUCH CONDITIONS AS PRESCRIBED BY OWNER.
C. PERFORM WORK WITHIN THE GUIDELINES OF THE ICRA REPORT PREPARED FOR THIS PROJECT
BY THE OWNER.
D. SEQUENCE DEMOLITION AND NEW CONSTRUCTION TO MINIMIZE NUMBER & DURATION OF
SHUTDOWNS REQUIRED. WHERE FEASIBLE INSTALL NEW MAINS PRIOR TO DEMOLITION OF EXISTING.
4. CONTRACTOR SHALL COORDINATE WORK WITH EXISTING CONDITIONS (STRUCTURE, DUCTWORK,
PIPING, CONDUIT, ETC.). PROVIDE OFFSETS AS REQUIRED TO INSTALL NEW WORK.
5. PIPING SHOWN TO BE REMOVED IS NOT TO BE CAPPED AND ABANDONED.
6. CONTRACTOR SHALL COORDINATE TIMING, DURATION AND AREAS AFFECTED BY SHUTDOWNS WITH
HOSPITAL IN ORDER TO FACILITATE REQUIRED FIRE WATCH.
7. CONTRACTOR SHALL COORDINATE NEW SPRINKLER HEAD LOCATIONS WITH CEILING GRID, CEILING
MOUNTED DEVICES (LIGHTS, DIFFUSERS, SMOKE DETECTORS, ETC.) AND OBSTRUCTIONS TO SPRINKLER
THROW (SOFFITS, PRIVACY CURTAINS, ETC.) PER NFPA 13.
KEYED NOTES.-
5
„P iw�umi F
OREMOVE EXISTING SPRINKLER HEAD AND EXTEND EXISTING I" BRANCH PIPING TO NEW SPRINKLER HEAD.
COORDINATE NEW LOCATION WITH ALL CEILING MOUNTED DEVICES. (LIGHTS, DIFFUSERS, SMOKE DETECTORS, ETC.)
ORAISE EXISTING A/S PIPING AS REQUIRED TO FACILITATE THE INSTALLATION OF THE NEW ABOVE CEILING SYSTEMS.)
CONTRACTOR SHALL COORDINATE LOCATION OF THE AREA CONTROL VALVE.
" <s i ty id
rr
1 r < Ii
Av ?�
X
7
PROVIDE QUICK RESPONSE
CONCEALED SPRINKLERS WITH
WHITE FINISH IN ALL SPACES
UNLESS OTHERWISE NOTED PER
LIGHT HAZARD OCCUPANCY.
NEW CONSTRUCTION LEGEND
SYMBOL
DESCRIPTION
DATE
EXISTING TO REMAIN
NEW CONSTRUCTION
-~--+�
CONNECT TO EXIST. AT THIS POINT
ijil ARRAY
hea ►thcare facilities solutions
6800 Broken Sound Boulevard NW
Suite 125
Boca Raton, FL 33487
t:561.995.1700
f:561.995.1701 firm license number
www.arrayhfs.com AA26000880
SEAL:
CONSULTANTS:
y m
o
OR �b/ �e••
i l t t�����
Smith
WAIIi.- Seckman
Reid, Inc.
600 West Hillsboro, Suite 300
Deerfield Beach, FL 33441
(954) 421 -1260
FAX: (954) 421 -1466
www.ssr- inc.com
Firm Certification - EB- 0000857
Michael A. Steward PE - 65701
John E. Moulder PE - 33200
SSR JOB t# 1232003.0
OWNER:
BAPTIST HEALTH
HOSPITAL:
SOUTH MIAMI
HOSPITAL
PROJECT:
Info Desk and Coffee
Shop
ADDRESS:
6200 Southwest 73rd Street
South Miami, FL 33143
1 BID AND PERMIT SET
07 -30 -12
N0. DESCRIPTION
DATE
REVISIONS /ISSUES
SHEET TITLE:
FIRST FLOOR PLAN NEW
CONSTRUCTION
FIRE PROTECTION
DRAWN: FL CHECKED:
CON /REF No. 00000
PROJECT No. 3601
DATE: 07/30/12 SCALE: As indicated
SHEET NO.
FP2.1
This i s_ur ent rnpyrig� r ect� <I In n.Ir-n _ si;? r.7 of AhF;A'( arJ
llc:ars d fer use in the tltlnd Fr t,--t onl %. �eorod_I ti er u,, A this d"�cum -.nt
7dthX1 Ii!I n i.(rrr-.,rm )f ,l TAY r+ ill. ,il `Ir -1 ,ill I uIol _rrl.l Tl'r IIt-
Cq)COPYRIGHT-2012 ARRAY HFS